CN207892240U - A kind of stair step aluminum alloy mould plate for building - Google Patents
A kind of stair step aluminum alloy mould plate for building Download PDFInfo
- Publication number
- CN207892240U CN207892240U CN201820069088.6U CN201820069088U CN207892240U CN 207892240 U CN207892240 U CN 207892240U CN 201820069088 U CN201820069088 U CN 201820069088U CN 207892240 U CN207892240 U CN 207892240U
- Authority
- CN
- China
- Prior art keywords
- plate
- pour
- aluminum alloy
- stair step
- holder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model discloses a kind of stair step aluminum alloy mould plates for building, including pouring plate, connecting tube, top board, lower platen, holder, it is described to pour setting above plate and pour pipe, described pour poured below pipe is provided with delivery pipe on plate, the delivery pipe is provided with the connecting tube far from the side for pouring plate, the plate that pours is provided with the holder close to the side of the delivery pipe, the holder is connected to support plate far from the side for pouring plate, the support plate and described pour are provided with formwork between plate, the formwork includes reinforcing slot, blow tank, rear fender, the top board and the lower platen, it is provided with the rear fender below the top board.Advantageous effect is:Light-weight, convenient transportation, intensity is big, is unlikely to deform, reasonable in design, easy to use, saves floor occupying area, and the stair step for being suitable for a variety of quantity uses, and longer life expectancy and can repeatedly move uses, clout recycling, reduction cost.
Description
Technical field
The utility model is related to construction clothing arts, and in particular to a kind of stair step aluminum alloy mould plate for building.
Background technology
Building template is a kind of temporary supporting structure, is made by design requirement, makes concrete structure, component by defined
Position, geometric dimension forming, keep its correct position, and bear the external loads of building template dead weight and effect on it.Into
The purpose of row form work engineering is to ensure concrete engineering quality and construction safety, accelerate construction progress and reduce engineering cost, builds
Building mould is the formwork and holder of concreting forming, and traditional stair tread formwork is mainly using building plank or steel plate
Make, wooden template service life is short, and pressure is small, and stair easily deform after concreting, influence stair it is beautiful and
Template loosens when due to pouring, and poor safety performance in use, steel template weight is big, difficult, and installation difficulty is big in use,
Higher to worker's physical demands, dismounting is difficult, and transportation cost is high, and construction material waste is serious in casting process.
Utility model content
The purpose of this utility model is that solve the above-mentioned problems and provides a kind of stair step aluminium alloy for building
Template.
The utility model is achieved through the following technical solutions above-mentioned purpose:
A kind of stair step aluminum alloy mould plate for building, including plate, connecting tube, top board, lower platen, holder are poured, institute
It states to pour to be provided with above plate and pours pipe, described pour poured below pipe is provided with delivery pipe on plate, the delivery pipe
The side for pouring plate is provided with the connecting tube, it is described pour plate be provided with close to the side of the delivery pipe it is described
Holder, the holder are connected to support plate far from the side for pouring plate, and the support plate and described pour are arranged between plate
It includes reinforcing slot, blow tank, rear fender, the top board and the lower platen, the top board to have formwork, the formwork
Lower section is provided with the rear fender, and the blow tank is provided between the rear fender and the lower platen, described to pour board bottom
End is provided with baffle, and the baffle upper surface is provided with clout slot, and the baffle is connected to institute far from the side for pouring plate
Support plate is stated, dismounting plate is provided between the formwork and the support plate.
In above structure, equipment is installed on by staff needs to carry out the region that stair pour, and the formwork is connected
It pours between plate and the support plate, the dismounting plate is completely embedded with the support plate, staff will build described in being connected on
It builds and pours the pipe feeding delivery pipe described in material warp, construction material is sent into the connecting tube, the connection by the delivery pipe
Pipe is passed through inside the formwork, and the blow tank is directed at the reinforcing slot, and construction material starts to fill inside the formwork,
After the completion of to be filled, extra construction material is entered by the reinforcing slot in the clout slot of lower section under the effect of gravity,
The clout slot is collected to be fallen and superfluous construction material in use, is recycled, after the completion of stair pour, work people
Member removes the plate that pours, and the support plate is detached with the dismounting plate, removes the formwork, and stair pour completion,
When transport, the formwork is multiple parts through dismounting, carries out separate type transport.
In order to further increase the ability easy to use of stair step aluminum alloy mould plate for building, it is described pour plate with it is described
Pipe is poured by clamp connection, the delivery pipe is connect with the plate that pours by card slot.
In order to further increase the ability easy to use of stair step aluminum alloy mould plate for building, the connecting tube with it is described
Delivery pipe is described to pour plate with the holder by being weldingly connected by flanged joint.
In order to further increase the ability easy to use of stair step aluminum alloy mould plate for building, the holder and the branch
Fagging is bolted, and the support plate is connected by screw with the dismounting plate.
In order to further increase the ability easy to use of stair step aluminum alloy mould plate for building, the dismounting plate with it is described
Formwork is connected by screw, and the top board is bolted with the lower platen.
In order to further increase the ability easy to use of stair step aluminum alloy mould plate for building, it is described pour plate with it is described
Baffle is connected by screw, and the support plate is connected by screw with the baffle.
In order to further increase the ability easy to use of stair step aluminum alloy mould plate for building, the top board with it is described
Rear fender is bolted.
Advantageous effect is:It is built using aluminium alloy, light-weight, convenient transportation, intensity is big, is unlikely to deform, structure design
Rationally, use more efficiently it is convenient, be internally provided with construction material and pour pipeline, save floor occupying area, component can flexible assembling, fit
Stair step for a variety of quantity uses, convenient dismounting design, transport and carries quickly, longer life expectancy and can repeatedly move
It uses, installation and easy to operate, mitigation worker's amount of labour, setting clout slot recycle superfluous construction material, reduce
Cost.
Description of the drawings
Fig. 1 is a kind of fractionation structural representation of stair step aluminum alloy mould plate for building described in the utility model;
Fig. 2 is a kind of pipe structure schematic diagram of stair step aluminum alloy mould plate for building described in the utility model;
Fig. 3 is a kind of formwork structural schematic diagram of stair step aluminum alloy mould plate for building described in the utility model.
The reference numerals are as follows:
1, plate is poured;2, pipe is poured;3, holder;4, slot is reinforced;5, plate is dismounted;6, support plate;7, clout slot;8, baffle;
9, formwork;10, connecting tube;11, top board;12, lower platen;13, blow tank;14, rear fender;15, delivery pipe.
Specific implementation mode
The utility model is described in further detail below in conjunction with the accompanying drawings:
As shown in Figure 1-Figure 3, a kind of stair step aluminum alloy mould plate for building, including pour plate 1, connecting tube 10, upper pressure
Plate 11, lower platen 12, holder 3, pour the top of plate 1 and are provided with and pour pipe 2, pour plate 1 for pouring construction material, pour pipe 2
For by the extraneous defeated feed arrangement of transport material, pouring 2 pouring for lower section of pipe and being provided with delivery pipe 15 on plate 1, delivery pipe 15
The side for pouring plate 1 is provided with connecting tube 10, connecting tube 10 is used for connecting conveying pipe 15 and formwork 9, it is close to pour plate 1
The side of delivery pipe 15 is provided with holder 3, and holder 3 is used to support equipment, and holder 3 is connected to support far from the side for pouring plate 1
Plate 6, support plate 6 are used to support formwork 9, support plate 6 and pour and are provided with formwork 9 between plate 1, and formwork 9 is for pouring
Stair tread, formwork 9 include reinforcing slot 4, blow tank 13, rear fender 14, top board 11 and lower platen 12, reinforce slot 4 and are used for
Reinforcing template block 9, for top board 11 for applying pressure to stair tread when pouring, 11 lower section of top board is provided with rear fender 14,
Rear fender 14 is used to support stair tread, blow tank 13 is provided between rear fender 14 and lower platen 12, blow tank 13 is used for will
Extra construction material discharge, pours 1 bottom end of plate and is provided with baffle 8, baffle 8, which is used to support, pours plate 1 and support plate 6, baffle 8
Upper surface is provided with clout slot 7, and clout slot 7 is for storing extra construction material, and baffle 8 is far from the side connection for pouring plate 1
To support plate 6, dismounting plate 5 is provided between formwork 9 and support plate 6, dismounting plate 5 is used for fast assembling-disassembling equipment.
In above structure, equipment is installed on by staff needs to carry out the region that stair pour, and formwork 9 is connected to
It pours between plate 1 and support plate 6, dismounting plate 5 is completely embedded with support plate 6, staff send construction material through pouring pipe 2
Enter delivery pipe 15, construction material is sent into connecting tube 10 by delivery pipe 15, and connecting tube 10 is passed through inside formwork 9, and blow tank 13 is right
Standard reinforces slot 4, and construction material starts inside fill mould plate 9, and after the completion of to be filled, extra construction material is under the effect of gravity
Entered in the clout slot 7 of lower section by reinforcing slot 4, clout slot 7 is collected to be fallen and superfluous construction material in use, is returned
It receives and utilizes, after the completion of stair pour, staff will pour plate 1 and remove, and support plate 6 is detached with dismounting plate 5, removes formwork
9, stair pour completion, and when transport, formwork 9 is multiple parts through dismounting, carries out separate type transport.
In order to further increase the ability easy to use of stair step aluminum alloy mould plate for building, pouring plate 1 and pour pipe 2
By clamp connection, delivery pipe 15 is connect with plate 1 is poured by card slot, and connecting tube 10, by flanged joint, is poured with delivery pipe 15
Plate 1 is built with holder 3 by being weldingly connected, holder 3 is bolted with support plate 6, and support plate 6 passes through screw with dismounting plate 5
Connection, dismounting plate 5 are connected by screw with formwork 9, and top board 11 is bolted with lower platen 12, pours plate 1 and gear
Plate 8 is connected by screw, and support plate 6 is connected by screw with baffle 8, and top board 11 is bolted with rear fender 14.
The basic principles and main features and advantage of the utility model have been shown and described above.The technical staff of the industry
It should be appreciated that the present utility model is not limited to the above embodiments, the above embodiments and description only describe this
The principle of utility model, on the premise of not departing from the spirit and scope of the utility model, the utility model also has various change
And improvement, these various changes and improvements fall within the scope of the claimed invention.
Claims (7)
1. a kind of stair step aluminum alloy mould plate for building, it is characterised in that:Including pouring plate (1), connecting tube (10), top board
(11), lower platen (12), holder (3), it is described pour to be provided with above plate (1) pour pipe (2), it is described to pour below pipe (2)
Described pour is provided with delivery pipe (15) on plate (1), the delivery pipe (15) is arranged far from the side for pouring plate (1)
Connecting tube (10) is stated, the plate (1) that pours is provided with the holder (3), the holder close to the side of the delivery pipe (15)
(3) it is connected to support plate (6) far from the side for pouring plate (1), the support plate (6) and described pour set between plate (1)
It is equipped with formwork (9), the formwork (9) includes reinforcing slot (4), blow tank (13), rear fender (14), the top board (11)
With the lower platen (12), be provided with the rear fender (14) below the top board (11), the rear fender (14) with it is described
The blow tank (13) is provided between lower platen (12), described plate (1) bottom end that pours is provided with baffle (8), the baffle (8)
Upper surface is provided with clout slot (7), and the baffle (8) is connected to the support plate (6) far from the side for pouring plate (1),
Dismounting plate (5) is provided between the formwork (9) and the support plate (6).
2. a kind of stair step aluminum alloy mould plate for building according to claim 1, it is characterised in that:It is described to pour plate
(1) with the pipe (2) that pours by clamp connection, the delivery pipe (15) is connect with the plate (1) that pours by card slot.
3. a kind of stair step aluminum alloy mould plate for building according to claim 1, it is characterised in that:The connecting tube
(10) described to pour plate (1) with the holder (3) by being weldingly connected with the delivery pipe (15) by flanged joint.
4. a kind of stair step aluminum alloy mould plate for building according to claim 1, it is characterised in that:The holder (3)
It is bolted with the support plate (6), the support plate (6) is connected by screw with the dismounting plate (5).
