CN207874817U - A kind of TPE production equipments water-circulating cooling device - Google Patents

A kind of TPE production equipments water-circulating cooling device Download PDF

Info

Publication number
CN207874817U
CN207874817U CN201721856430.9U CN201721856430U CN207874817U CN 207874817 U CN207874817 U CN 207874817U CN 201721856430 U CN201721856430 U CN 201721856430U CN 207874817 U CN207874817 U CN 207874817U
Authority
CN
China
Prior art keywords
tpe
water
wall
pipe
pressure chamber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721856430.9U
Other languages
Chinese (zh)
Inventor
杨洸
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangyin City Guang Yang Plastics Co Ltd
Original Assignee
Jiangyin City Guang Yang Plastics Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangyin City Guang Yang Plastics Co Ltd filed Critical Jiangyin City Guang Yang Plastics Co Ltd
Priority to CN201721856430.9U priority Critical patent/CN207874817U/en
Application granted granted Critical
Publication of CN207874817U publication Critical patent/CN207874817U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of TPE production equipments water-circulating cooling device,Including first support,TPE water cooling boxes are installed at the top of the first support,The inside of the TPE water cooling boxes is equipped with TPE water cooling tubes,It is provided with water inlet pipe and discharge port on the side outer wall of the TPE water cooling tubes,It is provided with outlet pipe and feed inlet on the outer wall of the other side,The water inlet pipe is located at the side of discharge port,The outlet pipe is located at the side of feed inlet,The TPE water cooling boxes are connected with cooler bin by water pipe,The inside of the cooler bin is equipped with 200 controllers of AMA,Pressure chamber,Aspiration pump,Hydraulic pump and fuel tank,The utility model installs Pressure chamber in cooler bin,Pass through cooling liquid steam pressure in hydraulic cylinder intensified pressure storehouse,Pressure rises causes Pressure chamber outside wall temperature to increase greatly,Hot-air is taken away by aspiration pump,Again by high-pressure coolant steam liquefied,Reduce coolant temperature,Complete the process of coolant liquid cooling,It is simple in structure compared to existing water circulation cooling device,And greatly improve cooling efficiency,Improve production equipment yield.

Description

A kind of TPE production equipments water-circulating cooling device
Technical field
The utility model belongs to TPE production equipment technologies, and in particular to a kind of TPE production equipments water-circulating cooling It sets.
Background technology
TPE is a kind of thermoplastic elastic material, have high intensity, high resilience, can injection molding feature, using model It encloses extensively, environment-protecting and non-poisonous safety has excellent coloring, soft-touch, weatherability, fatigue resistance and temperature tolerance, processing performance Superior, without vulcanization, can recycle reduces cost, both can be with secondary injection molding, with the matrixes such as PP, PE, PC, PS, ABS Material coating and bonding, can also be separately formed.
But existing TPE production equipments, there are coolant liquid cycle efficieny is low, consume energy high disadvantage, and in cooling cycle It is serious to waste electric power resource.
Utility model content
The purpose of this utility model is to provide a kind of TPE production equipments water-circulating cooling devices, existing cold to solve But cycle efficieny is low, energy consumption is high, and electric power resource wastes serious problem.
To achieve the above object, the utility model provides the following technical solutions:A kind of TPE production equipments water-circulating cooling It sets, including first support, TPE water cooling boxes is installed at the top of the first support, the inside of the TPE water cooling boxes is equipped with TPE water cooling tubes are provided with water inlet pipe and discharge port on the side outer wall of the TPE water cooling tubes, are provided with out on the outer wall of the other side Water pipe and feed inlet, the water inlet pipe are located at the side of discharge port, and the outlet pipe is located at the side of feed inlet, the TPE water Ice chest is connected with cooler bin by water pipe, and the inside of the cooler bin is equipped with AMA-200 controllers, Pressure chamber, aspiration pump, liquid Press pump and fuel tank, the Pressure chamber are located between AMA-200 controllers, aspiration pump and hydraulic pump, fuel tank, the Pressure chamber it is outer Demister is connected with by fluid pipeline close to the side of aspiration pump on wall, and is controlled close to AMA-200 on the outer wall of Pressure chamber The side of device is connected with atomizer by fluid pipeline, is equipped with suction pump at the top of the atomizer, and the one of the cooler bin It is provided with air pipeline on the outer wall of side, and air inlet, the pressure are offered on the adjacent side outer wall with fluid pipeline of cooler bin The inside top in power storehouse is equipped with hydraulic cylinder, and the hydraulic cylinder is connected with compression plate, the side of the compression plate by hydraulic stem Baroceptor is installed, one end of the air pipeline is equipped with air-dry machine, and the bottom of the air-dry machine is equipped on outer wall Third holder, and the inside of air-dry machine is equipped with conveyer belt, and feeder motor is provided on the side outer wall of the air-dry machine and is dissipated Hot mouth, the feeder motor are located at the top of thermovent, and the side of the first support is provided with second support, described second Heat is installed at the top of frame and melts case and extruder motor, the heat melts the side that case is located at extruder motor, and the heat melts the top of case Feed hopper is installed, and TPE liquid pumps are installed on the hot side outer wall for melting case, the extruder motor passes through feed pipe and fixes company It is connected to TPE water cooling boxes, the TPE liquid pumps, extruder motor, feeder motor, aspiration pump, demister, atomizer, suction pump, liquid Press pump, electronics check valve and baroceptor are connect with AMA-200 controllers.
Preferably, there are three the TPE water cooling tubes are arranged altogether, and three TPE water cooling tubes are evenly distributed on TPE water cooling boxes Interior bottom portion.
Preferably, sliding slot there are four being opened up on the side inner wall of the Pressure chamber.
Preferably, the oil outlet of the hydraulic pump is fixedly connected with hydraulic cylinder by oil pipe, and the oil inlet of hydraulic pump with Fuel tank is fixedly connected by oil pipe.
Preferably, the outlet pipe is fixedly connected with suction pump by water pipe.
The utility model compared with prior art, has the advantages that:
(1) the utility model installs Pressure chamber in cooler bin, and hydraulic oil is input to hydraulic pressure from fuel tank by hydraulic pump In cylinder, hydraulic stem drives compression plate to decline, and cooling liquid steam pressure increases in Pressure chamber, and pressure, which becomes larger, causes cooling liquid steam to put Heat, Pressure chamber outside wall temperature increase, and take the hot-air of Pressure chamber and surrounding away by aspiration pump, then high-pressure coolant steam is led to It crosses electronics check valve and is input in demister and liquefy, achieve the purpose that reduce coolant temperature, greatly improve cooling efficiency, Improve production equipment yield.
(2) hot-air in cooler bin is pumped into air-dry machine for air-drying TPE finished products by the utility model by aspiration pump, is saved Air-dry machine needs to carry out air-dried energy loss by heating air, has significantly saved electric power energy.
Description of the drawings
Fig. 1 is the front view of the utility model;
Fig. 2 is the cooler bin front view of the utility model;
Fig. 3 is enlarged drawing at the A of the utility model;
Fig. 4 is the TPE water cooling box vertical views of the utility model;
Fig. 5 is the circuit block diagram of the utility model;
In figure:1- first supports, 2- second supports, 3- thirds holder, 4- heat melt case, 5- feed hoppers, 6-TPE liquid pumps, 7- extruder motors, 8- cooler bins, 9-TPE water cooling boxes, 10- air pipelines, 11- conveyer belts, 12- feeder motors, 13- thermovents, 14-AMA-200 controllers, 15- Pressure chambers, 16- aspiration pumps, 17- demisters, 18- atomizers, 19- suction pumps, 20- hydraulic pumps, 21- fuel tanks, 22- air inlets, 23- electronics check valve, 24- discharge ports, 25- hydraulic cylinders, 26- compression plates, 27- baroceptors, 28- water inlet pipes, 29-TPE water cooling tubes, 30- outlet pipes, 31- feed inlets, 32- air-dry machines.
