CN207922379U - A kind of grill pan furnace system that can be applied to starting trouble and peaking boiler simultaneously - Google Patents

A kind of grill pan furnace system that can be applied to starting trouble and peaking boiler simultaneously Download PDF

Info

Publication number
CN207922379U
CN207922379U CN201820208095.XU CN201820208095U CN207922379U CN 207922379 U CN207922379 U CN 207922379U CN 201820208095 U CN201820208095 U CN 201820208095U CN 207922379 U CN207922379 U CN 207922379U
Authority
CN
China
Prior art keywords
boiler
heat exchanger
supply network
grill pan
steam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820208095.XU
Other languages
Chinese (zh)
Inventor
林军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang huizhiyuan Electric Power Development Group Co.,Ltd.
Original Assignee
Shenyang Ebizal Source Electrical Engineering Technical Service Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Ebizal Source Electrical Engineering Technical Service Co Ltd filed Critical Shenyang Ebizal Source Electrical Engineering Technical Service Co Ltd
Priority to CN201820208095.XU priority Critical patent/CN207922379U/en
Application granted granted Critical
Publication of CN207922379U publication Critical patent/CN207922379U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model is related to a kind of grill pan furnace systems that can be applied to starting trouble and peaking boiler simultaneously, including steam electric boiler, electric superheater, plate heat exchanger, the wherein described steam electric boiler connects sweet-water tank by desalination water pump, the steam electric boiler is also separately connected with peak adjusting device, plate heat exchanger by valve, pipeline, the electricity superheater passes through the auxiliary vapour system of pipeline access host, the plate heat exchanger is connect by valve, piping connection heat supply network feed pipe, heat supply network return pipe, realization with heat supply network.

Description

A kind of grill pan furnace system that can be applied to starting trouble and peaking boiler simultaneously
Technical field
The utility model is related to a kind of grill pan furnace systems, and in particular, to one kind can be applied to starting trouble and tune simultaneously The grill pan furnace system of peak boiler.
Background technology
At this stage, domestic electric heat storage peak adjusting device is only used as peak regulation, is had a single function, and the idleness of equipment phase is long.
Currently, each power plant is startup vapour when ensuring unit starting, 1-2 platform fire coal starting troubles are generally provided with, But this boiler in unit starting because only provide auxiliary steam, and auxiliary vapour system is typically provided communicating pipe between each unit in factory Increase flexibility, so utilization rate is very low, but emergency start and plant area's heat supply when unit full cut-off when to ensure unit failure, it opens Dynamic boiler winter general banking fire operation, this not only adds maintenance costs, also lead to coal-fired waste.
Utility model content
Thoroughly to solve the above problems, the utility model provides a kind of can be applied to starting trouble and peaking boiler simultaneously Electric boiler achieves by changing the configuration mode of traditional electric boiler and can not only be used for starting trouble but also as peaking boiler Purpose.
The concrete scheme of the utility model is as follows:
A kind of grill pan furnace system that can be applied to starting trouble and peaking boiler simultaneously, including steam electric boiler, electricity overheat Device, plate heat exchanger, wherein the steam electric boiler connects sweet-water tank by desalination water pump, the steam electric boiler passes through valve Door, pipeline are also separately connected with peak adjusting device, plate heat exchanger, and the electricity superheater is described by the main machine auxiliary steam system of pipeline Plate heat exchanger, by valve, piping connection heat supply network feed pipe, heat supply network return pipe, realization is connect with heat supply network.
In another embodiment, the peak adjusting device includes peak transformer, electric heat storage peak regulation bus section, busbar section.
Power plant can cancel starting trouble, replace coal-fired startup stove with steam electric boiler, daily maintenance expense is low, and put into operation speed Soon, the method for operation is flexible, and when day-to-day operation can be used as peak regulation use, and full factory shuts down or need starting trouble to put into operation constantly to can be used as and open Dynamic boiler uses, and substantially increases capacity utilization.Cancel coal-fired startup stove, can both cancel the starting trouble investment in power plant, The peak modulation capacity in power plant is increased again, and the standby redundancy of the equipment component, maintenance cost can be greatly reduced.
Description of the drawings
Fig. 1 is the structural schematic diagram of electric boiler system operation.
Specific implementation mode
To make those skilled in the art more fully understand the technical solution of the utility model, below in conjunction with the accompanying drawings and specifically Embodiment is described in further detail the grill pan furnace system of the utility model.
Fig. 1 is the structural schematic diagram of electric boiler system operation.It is the process flow chart of this system in dotted line frame.Steam grill pan Stove 7, electric superheater 11, plate heat exchanger 15 are the core equipments of the system, when steam electric boiler 7 is run as peak adjusting device, Peak regulation transformer B operations, step down side switch D are closed, electric heat storage peak regulation bus section, busbar section charges, the power supply E of steam electric boiler 7 Be closed, the switch F of electric superheater 11 is disconnected, steam electric boiler 7 is run, and valve 6,10,20 is closed, valve 8,9,16,17,18, 19 open, and steam electric boiler is by plate heat exchanger to heat user heat supply.
When being run as starting trouble, peak regulation transformer B is out of service, switch D is disconnected, and opens the standby A that becomes and runs, switch C is closed It is combined into the power supply of electric heat storage peak regulation bus section, busbar section, the switch E of steam electric boiler 7 is closed, the switch F of electric superheater 11 is closed, and valve 1 is opened It opening, chemistry water enters sweet-water tank 2, and the desalination water pump 4 of sweet-water tank 2 to steam electric boiler 7 is run, and valve 3,5,6 is opened, To ensure 7 high water tank of steam electric boiler in normal range (NR), the valve 8,9 of plate heat exchanger 15 is closed, steam electric boiler 7 to The steam valve 10 of electric superheater 11 is opened, and the outlet portal 12 of electric superheater 11, main machine auxiliary steam system valve 13 are opened, steam electricity The saturated vapor that boiler 7 generates uses after electric superheater 11 is heated to required parameter for host Auxiliary Steam 14, steam Water level decreasing caused by steam is exported in electric boiler, is supplemented by desalination water pump 4, whole system can long-time steady operation.
Therefore the method is by increasing electric superheater 11, pumps for hot water supply net 12 and its entrance door and valve 6, By small investment, that is, electric boiler systematic difference range is considerably increased, providing a kind of electric peaking boiler for thermal power plant replaces The scheme of generation coal-fired starting trouble, advantageous guarantee is provided for the safe operation in power plant.
It is understood that embodiment of above is merely to illustrate that the principles of the present invention and uses exemplary Embodiment, however the utility model is not limited thereto.For those skilled in the art, this is not being departed from In the case of the spirit and essence of utility model, various changes and modifications can be made therein, these variations and modifications are also considered as this reality With novel protection domain.

Claims (2)

1. a kind of grill pan furnace system that can be applied to starting trouble and peaking boiler simultaneously, which is characterized in that including steam grill pan Stove, electric superheater, plate heat exchanger, wherein the steam electric boiler connects sweet-water tank, the steam electricity by desalination water pump Boiler is also separately connected with peak adjusting device, plate heat exchanger by valve, pipeline, and the electricity superheater passes through pipeline access host Auxiliary vapour system, the plate heat exchanger are connect by valve, piping connection heat supply network feed pipe, heat supply network return pipe, realization with heat supply network.
2. the grill pan furnace system according to claim 1 that can be applied to starting trouble and peaking boiler simultaneously, feature exist In the peak adjusting device includes peak regulation transformer, electric heat storage peak regulation bus section, busbar section.
CN201820208095.XU 2018-02-07 2018-02-07 A kind of grill pan furnace system that can be applied to starting trouble and peaking boiler simultaneously Active CN207922379U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820208095.XU CN207922379U (en) 2018-02-07 2018-02-07 A kind of grill pan furnace system that can be applied to starting trouble and peaking boiler simultaneously

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820208095.XU CN207922379U (en) 2018-02-07 2018-02-07 A kind of grill pan furnace system that can be applied to starting trouble and peaking boiler simultaneously

Publications (1)

Publication Number Publication Date
CN207922379U true CN207922379U (en) 2018-09-28

Family

ID=63603658

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820208095.XU Active CN207922379U (en) 2018-02-07 2018-02-07 A kind of grill pan furnace system that can be applied to starting trouble and peaking boiler simultaneously

Country Status (1)

Country Link
CN (1) CN207922379U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109668134A (en) * 2019-01-30 2019-04-23 思安新能源股份有限公司 A kind of starting trouble system storing heat engine structure and boilers heated electrically and combining

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109668134A (en) * 2019-01-30 2019-04-23 思安新能源股份有限公司 A kind of starting trouble system storing heat engine structure and boilers heated electrically and combining
CN109668134B (en) * 2019-01-30 2024-01-02 思安新能源股份有限公司 Start boiler system combining heat storage and release mechanism and electric heating boiler

Similar Documents

Publication Publication Date Title
CN103382860B (en) Steam turbine power generation heating system controlling method
CN109339877B (en) Coal-based distributed energy supply system
CN207922379U (en) A kind of grill pan furnace system that can be applied to starting trouble and peaking boiler simultaneously
CN111058902A (en) Energy-saving system and energy-saving control method based on industrial steam turbine asynchronous power generation
CN204113354U (en) A kind of gland seal system and thermodynamic system of steam tur
CN102635847B (en) Water feeding system for multiple condensing boilers
CN202851092U (en) Circulating water start-up system of steam turbine
CN208982123U (en) A kind of system for realizing three kinds of state switchover operations of thermoelectricity unit
CN102840617A (en) Heat-power cogeneration system employing steam heat accumulator
CN208442817U (en) Solar energy thermo-power station underload heater system
CN207740054U (en) A kind of pressure and temperature reducing formula steam waste heat electricity generation system
CN204851350U (en) Utilize living water heating system of power plant's exhaust steam waste heat
CN104132326A (en) CFB boiler emergency water supplementing system without emergency water supplementing box
CN212431456U (en) Open cooling water system of high-backpressure circulating water heat supply unit
CN105423398B (en) One kind series connection heat supply network draining system
CN105605554B (en) 300MW and ratings above fired power generating unit condensate method for supplementing water and device
CN209763246U (en) Flue gas waste heat utilization heating system
CN211260990U (en) Steam heat transfer constant pressure water charging system
JP2022124996A (en) Thermal power generation plant and control method for thermal power generation plant
CN104727869B (en) Cogeneration units and boiler startup steam discharge thereof utilize method
CN209431389U (en) A kind of waste incineration and generating electricity heat energy recycling system of air compressor
CN106382620A (en) Low-pressure water supply system for steam extraction and backheating of power station unit
CN206739627U (en) More condenser boiler water supply systems
CN101761965A (en) High-zone directly-connected boosting heating system
CN205955783U (en) Draw gas low -pressure system of heating boiler feedwater of power station steam turbine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Suzhou Boamax Industry Co., Ltd.

Assignor: Shenyang Ebizal Source Electrical Engineering Technical Service Co Ltd

Contract record no.: 2019210000007

Denomination of utility model: Can be applied to electric boiler system of auxiliary boiler and peak regulation boiler simultaneously

Granted publication date: 20180928

License type: Common License

Record date: 20190327

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 1113, No.5-2 Tianci street, Hunnan New District, Shenyang City, Liaoning Province

Patentee after: Shenyang huizhiyuan Electric Power Development Group Co.,Ltd.

Address before: 1113, No.5-2 Tianci street, Hunnan New District, Shenyang City, Liaoning Province

Patentee before: SHENYANG HUIZHIYUAN POWER ENGINEERING TECHNOLOGY SERVICE Co.,Ltd.