5. a kind of stair step aluminum alloy mould plate for building according to claim 1, it is characterised in that:The dismounting plate
(5) it is connected by screw with the formwork (9), the top board (11) is bolted with the lower platen (12).
6. a kind of stair step aluminum alloy mould plate for building according to claim 1, it is characterised in that:It is described to pour plate
(1) it is connected by screw with the baffle (8), the support plate (6) is connected by screw with the baffle (8).
7. a kind of stair step aluminum alloy mould plate for building according to claim 1, it is characterised in that:The top board
(11) it is bolted with the rear fender (14).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820069088.6U CN207892240U (en) | 2018-01-16 | 2018-01-16 | A kind of stair step aluminum alloy mould plate for building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820069088.6U CN207892240U (en) | 2018-01-16 | 2018-01-16 | A kind of stair step aluminum alloy mould plate for building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207892240U true CN207892240U (en) | 2018-09-21 |
Family
ID=63552341
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820069088.6U Expired - Fee Related CN207892240U (en) | 2018-01-16 | 2018-01-16 | A kind of stair step aluminum alloy mould plate for building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207892240U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109594768A (en) * | 2018-10-09 | 2019-04-09 | 安徽海米新材料有限公司 | Integrated molding formula PE stair shaping mould for building |
CN110409817A (en) * | 2018-04-27 | 2019-11-05 | 湖南好快省建筑科技有限公司 | Stair template with stair cover board |
-
2018
- 2018-01-16 CN CN201820069088.6U patent/CN207892240U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110409817A (en) * | 2018-04-27 | 2019-11-05 | 湖南好快省建筑科技有限公司 | Stair template with stair cover board |
CN109594768A (en) * | 2018-10-09 | 2019-04-09 | 安徽海米新材料有限公司 | Integrated molding formula PE stair shaping mould for building |
CN109594768B (en) * | 2018-10-09 | 2021-02-26 | 安徽海米新材料有限公司 | PE stair forming die for integrally formed building |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102121310B (en) | Double column constructional template for large-section ultrahigh steel reinforced clear water concrete and construction method thereof | |
CN207892240U (en) | A kind of stair step aluminum alloy mould plate for building | |
CN106088588A (en) | A kind of cast-in-situ stair is closed formwork erecting structure and pours in down a chimney the construction of concrete | |
CN105804395A (en) | Staircase one-step continuous casting forming construction method based on integral shaped formwork | |
CN210622302U (en) | Pouring template for building construction | |
CN207863474U (en) | A kind of installation form structure for building | |
CN205857711U (en) | A kind of cast-in-situ stair closes formwork erecting structure | |
CN204781960U (en) | High -rise building shear force wall movement joint department template is propped up and is established and reinforcement system | |
CN202064636U (en) | Closed stair formwork erecting device | |
CN101886399B (en) | Integrated device of steel boxed cofferdam | |
CN210439681U (en) | Can have enough to meet need and use mould constructional column top plugging device | |
CN206048484U (en) | A kind of lightweight plate pours device | |
CN109098456A (en) | A kind of aluminum alloy pattern plate Transfer pipe molding machine and construction method | |
CN205314574U (en) | Material transportation vehicle for building construction | |
CN201339320Y (en) | High-altitude overhanging hanging reinforced concrete hanging bracket | |
CN204626983U (en) | Long cylinder concreting hopper | |
CN211775746U (en) | Sewage treatment pond cone basis steel form and matrix connection structure thereof | |
CN207813014U (en) | It can turnover type multi-ribbed plate plastics putamina joint treatment device | |
CN208168087U (en) | A kind of dismountable floor plates system | |
CN207847151U (en) | The telescopic support device to cornice for installing exterior wall | |
CN106481082A (en) | A kind of improvement casting method of constructional column | |
CN220414014U (en) | Combined cable tower concrete pouring system | |
CN219638475U (en) | Steel mould support beam-free reinforcing device | |
CN206752552U (en) | It is easy to formwork erection and the screw-type ditch cable duct chassis of form removal | |
CN206693239U (en) | The cast-in-place device of bridge machine T beams is realized on a kind of high-altitude thin-wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180921 Termination date: 20210116 |