CN207930145U - Steel reinforcement cage owner muscle interval controlling means - Google Patents

Steel reinforcement cage owner muscle interval controlling means Download PDF

Info

Publication number
CN207930145U
CN207930145U CN201820242130.XU CN201820242130U CN207930145U CN 207930145 U CN207930145 U CN 207930145U CN 201820242130 U CN201820242130 U CN 201820242130U CN 207930145 U CN207930145 U CN 207930145U
Authority
CN
China
Prior art keywords
steel reinforcement
reinforcement cage
control section
main reinforcement
cage main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820242130.XU
Other languages
Chinese (zh)
Inventor
刘金铭
金银铜
高会超
张西
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fifth Bureau Third Construction Co Ltd
Original Assignee
China Construction Fifth Bureau Third Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fifth Bureau Third Construction Co Ltd filed Critical China Construction Fifth Bureau Third Construction Co Ltd
Priority to CN201820242130.XU priority Critical patent/CN207930145U/en
Application granted granted Critical
Publication of CN207930145U publication Critical patent/CN207930145U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model provides a main muscle interval controlling means of steel reinforcement cage, includes the crow bar, the one end of crow bar is fixed with the dead lever with crow bar parallel arrangement, the diameter of crow bar and fixed lever is not less than the diameter of main muscle, the front end that the front end of dead lever stretches out the crow bar is protective layer thickness control section, the part that the dead lever did not stretch out the crow bar is steel reinforcement cage owner muscle control section, the length and the drilling bored concrete pile protective layer thickness phase-match of protective layer thickness control section, the length and the main muscle interval phase-match of steel reinforcement cage owner muscle control section of steel reinforcement cage, the unsafe problem of drilling bored concrete pile steel reinforcement cage main muscle interval control can effectively be solved to this device, and the preparation is convenient, simple structure, low cost, green can use widely in a large number.

Description

A kind of steel reinforcement cage main reinforcement pitch control unit
Technical field
The utility model is related to a kind of steel reinforcement cage main reinforcement pitch control units.
Background technology
With the development of building trade, the height of building is higher and higher, in order to ensure that foundation bearing capacity carries out pile foundation work Journey is constructed.The pile foundation engineering of mainstream mostly uses cast-in-situ bored pile at present.Borehole filling pile cage of reinforcement welding procedure, mainly by pre- First in the position for putting more energy into hoop label main reinforcement, the welding procedure of main reinforcement and hoop of putting more energy into then is carried out.Although drilling can be accurately controlled The spacing of filling pile cage of reinforcement main reinforcement, but it is long in the position for hoop standard main reinforcement of the putting more energy into consuming time in advance, and in main reinforcement and add When strength hoop welds, it is accurate that hoop of putting more energy into is put, once hoop of putting more energy into puts inaccuracy, welded reinforcement cage is exactly caused to twist change Shape.
Utility model content
The utility model proposes a kind of easy construction, quick, precise control steel reinforcement cage masters in view of the deficiencies of the prior art Muscle pitch control unit.
The purpose of this utility model is achieved by using following technical proposals:
One end of a kind of steel reinforcement cage main reinforcement pitch control unit, including crowbar, the crowbar is fixed with set parallel with crowbar The diameter of the fixed link set, the crowbar and fixed link is not less than the diameter of main reinforcement, and crowbar is stretched out in the front end of the fixed link Front end is protective layer thickness control section, and the part that the fixed link does not extend out crowbar is steel reinforcement cage main reinforcement control section, the protection The length of layer thickness control section matches with protective layer of cast-in-place pile thickness, the length and steel of the steel reinforcement cage main reinforcement control section Muscle cage main reinforcement spacing matches.In use, the spacing of steel reinforcement cage main reinforcement is determined first, according to steel reinforcement cage main reinforcement pitch requirements along water Square to two main reinforcements are well placed, hoop spot welding will be put more energy into wherein in a steel reinforcement cage main reinforcement, other steel reinforcement cage main reinforcements are placed in On reinforcing cage processing platform, the present apparatus is then used, the front end of crowbar is pressed in welded steel reinforcement cage main reinforcement so that Protective layer thickness control section is located at hoop inside of putting more energy into, and steel reinforcement cage main reinforcement to be welded is levered up by crowbar so as to be welded Steel reinforcement cage main reinforcement falls the tail end in fixed link, then utilizes lever principle, agitating steel reinforcement cage main reinforcement makes it put more energy into to be welded Hoop is in close contact, then by steel reinforcement cage main reinforcement and hoop contact point spot welding of putting more energy into, the welding of next main reinforcement is carried out after the completion of spot welding, directly It welds and completes to all main reinforcements, be not necessarily in this way in the position of the upper steel reinforcement cage main reinforcement of label in advance of hoop of putting more energy into, and Steel reinforcement cage main reinforcement accurate positioning, positioning, convenient welding, a worker can be completed in the present apparatus, and labour is greatly saved, and And quick construction, conveniently.
The length of the protective layer thickness control section is 50mm.
The length of the steel reinforcement cage main reinforcement control section is 174mm.
In conclusion utility model device can effectively solve borehole filling pile cage of reinforcement main reinforcement spacing control inaccuracy Problem, it is easy to make, it is simple in structure, it is of low cost, it is environmentally protective, it can be used with large-scale popularization.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model.
Fig. 2 is the utility model usage state diagram.
Specific implementation mode
Below in conjunction with the accompanying drawings and specific example, a kind of specific implementation of steel reinforcement cage main reinforcement pitch control unit is described in detail Mode.
As shown in Figure 1, 2, a kind of steel reinforcement cage main reinforcement pitch control unit, including crowbar 4, one end of the crowbar 4 are fixed Have and is not less than the diameter of main reinforcement, the fixation with 4 fixed link 2 disposed in parallel of crowbar, the diameter of the crowbar 4 and fixed link 2 The front end that crowbar is stretched out in the front end of bar 2 is protective layer thickness control section 2, and the part that the fixed link 2 does not extend out crowbar is reinforcing bar Cage main reinforcement control section 3, length and the protective layer of cast-in-place pile thickness of the protective layer thickness control section 2 match, the steel The length A of muscle cage main reinforcement control section 3 matches with steel reinforcement cage main reinforcement spacing.In this example, the length of the protective layer thickness control section Degree is 50mm.The length of the steel reinforcement cage main reinforcement control section is 174mm.
In use, determining the spacing of steel reinforcement cage main reinforcement 5 first, put in the horizontal direction according to 5 pitch requirements of steel reinforcement cage main reinforcement It puts two steel reinforcement cage main reinforcements 5 well, hoop spot welding will be put more energy into wherein in a steel reinforcement cage main reinforcement 5, other steel reinforcement cage main reinforcements 5 are placed in On reinforcing cage processing platform, the present apparatus is then used, the front end of crowbar is pressed in welded steel reinforcement cage main reinforcement so that Protective layer thickness control section 2 is located at 6 inside of hoop of putting more energy into, and the other end of crowbar is lifted then up, by steel reinforcement cage master to be welded Muscle is levered up by crowbar 4 so that steel reinforcement cage main reinforcement to be welded is supported on the tail end of fixed link, links with crowbar 4, then utilizes Lever principle, agitating steel reinforcement cage main reinforcement makes it be in close contact with hoop of putting more energy into be welded, then steel reinforcement cage main reinforcement and hoop of putting more energy into are connect Contact spot welding carries out the welding of next main reinforcement after the completion of spot welding, welds and completes until all main reinforcements, in this way without Need to be in the position of the upper steel reinforcement cage main reinforcement of label in advance of hoop of putting more energy into, and the present apparatus is to steel reinforcement cage main reinforcement accurate positioning, positioning, welding Convenient, a worker can be completed, and be greatly saved labour, and quick construction, conveniently.
Above-mentioned is preferred embodiments of the present invention, but those skilled in the art should be understood that and not depart from In the spirit and scope of the utility model defined by the appended claims, the utility model is made in form and details The various change gone out, belongs to the scope of protection of the utility model.

Claims (3)

1. a kind of steel reinforcement cage main reinforcement pitch control unit, it is characterised in that:Including crowbar, one end of the crowbar is fixed with and prizes The diameter of thick stick fixed link disposed in parallel, the crowbar and fixed link is not less than the diameter of main reinforcement, and the front end of the fixed link is stretched The front end for going out crowbar is protective layer thickness control section, and the part that the fixed link does not extend out crowbar is steel reinforcement cage main reinforcement control section, The length of the protective layer thickness control section matches with protective layer of cast-in-place pile thickness, the steel reinforcement cage main reinforcement control section Length matches with steel reinforcement cage main reinforcement spacing.
2. steel reinforcement cage main reinforcement pitch control unit according to claim 1, it is characterised in that:The protective layer thickness control The length of section is 50mm.
3. steel reinforcement cage main reinforcement pitch control unit according to claim 1, it is characterised in that:The steel reinforcement cage main reinforcement control The length of section is 174mm.
CN201820242130.XU 2018-02-09 2018-02-09 Steel reinforcement cage owner muscle interval controlling means Expired - Fee Related CN207930145U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820242130.XU CN207930145U (en) 2018-02-09 2018-02-09 Steel reinforcement cage owner muscle interval controlling means

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820242130.XU CN207930145U (en) 2018-02-09 2018-02-09 Steel reinforcement cage owner muscle interval controlling means

Publications (1)

Publication Number Publication Date
CN207930145U true CN207930145U (en) 2018-10-02

Family

ID=63652435

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820242130.XU Expired - Fee Related CN207930145U (en) 2018-02-09 2018-02-09 Steel reinforcement cage owner muscle interval controlling means

Country Status (1)

Country Link
CN (1) CN207930145U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109623243A (en) * 2019-01-07 2019-04-16 五冶集团上海有限公司 A kind of manually digging hole filling pile steel reinforcement cage main reinforcement welding locating rod
CN110587206A (en) * 2019-09-20 2019-12-20 五冶集团上海有限公司 Auxiliary fixture for welding pile foundation reinforcement cage and using method thereof
CN111889861A (en) * 2020-08-04 2020-11-06 新昌县南明街道益华机械厂 Welding arm device of reinforcement cage seam welder
CN112355202A (en) * 2020-09-27 2021-02-12 上海宝冶集团有限公司 Cast-in-place pile reinforcement cage main rib mounting and positioning device and using method thereof

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109623243A (en) * 2019-01-07 2019-04-16 五冶集团上海有限公司 A kind of manually digging hole filling pile steel reinforcement cage main reinforcement welding locating rod
CN110587206A (en) * 2019-09-20 2019-12-20 五冶集团上海有限公司 Auxiliary fixture for welding pile foundation reinforcement cage and using method thereof
CN111889861A (en) * 2020-08-04 2020-11-06 新昌县南明街道益华机械厂 Welding arm device of reinforcement cage seam welder
CN111889861B (en) * 2020-08-04 2021-06-08 承德连利水泥制品有限公司 Welding arm device of reinforcement cage seam welder
CN112355202A (en) * 2020-09-27 2021-02-12 上海宝冶集团有限公司 Cast-in-place pile reinforcement cage main rib mounting and positioning device and using method thereof
CN112355202B (en) * 2020-09-27 2022-07-05 上海宝冶集团有限公司 Cast-in-place pile reinforcement cage main rib mounting and positioning device and using method thereof

Similar Documents

Publication Publication Date Title
CN207930145U (en) Steel reinforcement cage owner muscle interval controlling means
CN105952474B (en) A kind of large cross-section tunnel confined concrete preliminary bracing rapid constructing method
CN103362119B (en) Large-size rebar cage exempt from the method that is welded to connect and syndeton
CN206408657U (en) Integrated bored concrete pile for static test
CN103498425A (en) Full-dismounting combination type multifunctional bracket supporting structure and construction method thereof
CN103243745A (en) Pipe pile deviation-rectifying and resetting method
CN104989434A (en) Method for treating landslide of tunneling working face with pipe penetration combined lagging jacks
CN206707128U (en) Reuse adjustable frame trestle reinforcing bar spacer ferrule
CN210946814U (en) Device for detecting cast-in-place pile concrete pouring height
CN207642213U (en) Bored concrete pile steel reinforcement cage spiral stirrup location auxiliary device
CN114657977B (en) Prestressed concrete pipe pile end crack reinforcing device
CN205314372U (en) Steel reinforcement cage protective layer cushion
CN105673019B (en) A kind of vertical shaft lower horizontal section top concrete slip-form construction method
CN211621558U (en) Bored concrete pile steel reinforcement cage elevation control mounting structure
CN205279925U (en) Accurate positioner of preformed hole is pour to concrete sample
CN204780892U (en) Tubular pile crack reinforcement structure of high strength
CN205024826U (en) Beam column core area sliding positioning stirrup device
CN211228413U (en) Assembled steel section of jurisdiction template suitable for quick lining cutting of horseshoe tunnel
CN210216398U (en) Large-scale storage tank bored concrete pile assembled pile cap
CN207846458U (en) Enhanced storage ground simple tower
CN102094391B (en) Positioning construction method for top reinforcing mesh in railway bridge support platform
CN205614240U (en) Bored concrete pile steel reinforcement cage owner muscle interval fixing tool
CN220033602U (en) Paying-off device for three-pile cap
CN206503076U (en) The stiff skeleton operating platform of hollow thin-walled high pier cage bar positioning
CN205077731U (en) A vertical rebar positioning device for silo sliding formwork construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181002

CF01 Termination of patent right due to non-payment of annual fee