Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820294883.5U
Other languages
Chinese (zh)
Inventor
康元丽
王春成
王跃
回彦年
孙昊成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Commercial Aircraft Corp of China Ltd
Beijing Aeronautic Science and Technology Research Institute of COMAC
Original Assignee
Commercial Aircraft Corp of China Ltd
Beijing Aeronautic Science and Technology Research Institute of COMAC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Commercial Aircraft Corp of China Ltd, Beijing Aeronautic Science and Technology Research Institute of COMAC filed Critical Commercial Aircraft Corp of China Ltd
Priority to CN201820294883.5U priority Critical patent/CN207882903U/en
Application granted granted Critical
Publication of CN207882903U publication Critical patent/CN207882903U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Control Of Eletrric Generators (AREA)

Abstract

It includes starter-generator analog module and adjustable filter unit that the utility model embodiment, which discloses a kind of starter-generator simulator and starter-generator simulation system, the starter-generator simulator,;The starter-generator analog module is simulated for the target motor parameter according to configuration to setting the working condition of target motor of model aircraft;The adjustable filter unit, it is connected with the starter-generator analog module, port current for being exported to the starter-generator analog module is filtered so that the port current exported under the port current working condition identical as the target motor of the starter-generator analog module is consistent.The utility model can improve the compatibility and versatility of starter-generator simulator, reduce experimental development cost, shorten the lead time.

Description

A kind of starter-generator simulator and starter-generator simulation system
Technical field
The utility model embodiment is related to electrical system technical field more particularly to a kind of starter-generator simulator and rises Dynamic generator simulation system.
Background technology
Starting-generating system is the core of entire aircraft power system, includes mainly starter-generator and starter-generator control Mechanical energy can be converted to various forms of electric energy by the equipment such as device processed, be used for all Mechatronic Systems on machine and electronic equipment.
The motor simulation device for being presently used for simulated firing electricity generation system is typically based on technical grade motor operating condition design and forms, Motor simulation device such as wind-driven generator simulator and for test controller characteristic, there is no be directed to the dedicated starting of aircraft Generator simulator.Also, for existing starter-generator simulator just for a kind of model design of electrical motor, compatibility is poor, only The characteristic of true motor could can be more accurately simulated under certain power grade, specific frequency and particular motor Parameter Conditions.And In the development process of aircraft, according to the difference of aircraft type, required power of motor grade, parameter of electric machine etc. can be Difference shortens the lead time, the stronger aircraft of versatility is needed to be simulated with starter-generator to reduce experimental development cost Device.
Utility model content
A kind of starter-generator simulator of the utility model embodiment offer and starter-generator simulation system, improve and start The compatibility and versatility of generator simulator reduce experimental development cost, shorten the lead time, started for various model aircrafts Demonstration, design and the integrated support that pre-verification is provided of electricity generation system.
In a first aspect, the utility model embodiment provides a kind of starter-generator simulator, including:Starter-generator mould Quasi- module and adjustable filter unit;
The starter-generator analog module, for the target motor parameter according to configuration, to setting the mesh of model aircraft The working condition of mark motor is simulated;
The adjustable filter unit is connected with the starter-generator analog module, for the starter-generator The port current that analog module is exported is filtered so that the port current of the starter-generator analog module and the mesh The port current exported under the identical working condition of mark motor is consistent.
Second aspect, the utility model embodiment additionally provide a kind of starter-generator simulation system, which is characterized in that packet It includes:Starter-generator simulator as described in relation to the first aspect, DC power supply, load, the second capacitance, starting-generating machine controller, Isolating transformer and motor characteristic controller;
Wherein, the DC power supply or the load pass through second capacitance and the starting-generating machine controller phase Even, the starting-generating machine controller is connected with the starter-generator simulator;The input terminal of the isolating transformer and three Phase power grid be connected, the output end of the isolating transformer is connected with the DC power supply, the motor characteristic controller with it is described Starter-generator simulator is connected;
The DC power supply is used to provide DC power supply in the starting dummy run phase for the starting-generating machine controller;
The load of target motor connection of the load for simulating the setting model aircraft;
Second capacitance is used to carry out voltage stabilizing and filtering to the starting-generating machine controller DC voltage;
The starting-generating machine controller is used to control the port voltage of the starter-generator simulator, is the starting Generator simulator provides electric energy;
The isolating transformer is used to carry out transformation to the voltage that the three phase network exports to obtain predeterminated voltage, and to institute It states starter-generator simulator and the predeterminated voltage is provided;
The motor characteristic controller is used for anti-according to preset motor real-time model and the starter-generator simulator The signal of feedback calculates parameter to be simulated needed for motor and the starter-generator simulator is supplied to carry out simulation tracing.
The utility model embodiment adds parameter by the starter-generator simulator in starter-generator simulation system Adjustable adjustable filter unit, the adjustment that filter unit is adjusted by the parameter of electric machine and hardware that are configured in software are realized Simulation to aircraft starting-generating system solves to carry out the exploitation week caused by experimental study using true motor in the prior art Phase is long, of high cost, application type is single and the compatibility and the poor problem of versatility of starter-generator simulator, realizes The starter-generator of flexible simulation different capacity grade, wide variable frequency range and different designs parameter, to improve starter-generator The compatibility and versatility of simulator reduce experimental development cost, shorten the lead time, are various model aircraft starting-generatings system Demonstration, design and the integrated support that pre-verification is provided of system.
Description of the drawings
Fig. 1 a are a kind of schematic diagrames for starter-generator simulator that the utility model embodiment one provides;
Fig. 1 b are a kind of schematic diagrames for starter-generator simulator that the utility model embodiment one provides;
Fig. 1 c are a kind of structural schematic diagrams for starter-generator analog module that the utility model embodiment one provides
Fig. 2 a are a kind of schematic diagrames for starter-generator simulation system that the utility model embodiment two provides;
Fig. 2 b are a kind of power flow cardons for starter-generator simulation system that the utility model embodiment two provides;
Fig. 2 c are a kind of structural schematic diagrams for starter-generator simulation system that the utility model embodiment two provides;
Fig. 2 d are a kind of information flows for starter-generator simulation system starting stage that the utility model embodiment two provides Schematic diagram;
Fig. 2 e are a kind of information flows for starter-generator simulation system power generating stage that the utility model embodiment two provides Schematic diagram;
Fig. 2 f are a kind of schematic diagrames of the equivalent circuit for non-salient pole permanent magnet synchronous motor that the utility model embodiment two provides;
Fig. 2 g are a kind of stator simulator exchange side stable state vector correlation figures that the utility model embodiment one provides;
Fig. 2 h are a kind of stator simulator exchange side stable state vector correlation figures that the utility model embodiment two provides;
Fig. 3 is a kind of flow chart for starter-generator analogy method that the utility model embodiment is applicable in;
Fig. 4 is a kind of flow chart for starter-generator analogy method that the utility model embodiment is applicable in.
Specific implementation mode
The utility model is described in further detail with reference to the accompanying drawings and examples.It is understood that herein Described specific embodiment is used only for explaining the utility model, rather than the restriction to the utility model.
Embodiment one
Fig. 1 a are a kind of schematic diagrames for starter-generator simulator that the utility model embodiment one provides, such as Fig. 1 a institutes Show, the concrete structure of the starter-generator simulator is as follows:
A kind of starter-generator simulator 10, including:Starter-generator analog module 11 and adjustable filter unit 12;Starter-generator analog module 11, for according to the target motor parameter of configuration, to setting the target motor of model aircraft Working condition is simulated;Adjustable filter unit 12, is connected with starter-generator analog module 11, for starter-generator The port current that analog module 11 is exported is filtered so that the port current of starter-generator analog module 11 and target electricity The port current exported under the identical working condition of machine is consistent.
Wherein, target motor parameter may include armature winding internal resistance, armature winding inductance, (Exciting Windings for Transverse Differential Protection internal resistance, excitation Winding inductance or permanent magnet flux linkage), number of pole-pairs, motor rotary inertia, damped coefficient, the ginsengs such as rated power and rated speed Number.Setting model aircraft target motor can be different model, different parameters true motor, utilize starter-generator mould When quasi- device 10 simulates true motor, in the power and voltage range that certain simulator is allowed, however, it would be possible to mould Intend any model true motor different with corresponding parameter.The working condition for setting the target motor of model aircraft includes starting State and the two different working conditions of generating state.Starter-generator analog module 11 can join according to the target motor of configuration Digital-to-analogue proposes the different working conditions for the target motor for determining model aircraft, and it is adjustable that the filtering parameter of filter unit 12, which is adjusted, , the standard port electric current that the true motor adaptively to match different model, different parameters is exported.
Correspondingly, the operation principle of the starter-generator simulator 10 is:It is simulated by starter-generator analog module 11 Port current of the target motor in starting stage and power generating stage of model aircraft is set, and right by adjustable filter unit 12 The port current that starter-generator analog module 11 exports is filtered so that the port current after filtered, which is more nearly, to be set Determine the port reference electric current that the target motor of model aircraft is exported in starting stage and power generating stage, and then realizes to a variety of differences Experimental demonstration is simulated and are unfolded to model, the characteristic of true motor of different parameters.
In an alternative embodiment of the utility model, the adjustable filter unit includes:At least two taps Inductor, and/or set the replaceable inductor of inductance value.
Wherein, the inductor of at least two taps is a kind of adjustable device of own inductance, the inductor with tap The range and interval of number of taps and inductance value can be designed according to actual demand.For example, the electricity of tap is carried Sensor can provide the inductance value of 10H-100H, between inductance value between be divided into 20H.When the inductor with tap is provided Inductance value when cannot meet the needs the parameter requirements of true motor of simulation, the design parameter that can be directed to true motor designs The inductor of corresponding inductance value is replaced the inductor with tap using the replaceable inductor of setting inductance value. Therefore, it frequently replaces in order to prevent and filter unit is adjusted, it, can be as possible by inductance usually when design carries the inductor of tap The range of value expands, to meet the simulation demand of the true motor of different model, different parameters.It is simulated in entire starter-generator In device, the function of adjustable filter unit is mainly to simulate the stator inductance of true starter-generator.
Fig. 1 b are a kind of schematic diagrames for starter-generator simulator that the utility model embodiment one provides, such as Fig. 1 b institutes Show, in an alternative embodiment of the utility model, starter-generator analog module 11 includes stator simulator 110, first Capacitance 120 and gird-connected inverter 130, wherein stator simulator 110 passes through the first capacitance 120 and 130 phase of gird-connected inverter Even, adjustable filter unit 12 is connected with stator simulator 110;Gird-connected inverter 130, for starting the dummy run phase by stator The electric energy that simulator 110 is obtained from external power supply carries out power grid feedback, and, to stator simulator in the dummy run phase that generates electricity 110 provide electric energy;First capacitance 120 is carried out for the busbar voltage between stator simulator 110 and gird-connected inverter 130 Voltage stabilizing and filtering;Stator simulator 110, for start the dummy run phase electric energy obtained from external power supply is sent to it is grid-connected inverse Become device 130 and carry out power grid feedback, and according to the target motor parameter of the configuration, of the target motor to setting model aircraft Dynamic state is simulated, and, the mesh of the electric energy and the configuration that are provided according to gird-connected inverter 130 in the dummy run phase that generates electricity The parameter of electric machine is marked, the generating state of the target motor of the setting model aircraft is simulated.
Wherein, stator simulator 110 can simulate different model, different parameters true motor, according to corresponding electric current Instruction exports corresponding port current, with the port reference electric current of the target motor of simulation setting model aircraft.Gird-connected inverter 130 are played the role of also differing in the starter-generator simulator different dummy run phase:The dummy run phase is started, it is grid-connected inverse Become the engine loading that device 130 is used to simulate true motor institute band;In the power generation dummy run phase, gird-connected inverter 130 is for being Dynamic generator simulator provides electric energy, be responsible for the electric energy feedback for absorbing stator simulator 110 from power supply to power grid with It realizes green energy conservation, and maintains DC bus-bar voltage.First capacitance 120 is then used to be stator simulator 110 and gird-connected inverter Busbar voltage between 130 carries out voltage stabilizing and filtering.
Fig. 1 c are a kind of structural schematic diagrams for starter-generator analog module that the utility model embodiment one provides, and are such as schemed Shown in 1c, in an alternative embodiment of the utility model, stator simulator 110 by setting quantity diode and crystal Pipe combination is constituted;And/or gird-connected inverter 130 is made of the diode of setting quantity and transistor combination.
Wherein, setting quantity can also carry out adaptability design with 6 according to actual demand, and the utility model is implemented Example is to this and is not limited, and optionally, transistor can select field-effect tube.In figure 1 c, stator simulator 110 and grid-connected The cathode and anode of diode in inverter 130 are connected with the drain electrode of field-effect tube and source electrode respectively.
Starter-generator analog module that the utility model embodiment includes by starter-generator simulator and inside and Adjustable filter unit simulates the characteristic of true motor, solves to carry out caused by experimental study using true motor in the prior art Development cycle is long, of high cost, application type is single and the compatibility of starter-generator simulator and versatility is poor asks Topic, realize flexible simulation different capacity grade, wide variable frequency range and different designs parameter starter-generator, started with improving The compatibility and versatility of generator simulator reduce experimental development cost, shorten the lead time, started for various model aircrafts Demonstration, design and the integrated support that pre-verification is provided of electricity generation system.
Embodiment two
Fig. 2 a are a kind of schematic diagrames for starter-generator simulation system that the utility model embodiment two provides, such as Fig. 2 a institutes Show, which specifically includes:
Starter-generator simulator 10, DC power supply 20 as described in embodiment one is any, the 90, second capacitance 30 of load, Starting-generating machine controller 40, isolating transformer 50 and motor characteristic controller 60;Wherein, DC power supply 20 passes through the second electricity Hold 30 with starting-generating machine controller 40 to be connected, starting-generating machine controller 40 is connected with starter-generator simulator 10;Isolation The input terminal of transformer 50 is connected with three phase network, and the output end of isolating transformer 50 is connected with DC power supply 20, motor characteristic Controller 60 is connected with starter-generator simulator 10;DC power supply 20 is used to provide direct current for starting-generating machine controller 40 Source;The load of target motor connection of the load 90 for simulating setting model aircraft;Second capacitance 30 is used for DC power supply 20 The voltage of output carries out voltage stabilizing and filtering;Starting-generating machine controller 40 is used to control the port electricity of starter-generator simulator 10 Pressure, electric energy is provided for the starter-generator simulator;The voltage that isolating transformer 50 is used to export three phase network becomes Pressure obtains predeterminated voltage, and provides the predeterminated voltage to starter-generator simulator 10;Motor characteristic controller 60 is used for root Calculating parameter to be simulated needed for motor according to preset motor real-time model is supplied to starter-generator simulator 10 to be simulated Tracking.
In the utility model embodiment, what starting-generating machine controller 40 was simulated is rising in aircraft starting-generating system Dynamic engine controller, in starter-generator simulation system, starting-generating machine controller 40 can control starting stage and hair The port voltage of starter-generator simulator 10 in the electric stage, and provide electric energy for starter-generator simulator 10.Default electricity Pressure is the in running order required voltage of starter-generator simulation system.Under normal conditions, three phase network UVW is directly exported Voltage can be too high or too low, be not directly applicable starter-generator simulation system.Therefore, in starter-generator simulation system Middle addition isolating transformer 50 carries out transformation with the voltage exported to three phase network UVW and obtains predeterminated voltage.Motor characteristic controls Device 60 is with DSP (Digital Signal Processor, digital signal processor) and FPGA (Field-Programmable Gate Array, field programmable gate array) it is core, it is acquired in starter-generator simulator 10 by the form of feedback signal The electric current and voltage of stator simulator 110 and 130 DC side of gird-connected inverter and exchange side, and based on the motor that can flexibly change Real-time model calculates electric current, voltage value that stator simulator 110 should send out or absorb, and controls stator mould by controlling signal The break-make of transistor in quasi- device 110 and gird-connected inverter 130, to realize to the corresponding starting-generating of true motor systematically mould It is quasi-.Motor characteristic controller 60 based on DSP+FPGA has stronger compatibility, and motor real-time model, control can be adjusted flexibly Algorithm processed and control logic, to enable the true starting-generating system that starter-generator simulation system is accurately simulated on software The operating condition of system, while the operating condition of simulation is expanded into a larger range, it can greatly extend starting-generating The compatibility of machine simulation system.
Fig. 2 b are a kind of power flow cardons for starter-generator simulation system that the utility model embodiment two provides, accordingly , as shown in Figure 2 b, the operation principle of the starter-generator simulation system in the utility model embodiment is:In starting stage, System obtains the predeterminated voltage after isolating transformer carries out transformation by three phase network, and is starter-generator by DC power supply Stator simulator, gird-connected inverter in controller, starter-generator analog module provide power supply.It is grid-connected inverse in power generating stage Become device be used as power supply into the load outside stator simulator, starting-generating machine controller and starter-generator simulation system (here Load simulation be actual airplane starting-generating system connection load) power supply.It should be noted that in power generating stage, figure DC power supply need not access circuit in 2a, it is therefore desirable to add switch and load in DC side.In actual circuit diagram In, it can be straight by two switch (such as contactor or relay) access loads or access between DC power supply and the second capacitance Galvanic electricity source so that in starting stage, DC power supply is accessed by circuit (not accessing load) by one of switch, in power generation rank Load is accessed circuit (not accessing DC power supply) by section by another switch.
Fig. 2 c are a kind of structural schematic diagrams for starter-generator simulation system that the utility model embodiment two provides, and are such as schemed Shown in 2c, in an alternative embodiment of the utility model, starting-generating machine controller 40 by the diode of setting quantity with And transistor combination is constituted.In an alternative embodiment of the utility model, starter-generator simulation system further includes:Open circuit Device 70 and filter circuit 80;One end of breaker 70 is connected with starting-generating machine controller 40, the other end of breaker 70 with rise Dynamic generator simulator 10 is connected, and the input terminal of filter circuit 80 is connected with isolating transformer 50, the output end of filter circuit 80 It is connected with starter-generator simulator 10;Breaker 70 is used to, when short circuit occurs in starter-generator simulation system, disconnect and start Connection between engine controller 40 and starter-generator simulator 10;Filter circuit 80 is for defeated to gird-connected inverter 130 The voltage gone out is filtered.
Wherein, the diode and transistor for setting quantity can equally be set according to actual demand, optionally, brilliant Field-effect tube may be used in body pipe.The main function of breaker 70 is the entire starter-generator simulation system of protection, anti-locking system To the damage of each device caused by short circuit.The voltage that filter circuit 80 then is used to export gird-connected inverter 130 is filtered, To provide the power supply for meeting waveform quality requirement for system.Filter circuit 80 is a kind of passive filter circuit, may include electricity The devices such as appearance, inductance, resistance.In addition, as shown in Figure 2 c, adjustable filter unit 12 is connected to open circuit in the form of three inductance Between device 70 and stator simulator 110, it should be noted that actual adjustable filter unit is using the inductance with tap It is not the mode with three inductance connections in circuit structure, but it is (packaged to connect the inductor with tap when device Device) fixed interface.In addition, be the prior art since filter circuit 80 is filtered three-phase voltage, internal device Composition and corresponding connection type there is a situation where it is a variety of different, therefore Fig. 2 c do not show that the internal components of filter circuit 80 with And its specific connection type.
As shown in Figure 2 c, in an alternative embodiment of the utility model, motor characteristic controller 60 is additionally operable to control The break-make of transistor in starting-generating machine controller 40, stator simulator 110 and gird-connected inverter 130.When transistor is selected When field-effect tube, Fig. 2 c do not show that institute in starting-generating machine controller 40, stator simulator 110 and gird-connected inverter 130 There is the connection type of the grid of field-effect tube, it should be noted that the grid of these field-effect tube is controlled by motor characteristic What device 60 was attached it and was controlled by corresponding pin.
In the utility model embodiment, starter-generator simulation system can simulate the target motor of setting model aircraft Starting stage and the two different working conditions of power generating stage.When being simulated, the starting rank of simulated target motor first Section, the then power generating stage of simulated target motor again.Fig. 2 d are a kind of starter-generators that the utility model embodiment two provides The information flow diagram of simulation system starting stage.As shown in Figure 2 d, in system simulated target electric motor starting phase process, electricity Machine characteristic control can detect the port voltage U of stator simulator first with voltage sampling unit1(breaker and stator mould Between quasi- device or the voltage between starting-generating machine controller and stator simulator), then with voltage U1, load torque TwFor input Amount calculates target motor in port voltage U in real time by the digital model in motor characteristic controller1Port under effect Reference current I1With rotating speed n, the electromagnetic torque T of target motor can also be calculatedemWith the angle theta of rotation.Then by end Mouth reference current I1Current control as stator simulator instructs, the consistent port electricity of control stator simulator reality output Stream.
Fig. 2 e are a kind of information flows for starter-generator simulation system power generating stage that the utility model embodiment two provides Schematic diagram.As shown in Figure 2 e, in system simulated target electric power generation phase process, motor characteristic controller can be first with Voltage sampling unit detects the port voltage U of stator simulator2(between breaker and stator simulator or starter-generator control Voltage between device and stator simulator processed), then with voltage U2, rotating speed n be input quantity pass through the number in motor characteristic controller Word model calculates target motor in port voltage U in real time2Port reference electric current I under effect2With load torque Tw, may be used also To calculate the electromagnetic torque T of target motoremWith the angle theta of rotation.Then by port reference electric current I2As stator mould The current control instruction of quasi- device, the consistent port current of control stator simulator reality output.
It should be noted that either starting stage and power generating stage, the work that starter-generator simulator is completed are equal It is the digitalized motor mould enabled in port current (inductive current of adjustable filter unit output) tracking motor characteristic control The port reference electric current for the target motor that type is calculated, what is externally presented is current source characteristic.Also, for starting rank For section and power generating stage, the port voltage of starter-generator simulator is determined by starting-generating machine controller, no It is controlled by starter-generator simulator.
In the utility model embodiment, important composition portion of the filter unit as starter-generator simulator is adjusted Point, be the key that starter-generator simulator can accurately simulate different model, different parameters true motor, and be different from The key of technical grade motor simulation device at present is mainly used for the stator inductance of simulated firing generator.Starter-generator simulator Main task be to simulate the port reference current characteristics of true motor, and the port reference electric current of true motor levels off to sine Wave.In order to enable the current waveform of the starter-generator simulator preferably true motor of simulation, it is necessary to the properly adjustable filter of design Wave unit, to be filtered to port current.The inductance of adjustable filter unit is bigger, is got over to the filter effect of port current It is good.But the value of filter inductance cannot unlimitedly increase, and be limited by starter-generator simulator DC bus-bar voltage.
In order to facilitate understanding, the utility model embodiment is illustrated by taking non-salient pole permanent magnet synchronous motor as an example.Fig. 2 f are these A kind of schematic diagram of the equivalent circuit for non-salient pole permanent magnet synchronous motor that utility model embodiment two provides.As shown in figure 2f, whereinFor counter electromotive force of motor,For motor port voltage, XsSynchronous reactance for motor per phase winding, RaFor the electricity of every phase winding Resistance.For a designed motor, under certain rotating speed,XsWith RaIt is constant.And in different control Under method and load, amplitude and the phase of armature supply have very big difference so that its armature reaction electric potentialAlso have very Big difference.But no matter under which kind of operating mode, each electricity in equivalent circuit diagram Fig. 2 f is both needed to meet basic circuital law, Otherwise this operating mode can not possibly then exist.If to simulate a motor completely, need to only provide identical with true motor 'sXsWith Ra, can determine that starter-generator simulator can run all operating modes of true motor at this time.
But due to true motorApproximate sine wave, depending on sub- simulator outputContain a large amount of switch The harmonic wave of frequency and its integral multiple.To make the electric current that stator simulator exports in THD (Total Harmonic Distortion, total harmonic distortion) on can be drawn close to the port reference electric current of true motor, the filter reactance of stator simulator is answered It is more true X than motorsLarger.The filter reactance of bigger makes the pressure drop in filter reactance increase, therefore in identical port voltage In the case of,Value also accordingly to increase.It can be provided due to stator simulatorBy straight in starter-generator simulator The limitation of busbar voltage is flowed, therefore the value of filter inductance can not be increased unlimitedly, according to the difference of motor operating mode, there are one Enable the upper limit value of circuit steady-state operation.Frequency under a certain operating mode is bigger or port current is bigger, then in filter reactance Pressure drop it is also bigger, the upper limit value of filter inductance is also just smaller.
Fig. 2 g are a kind of stator simulator exchange side stable state vector correlation figures that the utility model embodiment two provides, specifically , under stator simulator limit, the vector correlation of pressure drop on the voltage and inductance of stator simulator filter inductance both sides As shown in Figure 2 g.Stator simulator exchange side resistance is had ignored in Fig. 2 g, and fundamental wave sinusoidal electric quantity is only discussed.In figure 2g, V is Stator simulator exchange side phase voltage phasor, the phase voltage fundamental phasors that U is starting-generating machine controller exchange side, I are to start Engine controller exchange side phase current phasor, VLIt is the pressure drop on adjustable filter unit.When | U | it is constant, and | I | it is certain When, as the variation phasor V endpoint traces of power-factor angle ψ are with | VL| it is the circle of radius.A, C is stator simulator work(respectively The state point for the pure reactive power that rate factor is 0, B, D are stator simulator unit power factor rectifier, inverter mode respectively Operating point (stator simulator exchange side reference direction Motor convention).As stator simulator DC voltage VpnIt is fixed after determination Sub- simulator exchange side peak-peak also just determines therewith, i.e., | V |max=MVpn.Wherein, M is PWM (Pulse Width Modulation, pulse width modulation) phase voltage peak use rate, according to SVPWM (Space Vector Pulse Width Modulation, space vector pulse width modulation) modulation, then
With the variation of power factor and I, the size and Orientation of V can change in Fig. 2 g, U, V, VLConstitute one A phasor triangle.But by | V |max=MVpnIt is found that the maximum value of V is by VpnLimitation, therefore the adjustable maximum magnitude of V is With O1For the center of circle, | V |maxFor the circle of radius.And U, V, VLTwo vertex of phasor triangle are fixed, and third vertex is located at O For the center of circle, | VL| on the circle of radius, wherein E, F are the limit point intersected with circle O that voltage V can reach respectively.Fig. 2 h are A kind of stator simulator exchange side stable state vector correlation figure that the utility model embodiment two provides.As shown in fig. 2h, if | VL | too big and system is generated electricity with non-unity power factor, then is likely to occur phasor triangle third vertex and is located at circle O1Except Situation.Since V can not reach this vertex at this time, system can not be run under this operating mode.
From the foregoing discussion, it should be apparent that under a certain port voltage electric current | VL| size determine that can system simulate this operating mode.It is holding In the case of known to mouth voltage, port current, need to make limitation to the inductance value that filter unit is adjusted to limit | VL| size.It can Adjust the maximum value inductance value L of filter unitmaxIt can be given by: Wherein, f is current first harmonics frequency.
Judge that can starter-generator simulation system simulate the parameter of certain a set of true motor, a certain motor control is calculated Method or some motor operation operating mode are inherently to judge that can the system simulate all motors corresponding to the above situation Port voltage, port current situation.Therefore, it needs to find out first when judging to be simulated closest to starter-generator simulation system The port voltage for the potential limit of uniting, the port current situation (feelings that port voltage is high, port current is big, power factor is small, frequency is high Condition), then consider whether voltage and current amplitude has exceeded the limitation of switching device (transistor) and over-voltage over-current protection circuit. If not provided, further according to formulaCalculate a certain port voltage, end L under mouth electric currentmaxValue.If what adjustable filter unit was selected is the inductor with tap, and LmaxLess than any one Tap inductor value, then this port voltage electric current cannot be simulated by showing starter-generator simulation system centainly.Conversely, selection ratio LmaxThe tapped inductor small, inductance value is larger as possible is simulated.Therefore for the design of adjustable filter unit In selection, the inductor with tap for selecting a larger inductance value range is needed, a tap is pulled out every certain inductance value, It is customized according to actual demand.In addition, since adjustable filter unit is extremely important during hardware is debugged, so If it is required that the motor characteristic simulation precision of setting model aircraft is more demanding, being adapted to property design setting inductance value is replaced Inductor is changed, and the replaceable inductor of inductance value will be set as adjustable filter unit.It is single by adjustable filtering The design or replacement of member can make starter-generator simulator (starter-generator simulation system) can be compared in the angle of hardware The accurate large range of true motor operation operating mode of simulation, to greatly expand the compatibility of hardware, shorten New-type electric machine or The proving period of controller control strategy, and then save development cost.
The hardware and software that the utility model embodiment includes by starter-generator simulation system for different model, no The demand of same parameter aircrafts electric machinery is adjusted, and solves to carry out opening caused by experimental study using true motor in the prior art Send out that the period is long, of high cost, application type is single and the compatibility and the poor problem of versatility of starter-generator simulator, The starter-generator of the flexible simulation different capacity grade of realization, wide variable frequency range and different designs parameter, is sent out with improving starting The compatibility and versatility of motor simulation device, reduce experimental development cost, shorten the lead time, and hair is started for various model aircrafts Demonstration, design and the integrated support that pre-verification is provided of electric system.
Fig. 3 is a kind of flow chart for starter-generator analogy method that the utility model embodiment is applicable in, the present embodiment It is applicable to simulation different model, the working condition of the corresponding true motor of different parameters, which can specifically include Following operation:
Step 310, motor characteristic controller acquisition starter-generator simulator are in the first port voltage of starting stage.
For utility model in the starting stage of simulated target motor, motor characteristic controller is firstly the need of acquisition starting-generating Machine simulator is in the first port voltage of starting stage.Wherein, with reference to figure 2a and Fig. 2 c, when in starter-generator simulation system When not having breaker between starting-generating machine controller and adjustable filter unit, first port voltage is referred in starting stage Voltage between middle starting-generating machine controller and adjustable filter unit;When starter-generator in starter-generator simulation system When having breaker between controller and adjustable filter unit, first port voltage refers to the breaker in starting stage and can Adjust the voltage between filter unit.
Step 320, the motor characteristic controller are according to the negative of the first port voltage and the target motor simulated Set torque calculates the first port reference current of the target motor.
Wherein, first port reference current is the port electricity of simulated target motor under starting stage working condition Stream.In the utility model embodiment, when calculating port current of the target motor under the state of starting to work, need with first end Mouth voltage and load torque calculate target motor in real time as input quantity by the digital model in motor characteristic controller First port reference current under the effect of first port voltage.At the same time it can also calculate mesh by motor characteristic controller Mark the information such as angle and the electromagnetic torque that rotating speed, target motor of the motor under the effect of first port voltage rotate.When there is it When his demand, exported to starting-generating machine controller after the information such as rotating speed can also being encoded to realize closed loop.
Step 330, the motor characteristic controller send the calculated first port to starter-generator simulator The matched current control instruction of reference current, to control the starter-generator simulator output with the first port with reference to electricity Flow consistent first port electric current.
In the utility model embodiment, after motor characteristic controller calculates first port reference current, according to Single port reference current calculates its matched current control instruction, and current control instruction is sent to starter-generator simulation Device, and then control the output of starter-generator simulator and the matched first port electric current of the first port reference current.It needs Illustrate, since the corresponding first port reference current of target motor levels off to sine wave, and starter-generator simulator is defeated The original port current gone out is PWM wave, in order to enable the first end of starter-generator simulator preferably simulated target motor The waveform of mouth reference current needs the original port to output using the adjustable filter unit in starter-generator simulator Electric current is filtered so that first port electric current is consistent with first port reference current.
The utility model embodiment is by motor characteristic controller by collected first port voltage and the mesh simulated The load torque for marking motor calculates the first port reference current of target motor;And it is sent and first to starter-generator simulator The current control of port reference currents match instructs, to control the output of starter-generator simulator and first port reference current The first port electric current matched realizes the simulation to target motor starting stage, solves to carry out using true motor in the prior art Development cycle caused by experimental study is long, of high cost, application type is single and the compatibility of starter-generator simulator and The poor problem of versatility realizes the starting hair of flexibly simulation different capacity grade, wide variable frequency range and different designs parameter The starting stage of motor reduces experimental development cost, shortens and grind to improve the compatibility and versatility of starter-generator simulator Period processed, for the demonstration of various model aircraft starting-generating systems, design and the integrated support for providing pre-verification.
Fig. 4 is a kind of flow chart for starter-generator analogy method that the utility model embodiment is applicable in, the workflow Journey can specifically include following operation:
Step 410, motor characteristic controller acquisition starter-generator simulator are in the first port voltage of starting stage.
Step 420, the motor characteristic controller are according to the negative of the first port voltage and the target motor simulated Set torque calculates the first port reference current of the target motor.
Step 430, the motor characteristic controller send the calculated first port to starter-generator simulator The matched current control instruction of reference current, to control the starter-generator simulator output with the first port with reference to electricity Flow consistent first port electric current.
Step 440, motor characteristic controller acquisition starter-generator simulator are in the second port of power generating stage Voltage.
In the utility model embodiment, also need to answer starter-generator simulator the output phase by way of software The current-order of working condition.For this purpose, in the power generating stage of simulated target motor, motor characteristic controller is firstly the need of acquisition Starter-generator simulator is in the second port voltage of power generating stage.Wherein, with reference to figure 2a and Fig. 2 c, when starter-generator mould When not having breaker between starting-generating machine controller and adjustable filter unit in quasi- system, second port voltage refers to Voltage in power generating stage between starting-generating machine controller and adjustable filter unit;It is risen when in starter-generator simulation system Dynamic when having breaker between engine controller and adjustable filter unit, second port voltage refers to interrupting in power generating stage Voltage between road device and adjustable filter unit.
Step 450, the motor characteristic controller are according to the tachometer of the second port voltage and the target motor Calculate the second port reference current of the target motor.
Wherein, second port reference current is the port electricity of simulated target motor under power generating stage working condition Stream.In the utility model embodiment, when calculating port current of the target motor under power generation operation state, need with second end Mouthful voltage and rotating speed calculate target motor the in real time as input quantity, by the digital model in motor characteristic controller Second port reference current under the effect of Two-port netwerk voltage.At the same time it can also calculate target electricity by motor characteristic controller The information such as load torque, the angle of target motor rotation and electromagnetic torque of the machine under the effect of second port voltage.
Step 460, the motor characteristic controller send calculated described second to the starter-generator simulator The current control of port reference currents match instructs, and is joined with the second port with controlling the starter-generator simulator output Examine the second port electric current of currents match.
In the utility model embodiment, after motor characteristic controller calculates second port reference current, according to Two-port netwerk reference current calculates its matched current control instruction, and current control instruction is sent to starter-generator simulation Device, and then control the output of starter-generator simulator and the matched second port electric current of the second port reference current.It needs Illustrate, since the corresponding second port reference current of target motor equally levels off to sine wave, and starter-generator is simulated The original port current of device output is PWM wave, in order to enable the of starter-generator simulator preferably simulated target motor The waveform of Two-port netwerk reference current is needed using the adjustable filter unit in starter-generator simulator to the original of output Port current is filtered so that second port electric current is consistent with second port reference current.
It should be noted that S410-S460 is illustratively formed a kind of the utility model reality by the utility model embodiment The starter-generator analogy method that example is applicable in is applied, different capacity grade, wide variable frequency range and difference can be simulated simultaneously and set Count the starting stage and power generating stage of the starter-generator of parameter.But the present embodiment is only the example of the present invention, may be used also S430 and S460 are formed a kind of starter-generator analogy method that the utility model embodiment is applicable in, for simulating difference The power generating stage of the starter-generator of power grade, wide variable frequency range and different designs parameter.
The utility model embodiment is by motor characteristic controller by collected second port voltage and the mesh simulated The rotating speed for marking motor calculates the second port reference current of target motor;And to starter-generator simulator send and second port The matched current control instruction of reference current, it is matched with second port reference current to control the output of starter-generator simulator Second port electric current realizes the simulation to target motor power generating stage, solves to be tested using true motor in the prior art Development cycle caused by research institute is long, of high cost, application type is single and the compatibility of starter-generator simulator and general Property poor problem, realize flexible simulation different capacity grade, wide variable frequency range and different designs parameter starter-generator Starting stage and power generating stage, to improve the compatibility and versatility of starter-generator simulator, reduce experimental development cost, Shorten the lead time, for the demonstration of various model aircraft starting-generating systems, design and the integrated branch for providing pre-verification Support.
Note that above are only the preferred embodiment and institute's application technology principle of the utility model.Those skilled in the art's meeting Understand, the utility model is not limited to specific embodiment described here, can carry out for a person skilled in the art various bright Aobvious variation is readjusted and is substituted without departing from the scope of protection of the utility model.Therefore, although passing through above example The utility model is described in further detail, but the utility model is not limited only to above example, is not departing from Can also include other more equivalent embodiments in the case that the utility model is conceived, and the scope of the utility model is by appended Right determine.

Claims (8)

1. a kind of starter-generator simulator, which is characterized in that including:Starter-generator analog module, and adjustable filtering Unit;
The starter-generator analog module, for the target motor parameter according to configuration, to setting the target electricity of model aircraft The working condition of machine is simulated;
The adjustable filter unit is connected with the starter-generator analog module, for being simulated to the starter-generator The port current that module is exported is filtered so that the port current of the starter-generator analog module and target electricity The port current exported under the identical working condition of machine is consistent.
2. starter-generator simulator according to claim 1, which is characterized in that the adjustable filter unit includes: The inductor of at least two taps, and/or set the replaceable inductor of inductance value.
3. starter-generator simulator according to claim 1 or 2, which is characterized in that the starter-generator simulates mould Block includes stator simulator, the first capacitance and gird-connected inverter, wherein the stator simulator passes through first capacitance It is connected with the gird-connected inverter, the adjustable filter unit is connected with the stator simulator;
The gird-connected inverter, the electric energy for obtaining the stator simulator from external power supply in the starting dummy run phase carry out Power grid feedback, and, in the power generation dummy run phase electric energy is provided to the stator simulator;
First capacitance, between the stator simulator and the gird-connected inverter busbar voltage carry out voltage stabilizing and Filtering;
The stator simulator, for the electric energy obtained from external power supply to be sent to the parallel network reverse in the starting dummy run phase Device carries out power grid feedback, and according to the target motor parameter of the configuration, the starting shape of the target motor to setting model aircraft State is simulated, and, the target of the electric energy and the configuration that are provided according to the gird-connected inverter in the dummy run phase that generates electricity The parameter of electric machine simulates the generating state of the target motor of the setting model aircraft.
4. starter-generator simulator according to claim 3, it is characterised in that:
The stator simulator is made of the diode of setting quantity and transistor combination;And/or
The gird-connected inverter is made of the diode of setting quantity and transistor combination.
5. a kind of starter-generator simulation system, which is characterized in that including:It is sent out as claim 3-4 any one of them starts Motor simulation device, DC power supply, load, the second capacitance, starting-generating machine controller, isolating transformer and motor characteristic control Device;
Wherein, the DC power supply or the load are connected by second capacitance with the starting-generating machine controller, institute Starting-generating machine controller is stated with the starter-generator simulator to be connected;The input terminal and three phase network of the isolating transformer It is connected, the output end of the isolating transformer is connected with the DC power supply, and the motor characteristic controller is sent out with the starting Motor simulation device is connected;
The DC power supply is used to provide DC power supply in the starting dummy run phase for the starting-generating machine controller;
The load of target motor connection of the load for simulating the setting model aircraft;
Second capacitance is used to carry out voltage stabilizing and filtering to the voltage of the starting-generating machine controller DC side;
The starting-generating machine controller is used to control the port voltage of the starter-generator simulator, is the starting-generating Machine simulator provides electric energy;
The isolating transformer is used to carry out transformation to the voltage that the three phase network exports to obtain predeterminated voltage, and to described Dynamic generator simulator provides the predeterminated voltage;
What the motor characteristic controller was used to be fed back according to preset motor real-time model and the starter-generator simulator Signal calculates parameter to be simulated needed for motor and the starter-generator simulator is supplied to carry out simulation tracing.
6. system according to claim 5, which is characterized in that the starting-generating machine controller by setting quantity two poles Pipe and transistor combination are constituted.
7. system according to claim 6, which is characterized in that the motor characteristic controller is additionally operable to control the starting The break-make of transistor in engine controller, the stator simulator and the gird-connected inverter.
8. system according to claim 5, which is characterized in that the system also includes:Breaker and filter circuit;
One end of the breaker is connected with the starting-generating machine controller, and the other end of the breaker is sent out with the starting Motor simulation device is connected, and the input terminal of the filter circuit is connected with the isolating transformer, the output end of the filter circuit It is connected with the starter-generator simulator;
The breaker is used to, when short circuit occurs in the starter-generator simulation system, disconnect starting-generating machine controller and institute State the connection between starter-generator simulator;
The voltage that the filter circuit is used to export the gird-connected inverter is filtered.
CN201820294883.5U 2018-03-02 2018-03-02 A kind of starter-generator simulator and starter-generator simulation system Active CN207882903U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820294883.5U CN207882903U (en) 2018-03-02 2018-03-02 A kind of starter-generator simulator and starter-generator simulation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820294883.5U CN207882903U (en) 2018-03-02 2018-03-02 A kind of starter-generator simulator and starter-generator simulation system

Publications (1)

Publication Number Publication Date
CN207882903U true CN207882903U (en) 2018-09-18

Family

ID=63496873

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820294883.5U Active CN207882903U (en) 2018-03-02 2018-03-02 A kind of starter-generator simulator and starter-generator simulation system

Country Status (1)

Country Link
CN (1) CN207882903U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108241791A (en) * 2018-03-02 2018-07-03 中国商用飞机有限责任公司北京民用飞机技术研究中心 A kind of starter-generator simulator, starter-generator simulation system and method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108241791A (en) * 2018-03-02 2018-07-03 中国商用飞机有限责任公司北京民用飞机技术研究中心 A kind of starter-generator simulator, starter-generator simulation system and method

Similar Documents

Publication Publication Date Title
Prince et al. Modeling, parameter measurement, and control of PMSG-based grid-connected wind energy conversion system
Zhi et al. Model-based predictive direct power control of doubly fed induction generators
Jadric et al. Modeling and control of a synchronous generator with an active DC load
Zhi et al. Direct power control of DFIG with constant switching frequency and improved transient performance
CN103731079B (en) A kind of winding permanent magnet motor system of opening of common bus structure and the control method of suppression zero-sequence current thereof
CN108241791A (en) A kind of starter-generator simulator, starter-generator simulation system and method
CN107302330B (en) A kind of durface mounted permanent magnet synchronous motor loss minimization controller method
CN105811825A (en) Current compensation based power decoupling method of virtual synchronous power generator
Wang et al. Study of a novel energy efficient single-phase induction motor with three series-connected windings and two capacitors
CN105449639B (en) Voltage protection control method and device based on permanent magnet synchronous motor driver
CN110609230A (en) Power level simulation driving system and method of permanent magnet synchronous motor
CN102497154A (en) Method for avoiding shutdown of frequency converter under instantaneous power-down situation
CN108449000A (en) A kind of aircraft starting-generating system analog architectures and hardware design schematic circuit
CN207882903U (en) A kind of starter-generator simulator and starter-generator simulation system
CN106301055A (en) Inverter parallel loop current suppression system based on virtual synchronous generator control strategy
CN109494799A (en) Based on the magneto alternator direct grid-connected system and its control method for opening winding construction
Bhaskar et al. Non linear control of STATCOM
Song et al. Implementation of improved direct torque control method of brushless doubly-fed reluctance machines for wind turbine
CN107359645B (en) Zero-transition-process dynamic grid-connected system of permanent-magnet direct-drive fan
Oettmeier et al. Power-electronic-based machine emulator for high-power high-frequency drive converter test
Pattnaik et al. Control of double output induction machine based stand alone variable speed constant frequency generator with nonlinear and unbalanced loads
CN201160242Y (en) Series excited machine
Tsvetanov et al. Harmonic compensation in ship power system using peak detection control strategy based shunt active power filter
Afrasiabi et al. Dead Time Analysis of a Power-Hardware-in-the-Loop Emulator for Induction Machines
Yuan et al. Construction and first result of a scaled transmission system with the Distributed Power Flow Controller (DPFC)

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant