CN207900575U CN201721686676.6U CN201721686676U CN207900575U CN 207900575 U CN207900575 U CN 207900575U CN 201721686676 U CN201721686676 U CN 201721686676U CN 207900575 U CN207900575 U CN 207900575U
Authority
CN
China
Prior art keywords
assembly
magnetic roller
working cabined
cylinder
tube head
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721686676.6U
Other languages
Chinese (zh)
Inventor
宓建峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NINGBO CHENCI ELECTRONIC TECHNOLOGY Co Ltd
Original Assignee
NINGBO CHENCI ELECTRONIC TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NINGBO CHENCI ELECTRONIC TECHNOLOGY Co Ltd filed Critical NINGBO CHENCI ELECTRONIC TECHNOLOGY Co Ltd
Priority to CN201721686676.6U priority Critical patent/CN207900575U/en
Application granted granted Critical
Publication of CN207900575U publication Critical patent/CN207900575U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Automatic Assembly (AREA)

Abstract

The utility model is related to printer technology field, more particularly to the tube head and aluminum pipe molding assembly mechanism of a kind of printer magnetic roller.Including the second working cabined, third working cabined, the molding assembly device at the top of the second working cabined and the second conveyer for transmitting the magnetic roller aluminium pipe that assembly is completed, the second conveyer is mounted on third working cabined, the molding assembly device includes the second push component of peace and molding assembly component, the second push component includes the second positioning plate of the first assembly cylinder and the output mounted on the first assembly cylinder, and the output end of the first assembly cylinder is fixedly connected through the second positioning plate and with molding assembly component.The designated position for the product transmission that the utility model can accurately be completed assembly using such transmission mode.

Description

A kind of tube head and aluminum pipe molding assembly mechanism of printer magnetic roller
Technical field
The utility model is related to printer technology field, more particularly to the tube head and aluminum pipe of a kind of printer magnetic roller are assembled into Type mechanism.
Background technology
Magnetic roller is laser printer, the important accessory of cartridge used in duplicator or facsimile machine, magnetic roller usually by magnetic roller set, Magnetic core and the close-fitting left magnetic roller being plugged in it cover the conductive contact head of one end and the plastic cement separation sleeve composition at both ends, and magnetic roller covers then It is made of the aluminum pipe with face coat, which is equipped with the end coordinated with gear in the other end opposite with conductive contact head Axis, the end axis and aluminum pipe tight fit connection.When cartridge works, under the magnetic fields of magnetic core, carbon dust is attracted to aluminum pipe painting Carbon dust is transferred on photosensitive drum surface and realizes development by layer surface, aluminum pipe.
The assembly method of magnetic roller aluminium pipe and tube head in the prior art is all by artificial assembly method by magnetic roller aluminium pipe It is assembled together with tube head, such assembly method is likely to result in the generation of assembly defective products, thus will increase and is manufactured into Sheet and the output for increasing manpower.
Utility model content
The purpose of this utility model is that in view of the deficiencies of the prior art, providing a kind of tube head and aluminum pipe of printer magnetic roller Molding assembly mechanism.
To solve the above problems, the utility model provides following technical scheme:
A kind of tube head and aluminum pipe molding assembly mechanism of printer magnetic roller, including the second working cabined, third working cabined, installation Molding assembly device at the top of the second working cabined and the second conveyer for transmitting the magnetic roller aluminium pipe that assembly is completed, it is described Second conveyer is mounted on third working cabined, and the molding assembly device includes second be mounted at the top of the second working cabined Component and the molding assembly component mounted on the second push element outputs are pushed, the second push component includes the first assembly Second positioning plate of cylinder and output mounted on the first assembly cylinder, the output end of the first assembly cylinder is through the It two positioning plates and is fixedly connected with molding assembly component.
Further, the molding assembly component includes third positioning plate, the second positioning sliding block, is mounted on the second positioning cunning Assembly locating piece at the top of block and two are symmetricly set on third guide rod of first positioning plate far from the first assembly cylinder side, The third positioning plate is fixedly connected close to the side of the first assembly cylinder with two third guide rods, second positioning sliding block It is closely set on two third guide rods, the assembly locating piece is mounted by means of bolts on the top of the second positioning sliding block The side in portion, the assembly locating piece is equipped with for the first assembly fixed first straight slot of Telescopic-cylinder bar, and first straight slot passes through The upper and lower end face with locating piece is installed, one end far from the first assembly cylinder of the assembly locating piece is equipped with molding assembly head.
Further, the second conveyer includes being mounted on third working cabined for that will assemble the magnetic roller aluminium completed The second transfer member that pipe is transmitted and the output end mounted on third working cabined end and corresponding to the second transfer member The first blanking component being arranged, the first blanking component are arranged diagonally downward along the length direction in third working cabined.
Further, second transfer member includes third stepper motor, is mounted on third stepper motor output end The first runner assembly and at the top of third working cabined and the first bearing seat of one end far from third stepper motor, institute The end for stating third stepper motor is equipped with the 4th positioning plate, and the third stepper motor is fixedly mounted on the 4th positioning plate, And the output end of third stepper motor runs through the 4th positioning plate.
Further, second transmission parts include that the first drive link and two are symmetricly set on the first drive link First rotation carrier block, one end of first drive link are fixedly connected with the main shaft of third stepper motor, and the other end fixes peace In first bearing seat, distance is less than the length of magnetic roller aluminium pipe after the completion of assembly between two first rotation carrier blocks.
Further, the first blanking component include the first support pedestal and on the first support pedestal first Feeding plate, the first support pedestal be fixedly mounted on third working cabined close to first rotation carrier block one end, described first The feed end of feeding plate is docked with the discharge end of two first rotation carrier blocks.
Further, each first rotation carrier block is cylindrical structure, and the first rotation carrier block is equipped with Several equally distributed third bearing grooves of axis around the first rotation carrier block.
Advantageous effect:The tube head and aluminum pipe molding assembly mechanism of a kind of printer magnetic roller of the utility model, pass through assembly The magnetic roller aluminium pipe being assembled together and tube head are carried out assembling work by molding machine, complete the product after assembling work by the One transmission device is sent to designated position, the specific bit for the product transmission that such transmission mode can accurately complete assembly It sets.
Description of the drawings
Fig. 1 is the dimensional structure diagram of the automatic processing device of printer magnetic roller aluminium pipe and tube head;
Fig. 2 is the vertical view of the automatic processing device of printer magnetic roller aluminium pipe and tube head;
Fig. 3 is the sectional view along line A-A in Fig. 2;
Fig. 4 is the dimensional structure diagram that magnetic roller aluminium pipe is ground feed mechanism and third working cabined;
Fig. 5 is the dimensional structure diagram of the first storage device and the first feeding device;
Fig. 6 is the sectional view of the first storage device and the first feeding device;
Fig. 7 is the dimensional structure diagram of third working cabined and the first ejection part;
Fig. 8 is the dimensional structure diagram of second conveyer;
Fig. 9 is the enlarged drawing at B in Fig. 8;
Figure 10 is the dimensional structure diagram of the second working cabined and magnetic roller aluminium pipe tube head automatic feed mechanism;
Figure 11 is the dimensional structure diagram one of third feeding device;
Figure 12 is the vertical view of third feeding device;
Figure 13 is the sectional view of line C-C in Figure 12;
Figure 14 is the dimensional structure diagram two of third feeding device;
Figure 15 is the enlarged drawing at D in Figure 14;
Figure 16 is the tube head and aluminum pipe molding assembly mechanism of magnetic roller aluminium pipe and tube head automatic assembling mechanism and printer magnetic roller Dimensional structure diagram;
Figure 17 is the tube head and aluminum pipe molding assembly mechanism of magnetic roller aluminium pipe and tube head automatic assembling mechanism and printer magnetic roller Vertical view;
Figure 18 is the sectional view of E-E lines in Figure 17;
Figure 19 is the dimensional structure diagram of the second working cabined, molding assembly device and the first pusher;
Figure 20 is that the stereochemical structure of third working cabined, molding assembly device, second conveyer and the second push component is shown It is intended to one;
Figure 21 is that the stereochemical structure of third working cabined, molding assembly device, second conveyer and the second push component is shown It is intended to two;
Reference sign:Magnetic roller aluminium pipe is ground feed mechanism 1, the first working cabined 1a, the first storage device 1b, on first Expect device 1c, the second feeding device 1d, material storing box 1e, position feeding part 1f, the first stock supporting plate 1f1, the first hinged seat 1f2, First support bar 1f3, the first barrier plate 1f4, the first conveyer belt 1g, the first supporting beam 1g1, the first limiting component 1h, first limits Position frame 1h1, the first limiting plate 1h2, the first ejection part 1i, the first cylinder 1i1, the first die pad 1i2, the second conveyer belt 1j, First upper flitch 1j1, the first blanking component 1k, third barrier plate 1k1, the first driving portion 1m, the first stepper motor 1m1, second Barrier plate 1m2, lock seat 1m3, magnetic roller aluminium pipe tube head automatic feed mechanism 2, the second working cabined 2a, third feeding device 2b, the One pusher 2c, third feeding component 2d, the first feeding track 2e, the first push component 2f, the second cylinder 2f1, first leads Rail 2f2, the second limited block 2f3, the second locating piece 2f4, the second guide rod 2f5, first pushes against block 2f6, the first sliding groove 2f7, Second limiting component 2g, third cylinder 2g1, second pushes against block 2g2, vibration feeding cylinder 2h, the first transfer member 2i, the first feeding Road 2i1, the second charge channel 2i2, third charge channel 2i3 limit positioning element 2j, the first limited block 2j1, limit assembly 2j2, the One spring 2j3, the first limited post 2j4, the first buckling groove 2j5, magnetic roller aluminium pipe and tube head automatic assembling mechanism 3, third working cabined 3a, the first bogey 3b, the first feed device 3c, the first load bearing component 3d, the first feeding part 3e, the first material folding component 3f, the first bearing seat 3g, the first material conveying platform 3h, the second mounting plate 3h1, the second guide rail 3h2, the first mounting platform 3h3, the Two stepping motor 3h4, the second carrier block 3i, the first material folding component 3j, the first pusher cylinder 3j1, the first material folding block 3j2, second Bearing groove 3j3, the 4th mounting groove 3k, third mounting groove 3m, the first locating slot 3n, the first fin 3p, the tube head of printer magnetic roller With aluminum pipe molding assembly mechanism 4, molding assembly device 4a, second conveyer 4b, the second push component 4c, first assembles cylinder 4c1, the second positioning plate 4c2, molding assembly component 4d, third positioning plate 4d1, the second positioning sliding block 4d2 assemble locating piece 4d3, Molding assembly head 4d4, the second transfer member 4e, third stepper motor 4e1, the first drive link 4e2, the first rotation carrier block 4e3, Third bearing groove 4e4, the first blanking component 4f, the first support pedestal 4f1, the first feeding plate 4f2, the first runner assembly 4g, the One bearing block 4h.
Specific implementation mode
With reference to the accompanying drawings of the specification and embodiment, specific embodiment of the utility model is described in further detail:
Referring to figs. 1 to a kind of automatic processing device of printer magnetic roller aluminium pipe and tube head shown in Figure 21, including along magnetic The machine direction of roller aluminum pipe sets gradually is ground feed mechanism 1, magnetic roller aluminium pipe tube head automatic feed mechanism 2, magnetic for magnetic roller aluminium pipe The tube head and aluminum pipe molding assembly mechanism 4 of roller aluminum pipe and tube head automatic assembling mechanism 3 and printer magnetic roller, the magnetic roller aluminium pipe mill It includes the first working cabined 1a, the first storage device 1b, the first feeding device 1c and the second feeding device 1d, institute to cut feed mechanism 1 It states the first feeding device 1c and tilts upward setting along itself direction of transfer, the first storage device 1b settings are filled in the first feeding The input end of 1c is set, the first working cabined 1a is close to the output end setting of the first feeding device 1c, second feeding Device 1d is horizontal setting, and the input terminal of the second feeding device 1d is docked with the top of the first working cabined 1a, described Magnetic roller aluminium pipe tube head automatic feed mechanism 2 includes the second working cabined 2a, the third feeding device on the second working cabined 2a 2b and the first pusher 2c, the first pusher 2c are mounted on the top of the second working cabined 2a, the third feeding dress The output end for setting 2b is docked with the push end of the first pusher 2c, and the magnetic roller aluminium pipe includes with tube head automatic assembling mechanism 3 Third working cabined 3a, the first bogey 3b on third working cabined 3a and first for transporting aluminum pipe to be assembled Feed device 3c, the tube head and aluminum pipe molding assembly mechanism 4 of the printer magnetic roller include being mounted at the top of the second working cabined 2a Molding assembly device 4a and for transmit assembly complete magnetic roller aluminium pipe second conveyer 4b, the second conveyer 4b is mounted on third working cabined 3a, and feed mechanism 1, magnetic roller aluminium pipe tube head automatic feed mechanism 2, magnetic are ground by magnetic roller aluminium pipe Cooperation between roller aluminum pipe and tube head automatic assembling mechanism 3 and the tube head and aluminum pipe molding assembly mechanism 4 four of printer magnetic roller It can realize and feeding operation is carried out to magnetic roller aluminium pipe and magnetic roller aluminium pipe tube head, disclosure satisfy that accurate feeding, complete between the two Assembling work and can be by the two molding assembly.
The first storage device 1b includes material storing box 1e and the positioning feeding part 1f in material storing box 1e, described Material storing box 1e is equipped with open the first accommodating chamber upward, and the positioning feeding part 1f is mounted on the madial wall of material storing box 1e, The first feeding device 1c includes the first conveyer belt 1g and the magnetic roller at the top of the first conveyer belt 1g for treating feeding The input terminal for the first limiting component 1h, the first conveyer belt 1g that aluminum pipe is limited is located in the first accommodating chamber, and described The top of one working cabined 1a is docked with the output end of the first conveyer belt 1g, is equipped in the first working cabined 1a for by the first work Make the first ejection part 1i that the magnetic roller aluminium pipe for waiting for feeding on cabinet 1a carries out feeding, the second feeding device 1d includes the Two conveyer belt 1j and the first blanking component 1k mounted on the second conveyer belt 1j outputs, the input of the second conveyer belt 1j End is docked with the first ejection part 1i, is waited for that the magnetic roller aluminium pipe of feeding is placed into the first storage device 1b by several first, is passed through First conveyer belt 1g and the second conveyer belt 1j will wait for that the magnetic roller aluminium pipe of feeding is transmitted to designated position, and such transmission mode can Accurately realize the feeding of magnetic roller aluminium pipe.
The positioning feeding part 1f is separately mounted to two opposite sides material storing box 1e including the first stock supporting plate 1f1, two The first hinged seat 1f2 on the wall and first support bar 1f3 between two the first hinged seat 1f2, first bearing material Plate 1f1 is along waiting for that feeding magnetic roller aluminium pipe direction of transfer is arranged diagonally downward, and the both ends of the first support bar 1f3 are respectively with one The connection that a first hinged seat 1f2 can be rotated is set on the first support bar 1f3 there are two symmetrical first barrier plate 1f4, Each first barrier plate 1f4 is arranged straight down, and the setting of two symmetrical first barrier plate 1f4, which can be realized, to be treated The magnetic roller aluminium pipe of material realizes blocking and feeding operation, and the both ends first support bar 1f3 are mounted on two the first hinged seat 1f2, It can realize the rotation of two the first barrier plate 1f4, and then can realize the gap feeding operation for the magnetic roller aluminium pipe for treating feeding.
The bottom of the first conveyer belt 1g is symmetrical arranged the first supporting beam 1g1, the first conveyer belt 1g there are two setting Inclined to be arranged between material storing box 1e and the first working cabined 1a, the first limiting component 1h is installed respectively including two The both ends of the first position-limited rack 1h1 at both ends at the top of the first conveyer belt 1g, each first position-limited rack 1h1 pass through bolt respectively It is fixedly mounted on the first conveyer belt 1g, the bottom of the first position-limited rack 1h1 sets that there are two symmetrical and along the first transmission First limiting plate 1h2 of the direction of transfer setting with 1g, the both ends of each first limiting plate 1h2 are solid by bolt respectively On the first position-limited rack 1h1 of corresponding position, the setting of two the first supporting beam 1g1 disclosure satisfy that the first conveyer belt 1g for Dingan County Installation, and then disclosure satisfy that the feeding operation of several magnetic roller aluminium pipes for waiting for feeding, and then can realize to magnetic roller aluminium pipe and pipe The assembling work of head.
The first working cabined 1a is hollow structure, and the top of the first working cabined 1a is along the magnetic roller aluminium pipe for waiting for feeding Direction of transfer be arranged diagonally downward, the side wall of the first working cabined 1a is equipped with the first side door, first ejection part 1i is mounted in the first working cabined 1a, and the first ejection part 1i includes the first cylinder 1i1 and the first die pad 1i2, described The top of first working cabined 1a is equipped with the first straight slot passed through for the first die pad 1i2, the first cylinder 1i1 states in a vertical shape It is arranged in the first working cabined 1a, the first die pad 1i2 is on the output end of the first cylinder 1i1, the first working cabined The setting of upper first side doors of 1a disclosure satisfy that the repair and replacement of later stage pair the first cylinder 1i1 and the first die pad 1i2, the first gas The setting of cylinder 1i1 and the first die pad 1i2 disclosure satisfy that several feeding operations for waiting for feeding magnetic roller aluminium pipe.
The input end of the second conveyer belt 1j is equipped with the first upper flitch 1j1, the first upper flitch 1j1 fixed installations One end far from the first conveyer belt 1g at the top of first working cabined 1a, the first blanking component 1k include third barrier plate 1k1 and Mounted on the first driving portion 1m of the second conveyer belt 1j output ends, what the first barrier plate 1f4 can be rotated is mounted on second The top of conveyer belt 1j output ends disclosure satisfy that the magnetic roller aluminium pipe for treating feeding carries out by third barrier plate 1k1 is rotated Feeding operation can realize the feeding operation for the magnetic roller aluminium pipe for treating feeding by the rotation of the first driving portion 1m.
The first driving portion 1m is including the first stepper motor 1m1, the second barrier plate 1m2 and is mounted on the second conveyer belt 1j Output and the lock seat 1m3 of separate first one end stepper motor 1m1, one end and first of the second barrier plate 1m2 The main shaft of stepper motor 1m1 is fixedly connected, and the other end of the second barrier plate 1m2 is engaged by clamping with lock seat 1m3, by the One stepper motor 1m1 drives the second barrier plate 1m2 rotations to realize the feeding operation for treating feeding magnetic roller aluminium pipe, and then can realize Treat the assembling work of feeding magnetic roller aluminium pipe.
The second working cabined 2a is rectangular hollow structure, and the side of the second working cabined 2a is equipped with can open the Two side doors, the third feeding device 2b include the third feeding portion for will wait for that the tube head of the magnetic roller aluminium pipe of feeding is transmitted Part 2d and the first feeding track 2e for connecting third feeding component 2d and the first pusher 2c, the first push dress 2c is set to include the first push component 2f being fixedly mounted at the top of the second working cabined 2a and wait for feeding magnetic roller aluminium pipe pipe for limiting Second limiting component 2g of head, described first pushes component 2f is arranged along the width direction of the second working cabined 2a, and described second Limiting component 2g is arranged at the top of the second working cabined 2a and positioned at the output of the first push component 2f, and described first pushes away Component 2f is sent to be arranged along the length direction of the second working cabined 2a, the setting of second the second side door of the sides working cabined 2a can be real Now to the maintenance of third feeding component 2d and the first pusher 2c, several magnetic roller aluminium disclosure satisfy that by third feeding device 2b The feeding operation of pipe tube head, and then can realize the assembling work of magnetic roller aluminium pipe and aluminum pipe tube head.
The third feeding component 2d includes vibration feeding cylinder 2h and the first transport unit for being arranged in vibration feeding cylinder 2h Part 2i, the vibration feeding cylinder 2h are fixedly mounted on the top of the second working cabined 2a, and the vibration feeding cylinder 2h is equipped with open court Second accommodating chamber of upper setting, the first transfer member 2i are upwardly extended around the axis spiral of vibration feeding cylinder 2h and are set It sets, the output end of the first transfer member 2i is docked with the input terminal of the first feeding track 2e, passes through the first transfer member 2i Feeding operation to several magnetic roller aluminium pipe tube heads can realize the gap feeding operation of several magnetic roller aluminium pipe tube heads.
The first transfer member 2i includes the first charge channel 2i1, the second charge channel 2i2 and third charge channel 2i3, described First charge channel 2i1 is arranged in vibration feeding cylinder 2h, and the first charge channel 2i1 is close to the madial wall of vibration feeding cylinder 2h Setting, the top of the vibration feeding cylinder 2h are equipped with the notch passed through for the second charge channel 2i2, the first charge channel 2i1's Discharge end is docked with the feeding end of the second charge channel 2i2, and the discharge end of the second charge channel 2i2 is with third charge channel 2i3's Feed end docks, and the discharge end of the third charge channel 2i3 is docked with the feed end of the first feeding track 2e, passes through the first feeding The docking of road 2i1 and the second charge channel 2i2 coordinates, if the cooperation of the second charge channel 2i2 and third charge channel 2i3 can be realized pair The feeding operation of the dry magnetic roller aluminium pipe tube head for waiting for feeding, and then can realize the assembling work of magnetic roller aluminium pipe and tube head.
The first charge channel 2i1 is spiral charge channel, and the vertical section of the first charge channel 2i1 is rectangle, described Second charge channel 2i2 is horizontal setting, and the vertical section of the second charge channel 2i2 is also rectangle, the third feeding 2i3 docked with the second charge channel 2i2 one section in road is horizontal, the third charge channel 2i3 and the first 2e pairs of feeding track The one end connect is tilted down setting, the standard between the first charge channel 2i1, the second charge channel 2i2 and third charge channel 2i3 three Really cooperation can realize the accurate feeding for the magnetic roller aluminium pipe tube head for treating feeding.
The top of the vibration feeding cylinder 2h and the position of corresponding spiral charge channel are equipped with for several feedings that wait for Magnetic roller aluminium pipe tube head is realized that the top of limitation the positioning element 2j, the vibration feeding cylinder 2h of position arrangement are equipped with and is positioned for limitation First mounting groove of component 2j installation, the limitation positioning element 2j are symmetricly set on the including the first limited block 2j1 and two Limit assembly 2j2 on one mounting groove, interior the first mounting hole being equipped with for limit assembly 2j2 installations of first mounting groove, two A limit assembly 2j2 is engaged by clamping with the first limited block 2j1, if the limit by the first limited block 2j1 can control The feeding state of the magnetic roller aluminium pipe tube head of dry feeding, and then disclosure satisfy that the accurate feeding to magnetic roller aluminium pipe.
Each limit assembly 2j2 includes the first spring 2j3 and the first limited post 2j4, the first spring 2j3's One end is fixedly connected with the bottom of the first mounting hole, and the other end of the first spring 2j3 and the first limited post 2j4 are fixed and connected It connects, the first buckling groove 2j5 for clamping is equipped with corresponding to two the first limited post 2j4 on the first limited block 2j1, in card Under tight state, each limited post is connected in the first buckling groove 2j5 of corresponding position, passes through the first spring 2j3 and the Cooperation can realize the engaging of the first limited block 2j1 between one limited post 2j4, and then disclosure satisfy that the first limited block 2j1's Dismounting.
The first push component 2f is including the second cylinder 2f1, two symmetrically arranged first guide rail 2f2 and mounted on two Second limited block 2f3, the second cylinder 2f1 of a ends first guide rail 2f2 is fixedly mounted on the top of the second working cabined 2a, The outbound course of the second cylinder 2f1 is identical as the width direction of the second working cabined 2a, and each first guide rail 2f2 is solid Dingan County is mounted in the top of the second working cabined 2a, and each first guide rail 2f2 is rectangular configuration, the first guide rail 2f2's Length direction is identical as the outbound course of the second cylinder 2f1, and the end of the second cylinder 2f1 telescopic rods is equipped with the second locating piece The both ends of 2f4, the bottoms the second locating piece 2f4 are engaged by clamping with a first guide rail 2f2 respectively, second locating piece 2f4 can be slided on two the first guide rail 2f2, and the one end of the second locating piece 2f4 far from the second cylinder 2f1 is equipped with second The end of guide rod 2f5, the second guide rod 2f5 are equipped at the top of the first abutting block 2f6, the second limited block 2f3 and set Have and pushes against the first sliding groove 2f7, the first sliding groove 2f7 of block 2f6 slidings along the width of the second working cabined 2a for first The second limited block 2f3 is run through in direction, pushes the second limited block 2f3 to be moved up in two the first guide rail 2f2 by the second cylinder 2f1 It is dynamic, and then can realize and will wait for that the magnetic roller aluminium pipe tube head of feeding is pushed on magnetic roller aluminium pipe to be assembled, the two is fastened on one It rises, and then can realize the assembling work to the two.
The second limiting component 2g includes that third cylinder 2g1 and second pushes against block 2g2, and described second pushes against block 2g2's Side is fixedly connected with the end of third cylinder 2g1 telescopic rods, and the outbound course of the third cylinder 2g1 is perpendicular to the second cylinder The outbound course of 2f1, described second pushes against the top that the second limited block 2f3 is arranged in block 2g2, is set on the second abutting block 2g2 There is the third bearing groove 4e4 for waiting for the carrying of feeding magnetic roller aluminium pipe tube head, in the locked state, the second abutting block 2g2 is located at It on first sliding groove 2f7 and is covered in, drives second to push against block 2g2 on the second limited block 2f3 by third cylinder 2g1 It is mobile, and then disclosure satisfy that the feeding operation of the tube head for the magnetic roller aluminium pipe for treating feeding, it can control and wait for feeding magnetic roller aluminium pipe Gap feeding operation.
The third working cabined 3a is rectangular configuration, and the side that the third working cabined 3a is close to the second working cabined 2a is set It sets and close to the setting of the position of the second limited block 2f3, the side of the third working cabined 3a is equipped with the third that can be opened Side door, the first bogey 3b include first load bearing component 3d of two row symmetrically at the top of third working cabined 3a, and described One feed device 3c is arranged between two the first load bearing component of row 3d, and the first feed device 3c includes the first feeding part 3e With several the first material folding component 3f being mounted on the first feeding part 3e, the first feeding part 3e can be along third work Make the length direction movement of cabinet 3a, each first material folding component 3f can be moved up and down along vertical direction, third work The setting for making third side door on cabinet 3a disclosure satisfy that the installation of the first load bearing component 3d, the first feeding part 3e and several first The setting of material folding component 3f disclosure satisfy that the magnetic roller aluminium pipe for treating feeding realizes the pinch operation carried.
First load bearing component 3d described in each column includes three, and each first load bearing component 3d includes the first carrying It is equipped with for placing the second mounting groove for waiting for feeding magnetic roller aluminium pipe, each at the top of seat 3g, each first bearing seat 3g Second mounting groove is inversion isosceles trapezoidal structure, and the setting of the second mounting groove can realize the magnetic roller aluminium pipe for treating feeding Carrying operation is carried out, and then disclosure satisfy that the transport operation for treating feeding magnetic roller aluminium pipe.
The first feeding part 3e includes the first material conveying platform 3h being mounted at the top of third working cabined 3a, several described First material folding component 3f is rectangular to be distributed on the first material conveying platform 3h, and each first material folding component 3f can be dismantled simultaneously It can adjust with the first positions material conveying platform 3h on the first material conveying platform 3h, the setting of several first material folding component 3f It can realize the transport operation for the magnetic roller aluminium pipe for treating feeding.
The first material conveying platform 3h include the second mounting plate 3h1, two be symmetrically mounted on the second mounting plate 3h1 Two guide rail 3h2 and the first mounting platform 3h3 on two the second tracks, each second guide rail 3h2 is rectangle The length direction of structure, each second guide rail 3h2 is identical as the length direction of third working cabined 3a, first installation The end of platform 3h3, which is equipped with, can drive the first mounting platform 3h3 to realize mobile second step on two the second guide rail 3h2 Each first material folding component 3f that corresponds to of stepper motor 3h4, the first mounting platform 3h3 are all provided with that there are one for installation Three mounting groove 3m drive the first mounting platform 3h3 to be moved on the second guide rail 3h2, Jin Erneng by the second stepper motor 3h4 Enough feeding operations realized to several magnetic roller aluminium pipes for waiting for feeding.
In the third mounting groove 3m mounted on corresponding position that each first material folding component 3f can be dismantled, each The first material folding component 3f includes the second carrier block 3i and the first material folding component 3j in the second carrier block 3i, institute It states the one end of the second carrier block 3i far from the second stepper motor 3h4 and is equipped with the 4th mounting groove installed for the first material folding component 3j 3k, the 4th mounting groove 3k run through the side of the second carrier block 3i, are equipped with along vertical direction in the third mounting groove 3m The profile of first locating slot 3n of several spaced sets from top to bottom, each first locating slot 3n with third mounting groove The profile of 3m is identical, and the magnetic roller aluminium pipe of corresponding position is carried out gripping operation by the first material folding component 3j, is passing through second step Stepper motor 3h4 drives the first mounting platform 3h3 to be moved on the second guide rail 3h2.
It is equipped with the first fin 3p corresponding to each first locating slot 3n on the lateral wall of each second carrier block 3i, Under fastening state, the first fin 3p can be closely fastened in the first locating slot 3n of corresponding position, and all first is convex The cooperation of rib 3p and the first locating slot 3n disclosure satisfy that the adjusting of the positions on the first mounting platform 3h3 the second carrier block 3i.
Each first material folding component 3j includes the first pusher cylinder 3j1 and is stretched mounted on the first pusher cylinder 3j1 The top of first material folding block 3j2 of contracting boom end, each first material folding block 3j2 be equipped with for treat feeding magnetic roller aluminium pipe into Second bearing groove 3j3 of row carrying, each second bearing groove 3j3 is inversion isosceles trapezoidal structure, passes through the first pusher Cylinder 3j1 drives the first material folding block 3j2 movements, and then can realize the feeding operation for the magnetic roller aluminium pipe for treating feeding.
The molding assembly device 4a includes the second push component 4c being mounted at the top of the second working cabined 2a and is mounted on The molding assembly component 4d of second push component 4c output ends, the molding assembly component 4d correspond to third working cabined 3a upper the The position of one bearing seat 3g is arranged, and the second push component 4c is including the first assembly cylinder 4c1 and mounted on the first assembly gas The outbound course of second positioning plate 4c2 of the output of cylinder 4c1, the first assembly cylinder 4c1 and the second working cabined 2a's Width direction is identical, the output end of the first assembly cylinder 4c1 through the second positioning plate 4c2 and with molding assembly component 4d It is fixedly connected, passes through the assembling work of the first assembly cylinder 4c1 magnetic roller aluminium pipe and tube head to be assembled.
The molding assembly component 4d includes third positioning plate 4d1, the second positioning sliding block 4d2, is mounted on the second positioning cunning Assembly locating piece 4d3 at the top of block 4d2 and two are symmetricly set on the first positioning plate far from the first sides assembly cylinder 4c1 Third guide rod, the third positioning plate 4d1, which is fixed close to the side of the first assembly cylinder 4c1 with two third guide rods, to be connected It connects, the second positioning sliding block 4d2 is closely set on two third guide rods, and the assembly locating piece 4d3 is solid by bolt Dingan County is mounted in the top of the second positioning sliding block 4d2, and the top of the assembly locating piece 4d3 is equipped with stretches for the first assembly cylinder 4c1 Fixed first straight slot of contracting bar, first straight slot is through the upper and lower end face of assembly locating piece 4d3, the assembly locating piece 4d3 One end far from the first assembly cylinder 4c1 be equipped with molding assembly head 4d4, pass through the first assembly cylinder 4c1 and drive the first positioning Sliding block and assembly locating piece 4d3 are moved on the second guide rod 2f5, and then can realize the dress to magnetic roller aluminium pipe and aluminum pipe tube head With operation.
The second conveyer 4b include be mounted on third working cabined 3a on for will assemble completion magnetic roller aluminium pipe into Second transfer member 4e of row transmission and the output mounted on the third ends working cabined 3a and corresponding to the second transfer member 4e First blanking component 4f of end setting, the edges the first blanking component 4f are tilted towards in the length direction of third working cabined 3a and divide into It sets, is transported by the first blanking component 4f magnetic roller aluminium pipes for driving assembly to complete, be transported to designated position.
The second transfer member 4e includes third stepper motor 4e1, on third stepper motor 4e1 output ends First runner assembly 4g and at the top of third working cabined 3a and the first bearing of one end far from third stepper motor 4e1 Seat 4h, the end of the third stepper motor 4e1 are equipped with the 4th positioning plate, and the third stepper motor 4e1 is fixedly mounted on On 4th positioning plate, and the output end of third stepper motor 4e1 runs through the 4th positioning plate, is driven by third stepper motor 4e1 First runner assembly 4g rotations, and then can realize that the magnetic roller aluminium pipe for completing assembly is transmitted to designated position.
The second transfer member 4e includes that the first drive link 4e2 and two are symmetricly set on the first drive link 4e2 First rotation carrier block 4e3, one end of the first drive link 4e2 is fixedly connected with the main shaft of third stepper motor 4e1, another End is fixedly mounted on first bearing seat 4h, and distance is less than magnetic roller aluminium after the completion of assembly between two first rotation carrier block 4e3 The setting of the length of pipe, two first rotation carrier block 4e3 can realize that the magnetic roller aluminium pipe for completing assembly is transmitted to specific bit It sets.
The first blanking component 4f include the first support pedestal 4f1 and on the first support pedestal 4f1 first Feeding plate 4f2, the first support pedestal 4f1 are fixedly mounted on third working cabined 3a close to the one of the first rotation carrier block 4e3 End, the feed end of the first feeding plate 4f2 are docked with the discharge end of two first rotation carrier block 4e3, pass through the first blanking The magnetic roller aluminium pipe assembled is transmitted to designated position by plate 4f2.
Each first rotation carrier block 4e3 is cylindrical structure, and the first rotation carrier block 4e3 is equipped with several Around the equally distributed third bearing groove 4e4 of axis of the first rotation carrier block 4e3, the setting of several third bearing groove 4e4 It disclosure satisfy that and operation is born to several magnetic roller aluminium pipes assembled.
The above descriptions are merely preferred embodiments of the present invention, not makees to the technical scope of the utility model Go out any restrictions, thus it is any trickle amendment made by the above technical examples according to the technical essence of the present invention, equivalent Variation and modification, in the range of still falling within the technical solution of the utility model.

Claims (7)

1. the tube head and aluminum pipe molding assembly mechanism of a kind of printer magnetic roller, it is characterised in that:Including the second working cabined (2a), Three working cabineds (3a), the molding assembly device (4a) being mounted at the top of the second working cabined (2a) and the magnetic completed for transmitting assembly The second conveyer (4b) of roller aluminum pipe, the second conveyer (4b) are mounted on third working cabined (3a), the assembly Molding machine (4a) includes the second push component (4c) being mounted at the top of the second working cabined (2a) and is mounted on the second push part The molding assembly component (4d) of part (4c) output end, the second push component (4c) include the first assembly cylinder (4c1) and peace Mounted in the second positioning plate (4c2) of the output of the first assembly cylinder (4c1), the output of the first assembly cylinder (4c1) End is fixedly connected through the second positioning plate (4c2) and with molding assembly component (4d).
2. the tube head and aluminum pipe molding assembly mechanism of a kind of printer magnetic roller according to claim 1, it is characterised in that:Institute Molding assembly component (4d) is stated to include third positioning plate (4d1), the second positioning sliding block (4d2), be mounted on the second positioning sliding block Assembly locating piece (4d3) at the top of (4d2) and two are symmetricly set on the first positioning plate far from first assembly side cylinder (4c1) Third guide rod, the third positioning plate (4d1) is solid with two third guide rods close to the side of the first assembly cylinder (4c1) Fixed connection, second positioning sliding block (4d2) are closely set on two third guide rods, and the assembly locating piece (4d3) is logical The top that bolt is fixedly mounted on the second positioning sliding block (4d2) is crossed, the side of the assembly locating piece (4d3) is equipped with for the first dress With fixed first straight slot of cylinder (4c1) telescopic rod, first straight slot is through the upper and lower end face of assembly locating piece (4d3), institute The one end far from the first assembly cylinder (4c1) for stating assembly locating piece (4d3) is equipped with molding assembly head (4d4).
3. the tube head and aluminum pipe molding assembly mechanism of a kind of printer magnetic roller according to claim 2, it is characterised in that:Institute It includes that the magnetic roller aluminium pipe being mounted on third working cabined (3a) for completing assembly is transmitted to state second conveyer (4b) The second transfer member (4e) and mounted on the third working cabined end (3a) and corresponding to the second transfer member (4e) output The first blanking component (4f) of setting, the first blanking component (4f) is held to be tilted along the length direction in third working cabined (3a) It is down-set.
4. the tube head and aluminum pipe molding assembly mechanism of a kind of printer magnetic roller according to claim 3, it is characterised in that:Institute It includes third stepper motor (4e1), first on third stepper motor (4e1) output end to state the second transfer member (4e) Runner assembly (4g) and the first axle for being mounted on third working cabined (3a) top and one end far from third stepper motor (4e1) The end of bearing (4h), the third stepper motor (4e1) is equipped with the 4th positioning plate, and the third stepper motor (4e1) is solid Dingan County is on the 4th positioning plate, and the output end of third stepper motor (4e1) runs through the 4th positioning plate.
5. the tube head and aluminum pipe molding assembly mechanism of a kind of printer magnetic roller according to claim 4, it is characterised in that:Institute It includes the first drive link (4e2) and two first be symmetricly set on the first drive link (4e2) to state the second transfer member (4e) Carrier block (4e3) is rotated, one end of first drive link (4e2) is fixedly connected with the main shaft of third stepper motor (4e1), separately One end is fixedly mounted in first bearing seat (4h), and distance is less than after the completion of assembly between two first rotation carrier blocks (4e3) The length of magnetic roller aluminium pipe.
6. the tube head and aluminum pipe molding assembly mechanism of a kind of printer magnetic roller according to claim 5, it is characterised in that:Institute It includes the first support pedestal (4f1) and the first blanking on the first support pedestal (4f1) to state the first blanking component (4f) Plate (4f2), the first support pedestal (4f1) are fixedly mounted on third working cabined (3a) close to the first rotation carrier block (4e3) One end, the feed end of first feeding plate (4f2) with two first rotation carrier blocks (4e3) discharge end dock.
7. the tube head and aluminum pipe molding assembly mechanism of a kind of printer magnetic roller according to claim 6, it is characterised in that:Often It is a it is described first rotation carrier block (4e3) be cylindrical structure, it is described first rotation carrier block (4e3) be equipped with it is several around The equally distributed third bearing groove (4e4) of axis of first rotation carrier block (4e3).
CN201721686676.6U 2017-12-06 2017-12-06 A kind of tube head and aluminum pipe molding assembly mechanism of printer magnetic roller Expired - Fee Related CN207900575U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721686676.6U CN207900575U (en) 2017-12-06 2017-12-06 A kind of tube head and aluminum pipe molding assembly mechanism of printer magnetic roller

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721686676.6U CN207900575U (en) 2017-12-06 2017-12-06 A kind of tube head and aluminum pipe molding assembly mechanism of printer magnetic roller

Publications (1)

Publication Number Publication Date
CN207900575U true CN207900575U (en) 2018-09-25

Family

ID=63571561

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721686676.6U Expired - Fee Related CN207900575U (en) 2017-12-06 2017-12-06 A kind of tube head and aluminum pipe molding assembly mechanism of printer magnetic roller

Country Status (1)

Country Link
CN (1) CN207900575U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110773980A (en) * 2019-10-10 2020-02-11 林佳琳 Correcting device of printer roller shaft and assembling and correcting method thereof
CN113211073A (en) * 2021-04-22 2021-08-06 修中利 Thin-wall pipe connecting piece and machining method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110773980A (en) * 2019-10-10 2020-02-11 林佳琳 Correcting device of printer roller shaft and assembling and correcting method thereof
CN113211073A (en) * 2021-04-22 2021-08-06 修中利 Thin-wall pipe connecting piece and machining method thereof

Similar Documents

Publication Publication Date Title
CN207900575U (en) A kind of tube head and aluminum pipe molding assembly mechanism of printer magnetic roller
CN213356014U (en) Deviation rectifying and aligning equipment for corrugated case
US20050217974A1 (en) Transport device for containers
WO2019024807A1 (en) Construction device and house
US20080302769A1 (en) Three-dimensional laser beam machining apparatus for long workpiece
KR101387004B1 (en) Efficiency of automated production lines in large presses feed
CN105922114A (en) Polishing machine
CN109515883B (en) Automatic pallet corner protector placing machine
JP2009091119A (en) Sheet material alignment device
CN211569430U (en) Steel plate receiving device for transverse shearing machine
CN106516683A (en) Material conveying and transferring system
CN1026087C (en) Paper operater and unit thereof for transporting paper pile
CN207900574U (en) A kind of automatic processing device of printer magnetic roller aluminium pipe and tube head
CN207668840U (en) A kind of printer magnetic roller aluminium pipe and tube head automatic assembling mechanism
CN110653886A (en) Full-automatic gang drill device
CN207671244U (en) A kind of printer magnetic roller aluminium pipe head automatic feed mechanism
CN207669088U (en) A kind of printer magnetic roller aluminium pipe grinding feed mechanism
CN110091583B (en) Code spraying device for packaging bag printing and die cutting integrated machine and mounting method thereof
JPS6293171A (en) Sheet stacker
KR20170124914A (en) Driving method and reverse conveyor apparatus for feeding chinese cabbage
CN114012427B (en) Fence production line and production method
CN113352781B (en) Printing equipment applied to peripheral surface printing of rotating body
CN211520778U (en) Printing platform mobile device
ES2554838B1 (en) Box size adaptation device for box stacking machine
CN209614964U (en) A kind of automatic material distributing device after hydraulic machine blanking

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180925

Termination date: 20211206