CN207884199U - A kind of cable laying constructing device - Google Patents
A kind of cable laying constructing device Download PDFInfo
- Publication number
- CN207884199U CN207884199U CN201721299430.3U CN201721299430U CN207884199U CN 207884199 U CN207884199 U CN 207884199U CN 201721299430 U CN201721299430 U CN 201721299430U CN 207884199 U CN207884199 U CN 207884199U
- Authority
- CN
- China
- Prior art keywords
- rack
- fixed
- trench digging
- sliding sleeve
- digging head
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Laying Of Electric Cables Or Lines Outside (AREA)
Abstract
The utility model discloses a kind of cable laying constructing devices, including rack, the fixed connecting plate in front end of the rack, mounting hole there are one being opened on the connecting plate, the front end of the rack is horizontally mounted a main shaft by bearing, one traveling wheel is installed on the main shaft, a trench digging head is arranged in the lower part of the rack, the trench digging head is at the rear of traveling wheel, the vertical fixed riser in the rear end of the rack, the vertical fixed trailing bar in the bottom of the riser, the trailing bar is in the dead astern of trench digging head, the fixed fixed plate in top of the rack, a cable shafts are installed by bearing in the fixed plate, the fixed guide pipe in lower part of the rack, the guide pipe is at the rear of trench digging head.The utility model has many advantages, such as to save manpower and muscle power, efficiency are higher.
Description
Technical field
The utility model is related to road construction field, a kind of specifically cable laying constructing device.
Background technology
Cable is the general designation of optical cable, cable and other items, and there are many uses of the cable, is mainly used for control installation, connection is set
It is standby, the multiple actions such as transmit electric power, be a common and indispensable thing in daily life, since cable charges, so
It is especially careful that installation needs.
According to the needs of construction, part cable is laid on underground, currently, main now opened on the ground using artificial
Then cable is put into ditch by ditch again, then carry out earthing, therefore labor intensity is bigger, labor intensive and muscle power, and speed
Slower, inefficiency is spent, needs effectively to be improved.
Utility model content
Big, labor intensive that purpose of the utility model is to solve labor intensity in the prior art and muscle power and effect
The low defect of rate provides a kind of cable laying constructing device to solve the above problems.
To achieve the goals above, the technical solution of the utility model is as follows:The utility model discloses a kind of cable pavings
If constructing device, including rack, the fixed connecting plate in front end of the rack opens that there are one installations on the connecting plate
The front end in hole, the rack is horizontally mounted a main shaft by bearing, and a traveling wheel is installed on the main shaft, described
A trench digging head is arranged in the lower part of rack, and for the trench digging head at the rear of traveling wheel, the rear end of the rack is fixed vertically
One riser, the vertical fixed trailing bar in the bottom of the riser, the trailing bar are described in the dead astern of trench digging head
Rack the fixed fixed plate in top, a cable shafts are installed by bearing in the fixed plate, the rack
The fixed guide pipe in lower part, the guide pipe is at the rear of trench digging head.
Preferably, a vertical fixed support plate in the rack, there are one sliding for movable sleeve in the support plate
Set, the sliding sleeve relative to support plate can upper and lower Frictional Slipping, the mode level peace being connected through a screw thread on the sliding sleeve
A hold-down bolt is filled, the screw rod of the hold-down bolt reaches inside sliding sleeve, and sliding sleeve is pressed on support plate by hold-down bolt
On, the trench digging head is installed on sliding sleeve.
Preferably, being provided with scale in the support plate.
Preferably, the guide pipe tilts down from front to back.
The utility model has the following advantages compared with prior art:
1, labor intensity significantly reduces, prodigious to save manpower and muscle power;
2, using more convenient, efficiency significantly improves.
Description of the drawings
Fig. 1 is a kind of structural schematic diagram of cable laying constructing device of the utility model;
Fig. 2 is a kind of overlooking structure diagram of the trailing bar of cable laying constructing device of the utility model.
Wherein:1- racks;2- connecting plates;3- mounting holes;4- main shafts;5- traveling wheels;6- trench digging heads;7- risers;8- earthing
Plate;9- fixed plates;10- cable shafts;11- guide pipes;12- support plates;13- sliding sleeves;14- hold-down bolts;15- scales.
Specific implementation mode
To make the structure feature to the utility model and the effect of being reached has a better understanding and awareness, to compared with
Good embodiment and attached drawing cooperation detailed description, are described as follows:
As shown in Figs. 1-2, the utility model discloses a kind of cable laying constructing device, including rack 1, the racks
The 1 fixed connecting plate 2 in front end, opens that there are one mounting holes 3 on the connecting plate 2, and the front end of the rack 1 passes through axis
It holds and is horizontally mounted a main shaft 4, a traveling wheel 5 is installed on the main shaft 4, the lower part of the rack 1 is arranged one and opens
Ditch head 6, for the trench digging head 6 at the rear of traveling wheel 5, the vertical fixed riser 7 in rear end of the rack 1 is described
The vertical fixed trailing bar 8 in the bottom of riser 7, the trailing bar 8 is on the dead astern of trench digging head 6, the top of the rack 1
The fixed fixed plate 9 in portion, installs a cable shafts 10 in the fixed plate 9 by bearing, and the lower part of the rack 1 is solid
If a guide pipe 11, the guide pipe 11 is at the rear of trench digging head 6.
This product is connected by construction personnel first by cable winds in cable shafts 10, by connecting plate 2 with dynamic power machine,
When dynamic power machine drives this product walking by connecting plate 2 in this way, 6 pairs of ground of trench digging head are ditched, then by the one of cable
End is embedded to after guide pipe 11 in ditch, and the soil generated when ditching is covered on cable by further trailing bar 8 again, such side
It walks, the cable in cable shafts 10 unreels on one side, to realize trench digging, bury cable and earthing complete set of programs, efficiency significantly carry
Height, and labor intensity significantly reduces, it is prodigious to save manpower and muscle power, it is more convenient.
Preferably, a vertical fixed support plate 12 in the rack 1, in the support plate 12 activity be cased with one
A sliding sleeve 13, the sliding sleeve 13 relative to support plate 12 can upper and lower Frictional Slipping, be connected through a screw thread on the sliding sleeve 1
Mode is horizontally mounted a hold-down bolt 14, and the screw rod of the hold-down bolt 14 reaches inside sliding sleeve 1, and hold-down bolt 14 will
Sliding sleeve 13 is pressed in support plate 12, and the trench digging head 6 is installed on sliding sleeve 13.
By that will ditch, head 6 is arranged on sliding sleeve 13, when needing to adjust ditching depth, for increasing ditching depth, only
Bolt 14 need to be rotatably compressed so that hold-down bolt 14 no longer compresses sliding sleeve 13, then by sliding sleeve 13 along support plate 12 to
Lower movement, head 6 of ditching so move down, and it is the purpose for completing to adjust ditching depth then to compress sliding sleeve 13 again,
Therefore more convenient, and increase new function.
Preferably, being provided with scale 15 in the support plate 12.
By the way that scale 15 is arranged, it is convenient for adjusting the precision of ditching depth in this way, cable laying effect is also considerably improved.
Preferably, the guide pipe 11 tilts down from front to back, entered in this way from guide pipe 11 convenient for cable
In the ditch held successfully.
Preferably, the shape of the trailing bar 8 is arc, it is convenient for gathering soil into ditch in this way.
Basic principles, main features, and advantages of the present invention has been shown and described above.One's own profession
The technical staff of industry is it should be appreciated that the present utility model is not limited to the above embodiments, described in above embodiments and description
Only the principles of the present invention, on the premise of not departing from the spirit and scope of the utility model the utility model also have respectively
Kind changes and improvements, these changes and improvements are both fallen in claimed the scope of the utility model.The requires of the utility model
Protection domain defined by appended claims and its equivalent.
Claims (5)
1. a kind of cable laying constructing device, including rack (1), it is characterised in that:Fixed one of the front end of the rack (1)
Connecting plate (2) is opened on the connecting plate (2) there are one mounting hole (3), and it is horizontal that the front end of the rack (1) passes through bearing
One main shaft (4) is installed, a traveling wheel (5) is installed on the main shaft (4), the lower part of the rack (1) is arranged one
Trench digging head (6), for the trench digging head (6) at the rear of traveling wheel (5), vertical fixed one of the rear end of the rack (1) is vertical
Plate (7), the fixed trailing bar (8) in bottom of the riser (7), the trailing bar (8) trench digging head (6) just after
Side, the fixed fixed plate (9) in top of the rack (1) pass through bearing in the fixed plate (9) and install a cable
Axis (10), the fixed guide pipe (11) in lower part of the rack (1), the guide pipe (11) is after trench digging head (6)
Side.
2. a kind of cable laying constructing device according to claim 1, it is characterised in that:It is vertical in the rack (1)
A fixed support plate (12), for movable sleeve there are one sliding sleeve (13), the sliding sleeve (13) is opposite in the support plate (12)
In support plate (12) can upper and lower Frictional Slipping, the mode being connected through a screw thread on the sliding sleeve (13) is horizontally mounted a compression
The screw rod of bolt (14), the hold-down bolt (14) reaches sliding sleeve (13) inside, and hold-down bolt (14) presses sliding sleeve (13)
Tightly in support plate (12), the trench digging head (6) is installed on sliding sleeve (13).
3. a kind of cable laying constructing device according to claim 2, it is characterised in that:It is set in the support plate (12)
It is equipped with scale (15).
4. a kind of cable laying constructing device according to claim 1, it is characterised in that:The guide pipe (11) is by preceding
It tilts down backward.
5. a kind of cable laying constructing device according to claim 1, it is characterised in that:The shape of the trailing bar (8)
Shape is arc.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721299430.3U CN207884199U (en) | 2017-10-10 | 2017-10-10 | A kind of cable laying constructing device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721299430.3U CN207884199U (en) | 2017-10-10 | 2017-10-10 | A kind of cable laying constructing device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207884199U true CN207884199U (en) | 2018-09-18 |
Family
ID=63500530
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721299430.3U Active CN207884199U (en) | 2017-10-10 | 2017-10-10 | A kind of cable laying constructing device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207884199U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109672114A (en) * | 2019-01-21 | 2019-04-23 | 河北盛伟电力工程有限公司 | A kind of cable laying device |
CN111326991A (en) * | 2019-12-23 | 2020-06-23 | 深圳市科服信息技术有限公司 | Communication construction cable buries device underground |
CN113054592A (en) * | 2021-04-01 | 2021-06-29 | 厚祥建设有限公司 | High-efficiency cable burying device and using method thereof |
-
2017
- 2017-10-10 CN CN201721299430.3U patent/CN207884199U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109672114A (en) * | 2019-01-21 | 2019-04-23 | 河北盛伟电力工程有限公司 | A kind of cable laying device |
CN109672114B (en) * | 2019-01-21 | 2020-07-03 | 河北盛伟电力工程有限公司 | Cable laying device |
CN111326991A (en) * | 2019-12-23 | 2020-06-23 | 深圳市科服信息技术有限公司 | Communication construction cable buries device underground |
CN113054592A (en) * | 2021-04-01 | 2021-06-29 | 厚祥建设有限公司 | High-efficiency cable burying device and using method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207884199U (en) | A kind of cable laying constructing device | |
CN205935580U (en) | Novel large tracts of land mechanical float | |
CN210439271U (en) | Foundation tamping device for highway construction | |
CN202969381U (en) | Pile work machine use for driving pile | |
CN206367765U (en) | A kind of New-type refuse vehicle compressor station suitcase device | |
CN203346037U (en) | Hanging basket for spray seeding operation at very steep slope | |
CN215669780U (en) | Pipeline laying device for electric power installation | |
CN211556811U (en) | Support for corner of power transmission cable duct | |
CN210289649U (en) | Leakage-proof device for oil extraction pipeline | |
CN208292603U (en) | A kind of tunnel excavation operation platform | |
CN208844542U (en) | A kind of reinforcing soft foundation device | |
CN209169829U (en) | Multi-purpose assembly type cable unwinding device suitable for slope terrain | |
CN211113242U (en) | Combined sound insulation screen for expressway | |
CN216275749U (en) | A auxiliary device for structure of encorbelmenting backfills | |
CN203039301U (en) | A high-fall pipeline device | |
CN201883951U (en) | Overturn prevention device of piling machine | |
CN206787690U (en) | Shallow foundation hole overhead vehicle weight calculation equipment | |
CN211405426U (en) | Worker's well suitable for cable laying | |
CN207078816U (en) | Cable laying protection support | |
CN206290282U (en) | A kind of novel belt machine tail self-advancing device | |
CN105571886A (en) | Hydraulic support, surrounding rock coupling and automatic monitoring control analog simulation experiment stand and method | |
CN203039305U (en) | A pulley suspension bracket used for assembling a high-voltage cable connector | |
CN206396757U (en) | New Anchor Cable removes machine | |
CN204252115U (en) | A kind of civil engineering rammer structure | |
CN209162867U (en) | A kind of structure base structure not strong based on foundation bearing capacity |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |