CN207933359U - With the biomass gasifying furnace for scraping carbon slab - Google Patents

With the biomass gasifying furnace for scraping carbon slab Download PDF

Info

Publication number
CN207933359U
CN207933359U CN201820261917.0U CN201820261917U CN207933359U CN 207933359 U CN207933359 U CN 207933359U CN 201820261917 U CN201820261917 U CN 201820261917U CN 207933359 U CN207933359 U CN 207933359U
Authority
CN
China
Prior art keywords
carbon slab
charcoal
shaft
scraping
biomass gasifying
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820261917.0U
Other languages
Chinese (zh)
Inventor
余军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201820261917.0U priority Critical patent/CN207933359U/en
Application granted granted Critical
Publication of CN207933359U publication Critical patent/CN207933359U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Carbon And Carbon Compounds (AREA)

Abstract

There is the biomass gasifying furnace for scraping carbon slab the utility model is related to a kind of, including furnace body, power plant and scrape carbon slab, the furnace body is followed successively by pretreatment chamber on by down, aoxidize Burning Room, reductive cleavage room and carbonization-activation room, the bottom of the carbonization-activation room has charcoal notch and mounting hole, it is described to go out there is interval between charcoal notch and the mounting hole, bearing holder (housing, cover) is installed at the mounting hole, the power plant is equipped with shaft, the shaft is stretched by the bearing holder (housing, cover) in the furnace body, there is oil leab between the inner wall of the bearing holder (housing, cover) and the shaft, the carbon slab of scraping is located in the carbonization-activation room, the carbon slab of scraping is connect with the shaft.Shaft is mounted in bearing holder (housing, cover), and has oil leab between the inner wall and shaft of bearing holder (housing, cover), and lubricating oil can play lubrication and sealing function, prevent air from entering in furnace body from mounting hole.Therefore, the above-mentioned sealing performance that there is the biomass gasifying furnace for scraping carbon slab can improve furnace body.

Description

With the biomass gasifying furnace for scraping carbon slab
Technical field
The utility model is related to biomass equipment technical fields, more particularly to a kind of gasification of biomass for having and scraping carbon slab Stove.
Background technology
Biomass energy is to be fixed on tellurian solar energy by the photosynthesis of plant, has recyclability, low dirt The advantages that metachromia and widely distributed property.Biomass energy can be converted into clean fuel by biomass energy switch technology.Biomass The energy can the fuel such as Substitute coal, oil and natural gas, be used for the production of electric power.In this way, biomass energy can be reduced pair The destruction of environment, and advantageously account for air pollution problems inherent.
Gasification of biomass is a kind of method of biomass conversion, is by by after biomass material working process, gasifying Anoxycausis in stove, obtains imflammable gas and pyrocarbon.Wherein, gasification furnace include furnace body and for gasify medium apparatus.It should Furnace body is followed successively by pretreatment chamber, oxidation Burning Room, reductive cleavage room and carbonization-activation room on by down.Biomass material is also Primary fissure solution interior generation reduction reaction, is converted into biological flue gas and pyrocarbon.Carbon slab is scraped in carbonization-activation indoor location, passes through drive It is dynamic to scrape carbon slab rotation, activated carbon push-in carbonization-activation room is gone out into charcoal notch.However, power plant scrapes charcoal from furnace body external drive Plate rotates, and shaft needs to stretch into furnace body, and air is caused to be easy to enter furnace body, and then oxidation activity from the mounting hole of shaft Charcoal.Therefore, furnace body has the shortcomings that poor sealing performance.
Utility model content
Based on this, it is necessary to which the problem of being directed to furnace sealing poor performance provides a kind of gasification of biomass for having and scraping carbon slab Stove, it can improve the sealing performance of furnace body.
It is a kind of have scrape the biomass gasifying furnace of carbon slab, including furnace body, power plant and scrape carbon slab, the furnace body on by Under be followed successively by pretreatment chamber, oxidation Burning Room, reductive cleavage room and carbonization-activation room, the bottom of the carbonization-activation room have Go out charcoal notch and mounting hole, it is described to go out there is interval between charcoal notch and the mounting hole, bearing is installed at the mounting hole Set, the power plant are equipped with shaft, and the shaft is stretched by the bearing holder (housing, cover) in the furnace body, the inner wall of the bearing holder (housing, cover) There is oil leab between the shaft, the carbon slab of scraping is located in the carbonization-activation room, described to scrape carbon slab and described turn Axis connection.
Above-mentioned to have in the biomass gasifying furnace for scraping carbon slab, the shaft of power plant rotates, and carbon slab rotation is scraped to drive, And then the carbon slab of scraping rotated scrapes the indoor activated carbon of carbonization-activation into charcoal notch is gone out, and realizes the output of activated carbon.Also, shaft In bearing holder (housing, cover), and there is oil leab between the inner wall and shaft of bearing holder (housing, cover), lubricating oil can play lubrication and sealing Effect, prevents air from entering in furnace body from mounting hole.Therefore, above-mentioned that there is the biomass gasifying furnace for scraping carbon slab can improve stove The sealing performance of body.
Further, described to have that scrape the biomass gasifying furnace of carbon slab further include installation bearing, the installation bearing is located at The outside of the furnace body, the installation bearing holder (housing, cover) connect the shaft, and thermal insulation barriers are equipped between the installation bearing and the furnace body, There is the thermal insulation barriers cooling duct, one end of the cooling duct to be connected with water inlet pipe, and the other end of the cooling duct connects It is connected to outlet pipe.
Further, it is provided with sealing element between the thermal insulation barriers and the installation bearing.
Further, the sealing element is sealing ring or high temperature minuteness packing.
Further, described to have that scrape the biomass gasifying furnace of carbon slab further include charcoal storehouse, the charcoal storehouse be installed on it is described go out At charcoal notch.
Further, the charcoal material conveyer for conveying activated carbon, the charcoal material conveyer packet are provided in the charcoal storehouse Charcoal material conveying shell and screw conveyor shaft are included, the screw conveyor shaft is rotatably installed in the charcoal material conveying shell, institute It states screw conveyor shaft and is equipped with helical blade.
Further, it is described go out charcoal notch at be equipped with the first connecting flange, the charcoal storehouse have and first connection method Blue matched second connecting flange.
Further, it is described have scrape carbon slab biomass gasifying furnace further include hanger bar and be located at the carbonization-activation room Interior axle sleeve, the axle sleeve are fixedly sheathed in the shaft, and one end of the hanger bar is connected to the axle sleeve, described to scrape carbon slab It is swingably socketed in the hanger bar.
Further, the carbon slab side of scraping is socketed the hanger bar, and the carbon slab other side of scraping has arc.
Description of the drawings
Fig. 1 is the structural schematic diagram for having described in the utility model embodiment the biomass gasifying furnace for scraping carbon slab;
Fig. 2 is to have the installation for scraping shaft described in the biomass gasifying furnace of carbon slab described in the utility model embodiment Schematic diagram;
Fig. 3 is the carbonization-activation room bottom for having described in the utility model embodiment the biomass gasifying furnace for scraping carbon slab Structural schematic diagram.
100, furnace body, 101, pretreatment chamber, 102, oxidation Burning Room, 103, reductive cleavage room, 104, carbonization-activation room, 105, go out charcoal notch, 106, mounting hole, 107, bearing holder (housing, cover), 108, charcoal storehouse, the 109, first connecting flange, 110, axle sleeve, 111, outstanding Hanging rod, 200, power plant, 201, shaft, 202, installation bearing, 203, thermal insulation barriers, 204, water inlet pipe, 205, outlet pipe, 206, Sealing element, 300, scrape carbon slab, 400, charcoal material conveyer, 401, charcoal material convey shell, 402, screw conveyor shaft, 403, helical-blade Piece.
Specific implementation mode
The utility model is more fully retouched below with reference to relevant drawings for the ease of understanding the utility model, It states.The better embodiment of the utility model is given in attached drawing.But the utility model can come in many different forms It realizes, however it is not limited to embodiments described herein.On the contrary, the purpose of providing these embodiments is that making new to this practicality The disclosure of type understands more thorough and comprehensive.
It should be noted that when element is referred to as " being fixed on " another element, it can be directly on another element Or there may also be elements placed in the middle.When an element is considered as " connection " another element, it can be directly connected to To another element or it may be simultaneously present centering elements.On the contrary, when element is referred to as " directly existing " another element "upper", There is no intermediary elements.Term as used herein " vertically ", " horizontal ", "left", "right" and similar statement are For illustrative purposes." first " described in the utility model, " second ", " third " do not represent specific quantity and sequence, only It is only for the differentiation of title.
In one embodiment, it please refers to Fig.1 to Fig. 3, it is a kind of that there is the biomass gasifying furnace for scraping carbon slab, including furnace body 100, power plant 200 and carbon slab 300 is scraped, furnace body 100 is followed successively by pretreatment chamber 101, oxidation Burning Room 102, also on by down The bottom of former cracking room 103 and carbonization-activation room 104, carbonization-activation room 104 has charcoal notch 105 and mounting hole 106, goes out There is interval between charcoal notch 105 and mounting hole 106, bearing holder (housing, cover) 107 is installed at mounting hole 106, power plant 200, which is equipped with, to be turned Axis 201, shaft 201 are stretched by bearing holder (housing, cover) 107 in furnace body 100, have lubrication between the inner wall and shaft 201 of bearing holder (housing, cover) 107 Oil duct is scraped carbon slab 300 and is located in carbonization-activation room 104, scrapes carbon slab 300 and connect with shaft 201.
Above-mentioned to have in the biomass gasifying furnace for scraping carbon slab, the shaft 201 of power plant 200 rotates, and charcoal is scraped to drive Plate 300 rotates, and then the carbon slab 300 of scraping rotated scrapes the activated carbon in carbonization-activation room 104 into charcoal notch 105 is gone out, and realizes and lives The output of property charcoal.Also, shaft 201 is mounted in bearing holder (housing, cover) 107, and has profit between the inner wall of bearing holder (housing, cover) 107 and shaft 201 Grease way, lubricating oil can play lubrication and sealing function, prevent air from entering from mounting hole 106 in furnace body 100.Therefore, The above-mentioned sealing performance that there is the biomass gasifying furnace for scraping carbon slab can improve furnace body 100.
Wherein, lubricating oil is high temperature resistant luboil.Biomass material passes sequentially through pretreatment chamber 101, oxidation Burning Room 102, biomass material is realized in reductive cleavage room 103 and carbonization-activation room 104, and the reaction condition by controlling each locellus Classification gasification, effectively remove tar.Biomass material in pretreatment chamber 101, under 20 DEG C -200 DEG C of temperature condition into Pyrolytic reaction occurs at a temperature of 200 DEG C -600 DEG C for row evaporation drying, continuation, and biomass material cracks to obtain production among first Object, first intermediate product include combustible gas, tar and charcoal.First intermediate product enters oxidation Burning Room 102,900 Oxidation reaction occurs under the action of DEG C -1300 DEG C of temperature conditions and gasifying medium, obtains the second intermediate product.The second centre production Object includes carbon dioxide, vapor, charcoal and tar.Optionally, the gasifying medium be air, oxygen or vapor in one kind or It is a variety of.Downwardly into reductive cleavage room 103, in 900 DEG C of -1100 DEG C of temperature conditions reduction occurs for second intermediate product instead It answers, obtains third intermediate product.The third intermediate product includes biological flue gas and charcoal.Optionally, the component packet of the biological flue gas Include 10 parts -20 parts of 28 parts -42 parts of carbonic oxide, 25 parts -30 parts of hydrogen and methane.The charcoal enters carbonization-activation room 104, Priming reaction is carried out under the action of 450 DEG C of -900 DEG C of temperature conditions and addition vapor or carbon dioxide, iodine number is obtained and is more than The activated carbon final product of 800mg/g.The gasification efficiency of the furnace body 100 is high, tar can decompose completely, gas composition ability of regulation and control By force, raw material is applied widely, stable.It should be from tar removing formula biomass gasification reaction method in production high-quality biological combustion While gas, the charcoal and activated carbon of high added value can be produced.
Specifically, bearing holder (housing, cover) 107 is welded at mounting hole 106, to improve the air-tightness of connection.Alternatively, bearing holder (housing, cover) 107 It is connected on the side wall of mounting hole 106.For example, bearing holder (housing, cover) 107 is equipped with step, the bottom surface of step and carbonization-activation room 104 and The side wall of mounting hole 106 contacts, and lubricating oil or graphite are equipped at contact surface, can play sealing function.
Further, it please refers to Fig.1 to Fig. 3, further includes installation bearing 202, peace with the biomass gasifying furnace of carbon slab is scraped Dress bearing 202 is located at the outside of furnace body 100, and installation bearing 202 is socketed shaft 201, installs and set between bearing 202 and furnace body 100 Have a thermal insulation barriers 203, thermal insulation barriers 203 have a cooling duct, and one end of cooling duct is connected with water inlet pipe 204, cooling duct it is another One end is connected with outlet pipe 205.Bearing 202 is installed and is socketed shaft 201, is convenient for the stable rotation of shaft 201.Due to furnace body 100 It with high temperature, installs and is equipped with thermal insulation barriers 203 between bearing 202 and furnace body 100, thermal insulation barriers 203 can prevent the high temperature of furnace body 100 It is transmitted on installation bearing 202, prevents installation bearing 202 from deforming.
Specifically, cooling water is flowed out from the cooling duct that water inlet pipe 204 flows into thermal insulation barriers 203, and from outlet pipe 205, To reduce the temperature of thermal insulation barriers 203.Wherein, cooling duct is around the shaft 201.
Further, it please refers to Fig.1 to Fig. 3, sealing element 206 is provided between thermal insulation barriers 203 and installation bearing 202.It is close Sealing 206 not only further functions as heat-blocking action, avoids high temperature from leading to the deformation for installing bearing 202, and sealing element 206 seals The bearing holder (housing, cover) 107 being exposed at outside furnace body 100, can air enter furnace body from 107 end of bearing holder (housing, cover) being exposed at outside furnace body 100 In 100.
Further, it please refers to Fig.1 to Fig. 3, sealing element 206 is sealing ring or high temperature minuteness packing.
Further, it please refers to Fig.1 to Fig. 3, further includes charcoal storehouse 108, charcoal storehouse 108 with the biomass gasifying furnace of carbon slab is scraped It is installed on out at charcoal notch 105.Activated carbon is collected in charcoal storehouse 108, is readily transported, activated carbon is avoided to be deposited in carbonization-activation room 104 It is interior.
Further, it please refers to Fig.1 to Fig. 3, the charcoal material conveyer 400 for conveying activated carbon is provided in charcoal storehouse 108, Charcoal material conveyer 400 includes that charcoal material conveying shell 401 and screw conveyor shaft 402, screw conveyor shaft 402 are rotatably installed on charcoal In material conveying shell 401, screw conveyor shaft 402 is equipped with helical blade 403.In this way, after activated carbon falls into charcoal storehouse 108, it can be certainly Furnace body 100 is continuously left by the transport of charcoal material conveyer 400 dynamicly, saves manpower transport.
Further, it please refers to Fig.1 to Fig. 3, goes out and be equipped with the first connecting flange 109 at charcoal notch 105, charcoal storehouse 108 has With 109 matched second connecting flange of the first connecting flange.Flanged joint can ensure the air-tightness of connection, avoid air mixed Enter in carbonization-activation room 104, also, flanged joint is conducive to rapidly connect and dismantle.
Further, it please refers to Fig.1 to Fig. 3, further includes hanger bar 111 and be located at the biomass gasifying furnace of carbon slab is scraped Axle sleeve 110 in carbonization-activation room 104, axle sleeve 110 are fixedly sheathed in shaft 201, and one end of hanger bar 111 is connected to axle sleeve 110, it scrapes carbon slab 300 and is swingably socketed in hanger bar 111.It is swingably socketed in hanger bar 111 due to scraping carbon slab 300 On, thus scrape carbon slab 300 can with shaft 201 rotate and rotate but rotation during swing, scrape carbon slab 300 move It is more flexible, be conducive to activated carbon being swept into out charcoal notch 105.Also, scrape carbon slab 300 and swing setting so that scrapes the tool of carbon slab 300 It is flexible, it avoids stuck.
Further, it please refers to Fig.1 to Fig. 3, scrapes 300 side of carbon slab socket hanger bar 111, scrape 300 other side of carbon slab tool There is arc.Wherein, the activated carbon of 104 bottom of carbonization-activation room can obliquely be scraped by scraping the arcuate structure of carbon slab 300, thus by The resistance arrived is small, and activated carbon is cleaned convenient for scraping carbon slab 300.
Each technical characteristic of embodiment described above can be combined arbitrarily, to keep description succinct, not to above-mentioned reality It applies all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited In contradiction, it is all considered to be the range of this specification record.
Above-described embodiments merely represent several embodiments of the utility model, the description thereof is more specific and detailed, But therefore it can not be interpreted as the limitation to utility model patent range.It should be pointed out that for the common skill of this field For art personnel, without departing from the concept of the premise utility, various modifications and improvements can be made, these are belonged to The scope of protection of the utility model.Therefore, the protection domain of the utility model patent should be determined by the appended claims.

Claims (9)

1. a kind of having the biomass gasifying furnace for scraping carbon slab, which is characterized in that including furnace body, power plant and carbon slab is scraped, it is described Furnace body is followed successively by pretreatment chamber, oxidation Burning Room, reductive cleavage room and carbonization-activation room, the carbonization-activation room on by down Bottom there is charcoal notch and mounting hole, it is described to go out there is interval between charcoal notch and the mounting hole, at the mounting hole Bearing holder (housing, cover) is installed, the power plant is equipped with shaft, and the shaft is stretched by the bearing holder (housing, cover) in the furnace body, the axis There is oil leab, the carbon slab of scraping is located in the carbonization-activation room, described to scrape charcoal between the inner wall of bearing sleeve and the shaft Plate is connect with the shaft.
2. it is according to claim 1 have scrape the biomass gasifying furnace of carbon slab, which is characterized in that it is described have scrape carbon slab Biomass gasifying furnace further includes installation bearing, and the installation bearing is located at the outside of the furnace body, and the installation bearing holder (housing, cover) meets institute Shaft is stated, thermal insulation barriers are equipped between the installation bearing and the furnace body, the thermal insulation barriers have cooling duct, the cooling logical The one end in road is connected with water inlet pipe, and the other end of the cooling duct is connected with outlet pipe.
3. it is according to claim 2 have scrape the biomass gasifying furnace of carbon slab, which is characterized in that thermal insulation barriers and described It is provided with sealing element between installation bearing.
4. according to claim 3 have the biomass gasifying furnace for scraping carbon slab, which is characterized in that the sealing element is sealing Circle or high temperature minuteness packing.
5. it is according to claim 1 have scrape the biomass gasifying furnace of carbon slab, which is characterized in that it is described have scrape carbon slab Biomass gasifying furnace further includes charcoal storehouse, the charcoal storehouse be installed on it is described go out charcoal notch at.
6. according to claim 5 have the biomass gasifying furnace for scraping carbon slab, which is characterized in that be provided in the charcoal storehouse Charcoal material conveyer for conveying activated carbon, the charcoal material conveyer include charcoal material conveying shell and screw conveyor shaft, the spiral shell Rotation conveying axis is rotatably installed in the charcoal material conveying shell, and the screw conveyor shaft is equipped with helical blade.
7. it is according to claim 5 have scrape the biomass gasifying furnace of carbon slab, which is characterized in that it is described go out charcoal notch at set There are the first connecting flange, the charcoal storehouse to have and matched second connecting flange of first connecting flange.
8. there is the biomass gasifying furnace for scraping carbon slab according to claim 1-7 any one, which is characterized in that the tool Have scrape carbon slab biomass gasifying furnace further include hanger bar and be located at the indoor axle sleeve of the carbonization-activation, the axle sleeve fixing sleeve It is connected to the shaft, one end of the hanger bar is connected to the axle sleeve, and the carbon slab of scraping swingably is socketed in the suspension On bar.
9. according to claim 8 have the biomass gasifying furnace for scraping carbon slab, which is characterized in that described to scrape carbon slab side set The hanger bar is connect, the carbon slab other side of scraping has arc.
CN201820261917.0U 2018-02-22 2018-02-22 With the biomass gasifying furnace for scraping carbon slab Expired - Fee Related CN207933359U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820261917.0U CN207933359U (en) 2018-02-22 2018-02-22 With the biomass gasifying furnace for scraping carbon slab

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820261917.0U CN207933359U (en) 2018-02-22 2018-02-22 With the biomass gasifying furnace for scraping carbon slab

Publications (1)

Publication Number Publication Date
CN207933359U true CN207933359U (en) 2018-10-02

Family

ID=63653014

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820261917.0U Expired - Fee Related CN207933359U (en) 2018-02-22 2018-02-22 With the biomass gasifying furnace for scraping carbon slab

Country Status (1)

Country Link
CN (1) CN207933359U (en)

Similar Documents

Publication Publication Date Title
CN205528597U (en) Straw gasification system charcoal stove
CN106281374A (en) Biomass dry distillation gas production rotary furnace
CN207933359U (en) With the biomass gasifying furnace for scraping carbon slab
CN214619564U (en) Thermal plasma waste incineration device
CN104449852B (en) Closed updraught type fixed bed gasification furnace waste heat recycling device
CN201106868Y (en) Dry way gas purification generating stove for cleanness production of biomass
CN207552265U (en) A kind of biomass gasifying furnace gas separation equipment
CN207933363U (en) Biomass gasifying furnace with shaft
CN108148629B (en) Biomass gasification furnace convenient for carbon discharge
CN207933369U (en) With the biomass gasifying furnace for including knife
CN2816605Y (en) Coal-burning gasifying energy-saving stove
CN208587912U (en) A kind of oxygen-enriched second-time burning low pollution emission system of domestic garbage pyrolysis gasification
CN204400933U (en) A kind of device realizing high-efficient purification in biomass gas stove
CN207933360U (en) Biomass gasifying furnace
CN208684868U (en) Biomass garbage gasification installation
CN208166942U (en) The high biomass garbage gasification furnace of gasification efficiency
CN207933364U (en) Activate cell structure and gasification furnace
CN208553758U (en) A kind of device for eliminating CO in garbage disposal tail gas
CN207622051U (en) A kind of chimney deashing bio-robot
CN207933370U (en) Biomass gasifying furnace
CN207933366U (en) Biomass gasifying furnace
CN207933368U (en) The biomass gasifying furnace of slagging prevention
CN208104315U (en) Biomass gasifying furnace
CN207933367U (en) The biomass gasifying furnace being easily installed
CN205347329U (en) Rotatory dry distillation thermal cracking device of solid heat energy material

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181002