CN207918776U - Skid-mounted Automatic Control methane purification equipment - Google Patents

Skid-mounted Automatic Control methane purification equipment Download PDF

Info

Publication number
CN207918776U
CN207918776U CN201820230394.3U CN201820230394U CN207918776U CN 207918776 U CN207918776 U CN 207918776U CN 201820230394 U CN201820230394 U CN 201820230394U CN 207918776 U CN207918776 U CN 207918776U
Authority
CN
China
Prior art keywords
level
membrane tube
purifying
skid
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820230394.3U
Other languages
Chinese (zh)
Inventor
冯远哲
魏永
周思宇
耿琰
梁文豹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
River Beijing Annex Environmental Technology Co Ltd
Original Assignee
River Beijing Annex Environmental Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by River Beijing Annex Environmental Technology Co Ltd filed Critical River Beijing Annex Environmental Technology Co Ltd
Priority to CN201820230394.3U priority Critical patent/CN207918776U/en
Application granted granted Critical
Publication of CN207918776U publication Critical patent/CN207918776U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Separation Using Semi-Permeable Membranes (AREA)

Abstract

The utility model belongs to methane purification technical field, propose skid-mounted Automatic Control methane purification equipment, including skid main body, biogas film equipment for purifying is provided in skid main body, explosion proof control case, it is provided with anti-explosion partition between biogas film equipment for purifying and explosion proof control case, it is provided with methane concentration detector above biogas film equipment for purifying, emergency decompression valve, biogas film equipment for purifying, methane concentration detector, emergency decompression valve is connect with explosion proof control case, biogas film equipment for purifying includes sequentially connected marsh gas raw materials tank, coarse filtration removes water module, compression condensation module, buffer heating module, membrane module, the utility model solves the problems, such as film equipment for purifying, and the cable laying Connection Time is longer at the scene and film equipment for purifying calls inconvenience between disparity items.

Description

Skid-mounted Automatic Control methane purification equipment
Technical field
The utility model belongs to methane purification technical field, is related to skid-mounted Automatic Control methane purification equipment.
Background technology
Country advocates animal excretion and agricultural wastes recycling energetically now, methane purification prepare natural gas as One way in which is widely used, and embrane method equipment for purifying is the core equipment that methane purification prepares natural gas.Biogas film carries Pure equipment is that biogas film purification industry is used for detaching CH in biogas4And CO2Equipment, the product gas CH after film equipment for purifying4 Content usually up to 95% or more, can meet the requirement of city gas and gas station combustion gas standard.And biogas film traditional at present Equipment for purifying is installed separately mechanical equipment and switch board, needs to be laid with that the cable connection time is longer and film equipment for purifying at the scene It is inconvenient to be called between disparity items.
Utility model content
The utility model proposes skid-mounted Automatic Control methane purification equipment, solve film equipment for purifying cable at the scene The laying Connection Time is longer and film equipment for purifying calls inconvenient problem between disparity items.
What the technical solution of the utility model was realized in:
Skid-mounted Automatic Control methane purification equipment, including:
Skid main body is provided with biogas film equipment for purifying, explosion proof control case, the biogas film purification in the skid main body It is provided with anti-explosion partition between equipment and the explosion proof control case, methane concentration spy is provided with above the biogas film equipment for purifying Survey device, emergency decompression valve, the biogas film equipment for purifying, the methane concentration detector, the emergency decompression valve with it is described Explosion proof control case connects,
The biogas film equipment for purifying include sequentially connected marsh gas raw materials tank, coarse filtration water removal module, compression condensation module, Heating module, membrane module are buffered, the membrane module includes level-one membrane tube, two level membrane tube, three-level membrane tube, the level-one membrane tube, institute State two level membrane tube, the three-level membrane tube include tube body and be arranged on the tube body feed inlet, ooze vent outlet, ooze residual air Outlet,
It connects with the level-one membrane tube after the two level membrane tube, the three-level membrane tube parallel connection, the charging of the level-one membrane tube Mouth is connect with the buffering heating module, and the vent outlet that oozes of the level-one membrane tube is connect with the feed inlet of the three-level membrane tube, The level-one membrane tube ooze residual air outlet connect with the feed inlet of the two level membrane tube, the two level membrane tube ooze vent outlet, The three-level membrane tube ooze residual air outlet connect with the inlet end of the first compressor, the two level membrane tube ooze residual air export, The vent outlet that oozes of the three-level membrane tube is connect with methane storage tank, carbon dioxide holding tank respectively.
Further, coarse filtration water removal module include with the sequentially connected coarse filter of the marsh gas raw materials tank, charcoal canister, Demister, the demister are connect with the compression condensation module.
Further, the compression condensation module includes and sequentially connected first compressor of the demister, condenser, institute Condenser is stated to connect with the buffering heating module.
Further, the buffering heating module includes and the sequentially connected surge tank of the condenser, fine cleaner, heating Device, the heater are connect with the feed inlet of the level-one membrane tube.
Further, oozing for the three-level membrane tube is connected with the second compression between vent outlet and the carbon dioxide holding tank Machine.
Further, overhauls window is provided in the skid main body, the skid body top is provided with lifting lug.
It the utility model use principle and has the beneficial effect that:
1, biogas film equipment for purifying, explosion proof control case are integrally disposed in skid body interior in the utility model, and It is provided with anti-explosion partition between them, is additionally provided with methane concentration detector above biogas film equipment for purifying, is detecting first When alkane concentration abnormality, switch board controls emergency decompression valve and opens, and can effectively prevent the generation of accident.It is carried in biogas film Cable need not be laid between pure equipment, explosion proof control case, time saving and energy saving, the Connection Time is short, and equipment needs between disparity items It can be directly invoked when calling, convenient and simple, it is inconvenient to solve the problems, such as to call.
Marsh gas raw materials first pass through coarse filtration, desulfurization, dehydration in the utility model, are compressed by the first compressor, Enter membrane module after condensation, fine filtering, heating, membrane module includes three-level film purification pipe, and marsh gas raw materials initially enter level-one film Pipe, the seepage velocity of carbon dioxide is fast, is delivered in three-level membrane tube by the vent outlet that oozes of level-one membrane tube as fast gas, then pass through The purification of three-level membrane tube is crossed, ooze vent outlet of the carbon dioxide through three-level membrane tube of high concentration is expelled to carbon dioxide holding tank. The seepage velocity of methane is slow, is connect with the feed inlet of two level membrane tube by the residual air outlet of oozing of level-one membrane tube as slow gas, then pass through After crossing further purification, the methane of high concentration is delivered to methane storage tank by the residual air outlet of oozing through two level membrane tube.This practicality Equipment in novel can not only purify out the methane of high concentration, but also can store the carbon dioxide of high concentration and carry out profit again With the maximization of the utilization of resources may be implemented.
2, coarse filter can carry out gas with the large particulate matter in filter stock, charcoal canister in the utility model Desulfurization process, demister can remove the moisture in gas, in favor of the progress of purified reaction, and can protect equipment, prevent Sealing and sulphur damage equipment for purifying.
3, the first compressor can compress gas in the utility model, and condensation is sent into after gas pressure raising Device, then via surge tank after making pressure stability, then is heated via heater, enters membrane module later, proceed by film and carry Pure technique.
4, the second compressor can compress the carbon dioxide after purification in the utility model, and carbon dioxide can become High pressure and be liquid, convenient for storage.
5, overhauls window is provided in the utility model in skid main body, personnel convenient to overhaul overhaul and tie up to equipment Shield, skid body top are provided with lifting lug, facilitate the calling of skid main body, enhance the practicability and flexibility of this equipment.
Description of the drawings
Utility model will be further described in detail below with reference to the attached drawings and specific embodiments.
Fig. 1 is the flow chart of the utility model film equipment for purifying;
Fig. 2 is membrane module flow chart in the utility model;
Fig. 3 is the utility model skid-mounted Automatic Control methane purification device structure schematic diagram;
Fig. 4 is the utility model membrane tube structural schematic diagram;
In figure:1- skid main bodys, 2- biogas film equipment for purifying, 21- marsh gas raw materials tanks, 22- coarse filtration remove water module, 23- pressures Contracting condensation module, 24- buffer heating module, 25- membrane modules, 251- level-one membrane tubes, 2511- tube bodies, 2512- feed inlets, 2513- Vent outlet is oozed, 2514- oozes residual air and exports, 252- two level membrane tubes, 253- three-level membrane tubes, 3- explosion proof control cases, 4- anti-explosion partitions, 5- methane concentration detectors, 6- emergency decompression valves, the first compressors of 7-, 8- methane storage tanks, 9- carbon dioxide holding tanks, 10- Coarse filter, 11- charcoal canisters, 12- demisters, 13- condensers, 14- surge tanks, 15- fine cleaners, 16- heaters, 17- second Compressor, 18- lifting lugs.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without creative efforts The every other embodiment obtained, shall fall within the protection scope of the present invention.
As shown in Figure 1 to 4, the utility model proposes skid-mounted Automatic Control methane purification equipment, including:
Skid main body 1 is provided with biogas film equipment for purifying 2, explosion proof control case 3, biogas film equipment for purifying in skid main body 1 It is provided with anti-explosion partition 4 between 2 and explosion proof control case 3,2 top of biogas film equipment for purifying is provided with methane concentration detector 5, tight Anxious relief valve 6, biogas film equipment for purifying 2, methane concentration detector 5, emergency decompression valve 6 are connect with explosion proof control case 3,
Biogas film equipment for purifying 2 includes sequentially connected marsh gas raw materials tank 21, coarse filtration water removal module 22, compression condensation module 23, buffer heating module 24, membrane module 25, membrane module 25 include level-one membrane tube 251, two level membrane tube 252, three-level membrane tube 253, one Grade membrane tube 251, two level membrane tube 252, three-level membrane tube 253 are including tube body 2511 and the feed inlet being arranged on tube body 2511 2512, it oozes vent outlet 2513, ooze residual air outlet 2514,
It connects with level-one membrane tube 251 after two level membrane tube 252,253 parallel connection of three-level membrane tube, the feed inlet of level-one membrane tube 251 2512 connect with buffering heating module 24, the feed inlet 2512 for oozing vent outlet 2513 and three-level membrane tube 253 of level-one membrane tube 251 The residual air outlet 2514 of oozing of connection, level-one membrane tube 251 is connect with the feed inlet 2512 of two level membrane tube 252, and two level membrane tube 252 is oozed The residual air outlet 2514 of oozing of vent outlet 2513, three-level membrane tube 253 is connect with the inlet end of the first compressor 7, two level membrane tube 252 ooze residual air outlet 2514, three-level membrane tube 253 ooze vent outlet 2513 respectively with methane storage tank 8, carbon dioxide store Tank 9 connects.
Biogas film equipment for purifying 2, explosion proof control case 3 are integrally disposed in inside skid main body 1 in the utility model, and Anti-explosion partition 4 is provided between them, the top of biogas film equipment for purifying 2 is additionally provided with methane concentration detector 5, is detecting When methane concentration exception, explosion proof control case 3 controls emergency decompression valve 6 and opens, and can effectively prevent the generation of accident. Cable need not be laid between biogas film equipment for purifying 2, explosion proof control case 3, time saving and energy saving, the Connection Time is short, and equipment is not With needing the when of calling that can directly invoke between project, convenient and simple, it is inconvenient to solve the problems, such as to call.
Marsh gas raw materials first pass through coarse filtration, desulfurization, dehydration in the utility model, are compressed by the first compressor 7, Enter membrane module 25 after condensation, fine filtering, heating, membrane module 25 includes three-level film purification pipe, and marsh gas raw materials initially enter one Grade membrane tube 251, the seepage velocity of carbon dioxide is fast, is delivered to by the vent outlet 2513 that oozes of level-one membrane tube 251 as fast gas In three-level membrane tube 253, using the purification of three-level membrane tube 253, infiltration gas of the carbon dioxide through three-level membrane tube 253 of high concentration goes out Mouth 2513 is expelled to carbon dioxide holding tank 9.The seepage velocity of methane is slow, oozes residual air by level-one membrane tube 251 as slow gas Outlet 2514 is connect with the feed inlet 2512 of two level membrane tube 252, after further purification, through oozing for two level membrane tube 252 The methane of high concentration is delivered to methane storage tank 8 by residual air outlet 2514.Equipment in the utility model can not only purify out The methane of high concentration, and the carbon dioxide storage of high concentration can be recycled, the maximum of the utilization of resources may be implemented Change.
Further, coarse filtration water removal module 22 include with 21 sequentially connected coarse filter 10 of marsh gas raw materials tank, charcoal canister 11, Demister 12, demister 12 are connect with compression condensation module 23.
In the utility model coarse filter 10 can with the large particulate matter in filter stock, charcoal canister 11 can to gas into Row desulfurization process, demister 12 can remove the moisture in gas, in favor of the progress of purified reaction, and can protect and set It is standby, prevent water and sulphur from being damaged to equipment for purifying.
Further, compression condensation module 23 include with 12 sequentially connected first compressor 7 of demister, condenser 13, it is cold Condenser 13 is connect with buffering heating module 24.
Further, buffering heating module 24 includes and 13 sequentially connected surge tank 14 of condenser, fine cleaner 15, heater 16, heater 16 is connect with the feed inlet 2512 of level-one membrane tube 251.
The first compressor 7 can compress gas in the utility model, and condenser is sent into after gas pressure raising 13, then via surge tank 14, after making pressure stability, then heated via heater 16, enter membrane module 25 later, start into Row film purifying technique.
Further, oozing for three-level membrane tube 253 is connected with the second compression between vent outlet 2513 and carbon dioxide holding tank 9 Machine 17.
The second compressor 17 can compress the carbon dioxide after purification in the utility model, and carbon dioxide can become High pressure and be liquid, convenient for storage.
Further, overhauls window is provided in skid main body 1,1 top of skid main body is provided with lifting lug 18.
Overhauls window is provided in the utility model in skid main body 1, personnel convenient to overhaul overhaul and tie up to equipment Shield, 1 top of skid main body are provided with lifting lug 18, facilitate the calling of skid main body, enhance the practicability and flexibility of this equipment.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this Within the spirit and principle of utility model, any modification, equivalent replacement, improvement and so on should be included in the utility model Protection domain within.

Claims (6)

1. skid-mounted Automatic Control methane purification equipment, which is characterized in that including skid main body (1), the skid main body (1) Inside it is provided with biogas film equipment for purifying (2), explosion proof control case (3), the biogas film equipment for purifying (2) and the explosion proof control case (3) it is provided with anti-explosion partition (4) between, methane concentration detector (5), tight is provided with above the biogas film equipment for purifying (2) Anxious relief valve (6), the biogas film equipment for purifying (2), the methane concentration detector (5), the emergency decompression valve (6) with Explosion proof control case (3) connection,
The biogas film equipment for purifying (2) include sequentially connected marsh gas raw materials tank (21), coarse filtration water removal module (22), compression it is cold Solidifying module (23), buffering heating module (24), membrane module (25), the membrane module (25) includes level-one membrane tube (251), secondary membrane (252), three-level membrane tube (253) are managed, the level-one membrane tube (251), the two level membrane tube (252), the three-level membrane tube (253) are equal Including tube body (2511) with feed inlet (2512) on the tube body (2511) is set, oozes vent outlet (2513), ooze residual air It exports (2514),
It connects with the level-one membrane tube (251) after the two level membrane tube (252), the three-level membrane tube (253) are in parallel, the level-one The feed inlet (2512) of membrane tube (251) is connect with the buffering heating module (24), and the infiltration gas of the level-one membrane tube (251) goes out Mouth (2513) is connect with the feed inlet (2512) of the three-level membrane tube (253), and the level-one membrane tube (251) oozes residual air outlet (2514) it is connect with the feed inlet (2512) of the two level membrane tube (252), the two level membrane tube (252) oozes vent outlet (2513), the residual air outlet (2514) of oozing of the three-level membrane tube (253) is connect with the inlet end of the first compressor (7), described Two level membrane tube (252) ooze residual air outlet (2514), the three-level membrane tube (253) ooze vent outlet (2513) respectively with methane Storage tank (8), carbon dioxide holding tank (9) connection.
2. skid-mounted Automatic Control methane purification equipment according to claim 1, which is characterized in that the coarse filtration water removal Module (22) include with the sequentially connected coarse filter of the marsh gas raw materials tank (21) (10), charcoal canister (11), demister (12), The demister (12) connect with the compression condensation module (23).
3. skid-mounted Automatic Control methane purification equipment according to claim 2, which is characterized in that the compression condensation Module (23) includes and sequentially connected first compressor (7) of the demister (12), condenser (13), the condenser (13) it is connect with the buffering heating module (24).
4. skid-mounted Automatic Control methane purification equipment according to claim 3, which is characterized in that the buffering heating Module (24) include with the condenser (13) sequentially connected surge tank (14), fine cleaner (15), heater (16), it is described plus Hot device (16) connect with the feed inlet (2512) of the level-one membrane tube (251).
5. skid-mounted Automatic Control methane purification equipment according to claim 4, which is characterized in that the three-level membrane tube (253) ooze is connected with the second compressor (17) between vent outlet (2513) and the carbon dioxide holding tank (9).
6. skid-mounted Automatic Control methane purification equipment according to claim 1, which is characterized in that the skid main body (1) it is provided with overhauls window on, lifting lug (18) is provided at the top of the skid main body (1).
CN201820230394.3U 2018-02-08 2018-02-08 Skid-mounted Automatic Control methane purification equipment Expired - Fee Related CN207918776U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820230394.3U CN207918776U (en) 2018-02-08 2018-02-08 Skid-mounted Automatic Control methane purification equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820230394.3U CN207918776U (en) 2018-02-08 2018-02-08 Skid-mounted Automatic Control methane purification equipment

Publications (1)

Publication Number Publication Date
CN207918776U true CN207918776U (en) 2018-09-28

Family

ID=63603957

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820230394.3U Expired - Fee Related CN207918776U (en) 2018-02-08 2018-02-08 Skid-mounted Automatic Control methane purification equipment

Country Status (1)

Country Link
CN (1) CN207918776U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109593582A (en) * 2018-12-03 2019-04-09 中国船舶重工集团公司第七〇九研究所 Biogas film purifies integrating device and its methane purification method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109593582A (en) * 2018-12-03 2019-04-09 中国船舶重工集团公司第七〇九研究所 Biogas film purifies integrating device and its methane purification method

Similar Documents

Publication Publication Date Title
CN104745260B (en) A kind of methane producing quality gas and the method and its equipment stored
CN204897856U (en) Membrane separation marsh gas purification system
CN207918776U (en) Skid-mounted Automatic Control methane purification equipment
CN207632753U (en) A kind of biogas polishing purification compressed filling all-in-one machine
CN105065908B (en) A kind of sulfur-containing gas gas collection integrated device
CN106753627A (en) A kind of rubbish landfill gas cleaning treatment system
CN204848791U (en) A two -stage separation membrane system for marsh gas is handled
CN204848790U (en) Marsh gas purifies purification device
CN103496667A (en) Treating process for recycling methanol synthesis purge gas and using part of same to prepare hydrogen products
CN217323380U (en) System for utilize nitrogen trifluoride byproduct to retrieve high-purity hydrogen energy
CN206121466U (en) Multistage membrane separation natural pond gas purification device
CN204981794U (en) Dry dewatering device of marsh gas
CN213977579U (en) Landfill gas purification system
CN208414349U (en) A kind of device purifying production liquefied natural gas using UF membrane
CN210560298U (en) Combined coal bed gas purification system
CN207602693U (en) A kind of Hydrogen Storage System in Fuel Cell Automobiles
CN205740934U (en) A kind of methane purification is to the device systems of natural gas used for automobile
CN201801494U (en) Gas and sewage recovery device with outlet of water-ring vacuum pump
CN109160288A (en) A kind of the closed loop air-transport system and method for metal hydride
CN208348941U (en) Extinguishing chemical reclaimer based on purification device
CN210481314U (en) Landfill gas purification natural gas process device based on membrane method
CN206121443U (en) Reduce device of polyethylene from high pressure process material consumption
CN206514614U (en) A kind of air separation plant goes out tower nitrogen gas recovering apparatus
CN220774435U (en) Hydrogen recovery device of hydrogen fuel cell
CN207498327U (en) A kind of equipment for being pressurized film purifying biogas and preparing natural gas

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180928