CN207921494U - A kind of suspention functional column - Google Patents

A kind of suspention functional column Download PDF

Info

Publication number
CN207921494U
CN207921494U CN201820023378.7U CN201820023378U CN207921494U CN 207921494 U CN207921494 U CN 207921494U CN 201820023378 U CN201820023378 U CN 201820023378U CN 207921494 U CN207921494 U CN 207921494U
Authority
CN
China
Prior art keywords
fixed
special
bolt
plate
foreboard
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820023378.7U
Other languages
Chinese (zh)
Inventor
周子轶
刘昆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING CHENGWEI BORUI LAB-EQUIPMENT Co.,Ltd.
Liaoning Chengwei laboratory equipment Co., Ltd
Original Assignee
LANGFANG JUCHENG LABORATORY ENGINEERING TECHNOLOGY Co Ltd
BEIJING CHENGWEI BORUI LAB EQUIPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LANGFANG JUCHENG LABORATORY ENGINEERING TECHNOLOGY Co Ltd, BEIJING CHENGWEI BORUI LAB EQUIPMENT Co Ltd filed Critical LANGFANG JUCHENG LABORATORY ENGINEERING TECHNOLOGY Co Ltd
Priority to CN201820023378.7U priority Critical patent/CN207921494U/en
Application granted granted Critical
Publication of CN207921494U publication Critical patent/CN207921494U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model is related to a kind of cables to thread column, more particularly to a kind of suspention functional column, including two or more fixed beams and multiple function boxes, fixed beam is vertically arranged, function box is fixed in fixed beam, function box is hollow tubular, and splicing up and down between function box, it is provided with support element between two fixed beams, support element is fixedly connected with two fixed beams, function box includes foreboard, back plate and two blocks of side plates, foreboard, back plate and two blocks of side plates combine the tubulose to be formed continuously or discontinuously, foreboard and two pieces of side plate splicings are fixed, two blocks of side plates are separately fixed in two different fixed beams, back plate is fixed on support element.The utility model is split type by the way that function box to be arranged to so that dismounting foreboard can view the pipeline in function box completely, be overhauled to its internal pipeline, achieve the effect that quickly and easily to overhaul function box internal pipeline.

Description

A kind of suspention functional column
Technical field
The utility model is related to a kind of cables to thread column, more particularly to a kind of suspention functional column.
Background technology
On the one hand the power supply in laboratory, the circuit design of water supply and gas supply will meet the requirement of safety, on the other hand also Meet the convenience used, the wiring of traditional laboratory or circuit design are the installation function columns on experimental bench.
The prior art can refer to the utility model patent that Authorization Notice No. is CN206257362U, and it discloses a kind of suspentions Functional column, including two fixed beams and function box, function box is multiple, and fixed beam is vertically arranged, and function box is the side of monoblock type Tubulose and up and down splicing mutually, each function box is fixedly connected by bolt with two fixed beams, and circuit and pipeline are respectively positioned on work( Being suspended in midair in energy box, in laboratory has keel, two fixed beams to be fixed on keel.
Be in place of above-mentioned the deficiencies in the prior art, function box is monoblock type, when internal pipeline breaks down, need by Function box, which is all removed, could overhaul its internal pipeline, and process is complex.
Utility model content
The purpose of this utility model is to provide a kind of suspention functional column, solves maintenance function box inner tube in the prior art The complex problem of the process of line.
The above-mentioned technical purpose of the utility model technical scheme is that:
A kind of suspention functional column, including two or more fixed beams and multiple function boxes, fixed beam are vertically arranged, function box It is fixed in fixed beam, function box is hollow tubular, and splicing up and down between function box, and support is provided between two fixed beams Part, support element are fixedly connected with two fixed beams, and function box includes foreboard, back plate and two blocks of side plates, foreboard, back plate and two pieces of sides Board group closes the tubulose to be formed continuously or discontinuously, and foreboard and two pieces of side plate splicings are fixed, and two blocks of side plates are separately fixed at two not In same fixed beam, back plate is fixed on support element.
Through the above technical solutions, foreboard, which is separated side plate, can be observed various pipelines inside function box, facilitate inspection It repaiies.
Preferably, fixed beam is fixed with side plate by the first fastener;First fastener includes abnormity nut and bolt, different Shape nut includes fixed part, and fixed part is the trapezoidal trapezoid block in section, and the trapezium base centre position of fixed part offers spiral shell Keyhole, bolt are threadedly coupled with bolt hole;Fixed beam offers special-shaped slot vertically on the one side of proximal panel, and special-shaped slot is ladder Shape slot, towards outside, the centerline on the trapezoidal bottom edge of special-shaped slot offers special-shaped notch, special-shaped slot on the trapezoidal bottom edge of special-shaped slot The width of mouth is more than thickness of the fixed part on trapezoid cross section, and the width of special-shaped notch is less than the length of the trapezoidal bottom surface of fixed part Degree;When fixed beam is located at stationary state with side plate, abnormity nut is located in special-shaped slot and the trapezoid cross section of fixed part is perpendicular to different Shape slot, bolt pass through side plate and special-shaped notch to be threadedly coupled with the bolt hole of abnormity nut.
By using above-mentioned technical proposal, during fixed, profile nut and bolt are slightly loosened a bit, you can It realizes that function box is slided up and down along special-shaped slot, facilitates the installation of function box.It also avoids using plain bolt fixed function simultaneously The problem of mounting hole in alignment function box and fixed beam is needed when box and fixed beam.
Preferably, the centre position of the trapezium base of fixed part is convexly equipped with extension, the profile of extension is without departing from fixation The trapezium base profile in portion, bolt hole extend on extension.
By using above-mentioned technical proposal, extension can increase the screw thread of bolt and profile nut in the first fastener Bonding strength.
Preferably, function box is square tube type, the section of side plate and foreboard is in groove profile, and the notch of side plate is relative to each other, foreboard Notch towards back plate;Side plate includes the first plate in slot bottom and two piece of second plate in slot side, far from fixed beam The lateral surface of second plate is protruding with the foreboard lapping plate being vertically arranged, and foreboard lapping plate abuts with the side of foreboard and by common Bolt is fixed.
By using above-mentioned technical proposal, from outside can installation bolt fixed front plate lapping plate and foreboard, pacify installation and dismantling It is all more convenient to unload foreboard.
Preferably, gusset is provided at dog-ear between foreboard lapping plate and the second plate, on foreboard lapping plate and the second plate Several first clamping items parallel to each other are connected with, the first clamping item is directed toward gusset, is connected on the inner surface of gusset multiple Second parallel with the first clamping item is clamped item, and the second clamping item is located between the first clamping item and is clamped with the first clamping item.
By using above-mentioned technical proposal, gusset can protect the dog-ear between the second plate and foreboard lapping plate, prevent from rolling over Angle scratches staff;Gusset is fixed on by the form of clamping at the dog-ear between the second plate and foreboard lapping plate, installation and Dismounting is all more convenient.
Preferably, the side that the free end of the first clamping item is clamped item towards second is protruding with the first lug boss, the second card The side that the free end of narrow bars is clamped item towards first is protruding with the second lug boss, and the first clamping item is being installed with the second clamping item When fit closely mutually.
By using above-mentioned technical proposal, gusset and side plate squeeze the second clamping by the first lug boss of the first clamping item Item is deformed, and final first lug boss and the second lug boss staggeredly fasten, to achieve the purpose that gusset snaps onto on side plate.
Preferably, the free end end of the first clamping item is bent to form the first elbow to the direction far from the second clamping item, The free end end of second clamping item is bent to form the second elbow to the direction far from the first clamping item.
By using above-mentioned technical proposal, the setting of the second elbow and the first elbow is more convenient to set the second clamping item Between the first clamping item, the two is facilitated to dock.
Preferably, being connected with several partition boards being vertically arranged in back plate, function box is divided into multiple functional chambers by partition board.
By using above-mentioned technical proposal, partition board is separated out the mutual independent functional chamber come, and can lay different pipelines, Tracheae, water pipe, forceful electric power line and weak electric wire etc. is separated from each other, reduce influence of the pipeline to other pipelines.
Preferably, support element is several horizontally disposed plates, support plate is affixed by the second fastener and fixed beam;The Two fasteners include the first fastener and positioning sleeve, through-hole are offered on positioning sleeve, bolt passes through through-hole, and positioning sleeve is positioned at different Between the bolt head of shape nuts and bolt, the diameter of through-hole is less than the diameter of the bolt head of bolt;Fixed beam is close to support element Offer several special-shaped slots being vertically arranged on one side, the upper and lower surface of support element is provided with multiple deep gouges, deep gouge with it is solid The special-shaped slot determined on beam is corresponding, and deep gouge includes the straight trough for accommodating bolt and locating slot compatible with positioning sleeve shape, straight trough Across locating slot, and the width of straight trough is less than the width of locating slot;When fixed beam is in stationary state with support element, abnormity nut In special-shaped slot and the trapezoid cross section of fixed part is perpendicular to special-shaped slot, and positioning sleeve is located in locating slot, bolt pass through through-hole with Abnormity nut is threadedly coupled.
By using above-mentioned technical proposal, the support element intensity of plate is high, and support element can be hung down by the second fastener It is directly fixed in fixed beam, on the one hand easy to disassemble, another aspect support element can arbitrarily adjust position up and down along fixed beam.
Preferably, being connected with baffle on positioning sleeve, baffle is parallel with through-hole;When securing supports and fixed beam are fixed, Baffle extends towards fixed beam and is inserted into special-shaped slot along special-shaped notch, and baffle is abutted with the trapezoidal side of profile nut;When fixed When position set is abutted with the bolt head of bolt, along bolt axis direction, the distance of bolt tail to baffle is more than profile nut Thickness.
By using above-mentioned technical proposal, during affixed support element and fixed beam, baffle will not hinder special-shaped spiral shell Female vertical placement;After profile nut is inserted into special-shaped slot simultaneously, manually by fixed beam close to support element so that bolt is opposite Positioning sleeve slides a distance, and after being rotated further by profile nut to level at this time, the trapezoidal side of profile nut is abutted with baffle, this When tighten bolt again, profile nut will not rotate again under the withstanding effect of baffle.
In conclusion the utility model has the following technical effects:
1. split type by the way that function box to be arranged to so that dismounting foreboard can view the pipe in function box completely Line overhauls its internal pipeline;
2. side plate is affixed by the first fastener with fixed beam, it can realize that function box is slided up and down along special-shaped slot, it is convenient The installation of function box, while also avoiding needing alignment function box and fixation when using plain bolt fixed function box and fixed beam The problem of mounting hole on beam;
3. support plate is affixed by the second fastener with fixed beam, support element can be vertically fixed in fixed beam, one Aspect is easy to disassemble, and another aspect support element can arbitrarily adjust position up and down along fixed beam.
Description of the drawings
Fig. 1 is the installation condition schematic diagram of embodiment one;
Fig. 2 is the vertical view of fixed beam and function box and support board mounting structure in embodiment one;
Fig. 3 is the local D schematic diagrames in Fig. 2;
Fig. 4 is the structural schematic diagram of the first fastener;
Fig. 5 is the vertical view of fixed beam and function box and support board mounting structure in embodiment two;
Fig. 6 is the use state diagram of the second fastener;
Fig. 7 is the exploded perspective view of the second fastener;
Fig. 8 is the configuration schematic diagram of embodiment three;
Fig. 9 is the local A enlarged drawings in Fig. 8;
Figure 10 is the local B enlarged drawings in Fig. 8;
Figure 11 is the mounting structure schematic diagram of third fastener;
Figure 12 is the exploded perspective view of third fastener;
Figure 13 is the structural schematic diagram of the side installation of example IV, side explosion;
Figure 14 is the Local C enlarged drawing in Figure 13;
Figure 15 is the installation condition schematic diagram of embodiment five;
Figure 16 is the explosive state schematic diagram of embodiment five;
Figure 17 is the installation condition schematic diagram of embodiment six;
Figure 18 is the explosive state schematic diagram of embodiment six.
In figure, 1, keel;2, fixed beam;22, hollow hole;23, the first accommodating hole;24, the second accommodating hole;3, function box; 31, foreboard;32, back plate;33, side plate;331, the first plate;332, the second plate;333, gusset overlap edge;334, foreboard lapping plate; 335, gusset abuts side;336, foreboard abuts side;337, the first clamping item;3371, the first lug boss;3372, the first elbow; 35, gusset;351, the second clamping item;3511, the second lug boss;3512, the second elbow;36, spacing board;4, support element;5, different Shape slot;51, special-shaped notch;52, notch flanging;6, deep gouge;61, straight trough;62, locating slot;7, the first fastener;71, special-shaped spiral shell It is female;711, fixed part;712, extension;713, bolt hole;72, bolt;8, the second fastener;81, positioning sleeve;811, through-hole; 812, baffle;9, third fastener;91, fixed link;911, clamping portion;912, bar portion;9121, locating rod;91211, stepped stem; 9122, it is clamped bar;913, deep gouge is positioned;92, fixing sleeve;921, jack;922, threaded hole;923, spin slot;93, holding screw; 101, the first connector;102, the second connector.
Specific implementation mode
The utility model is described in further detail below in conjunction with attached drawing.The identical attached drawing of wherein identical parts Label indicates.It should be noted that word "front", "rear" used in the following description, "left", "right", "upper", "lower", " bottom Face " and " top surface " refer to that the direction in attached drawing, word "inner" and "outside" are referred respectively to towards or away from particular elements geometry The direction at center.
Embodiment one:
As shown in Figure 1, a kind of suspention functional column, including two fixed beams 2 and multiple function boxes 3, two fixed beams 2 are vertical Setting, function box 3 is hollow tubular, and splicing, function box 3 are fixedly connected with fixed beam 2 mutually up and down between function box 3, Gu Function box 3 can be arranged by determining the both sides of beam 2, and circuit and pipeline are respectively positioned on inside function box 3.Keel are provided at the top of laboratory 1, two fixed beams 2 are fixed on keel 1.After being arranged in this way, test indoor circuit and pipeline can by function box 3 into Row protection ensures that circuit is neat and safe.
As shown in Fig. 2, the section of fixed beam 2 is rectangle, mutually symmetrical with above and below 2 section of fixed beam, the section of fixed beam 2 On offer special-shaped slot 5 and hollow hole 22, special-shaped slot 5 opens up vertically respectively on four sides of fixed beam 2, wherein fixed beam 2 Special-shaped slot 5 there are two being opened up on two sides adjacent to each other.The purpose for opening up special-shaped slot 5 is opened up and is engraved for fixed function box 3 The purpose of emptying aperture 22 is to save material while mitigating the weight of fixed beam 2.
As shown in Fig. 2, special-shaped slot 5 is dovetail groove, the trapezoidal bottom edge of special-shaped slot 5 towards 2 outside of fixed beam, special-shaped slot 5 The centerline on trapezoidal bottom edge offers special-shaped notch 51.Since fixed beam 2 is generally process by light-weight metals such as aluminium alloys, For the ease of the special-shaped notch 51 of molding, Pressing Deformation is generally used, therefore notch flanging 52 can be formed at special-shaped notch 51, two A notch flanging 52 forms special-shaped notch 51.
Various shapes can be used in hollow hole 22, for saving material as much as possible, while ensureing that the structure of fixed beam 2 is strong Degree, hollow hole 22 use three kinds of shapes, respectively rectangular opening, square hole and flower-shape hole, rectangular opening to be located at four foldings of fixed beam 2 At angle, between three adjacent special-shaped slots 5, square hole is located between two flower-shape holes in flower-shape hole.
As shown in Fig. 2, being provided with support element 4 between two fixed beams 2, two fixed beams 2 are fixed with support element 4 respectively, Support element 4 can make more to stablize between two fixed beams 2, be easily installed function box 3.
There are many kinds of fixed forms between support element 4 and fixed beam 2, is carried out for square tube with support element 4 in the present embodiment Citing.
Support element 4 is square tube, and support element 4 is connect by the first fastener 7 with fixed beam 2.Meanwhile support element 4 is square tube, Pipeline can also be laid in support element 4.
As shown in figure 4, the first fastener 7 includes abnormity nut 71 and bolt 72, abnormity nut 71 includes fixed part 711, Fixed part 711 is the trapezoidal trapezoid block in section, and the centre position of 711 trapezium base of fixed part is convexly equipped with extension 712, prolongs The profile in long portion 712 offers on extension 712 and fixed part 711 and bolt without departing from the trapezoidal bottom profile of fixed part 711 The bolt hole 713 of 72 cooperations.Wherein, in conjunction with shown in Fig. 2, thickness of the fixed part 711 on trapezoid cross section is less than on special-shaped slot 5 The width of special-shaped notch 51, and the length of the trapezoidal bottom surface of fixed part 711 is more than the width of special-shaped notch 51, fixed part 711 Trapezoidal sectional shape is identical as the cross sectional shape of special-shaped slot 5, and the trapezoid cross section of fixed part 711 is sized to be slightly smaller than special-shaped slot 5 Cross-sectional sizes.
The setting of extension 712 therefore also may be used to increase the threaded connection length of bolt 72 and abnormity nut 71 The extension 712 of abnormity nut 71 is removed.
Support element 4 and the connection method of fixed beam 2 are:Bolt 72 is first passed through to the pipe of support element 4 from the inside of support element 4 Wall, then by the outstanding unification segment distance of abnormity nut 71 and bolt 72, the wherein extension 712 of profile nut 71 towards support element 4, Profile nut 71 is placed vertically later(That is the trapezoid cross section of fixed part 711 is parallel to the special-shaped slot 5 in fixed beam 2), by two Root fixed beam 2 is respectively close to support element 4 so that profile nut 71 is inserted into from special-shaped notch 51 in special-shaped slot 5, is rotated further by later different Type nut 71 is to horizontality(That is special-shaped slot 5 of the trapezoid cross section of fixed part 711 in fixed beam 2), make profile nut 71 are connected in special-shaped slot 5, tighten bolt 72, and the fixed part 711 of profile nut 71 is made to be connected on notch flanging 52, to solid Determine support element 4 and fixed beam 2.It is on the contrary then be detachably fixed beam 2 and support element 4.
Preferably, as shown in figure 4, anti-skid chequer can also be arranged by the trapezium base of fixed part 711 in profile nut 71, make Fixed part 711 and the abutting of notch flanging 52 are even closer, are not likely to produce sliding.
As shown in Fig. 2, function box 3 includes foreboard 31, back plate 32 and two blocks of side plates 33, foreboard 31 and two blocks of side plates 33 splice Fixed, back plate 32 combines the square tube type profile to form noncontinuity with foreboard 31 and side plate 33, back plate 32 be located at two fixed beams 2 it Between and be fixed on 4 outer surface of support element by plain bolt;33 section of side plate is in groove profile, and two blocks of side plates 33 notch phase each other Right, three plates of side plate 33 are respectively the first plate 331 in slot bottom and two piece of second plate 332 in slot side, close to solid The second plate 332 for determining beam 2 is fixed to by the first fastener 7 on the special-shaped slot 5 of fixed beam 2, as shown in figure 3, far from fixed beam 2 The lateral surface of the second plate 332 be protruding with and be vertically arranged with gusset overlap edge 333 and foreboard lapping plate 334, gusset overlap edge 333 The both sides of the second plate 332 are located at foreboard lapping plate 334, and gusset lapping plate 333 is close to the first plate 331, gusset overlap joint Plate 333 and foreboard lapping plate 334 form gusset with the two sides of the second plate 332 and abut at 335 and foreboard abutting 336 respectively; Foreboard 31 is groove type plate, and for the notch of foreboard 31 towards back plate 32, the side of foreboard 31 abuts the abutting of side 336, foreboard 31 with foreboard Side pass through plain bolt and foreboard lapping plate 334 and fix.
After function box 3 uses above-mentioned split type structure, when if you need to overhaul the pipeline in function box 3, it is only necessary to by foreboard 31 Separate two blocks of side plates 33 i.e. it can be seen that function box 3 in pipeline, it is overhauled.
As shown in Fig. 2, when fixed beam 2 is located at stationary state with side plate 33, abnormity nut 71 is located in special-shaped slot 5 and fixed Perpendicular to special-shaped slot 5, bolt 72 passes through the bolt hole of side plate 33 and special-shaped notch 51 and abnormity nut 71 for the trapezoid cross section in portion 711 713 are threadedly coupled.
In addition, the side plate 33 of function box 3 is fixed using the first fastener 7 with fixed beam 2, it, will be different during fixed Type nut 71 slightly loosens a bit with bolt 72, you can realizes that function box 3 is slided up and down along special-shaped slot 5, facilitates the peace of function box 3 Dress.It is needed when also avoided simultaneously using plain bolt fixed function box 3 and fixed beam 2 in alignment function box 3 and fixed beam 2 The problem of mounting hole.
Certainly, the foreboard 31 of function box 3, back plate 32 and side plate 33 or other shapes, as long as splicing is fixed mutually Form dismountable mode.
In order to increase the intensity of side plate 33, can be thickeied at the dog-ear of the first plate 331 and the second plate 332, it can at dog-ear Flower-shape hole is opened up to save material.
As shown in Fig. 2, several spacing boards 36 being vertically arranged, spacing board 36 can be fixed with plain bolt in back plate 32 Parallel with the first plate 331 of side plate 33, function box 3 is separated into multiple functional chambers by spacing board 36, can be distributed in each functional chamber Different pipelines, it is convenient to overhaul to achieve the purpose that apart from one another by different pipelines, while also avoiding mutual between various pipelines Mutually influence.
As shown in Fig. 2, forming an open dog-ear between foreboard lapping plate 334 and the second plate 332, suspention is being used When functional column, it is easy to scratch experimenter.To avoid such case from occurring, as shown in figure 3, in foreboard lapping plate 334 and second Gusset 35 is provided between plate 332, the clamping of gusset 35 is fastened at the dog-ear of foreboard lapping plate 334 and the second plate 332, wherein Gusset 35 can be arc plate or L-square;After installation, the side of gusset 35 abuts side 335 and gusset overlap edge with gusset 333 abut, and the other side of gusset 35 is abutted with the second plate 332 and foreboard 31.It is solid on foreboard lapping plate 334 and the second plate 332 It is connected to first clamping item 337 parallel to each other, the first clamping item 337 is directed toward gusset 35, it is preferable that the first clamping article 337 and the The angle of two plates 332 is 45 °, it is of course also possible to select other angles;Also two second are connected on inner surface on gusset 35 It is clamped item 351, and the second clamping item 351 on gusset 35 is parallel with the first clamping item 337 on the second plate 332, two second Item 351 is clamped to be located between two first clamping items 337 and be clamped with the first clamping item 337.
As shown in figure 3, the side that the free end of the first clamping item 337 is clamped item 351 towards second is protruding with the first protrusion Portion 3371, the side that the free end of the second clamping item 351 is clamped item 337 towards first are protruding with the second lug boss 3511, and first Clamping item 337 fits closely mutually when mounted with the second clamping item 351.When gusset 35 is fastened on foreboard lapping plate 334 and Process between two plates 332 at dog-ear, first by two second clamping items 351 be placed in two first clamping items 337 between, towards side Plate 33 presses gusset 35, and the second strip 351 is slided with gusset 35 along the first strip 337, when the second lug boss 3511 is in first When 3371 front of lug boss, gusset 35 is further pressed, the first clamping item 337 or second is clamped item 351 and deforms upon, and makes the Two lug bosses 3511 cross the first lug boss 3371, and the first clamping item 337 and second is clamped item 351 and is clamped at this time.
Preferably, as shown in figure 3, the first clamping item 337 and second is clamped the docking of item 351, the first clamping item for convenience 337 free end end is bent to form the first elbow 3372 to the direction far from the second clamping item 351, the second clamping item 351 Free end end is bent to form the second elbow 3512 to the direction far from the first clamping item 337, the first elbow 3372 and second curved Second clamping item 351 can be quickly and accurately placed between two first clamping items 337 by first 3512 docking.
In addition, as shown in figure 3, dismounting gusset 35 for convenience, it can be by gusset 35 by proximal panel 33 or foreboard 31 Side is arranged to arcwall face, is convenient for being inserted into 35 lower section of gusset from the both sides of gusset 35 with sharp instruments in this way, tilts gusset 35, with Achieve the purpose that dismantle gusset 35.
Embodiment two:
The difference is that, support element 4 is several horizontally disposed plates, support element 4 and fixed beam 2 with embodiment one And the connection type of function box 3 is also differed with embodiment one.
As shown in figure 5, the upper and lower surface of support element 4 is both provided with deep gouge 6, upper and lower surface includes respectively four heavy Slot 6, and deep gouge 6 is corresponding with the special-shaped slot 5 in left and right sides fixed beam 2 respectively, support element 4 is by the second fastener 8 and admittedly It is affixed to determine beam 2;The equal level in front and rear sides face of support element 4 offers special-shaped slot 5, and the back plate 32 and support element 4 of function box 3 are logical Cross the connection of the first fastener 7.The structure of special-shaped slot 5 such as embodiment one.
As shown in Figure 6 and Figure 7, the second fastener 8 increases positioning sleeve 81, positioning sleeve on the basis of the first fastener 7 Offer through-hole 811 on 81, bolt 72 passes through through-hole 811, positioning sleeve 81 be located at profile nut 71 and bolt 72 bolt head it Between, the diameter of through-hole 811 is less than the bolt head diameter of bolt 72.The shape of positioning sleeve 81 is there are many form, in the utility model Using cylinder, through-hole 811 is arranged perpendicular to the central axes of cylindrical positioning sleeve 81;Deep gouge 6 includes the straight trough for accommodating bolt 72 61 and locating slot 62 compatible with 81 shape of positioning sleeve, straight trough 61 passes through locating slot 62 and 61 width of straight trough is less than locating slot 62 Width.Also counterbore can be opened up close to one end of 72 bolt head of bolt in through-hole 811, bolt 72 is arranged to hexagon socket head cap screw, Facilitate rotating bolt 72 in this way.
Second fastener 8 compare the first fastener 7, the second fastener 8 can affixed two mutually perpendicular plates, compare Both two mutually perpendicular plates are fixed with using cornual plate, the connection procedure of the second fastener 8 is easier, and can adjust Fixed position.
In conjunction with shown in Fig. 5, support element 4 and the connection method of fixed beam 2 are:Positioning sleeve 81 is set in bolt 72 first On, then by the outstanding unification segment distance of profile nut 71 and bolt 72, the wherein extension 712 of profile nut 71 towards support element 4, Positioning sleeve 81 is fastened in locating slot 62 later, then profile nut 71 is placed vertically(That is the trapezoid cross section of fixed part 711 is flat Row is in the special-shaped slot 5 in fixed beam 2), by two fixed beams 2 respectively close to support element 4 so that profile nut 71 is from special-shaped notch 51 are inserted into special-shaped slot 5, are rotated further by profile nut 71 later to horizontality(I.e. the trapezoid cross section of fixed part 711 is perpendicular to solid Determine the special-shaped slot 5 on beam 2), so that profile nut 71 is connected in special-shaped slot 5, tighten bolt 72, make the fixed part of profile nut 71 711 are connected on notch flanging 52, as bolt 71 is gradually hung into profile nut 72, positioning sleeve 81 can be made to move closer to abnormal shape Nut 72, positioning sleeve 81 can drive support element 4 to move closer to fixed beam 2, to securing supports 4 and fixed beam 2.It is on the contrary then can Dismantle fixed beam 2 and support element 4.
Preferably, as shown in Figure 6 and Figure 7, baffle 812 can be connected on positioning sleeve 81, baffle 812 is parallel with through-hole 811; When securing supports 4 and fixed beam 2 are fixed, baffle 812 extends towards fixed beam 2 and is inserted into special-shaped slot 5 along special-shaped notch 51 Interior, baffle 812 is abutted with the trapezoidal side of profile nut 71;When positioning sleeve 81 is abutted with the bolt head of bolt 72, along spiral shell On 72 axis direction of bolt, the distance of 72 tail portion of bolt to baffle 812 is more than the thickness of profile nut 71.In this way, in affixed support During part 4 and fixed beam 2, baffle 812 will not hinder profile nut 71 to place vertically;Profile nut 71 is inserted into simultaneously different After in shape slot 5, manually by fixed beam 2 close to support element 4 so that 72 relative positioning of bolt set, 81 sliding a distance, at this time After being rotated further by profile nut 71 to level, the trapezoidal side of profile nut 71 is abutted with baffle 812, tightens bolt 72 again at this time, Profile nut 71 will not rotate again under the withstanding effect of baffle 812.
Embodiment three:
As shown in Figure 1, a kind of suspention function hanging pillar, including 1, two fixed beam 2 of keel and multiple function boxes 3, two solid Determine beam 2 to be vertically arranged, keel 1 are horizontally set on the top in laboratory, and two fixed beams 2 are fixed in the underface of keel 1, work( Energy box 3 is hollow tubular, and splicing, function box 3 are fixedly connected by bolt with fixed beam 2 mutually up and down between function box 3, line Road and pipeline are respectively positioned on inside function box 3, are provided with support element 4 between two fixed beams 2, support element 4 respectively with two fixations Beam 2 and function box 3 are fixed.
Fixed beam 2 and the structure of function box 3 use the knot of fixed beam 2 and function box 3 in embodiment one and embodiment two The form and structure of any one support element 4 in embodiment one or embodiment two can be used in structure, support element 4.
As shown in figure 8, the downside of keel 1 offers two special-shaped slots 5 parallel to each other along the extending direction of keel 1, Opened up on the side of two fixed beams 2 away from each other there are two deep gouge 6, the deep gouge 6 in fixed beam 2 respectively with 1 downside of keel The special-shaped slot 5 in face is corresponding, and two fixed beams 2 are fixed on the underface of keel 1 by the second fastener 8.Special-shaped slot 5 and deep gouge 6 structure such as embodiment two.
In conjunction with shown in Fig. 8~10, the process that keel 1 and fixed beam 2 are fixed using the second fastener 8 is:It first will positioning Set 81 is set on bolt 72, then by profile nut 71 and the outstanding unification segment distance of bolt 72, the wherein extension of profile nut 71 Positioning sleeve 81 is fastened in locating slot 62 by portion 712 later towards support element 4, then profile nut 71 is placed vertically(It is i.e. fixed The trapezoid cross section in portion 711 is parallel to the special-shaped slot 5 in fixed beam 2), by two fixed beams 2 respectively close to support element 4 so that different Type nut 71 is inserted into from special-shaped notch 51 in special-shaped slot 5, is rotated further by profile nut 71 later to horizontality(That is fixed part 711 Special-shaped slot 5 of the trapezoid cross section in fixed beam 2), so that profile nut 71 is connected in special-shaped slot 5, at this time in fixed beam 2 Under the action of its own gravity, the fixed part 711 of abnormity nut 71 is closely connected on notch flanging 52, finally tightens bolt 72, As bolt 71 is gradually hung into profile nut 72, positioning sleeve 81 can be made to move closer to profile nut 72, positioning sleeve 81 can drive Support element 4 moves closer to fixed beam 2, to securing supports 4 and fixed beam 2.It is on the contrary then be detachably fixed beam 2 and support element 4.
In addition, during fixed beam 2 is fixed to keel 1, profile nut 71 and bolt 72 are slightly loosened a bit, Fixed beam 2 is lifted slightly, you can is realized that special-shaped slot 5 of the fixed beam 2 on keel 1 slides, is facilitated the installation position for changing fixed beam 2 It sets.It is needed when also avoided simultaneously using plain bolt fixed function box 3 and fixed beam 2 in alignment function box 3 and fixed beam 2 The problem of mounting hole.
Preferably, upper and lower and left and right symmetrical as shown in figure 9, the section of keel 1 is square, i.e. the four of keel 1 Side offers special-shaped slot 5 so that the interchangeability of keel 1 is stronger;Diversified forms can also be provided on the section of keel 1 Hollow hole reduces the weight of keel 1 in order to save material.
Example IV:
With the difference of embodiment three, keel 1 are different from the connection type of fixed beam 2 and link position.
In the present embodiment, two fixed beams 2 are fixed in the forward and backward side of keel 1 by third fastener 9.In this way, when branch When support member 4 is using such as structure of embodiment one, the inner tubular portion of support element 4 can also lay circuit, increase the logical of route arrangement Road makes full use of space.
In addition, fixed beam 2 can be all arranged in the both sides of keel 1, based on the setting suspention functional column of fixed beam 2 so that space profit With maximization.
The two sides of keel 1 are opened up there are two special-shaped slot 5, the structure such as embodiment one of special-shaped slot 5.
As is illustrated by figs. 11 and 12, third fastener 9 includes fixed link 91, fixing sleeve 92 and holding screw 93;Fixed link 91 comprising being integrally formed and the clamping portion 911 set gradually and bar portion 912, and clamping portion 911 be that section is trapezoidal trapezoid block, is tied Structure is identical as 711 structure of fixed part of the first fastener 7, the relative size of clamping portion 911 and fixed part 711 and special-shaped slot 5 Identical, bar portion 912 is fixed on the trapezoidal bottom surface of clamping portion 911, and bar portion 912 radially offers positioning deep gouge 913, and positioning is heavy Slot 913 coordinates with holding screw 93, and positions trapezoid cross section of the axis perpendicular to clamping portion 911 of deep gouge 913;Fixing sleeve 92 is One end end of cylinder or other shapes, fixing sleeve 92 radially offers jack 921,92 other end of fixing sleeve End is provided in the axial direction with threaded hole 922, and bar portion 912 can be inserted into jack 921, and holding screw 93 is threaded in threaded hole In 922.
Preferably, as shown in figure 11, bar portion 912 includes locating rod 9121 and clamping bar 9122, and locating rod 9121 is far from card One end of extension bar 9122 is provided with stepped stem 91211, and stepped stem 91211 and clamping portion 91 are affixed, and the section of stepped stem 91211 is not Trapezoidal bottom surface beyond clamping portion 91, the diameter of locating rod 9121 be more than the diameter of clamping bar 9122, jack 921 diameter and The width of special-shaped notch 51 on keel 1, stepped stem locating rod 9121 by the conical surface with clamping 9122 transition of bar, jack 921 with It is clamped bar 9122 to coordinate, positioning deep gouge 913 is opened on clamping bar 9122.After being arranged in this way, bar portion 912 is being inserted into jack Process in 921, clamping bar 9122 are first inserted into jack 921, and locating rod 9121 is abutted with jack 921 later, and bar portion 912 cannot It is further inserted into along jack 921, convenient for the alignment positioning deep gouge 913 of holding screw 93 in threaded hole 922.
As shown in figure 14, fixed beam 2 vertically offers bar portion 912 in accommodating third fastener 9 close to the one side of keel 1 The first accommodating hole 23(Only illustrate the intersection of the first accommodating hole 23 and the second accommodating hole 24 in figure), fixed beam 2 is parallel to The one side of one accommodating hole 23 vertically offers the second accommodating hole 24 of fixing sleeve 92 in accommodating third fastener 9, and first is accommodating Hole 23 is orthogonal with the second accommodating hole 24 and crosses.
Fixed beam 2 and the fixing means of keel 1 are:In conjunction with Figure 13 and Figure 14, first fixed link 91 is horizontally arranged, rotation is solid Fixed pole 91 makes the special-shaped slot 5 that the trapezoid cross section of clamping portion 911 is parallel on keel 1, by the clamping portion 911 of fixed link 91 from abnormity Notch 51 is inserted into special-shaped slot 5, and rotating fixed link 91 later makes abnormity of the trapezoid cross section of clamping portion 911 on keel 1 Slot 5, at this time clamping portion 911 be connected in the special-shaped slot 5 on keel 1;Then, tight fixed bolt 93 is screwed in the screw thread of fixing sleeve 92 In hole 922, then fixing sleeve 92 is placed in the second accommodating hole 24, rotation fixing sleeve 92 makes jack 921 towards fixed link 91, later By fixed beam 2 close to keel 1, makes to be connected to the fixed link 91 on keel 1 in special-shaped slot 5 and be inserted into the first storage tank 23, reach The effect of pre-determined bit, at this point, staff only needs hand steered fixed beam 2, it is not necessary to lift fixed beam 2;As fixed link 91 is gradually inserted Enter in the first storage tank 23, the clamping bar 9122 of fixed link 91 is first inserted into the jack 921 of fixing sleeve 92, later fixed link 91 Locating rod 9121 abutted with jack 921, the positioning deep gouge 913 in locating rod 9121 is aligned with holding screw 93 at this time, is screwed Holding screw 93 makes holding screw 93 be inserted into positioning deep gouge 913, to fix keel 1 and fixed beam 2.
Due to during keel 1 and fixed beam 2 are fixedly mounted using third fastener 9, positioning deep gouge 913 and tightening Screw 93 is difficult disposable alignment, and needing to apply prodigious power keeps fixed beam 2 and keel 1 adjacent to each other to ensure holding screw 93 Alignment positioning deep gouge 913.To solve the above problems, as shown in figure 12, ovalisation can be arranged in the notch for positioning deep gouge 913 And the long side of ellipse is parallel to the axis of fixed link 91, the slot bottom centre position for positioning deep gouge 913 is arranged to and holding screw The taper of 93 cooperations, in this way, the cell wall of positioning deep gouge 913 is skewed.It is arranged according to this, determines when the ailhead of holding screw 93 is inserted into When at the oval notch of position deep gouge 913, with gradually tightening for holding screw 93, the ailhead of holding screw 93 is along positioning deep gouge 913 inclination cell wall gradually pushes, and is finally fitted close with positioning 913 intermediate tapered portion of deep gouge, in this way, during the installation process, Slightly the alignment positioning deep gouge 913 of holding screw 93 can be realized in fitting between fixed beam 2 and keel 1, realizes and fixes, and solid Fixed beam 2 can also be pulled to keel 1 by fixed process.
In addition, as shown in figure 12, one end end that threaded hole 922 can be offered in fixing sleeve 92 radially offers one Word spin slot 923, it is convenient that fixing sleeve 92 is rotated by spin slot 923 when fixing sleeve 92 is located in the second accommodating hole 24 so that fixed Jack 921 on set 92 is towards fixed link 91.
Embodiment five:
A kind of fixing means fixes the first connector 101 and the second connector 102 using the second fastener 8.
Fixed beam 2 during fixed beam 2 is fixedly connected with support element 4 in the first such as embodiment two of connector 101, the second connection Part 102 such as support element 4 among the above;Meanwhile first connector 101 also as in embodiment three keel 1 be fixedly connected with fixed beam 2 In keel 1, the second connector 102 such as fixed beam 2 among the above.Second connector 102 is vertically fixed by the second fastener 8 On the first connector 101.
As shown in figure 15, special-shaped slot 5 is offered on the one side of the first connector 101, the second connector 102 is perpendicular to different Deep gouge 6 is offered on the side of shape slot 5, deep gouge 6 is corresponding with the position of special-shaped slot 5.
Fixing step using the second fastener 8 is:
In conjunction with shown in Figure 16, positioning sleeve 81 is set on bolt 72 first, then hangs profile nut 71 and bolt 72 Unify segment distance, positioning sleeve 81 is fastened on locating slot by wherein 71 trapezoidal bottom of profile nut later facing towards the second connector 102 In 62, then by profile nut 71 vertically place(That is the trapezoid cross section of fixed part 711 is parallel to the abnormity on the first connector 101 The extending direction of slot 5), by two first connectors 101 respectively close to the second connector 102 so that profile nut 71 is from abnormity Notch 51 is inserted into special-shaped slot 5, is rotated further by profile nut 71 later to horizontality(That is the trapezoid cross section of fixed part 711 is vertical In the extending direction of the special-shaped slot 5 on the first connector 101), so that profile nut 71 is connected in special-shaped slot 5, tighten bolt 72, The fixed part 711 of profile nut 71 is set to be connected on special-shaped notch 51, as bolt 71 is gradually hung into profile nut 72, bolt 71 Positioning sleeve 81 can be squeezed and move closer to profile nut 72, positioning sleeve 81 can drive the second connector 102 gradually by locating slot 62 Close to the first connector 101, to fix the second connector 102 and the first connector 101.On the contrary then detachable first connector 101 and second connector 102.
Two 101 and second connectors 102 of mutually perpendicular first connector, phase can be fixed using the second fastener 8 Mode more fixed than common cornual plate, it is easier using the fixation of the second fastener 8, and can be along the extending direction of special-shaped slot 5 The second connector 102 of upper adjusting is fixed on the position on the first connector 101.
Embodiment six:
A kind of fixing means fixes the first connector 101 and the second connector 102 using third fastener 9.
As shown in figure 17, the first connector 101 and the second connector 102 are respectively such as keel 1 in example IV and fixed beam 2 Keel 1 in being fixedly connected and fixed beam 2.Second connector 102 is fixed on the first connector by the way that third fastener 9 is parallel 101 one side.
As shown in figure 18, special-shaped slot 5 is offered on the one side of the first connector 101, the second connector 102 is close to first The one side of connector 101 vertically offers the first accommodating hole 23, and the second connector 102 is parallel to the side of the first accommodating hole 23 Face vertically offers the second accommodating hole 24, and the first accommodating hole 23 is orthogonal with the second accommodating hole 24 and crosses, the first accommodating hole 23 bar portion 912 for housing third fastener 9, the second accommodating hole 24 are used to house the fixing sleeve 92 in third fastener 9.
Fixing step using third fastener 9 is:
In conjunction with shown in Figure 18, first fixed link 91 is horizontally arranged, rotation fixed link 91 keeps the trapezoid cross section of clamping portion 911 flat The clamping portion 911 of fixed link 91 is inserted by row in the extending direction of the special-shaped slot 5 on the first connector 101 from special-shaped notch 51 In special-shaped slot 5, rotating fixed link 91 later makes the trapezoid cross section of clamping portion 911 perpendicular to the extending direction of special-shaped slot 5, blocks at this time Socket part 911 is connected in special-shaped slot 5;Then, tight fixed bolt 93 is screwed in the threaded hole 922 of fixing sleeve 92, then by fixing sleeve 92 are placed in the second accommodating hole 24, and rotation fixing sleeve 92 makes jack 921 towards fixed link 91, later leans on the second connector 102 Nearly first connector 101, make the fixed link being connected in special-shaped slot 5 91 be inserted into the first storage tank 23 in, with fixed link 91 by It is gradually inserted into the first storage tank 23, the clamping bar 9122 of fixed link 91 is first inserted into the jack 921 of fixing sleeve 92, is fixed later The locating rod 9121 of bar 91 is abutted with jack 921, and the positioning deep gouge 913 in locating rod 9121 is aligned with holding screw 93 at this time, Screwing holding screw 93 makes holding screw 93 be inserted into positioning deep gouge 913, to fix the first connector 101 and the second connector 102。
This specific embodiment is only the explanation to the utility model, is not limitations of the present invention, ability Field technique personnel can as needed make the present embodiment the modification of not creative contribution after reading this specification, but As long as all being protected by Patent Law in the right of the utility model.

Claims (10)

1. a kind of suspention functional column, includes two or more fixed beams(2)With multiple function boxes(3), fixed beam(2)It sets vertically It sets, function box(3)It is fixed in fixed beam(2)On, function box(3)For hollow tubular, and function box(3)Between up and down splicing, two Root fixed beam(2)Between be provided with support element(4), support element(4)With two fixed beams(2)It is fixedly connected, which is characterized in that work( It can box(3)Including foreboard(31), back plate(32)With two blocks of side plates(33), foreboard(31), back plate(32)With two blocks of side plates(33)Group Close the tubulose formed continuously or discontinuously, foreboard(31)With two blocks of side plates(33)Splicing is fixed, two blocks of side plates(33)It fixes respectively In two different fixed beams(2)On, back plate(32)It is fixed on support element(4)On.
2. a kind of suspention functional column according to claim 1, which is characterized in that fixed beam(2)With side plate(33)Pass through One fastener(7)It is fixed;First fastener(7)Including abnormity nut(71)And bolt(72), abnormity nut(71)Including fixation Portion(711), fixed part(711)For the trapezoidal trapezoid block in section, fixed part(711)Trapezium base centre position offer spiral shell Keyhole(713), bolt(72)With bolt hole(713)It is threadedly coupled;Fixed beam(2)By proximal panel(33)One side on open vertically Equipped with special-shaped slot(5), special-shaped slot(5)For dovetail groove, special-shaped slot(5)Trapezoidal bottom edge towards outside, special-shaped slot(5)Trapezoidal bottom The centerline on side offers special-shaped notch(51), special-shaped notch(51)Width be more than fixed part(711)On trapezoid cross section Thickness, and special-shaped notch(51)Width be less than fixed part(711)Trapezoidal bottom surface length;Fixed beam(2)With side plate (33)When positioned at stationary state, abnormity nut(71)Positioned at special-shaped slot(5)Interior and fixed part(711)Trapezoid cross section perpendicular to different Shape slot(5), bolt(72)Across side plate(33)With special-shaped notch(51)With abnormity nut(71)Bolt hole(713)Screw thread connects It connects.
3. a kind of suspention functional column according to claim 2, which is characterized in that fixed part(711)Trapezium base in Between position be convexly equipped with extension(712), extension(712)Profile without departing from fixed part(711)Trapezium base profile, bolt Hole(713)Extend to extension(712)On.
4. a kind of suspention functional column according to claim 2, which is characterized in that function box(3)For square tube type, side plate(33) And foreboard(31)Section be in groove profile, side plate(33)Notch it is relative to each other, foreboard(31)Notch towards back plate(32);Side plate (33)Including the first plate in slot bottom(331)With two piece of second plate in slot side(332), far from fixed beam(2) Two plates(332)Lateral surface be protruding with the foreboard lapping plate being vertically arranged(334), foreboard lapping plate(334)With foreboard(31)'s Side abuts and is fixed by plain bolt.
5. a kind of suspention functional column according to claim 4, which is characterized in that foreboard lapping plate(334)With the second plate (332)Between dog-ear at be provided with gusset(35), foreboard lapping plate(334)With the second plate(332)On be connected with it is several mutually The first parallel clamping item(337), the first clamping item(337)It is directed toward gusset(35), gusset(35)Inner surface on be connected with It is multiple to be clamped item with first(337)The second parallel clamping item(351), the second clamping item(351)Positioned at the first clamping item(337) Between and with first clamping item(337)Clamping.
6. a kind of suspention functional column according to claim 5, which is characterized in that the first clamping item(337)Free end court To the second clamping item(351)Side be protruding with the first lug boss(3371), the second clamping item(351)Free end towards first It is clamped item(337)Side be protruding with the second lug boss(3511), the first clamping item(337)With the second clamping item(351)Pacifying It is fitted closely mutually when dress.
7. a kind of suspention functional column according to claim 6, which is characterized in that the first clamping item(337)Free end end Portion is to far from the second clamping item(351)Direction be bent to form the first elbow(3372), the second clamping item(351)Free end end Portion is to far from the first clamping item(337)Direction be bent to form the second elbow(3512).
8. a kind of suspention functional column according to claim 2, which is characterized in that back plate(32)On be connected with and several set vertically The partition board set(36), partition board(36)By function box(3)It is divided into multiple functional chambers.
9. a kind of suspention functional column according to claim 2, which is characterized in that support element(4)It is several horizontally disposed Plate, support element(4)Pass through the second fastener(8)With fixed beam(2)It is affixed;Second fastener(8)Including the first fastener(7) And positioning sleeve(81), positioning sleeve(81)On offer through-hole(811), bolt(72)Across through-hole(811), and positioning sleeve(81)Position In abnormity nut(71)And bolt(72)Bolt head between, through-hole(811)Diameter be less than bolt(72)Bolt head it is straight Diameter;Fixed beam(2)Close to support element(4)One side on offer several special-shaped slots being vertically arranged(5), support element(4)'s Upper and lower surface is provided with multiple deep gouges(6), deep gouge(6)With fixed beam(2)On special-shaped slot(5)It is corresponding, deep gouge(6)Packet The bolt containing receiving(72)Straight trough(61)With with positioning sleeve(81)The compatible locating slot of shape(62), straight trough(61)Across positioning Slot(62), and straight trough(61)Width be less than locating slot(62)Width;Fixed beam(2)With support element(4)In stationary state When, abnormity nut(71)Positioned at special-shaped slot(5)Interior and fixed part(711)Trapezoid cross section perpendicular to special-shaped slot(5), positioning sleeve (81)Positioned at locating slot(62)It is interior, bolt(72)Across through-hole(811)With abnormity nut(71)It is threadedly coupled.
10. a kind of suspention functional column according to claim 9, which is characterized in that positioning sleeve(81)On be connected with baffle (812), baffle(812)With through-hole(811)It is parallel;Work as securing supports(4)And fixed beam(2)When fixed, baffle(812)Direction Fixed beam(2)Extend and along special-shaped notch(51)It is inserted into special-shaped slot(5)It is interior, baffle(812)With abnormity nut(71)Trapezoidal side Face abuts;Work as positioning sleeve(81)With bolt(72)Bolt head abut when, along bolt(72)On axis direction, bolt(72)Tail Portion is to baffle(812)Distance be more than abnormity nut(71)Thickness.
CN201820023378.7U 2018-01-06 2018-01-06 A kind of suspention functional column Active CN207921494U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820023378.7U CN207921494U (en) 2018-01-06 2018-01-06 A kind of suspention functional column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820023378.7U CN207921494U (en) 2018-01-06 2018-01-06 A kind of suspention functional column

Publications (1)

Publication Number Publication Date
CN207921494U true CN207921494U (en) 2018-09-28

Family

ID=63617194

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820023378.7U Active CN207921494U (en) 2018-01-06 2018-01-06 A kind of suspention functional column

Country Status (1)

Country Link
CN (1) CN207921494U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108019565A (en) * 2018-01-06 2018-05-11 北京成威博瑞实验室设备有限公司 One kind suspention functional column

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108019565A (en) * 2018-01-06 2018-05-11 北京成威博瑞实验室设备有限公司 One kind suspention functional column
CN108019565B (en) * 2018-01-06 2023-10-20 北京成威博瑞实验室设备有限公司 Suspension function post

Similar Documents

Publication Publication Date Title
CN108019565A (en) One kind suspention functional column
CN207921494U (en) A kind of suspention functional column
CN101403468A (en) Supporting bracket and nut holder
CN207277817U (en) Falsework rack connecting structure
CN207919988U (en) A kind of suspention function davit
CN207926096U (en) A kind of novel suspention function davit
CN207919987U (en) Suspend function davit in midair
CN207917082U (en) A kind of folding mast for glass reinforced plastic boat
CN108023313A (en) A kind of new suspention function davit
CN108005353A (en) One kind suspention function davit and fixing means
CN209062975U (en) Instrument dismantling device
CN108199310A (en) Suspend function davit and fixing means in midair
CN206829022U (en) A kind of driveway railing with night prompting function
CN206455613U (en) The attaching/detaching apparatus of stud
CN103590554A (en) Angle-adjustable guardrail pipe connecting piece
CN201702519U (en) Solder joint protection device
CN206029690U (en) A device for installing preceding support rolls
CN204986718U (en) No frame section of thick bamboo shot -light
CN209486094U (en) A kind of connecting piece base for automatic welder metallographic test
CN214305557U (en) Auxiliary device for mounting stand column
CN206436152U (en) A kind of adjacent tubes butting joint fixture
CN209084694U (en) A kind of warning lamp bracket
CN110315497A (en) Adjustable Simple rack, shelf method of adjustment, crosspiece method of adjustment
CN216921508U (en) Support steel pipe
CN109537919A (en) A kind of quick erection method being segmented tongue and groove fence

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210423

Address after: 101149 100m south of Xiji Town Xiji Village Committee, Tongzhou District, Beijing

Patentee after: BEIJING CHENGWEI BORUI LAB-EQUIPMENT Co.,Ltd.

Patentee after: Liaoning Chengwei laboratory equipment Co., Ltd

Address before: 101108, Beijing, Tongzhou District, west market town, 100 meters south of the village committee

Patentee before: BEIJING CHENGWEI BORUI LAB-EQUIPMENT Co.,Ltd.

Patentee before: LANGFANG JUCHENG LABORATORY ENGINEERING TECHNOLOGY Co.,Ltd.

TR01 Transfer of patent right