Specific implementation mode
- 5 are please referred to Fig.1, the utility model provides the following technical solutions:A kind of TPE production equipments water-circulating cooling device, Including first support 1, the top of first support 1 is equipped with TPE water cooling boxes 9, and the inside of TPE water cooling boxes 9 is equipped with TPE water cooling tubes It is provided with water inlet pipe 28 and discharge port 24 on the side outer wall of 29, TPE water cooling tubes 29, outlet pipe 30 is provided on the outer wall of the other side With feed inlet 31, water inlet pipe 28 is located at the side of discharge port 24, and outlet pipe 30 is located at the side of feed inlet 31, and TPE water cooling boxes 9 are logical It crosses water pipe and is connected with cooler bin 8, the inside of cooler bin 8 is equipped with AMA-200 controllers 14, Pressure chamber 15, aspiration pump 16, hydraulic pressure Pump 20 and fuel tank 21, fuel tank 21 play the role of storing hydraulic oil, and Pressure chamber 15 is located at AMA-200 controllers 14, aspiration pump 16 Between hydraulic pump 20, fuel tank 21, Pressure chamber 15 by fluid pipeline close to being connected with demisting on the side outer wall of aspiration pump 16 Device 17, demister 17 plays the role of the cooling liquid steam that liquefies, and Pressure chamber 15 is close to the side outer wall of AMA-200 controllers 14 Upper to be connected with atomizer 18 by fluid pipeline, the top of atomizer 18 is equipped with suction pump 19, on the side outer wall of cooler bin 8 It is provided with air pipeline 10, air inlet 22 is offered on adjacent side outer wall, the inside top of Pressure chamber 15 is equipped with hydraulic pressure Cylinder 25, hydraulic cylinder 25 are connected with compression plate 26 by hydraulic stem, baroceptor 27 are equipped on the side outer wall of compression plate 26, Baroceptor 27 plays the role of detecting air pressure in Pressure chamber 15, and one end of air pipeline 10 is equipped with air-dry machine 32, air-dries Machine 32 plays the role of air-dried TPE finished products, and the bottom of air-dry machine 32 is equipped with third holder 3, and the inside installation of air-dry machine 32 There is conveyer belt 11, feeder motor 12 and thermovent 13 are provided on the side outer wall of air-dry machine 32, feeder motor 12 is located at heat dissipation The side at the top of mouth 13, first support 1 is provided with second support 2, and the top of second support 2 is equipped with heat and melts case 4 and squeeze out Motor 7, heat melt the side that case 4 is located at extruder motor 7, and the top that heat melts case 4 is equipped with feed hopper 5, and heat is melted outside the side of case 4 TPE liquid pumps 6 are installed, extruder motor 7 is fixedly connected with TPE water cooling boxes 9 by feed pipe, and TPE liquid pumps 6 squeeze out on wall Motor 7, feeder motor 12, aspiration pump 16, demister 17, atomizer 18, suction pump 19, hydraulic pump 20,23 and of electronics check valve Baroceptor 27 is connect with AMA-200 controllers 14,7 model Z4-200-11 of extruder motor, 12 model of feeder motor YEZ90L-4。
Multiple TPE finished products are carried out at the same time cooling for convenience, in the present embodiment, it is preferred that TPE water cooling tubes 29 are provided with altogether Three, and three TPE water cooling tubes 29 are evenly distributed on the interior bottom portion of TPE water cooling boxes 9.
In order to ensure compression plate 26 during decline, each point keeps synchronism in compression plate 26, in the present embodiment, preferably , it is opened up on the side inner wall of Pressure chamber 15 there are four sliding slot.
In order to which the hydraulic oil ensured in fuel tank 21 can be normally pumped into hydraulic cylinder 25, in the present embodiment, it is preferred that hydraulic pump 20 oil outlet is fixedly connected with hydraulic cylinder 25 by oil pipe, and the oil inlet of hydraulic pump 20 is fixed by oil pipe with fuel tank 21 and connected It connects.
In order to ensure that coolant liquid can normally enter in cooler bin 8, in the present embodiment, it is preferred that outlet pipe 30 with draw water Pump 19 is fixedly connected by water pipe.
The operation principle and process for using of the utility model:Using preceding connection external power supply, by TPE particles from feed hopper 5 The heat poured into second support 2 melts case 4, and TPE is melted glue and is transported to by the power supply TPE of AMA-200 controllers 14 liquid pumps 6 Extruder motor 7, and compression moulding, molding TPE are entered by feed inlet 31 in the TPE water cooling boxes 9 being mounted in first support 1 In TPE water cooling tubes 29, coolant liquid starts to enter in TPE water cooling tubes 29 from water inlet pipe 28 in TPE water cooling tubes 29, is cooled and shaped TPE Enter in cooler bin 8 from outlet pipe 30 afterwards, the suction pump 19 in cooler bin 8 inputs high temperature coolant into atomizer 18, cold But it is cooling liquid steam that liquid is atomized in atomizer 18, and cooling liquid steam is entered by electronics check valve 23 in Pressure chamber 15, The power supply hydraulic pump 20 of AMA-200 controllers 14, hydraulic oil enter from extraction in fuel tank 21 in hydraulic cylinder 25, and hydraulic stem pushes compression Plate 26 moves downward, cooling liquid steam in compression pressure storehouse 15, and generates heat, and gas in storehouse is detected by baroceptor 27 Pressure, meanwhile, aspiration pump 16 is run in cooler bin 8, extracts hot-air in cooler bin 8, in cooler bin 8 air pressure be lower, it is extraneous empty Gas enters from air inlet 22 in cooler bin 8, and hot-air is entered by gas pipeline 10 in the air-dry machine 32 at 3 top of third holder, TPE products after cooling are air-dried, after Pressure chamber 15 is compressed to constant pressure, hydraulic stem drives compression plate 26 to rise, gas The low cooling liquid steam temperature of buckling descends through to liquefy in the entrance demister 17 of electronics check valve 23, passes through water inlet later Pipe 28 is again introduced into TPE water cooling tubes, and finished product TPE after cooling enters air-dry machine 32 from discharge port 24 and air-dries, and is sealed after air-drying Fill TPE finished products.

Claims (5)

1. a kind of TPE production equipments water-circulating cooling device, including first support(1), it is characterised in that:The first support (1)Top TPE water cooling boxes are installed(9), the TPE water cooling boxes(9)Inside TPE water cooling tubes are installed(29), the TPE Water cooling tube(29)Side outer wall on be provided with water inlet pipe(28)And discharge port(24), outlet pipe is provided on the outer wall of the other side (30)And feed inlet(31), the water inlet pipe(28)Positioned at discharge port(24)Side, the outlet pipe(30)Positioned at feed inlet (31)Side, the TPE water cooling boxes(9)It is connected with cooler bin by water pipe(8), the cooler bin(8)Inside be equipped with AMA-200 controllers(14), Pressure chamber(15), aspiration pump(16), hydraulic pump(20)And fuel tank(21), the Pressure chamber(15)Position In AMA-200 controllers(14), aspiration pump(16)With hydraulic pump(20), fuel tank(21)Between, the Pressure chamber(15)Outer wall Upper close aspiration pump(16)Side demister is connected with by fluid pipeline(17), and Pressure chamber(15)Outer wall on it is close AMA-200 controllers(14)Side atomizer is connected with by fluid pipeline(18), the atomizer(18)Top installation There is suction pump(19), the cooler bin(8)Side outer wall on be provided with air pipeline(10), and cooler bin(8)It is adjacent with it is empty Feed channel(10)Side outer wall on offer air inlet(22), the Pressure chamber(15)Inside top hydraulic cylinder is installed (25), the hydraulic cylinder(25)It is connected with compression plate by hydraulic stem(26), the compression plate(26)Side outer wall on install There is baroceptor(27), the air pipeline(10)One end air-dry machine is installed(32), the air-dry machine(32)Bottom Third holder is installed(3), and air-dry machine(32)Inside conveyer belt is installed(11), the air-dry machine(32)Side outer wall On be provided with feeder motor(12)And thermovent(13), the feeder motor(12)Positioned at thermovent(13)Top, described One holder(1)Side be provided with second support(2), the second support(2)Top heat be installed melt case(4)It is electric with squeezing out Machine(7), the heat melts case(4)Positioned at extruder motor(7)Side, the heat melts case(4)Top feed hopper is installed(5), And heat melts case(4)Side outer wall on TPE liquid pumps are installed(6), the extruder motor(7)It is fixedly connected with by feed pipe TPE water cooling boxes(9), the TPE liquid pumps(6), extruder motor(7), feeder motor(12), aspiration pump(16), demister(17)、 Atomizer(18), suction pump(19), hydraulic pump(20), electronics check valve(23)And baroceptor(27)Controlled with AMA-200 Device processed(14)Connection.
2. a kind of TPE production equipments water-circulating cooling device according to claim 1, it is characterised in that:The TPE water coolings Pipe(29)Altogether there are three settings, and three TPE water cooling tubes(29)It is evenly distributed on TPE water cooling boxes(9)Interior bottom portion.
3. a kind of TPE production equipments water-circulating cooling device according to claim 1, it is characterised in that:The Pressure chamber (15)Side inner wall on open up there are four sliding slot.
4. a kind of TPE production equipments water-circulating cooling device according to claim 1, it is characterised in that:The hydraulic pump (20)Oil outlet and hydraulic cylinder(25)It is fixedly connected by oil pipe, and hydraulic pump(20)Oil inlet and fuel tank(21)Pass through oil Pipe is fixedly connected.
5. a kind of TPE production equipments water-circulating cooling device according to claim 1, it is characterised in that:The outlet pipe (30)With suction pump(19)It is fixedly connected by water pipe.
CN201721856430.9U 2017-12-27 2017-12-27 A kind of TPE production equipments water-circulating cooling device Active CN207874817U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721856430.9U CN207874817U (en) 2017-12-27 2017-12-27 A kind of TPE production equipments water-circulating cooling device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721856430.9U CN207874817U (en) 2017-12-27 2017-12-27 A kind of TPE production equipments water-circulating cooling device

Publications (1)

Publication Number Publication Date
CN207874817U true CN207874817U (en) 2018-09-18

Family

ID=63503733

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721856430.9U Active CN207874817U (en) 2017-12-27 2017-12-27 A kind of TPE production equipments water-circulating cooling device

Country Status (1)

Country Link
CN (1) CN207874817U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109852278A (en) * 2018-12-15 2019-06-07 东莞晨光印刷有限公司 A kind of TPE noresidue self-adhesive paste fabricating process

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109852278A (en) * 2018-12-15 2019-06-07 东莞晨光印刷有限公司 A kind of TPE noresidue self-adhesive paste fabricating process

Similar Documents

Publication Publication Date Title
CN207874817U (en) A kind of TPE production equipments water-circulating cooling device
CN204525925U (en) The vacuum cooled mould of EPP profiled member
CN203844179U (en) Feeding device of plastic extruding machine
CN205965747U (en) High -efficient granulator
CN205800147U (en) A kind of plastic extruder
CN208826938U (en) A kind of nano material sealing element injection molding apparatus
CN201989312U (en) Residual heat drying device of main machine of plastic film extruding machine
CN201442358U (en) Full-automatic hydraulic oil press
CN203739120U (en) Centralized feeding device for injection molding
CN206287505U (en) Plastics sucking moulding device
CN206678256U (en) High temperature plastics bar rapid shaping Anti-adhering device
CN211616723U (en) High-efficient fusible energy-saving briquetting machine for particle steel
CN101774233A (en) Spiral automatic cooling dustproof hoisting machine for plastic
CN208375823U (en) A kind of injection mold production radiator convenient for heat recovery
CN205185189U (en) Take foamed plastic forming machine of negative pressure drainage system
CN204054570U (en) A kind of high-efficient energy-saving environment friendly with electromagnetic induction heating moulds volume wire drawing machine
CN104875356B (en) A kind of plastic grain feeder apparatus of extruding machine
CN104608310B (en) EPP profiled member vacuum cooled mould and EPP profiled member vacuum cooled technique
CN208714293U (en) A kind of cooling treatment equipment of carat of pipe fitting
CN208247438U (en) A kind of plastic packing box molding die
CN107553854A (en) A kind of novel plastic wire drawing machine
CN207156297U (en) A kind of heating mould for compression molding
CN111001533A (en) Corrugated box gluing device
CN208529480U (en) A kind of integral type half cycle type polyurethane boiler cooling device
CN108000777B (en) Digital automatic rapid forming machine and operation method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant