CN207918374U - Piping lane interlayer pipelining provision for disengagement - Google Patents
Piping lane interlayer pipelining provision for disengagement Download PDFInfo
- Publication number
- CN207918374U CN207918374U CN201820112272.4U CN201820112272U CN207918374U CN 207918374 U CN207918374 U CN 207918374U CN 201820112272 U CN201820112272 U CN 201820112272U CN 207918374 U CN207918374 U CN 207918374U
- Authority
- CN
- China
- Prior art keywords
- telescopic arm
- interlayer
- piping lane
- pipelining
- holder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model is related to piping lane interlayer pipelining provisions for disengagement, it is pressed from both sides including holder, telescopic arm and slow lowering pipe, it is provided with saddle weight below the holder, the telescopic arm is provided with above the holder, one end of the telescopic arm is provided with counterweight balancing device, the other end of the telescopic arm is provided with the slow lowering pipe folder, the holder is electric hydaulic adjustable trestle, the telescopic arm is electric hydaulic adjustable telescopic arm, the counterweight balancing device is sensor-type counterweight balancing device, and the slow lowering pipe folder is that adjustable slow lowering pipe presss from both sides.Work efficiency is high for the piping lane interlayer pipelining provision for disengagement of the utility model, easy to operate, and working security is high.
Description
Technical field
The utility model is related to chemical plant installations maintenance renovation technique fields, and in particular to piping lane interlayer pipelining dismounting dress
It sets.
Background technology
In the maintenance transformation of chemical plant installations, the case where being frequently encountered increase or reduce piping lane pipeline.With piping lane
The interlayer pipeline of the general mode for taking multi-tier arrangement, piping lane increases and replaces, and is always the problem in process pipe installation.
When carrying out piping lane interlayer pipeline construction, due to the arm of crane and the height limitation of suspension hook, the lifting of interlayer pipeline can not be carried out,
And trestle is due to narrow space, can not erect-position crane, the lifting of pipeline can not be also carried out with crane.At present for piping lane interlayer pipe
The construction method of line is:Built construction is set up by piping lane, and suspension centre is set up in erection, chain block is arranged on suspension centre, uses hand
It draws cucurbit that pipeline section or pipe fitting are hung the tube layer position to place, then is set up pipeline section or pipe fitting chain block by setting up interlayer
Coordinate with jack, pipeline is in place, and this construction method will not only set up a large amount of construction and set up, but also expend a large amount of
Human resources.In addition to this, this working method requires the cooperation degree of worker very high, careless slightly to will result in
To colliding with pipeline, formation construction safety hidden danger is serious also to cause safety accident.
Utility model content
For the piping lane interlayer pipelining provision for disengagement construction trouble for solving traditional, working efficiency is low and construction hidden danger is big
Deficiency, the utility model provides piping lane interlayer pipelining provision for disengagement.
In order to solve the above technical problems, the utility model provides the following technical solution:
Piping lane interlayer pipelining provision for disengagement, including holder, telescopic arm and slow lowering pipe press from both sides, and are set below the holder
It is equipped with saddle weight, the telescopic arm is provided with above the holder, one end of the telescopic arm is provided with counterweight balancing device,
The other end of the telescopic arm is provided with the slow lowering pipe folder, and the holder is electric hydaulic adjustable trestle, the telescopic arm
For electric hydaulic adjustable telescopic arm, the counterweight balancing device is sensor-type counterweight balancing device, and the slow lowering pipe folder is can
Mode slow lowering pipe presss from both sides.
Further, the junction of the holder and the telescopic arm is provided with rolling bearing, and telescopic arm can be turned
It is dynamic, facilitate construction, reduce difficulty of construction, improves working efficiency.
Further, the counterweight balancing device is connect with the telescopic arm by pulley, flat by pulley mobile counterweight
Weigh device, can rapidly balance whole device, reduces security risk, safe.
Further, it is provided with supporting rack between the holder and the saddle weight, increases the stability of whole device, dropped
The security risk of low construction.
Further, the saddle weight is iron block, and material is hard, and stability is good.
Compared with prior art, the utility model has the beneficial effects that:The piping lane interlayer pipelining of the utility model is torn open
Handler is without the use of big machinery, need not set up the erection outside piping lane, need not expend a large amount of manpower and materials, overall process
It only needs two workers to carry out the operation of power button, the pipeline installed or dismantled is needed to pass through holder, telescopic arm and slow
The action of drop pipe clamp is moved, and is reduced the labor intensity of worker to the maximum extent, has been saved construction cost, improves construction
Working efficiency, ensured construction safety.Except before this, being existed using the piping lane interlayer pipelining provision for disengagement of the utility model
Piping lane interlayer carry out pipeline installation when, pipeline position can be finely adjusted when pipeline is in place, can effective guarantee pipeline installation
Precision improves the quality of construction.
Description of the drawings
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment
Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only
It is the embodiments of the present invention, for those of ordinary skill in the art, without creative efforts, also
Other attached drawings can be obtained with reference to the accompanying drawings.
Fig. 1 is the structural schematic diagram of the utility model piping lane interlayer pipelining provision for disengagement.
In figure:1, holder;2, telescopic arm;3, slow lowering pipe presss from both sides;4, saddle weight;5, counterweight balancing device;6, rolling bearing;7、
Pulley;8, supporting rack.
Specific implementation mode
Below by the technical scheme in the utility model embodiment is clearly and completely described, it is clear that described
Embodiment is only a part of the embodiment of the utility model, instead of all the embodiments.Based on the implementation in the utility model
Example, all other embodiment obtained by those of ordinary skill in the art without making creative efforts belong to
The range of the utility model protection.
The utility model embodiment includes:
As shown in Fig. 1, piping lane interlayer pipelining provision for disengagement, including holder 1, telescopic arm 2 and slow lowering pipe folder 3,
The lower section of the holder 1 is provided with saddle weight 4, and the top of the holder 1 is provided with the telescopic arm 2, and the one of the telescopic arm 2
End is provided with counterweight balancing device 5, and the other end of the telescopic arm 2 is provided with the slow lowering pipe folder 3, and the holder 1 is electronic
Hydraulically adjustable holder, the telescopic arm 2 are electric hydaulic adjustable telescopic arm, and the counterweight balancing device 5 is sensor-type matches
Weight balancing device, the slow lowering pipe folder 3 press from both sides for adjustable slow lowering pipe.
Further, the holder 1 and the junction of the telescopic arm 2 are provided with rolling bearing 6, and telescopic arm can carry out
Rotation facilitates construction, reduces difficulty of construction, improves working efficiency.
Further, the counterweight balancing device 5 is connect with the telescopic arm 2 by pulley 7, passes through pulley mobile counterweight
Balancing device can rapidly balance whole device, reduce security risk, safe.
Further, it is provided with supporting rack 8 between the holder 1 and the saddle weight 4, increases the stabilization of whole device
Property, reduce the security risk of construction.
Further, the saddle weight 4 is iron block, and material is hard, and stability is good.
The operation principle and process for using of the utility model:When being laid and dismantling construction, need that two piping lanes are arranged
Interlayer pipelining provision for disengagement.When carrying out laying task, straightness is found for the electric hydaulic adjustable trestle of two devices,
It is allowed to parallel with the pipeline axis to be laid, by the side of the arm diverter conduit laying with pulley side, matches galassing at this time
The device that weighs is sky.Counterweight is loaded onto on the electric hydaulic adjustable telescopic arm of two devices, will be prepared in piping lane interlayer
Pipeline to be laid is risen with adjustable slow lowering pipe bucket, while starting two electric hydaulic adjustable trestles, is allowed to drive pipeline
It rises to above pipeline mounting plane, stops holder and rise simultaneously fixing bracket height.Start electric hydaulic adjustable telescopic simultaneously
Arm, while equilibrium state is detected by sensor, start pulley, translates the position of sensor-type counterweight balancing device, remain
Telescopic arm is horizontal, extends telescopic arm, is allowed to inner elongated to pipeline installation site to piping lane.The rotation of two holders is rotated respectively
Bearing finely tunes pipe string angle, is allowed to the position directly above in installation conduit saddle, falls slow lowering pipe folder successively, pipeline is slowly dropped down onto
In installation site, pipe clamp, pipeline is in place, spot welding are unclamped.When carrying out dismounting operation, the phase reaction with pipelining need to be only carried out
Work can complete dismounting operation on the contrary.
The utility model has the beneficial effects that:The piping lane interlayer pipelining provision for disengagement of the utility model, is without the use of
Big machinery need not set up the erection outside piping lane, need not expend a large amount of manpower and materials, overall process only need two workers into
The operation of row power button needs the pipeline installed or dismantled to be carried out by the action that holder, telescopic arm and slow lowering pipe press from both sides
It is mobile, the labor intensity of worker is reduced to the maximum extent, has saved construction cost, improves the working efficiency of construction, is ensured
Construction safety.Except before this, pipe is carried out in piping lane interlayer using the piping lane interlayer pipelining provision for disengagement of the utility model
Line install when, pipeline position can be finely adjusted when pipeline is in place, can effective guarantee pipeline installation accuracy, improve construction
Quality.
The above description is only the embodiments of the present invention, and it does not limit the scope of the patent of the present invention, every
Using equivalent structure or equivalent flow shift made by the utility model description, it is applied directly or indirectly in other phases
The technical field of pass, is equally included in the patent within the scope of the utility model.
Claims (5)
1. piping lane interlayer pipelining provision for disengagement, which is characterized in that pressed from both sides including holder, telescopic arm and slow lowering pipe, the branch
It is provided with saddle weight below frame, the telescopic arm is provided with above the holder, one end of the telescopic arm, which is provided with, matches
The other end of weight balancing device, the telescopic arm is provided with the slow lowering pipe folder, and the holder is electric hydaulic adjustable trestle,
The telescopic arm is electric hydaulic adjustable telescopic arm, and the counterweight balancing device is sensor-type counterweight balancing device, described slow
Pipe clamp is dropped to press from both sides for adjustable slow lowering pipe.
2. piping lane interlayer pipelining provision for disengagement according to claim 1, which is characterized in that the holder is stretched with described
The junction of contracting arm is provided with rolling bearing.
3. piping lane interlayer pipelining provision for disengagement according to claim 1, which is characterized in that the counterweight balancing device
It is connect by pulley with the telescopic arm.
4. piping lane interlayer pipelining provision for disengagement according to claim 1, which is characterized in that the holder and the pressure
Supporting rack is provided between pouring weight.
5. piping lane interlayer pipelining provision for disengagement according to claim 1, which is characterized in that the saddle weight is iron
Block.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820112272.4U CN207918374U (en) | 2018-01-23 | 2018-01-23 | Piping lane interlayer pipelining provision for disengagement |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820112272.4U CN207918374U (en) | 2018-01-23 | 2018-01-23 | Piping lane interlayer pipelining provision for disengagement |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207918374U true CN207918374U (en) | 2018-09-28 |
Family
ID=63605462
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820112272.4U Active CN207918374U (en) | 2018-01-23 | 2018-01-23 | Piping lane interlayer pipelining provision for disengagement |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207918374U (en) |
-
2018
- 2018-01-23 CN CN201820112272.4U patent/CN207918374U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206521197U (en) | A kind of adjustable balance hoisting beam | |
CN205653092U (en) | Tower crane of band plate material bracket | |
CN207757508U (en) | A kind of tubing detection fixed equipment of the realm of building construction | |
CN104210758A (en) | Pipe fitting placing frame for building | |
CN104179342A (en) | Hanging cage and construction method thereof for mounting profiled steel sheets on steel structural workshop wall surface | |
CN102381625B (en) | Large-diameter reinforcing steel bar lifting tongs | |
CN104153586B (en) | A kind of suspension cable hangs the construction method of mounting purlines | |
CN207918374U (en) | Piping lane interlayer pipelining provision for disengagement | |
CN205276887U (en) | Hot wall concrete pumping auxiliary assembly is prevented to large -scale steel form | |
CN105888529B (en) | A kind of catch pit port cat ladder | |
CN203701597U (en) | Outer wall formwork supporting and bearing device | |
CN202746764U (en) | Lifting bracket for pipeline butting adjustment | |
CN110282557A (en) | Assist mounting platform and the method with high vacant duct in bridge crane installation workshop | |
CN207581233U (en) | A kind of easy pipe fitting lifting device | |
CN203199874U (en) | Automatic lifting tool for steel plates | |
CN202767547U (en) | Nuclear plant construction safety rope fixing clamping rod | |
CN203820360U (en) | Lifting appliance for installing existing railway sound barrier plate | |
CN210890408U (en) | Tunnel wind water pipe freely removes support | |
CN204252082U (en) | Arch dam bracket plate device | |
CN210738055U (en) | Blast furnace shell installation service platform | |
CN204137550U (en) | A kind of pipe fitting rack for building | |
CN209874434U (en) | Simple and easy scaffold frame of encorbelmenting of building high latitude | |
CN206417797U (en) | Large diameter pipeline counterpart apparatus | |
CN108868098B (en) | Support frame used outside hoistway and mounting method thereof | |
CN205367531U (en) | A folded cascade hoisting accessory for building material |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |