CN207931130U - Movable pipe winding production line - Google Patents
Movable pipe winding production line Download PDFInfo
- Publication number
- CN207931130U CN207931130U CN201820116901.0U CN201820116901U CN207931130U CN 207931130 U CN207931130 U CN 207931130U CN 201820116901 U CN201820116901 U CN 201820116901U CN 207931130 U CN207931130 U CN 207931130U
- Authority
- CN
- China
- Prior art keywords
- tubing
- mobile platform
- band
- production line
- movable pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02W—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
- Y02W30/00—Technologies for solid waste management
- Y02W30/50—Reuse, recycling or recovery technologies
- Y02W30/62—Plastics recycling; Rubber recycling
Abstract
The utility model is related to a kind of movable pipe winding production lines, including mobile platform, the band extruder installed tubing Wiring apparatus on a mobile platform and be rotatably arranged on mobile platform, the gelatin extrusion machine for being connected to band daub is provided on the tubing Wiring apparatus, the band extruder input terminal is connected with feed bin, output end is connected with cooler bin, the band of the cooler bin output is connected on tubing Wiring apparatus, the driving mechanism that driving band extruder rotates on a mobile platform is provided between the tubing Wiring apparatus and band extruder, the generator being used to provide power is additionally provided on the mobile platform.The utility model directly processes tubing at the construction field (site), is not necessarily to long-distance transport, prevents tubing from damaging, and can produce the tubing of different length as needed, reduces transportation cost and construction cost.
Description
Technical field
The utility model is related to tubing production equipment field, more particularly to a kind of movable pipe winding production line.
Background technology
Existing tubing, especially heavy caliber pipe are then to carry out fixed length cutting in manufacturer's machine-shaping mostly,
Then it is transported to construction site by means of transport and carries out installation, but the shortcomings that this method is:(1)Due to tubing
Caliber is big, and when trans-regional transport needs oversize vehicle to transport, and transportation cost is expensive;(2)Since tubing bore is larger, handling when ratio
It is more difficult;(3)Situations such as damage, deformation, often occurs in transportational process for tubing;(4)Tubing is all that fixed length is cut when producing
It cuts, length is usually no more than 10 meters, and tubing in the construction process is typically necessary hundreds of meters of even upper kms, using 10 meters
Tubing just repeatedly to connect, influence construction speed and the service life of tubing, the seal of tubing is also affected.
Invention content
The purpose of this utility model is to provide a kind of movable pipe winding production lines, directly add at the construction field (site)
Work tubing is not necessarily to long-distance transport, prevents tubing from damaging, can produce the tubing of different length as needed, reduce transportation cost and
Construction cost.
The above-mentioned purpose of the utility model technical scheme is that:
A kind of movable pipe winding production line includes the tubing winding of mobile platform, installation on a mobile platform
Equipment and the band extruder being rotatably arranged on mobile platform are provided with for being smeared to band on the tubing Wiring apparatus
The gelatin extrusion machine of glue connection, the band extruder input terminal are connected with feed bin, and output end is connected with cooler bin, and the cooler bin is defeated
The band gone out is connected on tubing Wiring apparatus, and driving band is provided between the tubing Wiring apparatus and band extruder and is squeezed
Go out the driving mechanism that machine rotates on a mobile platform, the generator being used to provide power is additionally provided on the mobile platform.
By using above-mentioned technical proposal, install on a mobile platform tubing Wiring apparatus, band extruder, gelatin extrusion machine,
A whole set of complete pipe production line is arranged in the structures such as feed bin, cooler bin and generator on a mobile platform, when needs are being constructed
When scene is laid with pipeline, directly mobile platform can be transported to construction site, the tubing bore and length needed according to scene, directly
It is connected on scene and carries out tubular object extruding;After mobile platform comes to a complete stop, rotation band extruder to its output end is directed toward tubing Wiring apparatus,
It opens generator and provides electric power for band extruder and tubing Wiring apparatus, rubber raw materials are launched into feed bin, raw material passes through band
Material extruder heating and melting and extrusioning shaping formation band, then pass through cooler bin hardening and are wound on tubing Wiring apparatus later
Tubing is formed, then gelatin extrusion machine carries out the connection sealing of tubing, with tubing Wiring apparatus again to daub at the gap of tubing
Work, constantly exports molding tubing;The length of tubing can carry out cutting severing as needed, eliminate transportation cost, with making
With with processing, avoids tubing from overstocking occupied space, substantially increase engineering efficiency.
Preferably, the gelatin extrusion machine includes being arranged on tubing Wiring apparatus top by the motor-driven spiral plastic squeeze of defeated glue
Cylinder and the loading hopper in spiral Gum squeezing barrel motor one end is set, the output end of the spiral Gum squeezing barrel, which is provided with, to be bent downward and supports
Glue conveying box at coiled material gap.
By using above-mentioned technical proposal, gelatin extrusion machine uses the structure of helical feed, can heat solid gum and be extruded as
Liquid glue ensures the viscosity of glue, improves the flow velocity of glue, improves the quality and leakproofness of the tubing after bonding, improves
The service life of tubing, while it is convenient to supplement glue.
Preferably, the open upper end of the feed bin is provided with crusher, the discharge port of the crusher is connected to feed bin
It is interior.
By using above-mentioned technical proposal, crusher is set on feed bin, when site operation, collects some waster rubber materials
As the raw material of tubing, waster rubber material mixed in the broken raw material being added to, is produced by band extruder
Band reduces production cost, while waste is turned one's head utilization, environmentally protective.
Preferably, the driving mechanism is pneumatic cylinder, one end is against tubing Wiring apparatus bottom, and the other end is against band
The bottom in extruder centre position, the mobile platform are provided with the air pump being connect with driving mechanism.
By using above-mentioned technical proposal, band extruder is pushed to rotate on a mobile platform by pneumatic cylinder, and pass through
Air pump provides power, does not need manual rotation, reduces the labor intensity of worker, the positioning of band extruder is more accurate.
Preferably, the tubing Wiring apparatus is arranged along the length direction of mobile platform, the band extruder is driving
The driving backspin of motivation structure goes to vertical with the length direction of mobile platform, and the cooler bin is located at turning end, and delivery outlet refers to
To the tubing being arranged on tubing Wiring apparatus around axis.
By using above-mentioned technical proposal, along mobile platform length side when tubing Wiring apparatus and initial band extruder
To setting, the floor space of mobile platform is reduced, the width of mobile platform can be reduced, road is transported in convenience;Band extruder turns
Move to it is vertical with the length direction of mobile platform when, cooler bin delivery outlet is directed toward tubing around axis, facilitates the quick winding of band calmly
Type improves the processing efficiency of tubing.
Preferably, the tubing on the tubing Wiring apparatus is provided with pipe cutting apparatus around shaft end.
By using above-mentioned technical proposal, shaft end is provided with pipe cutting apparatus in tubing, can produce and appoint in tubing
It is more convenient that tubing is cut when length of anticipating, so that tubing is met more length requirements.
Preferably, the free end downside of the band extruder is provided with mounting groove, rotates and set in the mounting groove
It is equipped with the support column that can be abutted on the ground.
By using above-mentioned technical proposal, when band extruder works, support column is produced into support on the ground, for branch
Band extruder is supportted, so that band extruder is fixed more secured, ensures that band extruder even running, band extruder do not work
When, support column can be recovered in mounting groove, not interfere with band extruder and rotate on a mobile platform, support column user
Just.
Preferably, the support column is pneumatic cylinder, it is connected on air pump.
By using above-mentioned technical proposal, support column uses pneumatic cylinder, air pump is used in combination to control, and support column is more square using adjusting
Just quick, save manpower.
Preferably, the cooler bin uses water-cooling system, the mobile platform to be equipped with water tank.
By using above-mentioned technical proposal, band uses water-cooling system, can reduce the waste of the energy, more environmentally-friendly, simultaneously
Construction site water intaking is convenient, reduces processing cost.
Preferably, the equipped at outlet port of the cooler bin is provided with dryer.
By using above-mentioned technical proposal, setting drying function is quickly evaporated the water on band, does not interfere with pipe
The winding of material and daub.
Preferably, the mobile platform is equipped with for detecting the detection platform for squeezing out band.
By using above-mentioned technical proposal, can detection be sampled to the band or tubing produced at the scene, be
It is no to comply with standard, it complies with standard, continues to produce, be not inconsistent standardization and then adjust raw material or equipment, to meet standard, improve whole
The practicability of a production line.
Preferably, the generator is fuel electric generator.
It is more convenient using transport at the scene using fuel electric generator by using above-mentioned technical proposal, applying working condition is wanted
Ask low.
In conclusion the utility model has the advantages that:
1, the utility model installs a whole set of pipe production line on a mobile platform, can direct production pipe at the construction field (site)
Material saves the link and cost of transport and handling, and tubing, which is produced, to be directly laid with, will not occupied space, improve
Construction quality reduces production and construction cost.
2, the length of tubing can arbitrarily be chosen according to field working conditions, avoid excessive pipe fitting, installation is quicker, together
When pipe fitting it is few, the leakproofness of pipeline is all right, improves construction quality, extends the service life of pipeline.
3, the utility model can be launched into band extruder using rubber scrap as raw material and produce band, can will give up
Object is recycled, and reduces the production cost of tubing, energy conservation and environmental protection.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model pipe production line;
Fig. 2 is the structural schematic diagram of the utility model pipe production line tubing Wiring apparatus;
Fig. 3 is the structural schematic diagram of the utility model pipe production line band extruder;
Fig. 4 is the utility model pipe production line band extruder downside shaft side figure;
Fig. 5 is the usage state diagram of the utility model pipe production line.
In figure, 1, mobile platform;11, air pump;12, water tank;13, detection platform;2, tubing Wiring apparatus;20, driving portion
Point;21, tubing is around axis;22, pipe cutting apparatus;3, band extruder;31, mounting groove;32, support column;33, shaft;4, it squeezes
Glue machine;41, defeated glue motor;42, spiral Gum squeezing barrel;43, loading hopper;44, glue conveying box;5, feed bin;6, cooler bin;61, dryer;
7, driving mechanism;8, generator;9, crusher.
Specific implementation mode
The utility model is described in further detail below in conjunction with attached drawing.
The utility model create description in, it is to be understood that term "center", "upper", "lower", "front", "rear",
The orientation or positional relationship of the instructions such as "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outside" is based on attached drawing institute
The orientation or positional relationship shown is merely for convenience of description the utility model and creates and simplify description, rather than indicates or imply
Signified device or element must have a particular orientation, with specific azimuth configuration and operation, therefore should not be understood as to this
The limitation of utility model.
A kind of movable pipe winding production line, as shown in Fig. 1, by mobile platform 1, tubing Wiring apparatus 2, band
The structure compositions such as material extruder 3, gelatin extrusion machine 4, feed bin 5, cooler bin 6, driving mechanism 7, generator 8 and crusher 9.
Mobile platform 1 is mounted on the compartment board of mobile vehicle, and length direction is arranged along the direction of travel of automobile, and tubing twines
Around equipment 2 along the side for being fixed on mobile platform 1,2 upper end of tubing Wiring apparatus is equipped with gelatin extrusion machine 4, and band is wound in tubing
Do not stop to wind in equipment 2, gelatin extrusion machine 4 carries out daub to the seam crossing of band, and band is made to be wound in closed tubing.
Band extruder 3 is rotatably installed in the other side of mobile platform 1, and turning end is located at the rear portion of mobile platform 1, from
By holding positioned at the front end of mobile platform 1, band extruder 3 uses screw auger structure, inner wall to be gradually reduced, will go into band
Material in material extruder 3, which squeezes, to be melted, then extrusioning shaping, and material is provided at the free end screw auger of band extruder 3
Storehouse 5, band raw material is placed in feed bin 5, and is entered in screw auger;The top of feed bin 5 is equipped with crusher 9, crusher 9
Discharge port is connected in feed bin 5, and crusher 9 is used to the waste old of recycling being broken into particle, and waste and old particle enters feed bin 5
In, with good band raw material hybrid process at band;The output end of band extruder 3 is provided with for that will squeeze out the fast quickly cooling of band
But the cooler bin 6 shaped.
The front end of mobile platform 1 is provided with water tank 12, and water tank 12 is connect by pipeline with cooler bin 6, and cooler bin 6 uses water
Cooling system carries out fast cooling sizing to the band of extrusion by the water mist of ejection, is also needed to before water cooling cold by vacuum
But, one section of vacuum cooled region can be installed in the front end of cooler bin 6, the band of extrusion is enable quickly to determine circle or sizing;Water tank
12 side is provided with detection platform 13, and detection device is provided in detection platform 13, and whether the band for detecting processing accords with
Standardization;Be provided with generator 8 and air pump 11 between detection platform 13 and band extruder 3, generator 8 using diesel oil or
Gasoline is the fuel electric generator of raw material, the electric power sent out, for being carried to tubing Wiring apparatus 2, band extruder 3 and air pump 11
For power.
As shown in Fig. 2, tubing Wiring apparatus 2 includes the drive part 20 as main body, and drive part 20 includes driving
Motor and speed reducer, the output shaft of drive part 20 are the tubing for tubing coiling around axis 21, and tubing is around the end of axis 21
It is provided with the pipe cutting apparatus 22 on the mobile platform 1, the tubing of coiling, can be with by after pipe cutting apparatus 22
It is cut off by pipe cutting apparatus 22, using the circular saw blade rotated, the outer wall for being attached to tubing is rotated and cut pipe cutting apparatus 22
Disconnected tubing.
Gelatin extrusion machine 4 is mainly made of defeated glue motor 41, spiral Gum squeezing barrel 42, loading hopper 43 and glue conveying box 44, is mounted on and is driven
On dynamic part 20, defeated glue motor 41 is mounted on front end, and spiral Gum squeezing barrel 42 is screw auger structure, is connected to defeated glue motor 41
On output shaft, loading hopper 43 is connected to the top of 42 input terminal of spiral Gum squeezing barrel, and glue conveying box 44 is connected to spiral Gum squeezing barrel 42
Output end, and be bent downwardly, opening is against the seam crossing of tubing.Glue enters spiral Gum squeezing barrel 42 by loading hopper 43
In, it squeezes and melts by the heating of spiral Gum squeezing barrel 42, then drop onto the seam crossing of tubing through glue conveying box, paste tubing.Spiral
The outer wall of Gum squeezing barrel 42 is wound with electric heating wire, is heated to internal glue, be provided with outside electric heating wire outer cover with
And heat emission hole.
As shown in figures 3 and 4, one end of band extruder 3 be free end, the other end be turning end and be provided with it is vertical
Shaft 33, crusher 9 are mounted on the free end of band extruder 3, the free end downside setting of band extruder 3 by holder
There is the mounting groove 31 being arranged along 3 length direction of band extruder, is rotated in mounting groove 31 and be provided with support column 32, support column 32 is cut with scissors
It is connected on the one end of mounting groove 31 far from shaft 33, support column 32 can be hidden in mounting groove 31, do not influenced band extruder 3 and existed
It is rotated on mobile platform 1, support column 32 can also be turned to perpendicular to the ground and be supported on the ground.Support column 32 uses pneumatic linear actuator
Structure is connect with air pump 11 by tracheae, and controls the flexible of support column 32 by air pump 11.The output end of cooler bin 6 is arranged
There is dryer 61, band is by 6 water cooling of cooler bin and then by dryer heat drying and shapes, convenient to be wound in tubing
Daub connects in equipment 2.
The production line of the utility model, which is not limited only to band extruder 3 and tubing Wiring apparatus 2, to carry out output in 90 ° and twines
Around can also be linear type production line, i.e. 3 extrusion molding product of band extruder can directly block after cooling.
As shown in Fig. 5, the application method of the utility model movable pipe winding production line is as follows:It will be mobile flat
Platform 1 is transported to construction site, is chosen ground grading and is parked;Engine 8 is opened, provides electric power for air pump 11, the control of air pump 11 is set
The elongation of the driving mechanism 7 between tubing Wiring apparatus 2 and band extruder 3 is set, driving mechanism 7 is using horizontal positioned air pressure
Cylinder, one end are fixed on 2 bottom of tubing Wiring apparatus, and the other end is connected to the bottom among band extruder 3;With driving mechanism
7 elongation pushes 33 rotation around the shaft of band extruder 3, and it is vertical around axis 21 with tubing to go to band extruder 3, cooler bin 6
Delivery outlet face tubing is produced and is elongated from mounting groove 31 around the junction of axis 21 and drive part 20, by support column 32, branch
Dagger 32 supports on the ground;The power supply for opening tubing Wiring apparatus 2, gelatin extrusion machine 4, cooler bin 6 and crusher 9, into crusher 9
Waste old raw material is launched, waste old raw material is broken into particle through crusher 9, can pass through feed bin 5 and band extruder 3 squeezes
It is molded, then the cooling and drying through cooler bin 6 and dryer 61, tubing is wrapped on axis 21;It is added into loading hopper 43 viscous
Rubberizing raw material, glue raw material is squeezed by spiral Gum squeezing barrel 42 to be melted, and is flowed at the gap of dry vegetalbe, will be managed by glue conveying box 44
Material is bonded;As tubing is around the continuous rotation of axis 21, tubing is constantly molded elongation, and passes through pipe cutting apparatus 22, by pipe
The cutting of material disconnecting device 22 is blocked.
This specific embodiment is only the explanation to the utility model, is not limitations of the present invention, ability
Field technique personnel can as needed make the present embodiment the modification of not creative contribution after reading this specification, but
As long as all being protected by Patent Law in the right of the utility model.
Claims (12)
1. a kind of movable pipe winding production line, it is characterised in that:Including mobile platform(1), be mounted on mobile platform
(1)On tubing Wiring apparatus(2)And it is rotatably arranged on mobile platform(1)On band extruder(3), the tubing winding
Equipment(2)On be provided with gelatin extrusion machine for being connected to band daub(4), the band extruder(3)Input terminal is connected with material
Storehouse(5), output end is connected with cooler bin(6), the cooler bin(6)The band of output is connected to tubing Wiring apparatus(2)On, institute
State tubing Wiring apparatus(2)With band extruder(3)Between be provided with driving band extruder(3)In mobile platform(1)It is upper to turn
Dynamic driving mechanism(7), the mobile platform(1)On be additionally provided with the generator being used to provide power(8).
2. movable pipe winding production line according to claim 1, it is characterised in that:The gelatin extrusion machine(4)Packet
It includes and is arranged in tubing Wiring apparatus(2)Top is by defeated glue motor(41)The spiral Gum squeezing barrel of driving(42)With setting in spiral plastic squeeze
Cylinder(42)The loading hopper of motor one end(43), the spiral Gum squeezing barrel(42)Output end be provided with and bend downward and be against coiled material
Glue conveying box at gap(44).
3. movable pipe winding production line according to claim 1, it is characterised in that:The feed bin(5)Open
Mouth upper end is provided with crusher(9), the crusher(9)Discharge port be connected to feed bin(5)It is interior.
4. movable pipe winding production line according to claim 1, it is characterised in that:The driving mechanism(7)
For pneumatic cylinder, one end is against tubing Wiring apparatus(2)Bottom, the other end are against band extruder(3)The bottom in centre position, institute
State mobile platform(1)It is provided with and driving mechanism(7)The air pump of connection(11).
5. movable pipe winding production line according to claim 1, it is characterised in that:The tubing Wiring apparatus
(2)Along mobile platform(1)Length direction setting, the band extruder(3)In driving mechanism(7)Driving backspin go to
Mobile platform(1)Length direction it is vertical, the cooler bin(6)Positioned at turning end, delivery outlet is directed toward setting and is wound in tubing
Equipment(2)On tubing around axis(21).
6. movable pipe winding production line according to claim 5, it is characterised in that:The tubing Wiring apparatus
(2)On tubing around axis(21)End is provided with pipe cutting apparatus(22).
7. movable pipe winding production line according to claim 4, it is characterised in that:The band extruder
(3)Free end downside be provided with mounting groove(31), the mounting groove(31)Interior rotation is provided with and can abut on the ground
Support column(32).
8. movable pipe winding production line according to claim 7, it is characterised in that:The support column(32)For
Pneumatic cylinder is connected to air pump(11)On.
9. movable pipe winding production line according to claim 1, it is characterised in that:The cooler bin(6)It adopts
With water-cooling system, the mobile platform(1)On be provided with water tank(12).
10. movable pipe winding production line according to claim 9, it is characterised in that:The cooler bin(6)'s
Equipped at outlet port is provided with dryer(61).
11. movable pipe winding production line according to claim 1, it is characterised in that:The mobile platform(1)
On be provided with for detect squeeze out band detection platform(13).
12. movable pipe winding production line according to claim 1, it is characterised in that:The generator(8)For
Fuel electric generator.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820116901.0U CN207931130U (en) | 2018-01-23 | 2018-01-23 | Movable pipe winding production line |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820116901.0U CN207931130U (en) | 2018-01-23 | 2018-01-23 | Movable pipe winding production line |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207931130U true CN207931130U (en) | 2018-10-02 |
Family
ID=63649507
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820116901.0U Expired - Fee Related CN207931130U (en) | 2018-01-23 | 2018-01-23 | Movable pipe winding production line |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207931130U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108189438A (en) * | 2018-01-23 | 2018-06-22 | 北京拓普天品科技有限公司 | Movable pipe winding production line |
-
2018
- 2018-01-23 CN CN201820116901.0U patent/CN207931130U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108189438A (en) * | 2018-01-23 | 2018-06-22 | 北京拓普天品科技有限公司 | Movable pipe winding production line |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11141900B2 (en) | Modular pipe formation apparatus | |
CN207931130U (en) | Movable pipe winding production line | |
CN201309378Y (en) | Vehicle tyre explosion proof automatic air charging or bleeding device of carrier loader | |
CN106287009A (en) | Frame-type spiral winding plastic tube and produce equipment and production technology | |
CN108189438A (en) | Movable pipe winding production line | |
CN112477048A (en) | Plastic square tube production line with cutting function and production method thereof | |
CN109927265B (en) | Continuous processing and forming equipment and process for Kela pipe | |
CN209292851U (en) | The dotted extruding striping machine of two-component | |
CN203739049U (en) | Counter-blowing type hot-cutting hood with cooling effect | |
CN209851530U (en) | Krah pipe continuous processing shaping equipment | |
CN211571339U (en) | Automatic patching device of highway road surface detection | |
CN211640691U (en) | Sizing material stripping device for manufacturing puncture-resistant tire | |
CN102029697B (en) | Crawler type fuel oil power hydraulic drive pipe extruder | |
CN203238526U (en) | Asphalt crack-pouring car | |
CN113635533B (en) | Double-layer pipe forming device | |
CN219543962U (en) | Biodegradable material screw extrusion device | |
CN205873403U (en) | A decoiler unit for SMC coiled material promotion unwinding unit | |
CN215661717U (en) | Vehicle-mounted movable pipeline production line | |
KR101206779B1 (en) | Mobile production apparaus for resin hume pipe | |
CN219710029U (en) | Energy storage luminous road marking construction device | |
CN219667121U (en) | Production equipment for thermoplastic low-smoke halogen-free flame-retardant PVC cable material | |
CN211990803U (en) | Automatic feeding machine for production of forged pieces | |
CN202572972U (en) | Vehicle-mounted winding machine | |
CN215359750U (en) | Electromagnetic heating plastic flat film wire drawing machine | |
CN219400778U (en) | Rubber tube production coating forming device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181002 Termination date: 20200123 |