CN207923247U - A kind of mobile axial centring tube road holder - Google Patents

A kind of mobile axial centring tube road holder Download PDF

Info

Publication number
CN207923247U
CN207923247U CN201721893941.8U CN201721893941U CN207923247U CN 207923247 U CN207923247 U CN 207923247U CN 201721893941 U CN201721893941 U CN 201721893941U CN 207923247 U CN207923247 U CN 207923247U
Authority
CN
China
Prior art keywords
straight pipe
tube road
mobile
preceding straight
checklist
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721893941.8U
Other languages
Chinese (zh)
Inventor
贾文涛
宫本利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DANDONG YIBANG GAGING INSTRUMENT APPLIANCE Ltd Co
Original Assignee
DANDONG YIBANG GAGING INSTRUMENT APPLIANCE Ltd Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DANDONG YIBANG GAGING INSTRUMENT APPLIANCE Ltd Co filed Critical DANDONG YIBANG GAGING INSTRUMENT APPLIANCE Ltd Co
Priority to CN201721893941.8U priority Critical patent/CN207923247U/en
Application granted granted Critical
Publication of CN207923247U publication Critical patent/CN207923247U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Pipeline Systems (AREA)

Abstract

The utility model is related to a kind of mobile axial centring tube road holders, preceding straight pipe and pneumatic expansion joint including fixed rear straight pipe, movement, it is mounted as a whole on monitor station work top, also there is mobile axial centring tube road holder and sliding rail, sliding rail is divided into two sections, the both sides of monitor station work top are parallelly mounted to, it is parallel with the axis direction that forward and backward straight pipe and checklist are concentric;The top of mobile axial direction centring tube road holder is fixed with preceding straight pipe, the sliding block connection of lower part and sliding rail;Mobile axial direction centring tube road frame upper is fixed by connecting bolt and fixture with mobile preceding straight pipe, and the distance between fixture and preceding straight pipe flange end are arbitrarily adjusted according to the length of checklist.The utility model is equipped with limit guide rail, avoid the case where segmented conduit connection back axis offset misaligns, ensure that the axial direction of checklist clamping and vertical missing are respectively less than 0.2mm, ensure the sectional area and shape of tong-test ammeter area pipeline drift diameter, improves the accuracy of checklist verification result.

Description

A kind of mobile axial centring tube road holder
Technical field
The utility model is related to a kind of flow standard detection device, specially a kind of mobile axial centring tube road holder.
Background technology
Currently, in domestic gas flow standard device, checklist clamping is carried out only with pneumatic expansion joint extensively, is being examined and determine In the process, checklist is placed on the checklist area among transportable preceding straight pipe and fixed rear straight pipe, then opened Dynamic expansion bend reduces tong-test ammeter area axial distance, until checklist is clamped in completely between rear straight pipe and preceding straight pipe, completes Checklist clamping, and in the process, some longer checklists of table body often occur pipeline drift diameter in clamping process and are difficult to pair Neat situation causes the sectional area of fluid latus rectum and shape to be changed, and then causes checklist zone duct flow field unstable And influence the authenticity of verification result;Existing structure is also generally needed when tong-test ammeter operates, and is aided with and is manually adjusted flange hole pressure Centering, operation sequence is complicated, and adjustment time is long, and has security risk.
Under normal conditions, the clamping mechanism operation principle of pneumatic expansion joint is used only as shown in Figure 1, when pneumatic expansion joint presss from both sides When table works, preceding straight pipe 3 moves along arrow direction and clamps checklist 2, in moving process, as pneumatic expansion joint is stretched One end of the elongation of contracting bar, the end face of flange of preceding straight pipe 3 will sink, and off-axis is straight after just will appear to bottom offset Pipeline section 1, checklist 2 and 3 axle center of preceding straight pipe are different and change the sectional area and shape of pipeline drift diameter, influence verification result Accuracy.
Utility model content
For in the prior art, be aided with when tong-test ammeter operates manually adjust forced centering, operation sequence is complicated the deficiencies of, this Utility model will solve the problems, such as to be to provide that a kind of can to effectively improve the pipeline after checklist is connect with front and back straight pipe concentric The mobile axial centring tube road holder of degree.
In order to solve the above technical problems, the technical solution adopted in the utility model is:
A kind of mobile axial centring tube road holder of the utility model, includes the preceding straight pipe of fixed rear straight pipe, movement And pneumatic expansion joint, it is mounted as a whole on monitor station work top, also there is mobile axial centring tube road holder and sliding rail, In, sliding rail is divided into two sections, is parallelly mounted to the both sides of monitor station work top, the concentric axis with forward and backward straight pipe and checklist Line direction is parallel;The top of mobile axial direction centring tube road holder is fixed with preceding straight pipe, the sliding block connection of lower part and sliding rail.
Mobile axial direction centring tube road frame upper is fixed by connecting bolt and fixture with mobile preceding straight pipe, according to quilt The length of inspection table arbitrarily adjusts the distance between fixture and preceding straight pipe flange end.
The fixture is gantry frame structure, is equipped with ring-shaped clip, two columns and connection bolt, ring-shaped clip and passes through Bolt hoop is connected in preceding straight pipe periphery;It is respectively equipped with height adjustment bolt hole on two columns, passes through height adjustment bolt tune Save the spacing of two columns.
The fixture is connected with mobile preceding straight pipe, is openable and closable ring-shaped clip structure, and retractable place is equipped with bolt Hole is fastened the flange end of fixture and preceding straight pipe by bolt.
Openable and closable loop configuration is elastic force clamping clip.
Openable and closable loop configuration is elastic force clamping clip.
The utility model has the advantages that and advantage:
1. the utility model movement axial centring tube road holder effectively prevents segmented conduit company because being equipped with limit guide rail Connect the case where back axis offset misaligns, it is ensured that the axial direction and vertical missing of checklist clamping are respectively less than 0.2mm, ensure that tong-test ammeter The sectional area and shape of area's pipeline drift diameter effectively reduce the measurement error caused by checklist clamping deviation, improve magnitude and pass The stability of the accuracy and pipeline flow field with assay calibration is passed, the accuracy of checklist verification result is improved.
2. the utility model movement axial centring tube road holder can be widely applied to the checklist of gas flow standard device In clamping working table, effectively avoid the flow field caused by the sectional area of tong-test ammeter area pipeline drift diameter and change in shape disorderly.
3. the utility model simple structure, manufacturing process is simple, and failure rate is low, securely and reliably;Operation sequence is simple simultaneously, Artificial input is effectively reduced, it is energy-efficient.
Description of the drawings
Fig. 1 is pipeline architecture schematic diagram in the prior art;
Fig. 2 is the utility model pipeline architecture schematic diagram.
Wherein, 1 is rear straight pipe, and 2 be checklist, and 3 be preceding straight pipe, and 4 be pneumatic expansion joint, and 5 is axially-centered for movement Support of pipelines, 6 be sliding rail, and 7 be monitor station.
Specific implementation mode
The utility model is further elaborated with reference to the accompanying drawings of the specification.
As shown in Fig. 2, a kind of mobile axial centring tube road holder of the utility model, including fixed rear straight pipe 1, movement Preceding straight pipe 3 and pneumatic expansion joint 4, be mounted as a whole on the work top of monitor station 7, also there is mobile axial centring tube Road holder 5 and sliding rail 6, wherein sliding rail 6 is equipped with two sections, the both sides of the work top of monitor station 7 is parallelly mounted to, with preceding straight tube Section 3, rear straight pipe 1 are parallel with the axis direction that checklist 2 is concentric, the top of mobile axial direction centring tube road holder 5 and preceding straight tube Section 3 is fixed, and lower part is slidably connected with sliding rail 6.
Holder 5 top in mobile axial direction centring tube road is fixed by bolt and fixture with mobile preceding straight pipe 3, according to tested The distance between the length adjustment fixture of table and preceding straight pipe flange end.
In the present embodiment, the fixture of support of pipelines is connected with mobile preceding straight pipe, and fixture is gantry frame structure, is equipped with Ring-shaped clip, two columns, connection bolt and height adjustment bolt.Two columns are equipped with height adjustment bolt hole, pass through Height adjustment bolt adjusts the spacing of two columns, and the axle center height of preceding straight pipe and rear straight pipe, checklist is adjusted to consistent. Fixture can also be used openable and closable loop configuration, and retractable place is equipped with bolt hole, by bolt by the method for fixture and preceding straight pipe Lan Duan is fastened;Openable and closable loop configuration is elastic force clamping clip.In this way by depressing elastic force spanner, by openable and closable ring-shaped clip The flange end of straight pipe before being sleeved on unclamps before ring-shaped clip can be clamped on by spanner on straight pipe;It can also utilize and be set to The bolt hole of opening and closing place is further fastened fixture and preceding straight pipe by bolt.
The operation principle of the utility model is as follows:
Holder 5 top in mobile axial direction centring tube road is fixed on the flange of moveable preceding straight pipe 3 by bolt and fixture Preceding straight pipe 3 is located in the axis direction concentric with rear straight pipe 1 and checklist 2 by accurate sliding rail, works as gas by one end, lower part When straight pipe 3 is along arrow direction before dynamic expansion bend 4 drives, under sliding rail 6 and fixture cooperation, always by preceding straight pipe 3 Flange one end be maintained on the axis of setting, avoid leading to pipeline not because of the free deviation that unconfined free pipeline section generates With one heart, the stability in calibrating region flow field is improved.
The utility model movement axial centring tube road holder effectively avoids segmented conduit off-centring because there is limit guide rail The case where misaligning, it is ensured that the axial direction and vertical missing of checklist clamping are respectively less than 0.2mm, ensure that tong-test ammeter area pipeline drift diameter Sectional area and shape effectively reduce the measurement error caused by checklist clamping deviation, improve transmission of quantity value and assay calibration Accuracy and pipeline flow field stability, improve checklist verification result accuracy.

Claims (5)

1. a kind of mobile axial centring tube road holder, includes the preceding straight pipe and Pneumatic extension of fixed rear straight pipe, movement Device is mounted as a whole on monitor station work top, it is characterised in that:Also there is mobile axial centring tube road holder and sliding rail, In, sliding rail is divided into two sections, is parallelly mounted to the both sides of monitor station work top, the concentric axis with forward and backward straight pipe and checklist Line direction is parallel;The top of mobile axial direction centring tube road holder is fixed with preceding straight pipe, the sliding block connection of lower part and sliding rail.
2. mobile axial centring tube road holder as described in claim 1, it is characterised in that:On mobile axial direction centring tube road holder Portion is fixed by connecting bolt and fixture with mobile preceding straight pipe, and fixture and preceding straight tube are arbitrarily adjusted according to the length of checklist The distance between section flange end.
3. mobile axial centring tube road holder as described in claim 2, it is characterised in that:The fixture is gantry frame knot Structure is equipped with ring-shaped clip, two columns and connection bolt, and ring-shaped clip is by connecting bolt hoop in preceding straight pipe periphery;Two It is respectively equipped with height adjustment bolt hole on a column, the spacing of two columns is adjusted by height adjustment bolt.
4. mobile axial centring tube road holder as described in claim 2, it is characterised in that:The fixture and mobile preceding straight tube Section is connected, and is openable and closable ring-shaped clip structure, and retractable place is equipped with bolt hole, by bolt by the method for fixture and preceding straight pipe Lan Duan is fastened.
5. mobile axial centring tube road holder as described in claim 3, it is characterised in that:Openable and closable loop configuration is elastic force Clamping clip.
CN201721893941.8U 2017-12-29 2017-12-29 A kind of mobile axial centring tube road holder Active CN207923247U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721893941.8U CN207923247U (en) 2017-12-29 2017-12-29 A kind of mobile axial centring tube road holder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721893941.8U CN207923247U (en) 2017-12-29 2017-12-29 A kind of mobile axial centring tube road holder

Publications (1)

Publication Number Publication Date
CN207923247U true CN207923247U (en) 2018-09-28

Family

ID=63615634

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721893941.8U Active CN207923247U (en) 2017-12-29 2017-12-29 A kind of mobile axial centring tube road holder

Country Status (1)

Country Link
CN (1) CN207923247U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112344102A (en) * 2020-10-17 2021-02-09 中建一局集团第一建筑有限公司 BIM-based cold and heat source pump room pipeline assembly type system and construction method thereof
CN113029302A (en) * 2020-12-24 2021-06-25 安徽金大仪器有限公司 Tracking and calibrating coaxial meter supporting device for main pipeline
CN113639621A (en) * 2021-07-16 2021-11-12 渤海造船厂集团有限公司 Bent tube type vibration reduction connecting tube measuring device and method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112344102A (en) * 2020-10-17 2021-02-09 中建一局集团第一建筑有限公司 BIM-based cold and heat source pump room pipeline assembly type system and construction method thereof
CN113029302A (en) * 2020-12-24 2021-06-25 安徽金大仪器有限公司 Tracking and calibrating coaxial meter supporting device for main pipeline
CN113639621A (en) * 2021-07-16 2021-11-12 渤海造船厂集团有限公司 Bent tube type vibration reduction connecting tube measuring device and method
CN113639621B (en) * 2021-07-16 2024-05-14 渤海造船厂集团有限公司 Bent pipe type vibration reduction connecting pipe measuring device and method

Similar Documents

Publication Publication Date Title
CN207923247U (en) A kind of mobile axial centring tube road holder
CN109079419A (en) A kind of height-adjustable metal tube welding tooling
CN207840554U (en) A kind of flange welding positioning tooling
CN203924705U (en) Rectangular beam die clamper
CN205642766U (en) Bellows gas tightness detection tool
CN203973102U (en) A kind of operator's seat backrest welding tooling
CN218956004U (en) Quick-change clamp for detecting air tightness of pipeline
CN206710248U (en) A kind of easy-to-read mortar consistency determining apparatus
CN109341966A (en) A kind of dual-function detector based on tap
CN206426002U (en) A kind of fixture with detection function
CN205561991U (en) Two -way tong -test ammeter device
CN206029373U (en) Clamping mechanism
CN203356940U (en) Thermal bulb sleeve positioning device
CN217638430U (en) Hydraulic test bench for detection
CN208282932U (en) A kind of device for automobile exhaust noise testing
CN207945409U (en) A kind of pipeline no-dig technique repair apparatus
CN219221705U (en) Supporting and hanging frame structure for flowmeter
CN219625456U (en) Cavity positioning device of instrument analyzer
CN206543957U (en) A kind of Pneumatic quick connector pressure welding servicing unit
CN205571829U (en) Natural gas line incessantly defeated area presses welding set that relocates
CN206305824U (en) A kind of steady type tubing clamp system
CN208026229U (en) The electronic debugging center fixture of air-actuated jaw
CN219624864U (en) Flow detection device for water meter production and processing
CN205118497U (en) Pipeline butt joint fastening device
CN205245980U (en) Measure device of barrel both ends flange axiality

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant