CN207863599U - A kind of construction construction protection fence - Google Patents

A kind of construction construction protection fence Download PDF

Info

Publication number
CN207863599U
CN207863599U CN201721409742.5U CN201721409742U CN207863599U CN 207863599 U CN207863599 U CN 207863599U CN 201721409742 U CN201721409742 U CN 201721409742U CN 207863599 U CN207863599 U CN 207863599U
Authority
CN
China
Prior art keywords
connecting rod
column
construction
protection fence
expansion bracket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721409742.5U
Other languages
Chinese (zh)
Inventor
柳荣芳
杨巧利
李强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201721409742.5U priority Critical patent/CN207863599U/en
Application granted granted Critical
Publication of CN207863599U publication Critical patent/CN207863599U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Fencing (AREA)

Abstract

The utility model discloses a kind of construction construction protection fence, including isolation board, column, first connecting rod, second connecting rod and pop-up sleeve, it is symmetrically arranged with fixed seat at left and right sides of the column top, it is provided with first connecting rod and second connecting rod between the column and column, it is provided with expansion bracket between the column and first connecting rod, expansion bracket top left and right ends between the column and first connecting rod are separately mounted to by shaft in the fixed seat on column top and the fixed seat on first connecting rod top, it is provided with expansion bracket between the second connecting rod and second connecting rod, the isolation board is mounted on column by bolt, on mounting hole on first connecting rod and second connecting rod.The utility model by the way that isolation board, column, first connecting rod, second connecting rod, pin and pop-up sleeve is arranged, solve the problems, such as traditional architecture construction protective fence installing and dismounting, carry inconvenient and protective fence between angle do not adjust rotatably.

Description

A kind of construction construction protection fence
Technical field
The utility model is related to Architectural Equipment technical field, specially a kind of construction construction protection fence.
Background technology
Construction guardrail is used for separating building construction site, prevents people from turning over, creeping out, to without fixed duties when avoiding construction People etc. causes unnecessary injury, improves safety, construction guardrail ontology, which is sticked on, obvious reflective membrane, has significantly to passing person Warning function reminds pedestrian or vehicular traffic to enhance your vigilance to avoid in time, traditional construction construction protection fence shape Single, whole larger using build is welded to connect, it is more inconvenient to carry, and needs to carry out welding procedure at the scene when mounted, apply Work difficulty is big, inconvenient, and the angle formed between fence and fence is unadjustable or can only carry out subtle adjusting, using not It is convenient.
Utility model content
(1) the technical issues of solving
In view of the deficiencies of the prior art, the utility model provides a kind of construction construction protection fence, solves Traditional architecture construction protective fence installing and dismounting carries the problem of angle is not adjusted rotatably between inconvenience and protective fence.
(2) technical solution
To achieve the above object, the utility model provides the following technical solutions:A kind of construction construction protection fence, Including isolation board, column, first connecting rod, second connecting rod and pop-up sleeve, it is symmetrically arranged at left and right sides of the column top solid Reservation is symmetrically arranged with sliding rail at left and right sides of the column lower part, and first connecting rod and the are provided between the column and column Two connecting rods are provided with expansion bracket between the column and first connecting rod, the expansion bracket top between the column and first connecting rod Left and right ends are separately mounted to by shaft in the fixed seat on column top and the fixed seat on first connecting rod top, the column Expansion bracket lower part left and right ends between first connecting rod are separately mounted to by shaft on the slide-bar in the sliding rail of column lower part And on the slide-bar in the sliding rail of first connecting rod lower part, expansion bracket is provided between the second connecting rod and second connecting rod, it is described Expansion bracket top left and right ends between second connecting rod are separately mounted to by shaft in the fixed seat on second connecting rod top, described Expansion bracket lower part left and right ends between second connecting rod are separately mounted to the slide-bar in the sliding rail of second connecting rod lower part by shaft On, it is fixed with pop-up sleeve on the outside of the first connecting rod, branch sleeve, the pop-up sleeve are fixed on the outside of the second connecting rod It is fixed by fixing bolt with branch sleeve, the first connecting rod upper and lower part is both provided with card slot, and the column, first connect The upper, middle and lower of bar and second connecting rod is both provided with mounting hole, and the isolation board is mounted on column, first by bolt On mounting hole on connecting rod and second connecting rod.
Preferably, it is to be slidably connected between the slide-bar and sliding rail.
Preferably, the pop-up sleeve is arranged below branch sleeve.
Preferably, the pin end on the second connecting rod is clamped with the card slot on first connecting rod.
Preferably, the card slot on the first connecting rod top and the pin on second connecting rod top are at the same horizontal position, The card slot of the first connecting rod lower part and the pin of second connecting rod lower part are at the same horizontal position.
Preferably, the column bottom is equipped with sinker, and mounting hole is provided on the sinker.
Preferably, the isolation board is mounted on the front end face of column.
Preferably, there are two the first connecting rod and second connecting rod are respectively provided with, the first connecting rod and second connecting rod top It is respectively arranged with fixed seat and sliding rail with lower part.
Preferably, restricted steel chain is fixed between the column and first connecting rod, there are two the limitation steel chain settings.
Preferably, the second connecting rod upper and lower part is both provided with pin, and the pin is mounted on second by shaft On connecting rod.
(3) advantageous effect
The utility model provides a kind of construction construction protection fence, has following advantageous effect:
(1) the utility model setting column, first connecting rod and second connecting rod, in column and first connecting rod and second connecting rod Between be all made of expansion bracket and be attached so that the novel length-adjustable function of realization, while being easily installed, dismantle and removing Fortune fixes limitation steel chain, prevents from stretching long cause between first connecting rod and column and between second connecting rod and second connecting rod Expansion bracket is damaged.
(2) it is attached using fixing bolt between the utility model first connecting rod and second connecting rod, in actual use Can according to construction site adjust first connecting rod and second connecting rod angle, realize short distance angle arbitrarily adjust, will not enclose from compared with The useless ground of more constructions can more meet the big small-sized construction site isolation requirement of traffic pressure.
(3) mounting hole is arranged in the utility model on sinker, can be fixed on ground by sinker by drill rod when in use On face, increase whole stability.
Description of the drawings
Fig. 1 is the utility model front view;
Fig. 2 is the utility model internal structure schematic diagram;
Fig. 3 is the utility model first connecting rod and second connecting rod structure schematic diagram;
Fig. 4 is the utility model first connecting rod and second connecting rod attachment structure schematic diagram;
Fig. 5 is the utility model first connecting rod structural schematic diagram.
In figure:1 isolation board, 2 columns, 3 sinkers, 4 fixed seats, 5 expansion brackets, 6 first connecting rods, 7 second connecting rods, 8 limitations Steel chain, 9 mounting holes, 10 slide-bars, 11 sliding rails, 12 pins, 13 card slots, 14 pop-up sleeves, 15 fixing bolts, 16 branch sleeves.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work The every other embodiment obtained, shall fall within the protection scope of the present invention.
As shown in Figs. 1-5, the utility model provides a kind of technical solution:A kind of construction construction protection fence, packet Isolation board 1, column 2, first connecting rod 6, second connecting rod 7 and pop-up sleeve 14 are included, is symmetrically arranged at left and right sides of 2 top of column solid Reservation 4,2 lower part of the column left and right sides are symmetrically arranged with sliding rail 11, first connecting rod 6 and second are provided between column 2 and column 2 There are two connecting rod 7, first connecting rod 6 and second connecting rod 7 are respectively provided with, first connecting rod 6 and 7 upper and lower part of second connecting rod are respectively set There are fixed seat 4 and sliding rail 11, expansion bracket 5 is provided between column 2 and first connecting rod 6, expansion bracket 5 realizes column 2 and first Length-adjustable function between connecting rod 6 and second connecting rod 7,5 top of expansion bracket between column 2 and first connecting rod 6 or so two End is separately mounted to by shaft in the fixed seat 4 on 6 top of fixed seat 4 and first connecting rod on 20 top of column, column 2 and the 5 lower part left and right ends of expansion bracket between one connecting rod 6 are separately mounted to the slide-bar 10 in the sliding rail 11 of 2 lower part of column by shaft On slide-bar 10 in the upper and sliding rail 11 of 6 lower part of first connecting rod, to be slidably connected between slide-bar 10 and sliding rail 11, column 2 with Restricted steel chain 8 is fixed between first connecting rod 6, prevents expansion bracket 5 from causing expansion bracket 5 to damage since dynamics is excessive when stretching, It limits there are two the settings of steel chain 8, expansion bracket 5 is provided between second connecting rod 7 and second connecting rod 7, it is flexible between second connecting rod 7 5 top left and right ends of frame are separately mounted to by shaft in the fixed seat 4 on 7 top of second connecting rod, flexible between second connecting rod 7 5 lower part left and right ends of frame are separately mounted to by shaft on the slide-bar 10 in the sliding rail 11 of 7 lower part of second connecting rod, first connecting rod 6 Outside is fixed with pop-up sleeve 14, and 7 outside of second connecting rod is fixed with branch sleeve 16, and pop-up sleeve 14 is arranged in branch sleeve 16 Lower section, pop-up sleeve 14 are fixed with branch sleeve 16 by fixing bolt 15, and 6 upper and lower part of first connecting rod is both provided with card slot 13,7 upper and lower part of second connecting rod is both provided with pin 12, and pin 12 is mounted on by shaft on second connecting rod 7, second connecting rod 12 end of pin on 7 is clamped with the card slot 13 on first connecting rod 6, optionally will when in use according to actual demand Same plane state is fixed between first connecting rod 6 and second connecting rod 7, on the card slot 13 and second connecting rod 7 on 6 top of first connecting rod The pin 12 in portion is at the same horizontal position, and the pin 12 of 7 lower part of card slot 13 and second connecting rod of 6 lower part of first connecting rod is in At the same horizontal position, the upper, middle and lower of column 2, first connecting rod 6 and second connecting rod 7 is both provided with mounting hole 9, every From the front end face that plate 1 is mounted on column 2, isolation board 1 is mounted on by bolt on column 2, first connecting rod 6 and second connecting rod 7 Mounting hole 9 on, the setting of isolation board 1 can prevent construction materials from shedding to outside, and 2 bottom of column is equipped with sinker 3, counterweight It is provided with mounting hole on seat 3, ground is fixed on by drill rod, enhances overall stability.
In use, by stretch both ends column 2 make expansion bracket 5 elongation by this it is novel be stretched to required length, according to field Ground demand suitably adjusts the angle between two planes at 7 place of first connecting rod 6 and second connecting rod so that the New Energy is meeting Minimal isolation construction site under the premise of safety reduces the traffic pressure on the outside of construction site, is fastened and fixed bolt 15 So that first connecting rod 6 and second connecting rod 7 is not relatively rotated, the sinker 3 of 2 bottom of column of the novel one end will be passed through Drill rod fixes on the ground, and isolation board 1 is mounted on column 2, first connecting rod 6 and second connecting rod 7 by bolt later.
It can to sum up obtain, the utility model is by being arranged isolation board 1, column 2, first connecting rod 6, second connecting rod 7,12 and of pin Pop-up sleeve 14, solve traditional architecture construction protective fence installing and dismounting, carry inconvenient and protective fence between angle not Rotatable the problem of adjusting.
It should be noted that herein, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also include other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is appreciated that can these embodiments be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (10)

1. a kind of construction construction protection fence, including isolation board (1), column (2), first connecting rod (6), second connecting rod (7) and pop-up sleeve (14), it is characterised in that:It is symmetrically arranged with fixed seat (4) at left and right sides of column (2) top, it is described It is symmetrically arranged with sliding rail (11) at left and right sides of column (2) lower part, first connecting rod is provided between the column (2) and column (2) (6) and second connecting rod (7), it is provided with expansion bracket (5) between the column (2) and first connecting rod (6), the column (2) and the Expansion bracket (5) top left and right ends between one connecting rod (6) are separately mounted to the fixed seat (4) on column (2) top by shaft And in the fixed seat (4) on first connecting rod (6) top, expansion bracket (5) lower part between the column (2) and first connecting rod (6) Left and right ends are separately mounted to by shaft on the slide-bar (10) in the sliding rail (11) of column (2) lower part and first connecting rod (6) On slide-bar (10) in the sliding rail (11) of lower part, it is provided with expansion bracket (5) between the second connecting rod (7) and second connecting rod (7), Expansion bracket (5) top left and right ends between the second connecting rod (7) are separately mounted to second connecting rod (7) top by shaft In fixed seat (4), expansion bracket (5) lower part left and right ends between the second connecting rod (7) are separately mounted to second by shaft On slide-bar (10) in the sliding rail (11) of connecting rod (7) lower part, pop-up sleeve (14), institute are fixed on the outside of the first connecting rod (6) It states and is fixed with branch sleeve (16) on the outside of second connecting rod (7), the pop-up sleeve (14) passes through fixed spiral shell with branch sleeve (16) Bolt (15) is fixed, and first connecting rod (6) upper and lower part is both provided with card slot (13), the column (2), first connecting rod (6) It is both provided with mounting hole (9) with the upper, middle and lower of second connecting rod (7), the isolation board (1) is mounted on vertical by bolt On mounting hole (9) on column (2), first connecting rod (6) and second connecting rod (7).
2. a kind of construction construction protection fence according to claim 1, it is characterised in that:The slide-bar (10) with It is to be slidably connected between sliding rail (11).
3. a kind of construction construction protection fence according to claim 1, it is characterised in that:The pop-up sleeve (14) setting is below branch sleeve (16).
4. a kind of construction construction protection fence according to claim 1, it is characterised in that:The second connecting rod (7) pin (12) end on is clamped with the card slot (13) on first connecting rod (6).
5. a kind of construction construction protection fence according to claim 1, it is characterised in that:The first connecting rod (6) card slot (13) on top and the pin (12) on second connecting rod (7) top are at the same horizontal position, the first connecting rod (6) card slot (13) of lower part and the pin (12) of second connecting rod (7) lower part are at the same horizontal position.
6. a kind of construction construction protection fence according to claim 1, it is characterised in that:Column (2) bottom Portion is equipped with sinker (3), and mounting hole is provided on the sinker (3).
7. a kind of construction construction protection fence according to claim 1, it is characterised in that:The isolation board (1) Front end face mounted on column (2).
8. a kind of construction construction protection fence according to claim 1, it is characterised in that:The first connecting rod (6) and there are two second connecting rod (7) is respectively provided with, the first connecting rod (6) and second connecting rod (7) upper and lower part are respectively arranged with Fixed seat (4) and sliding rail (11).
9. a kind of construction construction protection fence according to claim 1, it is characterised in that:The column (2) with Restricted steel chain (8) is fixed between first connecting rod (6), there are two limitation steel chain (8) settings.
10. a kind of construction construction protection fence according to claim 1, it is characterised in that:The second connecting rod (7) upper and lower part is both provided with pin (12), and the pin (12) is mounted on by shaft on second connecting rod (7).
CN201721409742.5U 2017-10-29 2017-10-29 A kind of construction construction protection fence Active CN207863599U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721409742.5U CN207863599U (en) 2017-10-29 2017-10-29 A kind of construction construction protection fence

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721409742.5U CN207863599U (en) 2017-10-29 2017-10-29 A kind of construction construction protection fence

Publications (1)

Publication Number Publication Date
CN207863599U true CN207863599U (en) 2018-09-14

Family

ID=63474455

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721409742.5U Active CN207863599U (en) 2017-10-29 2017-10-29 A kind of construction construction protection fence

Country Status (1)

Country Link
CN (1) CN207863599U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112727234A (en) * 2021-01-06 2021-04-30 国网山东省电力公司成武县供电公司 Fence for electric power construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112727234A (en) * 2021-01-06 2021-04-30 国网山东省电力公司成武县供电公司 Fence for electric power construction

Similar Documents

Publication Publication Date Title
CN207406115U (en) A kind of construction guardrail
CN205955377U (en) A rail guard for building engineering
CN212927333U (en) Rail guard for construction convenient to it is flexible folding
CN207863599U (en) A kind of construction construction protection fence
CN210858226U (en) Convenient to use's isolated column for building engineering
CN208455539U (en) A kind of protective net of highway engineering construction
CN101966962B (en) Anti-climbing guardrail device on escalator or moving pavement
CN208563193U (en) A kind of traffic route temporary guard rail convenient for storage
CN208219503U (en) A kind of town road multifunction anti-collision guardrail
CN206570706U (en) A kind of road and bridge engineering protection device
CN215520310U (en) Real estate development is with fast assembly's protection frame
CN109024380A (en) A kind of compound guardrail convenient for folding
CN208996045U (en) Adjustable apparatus suitable for the conversion of interim stress system
CN104071682A (en) Rail device capable of preventing pedestrians from striding across
CN108978487B (en) A easily set up quick detachable protection rack for bridge construction
CN209082336U (en) Overbridge traffic safety guard
CN218622001U (en) Adjustable rail guard based on road and bridge design
CN210529580U (en) Town road construction rail guard
CN216811223U (en) Building engineering rail guard
CN211114927U (en) Special guardrail of civil engineering
CN215164541U (en) Town road guardrail easy to assemble
CN214498636U (en) Building engineering is with rail guard that has dustproof function
CN215595176U (en) Municipal pipe network auxiliary device for maintenance engineering
CN214463209U (en) Bridge road construction rail guard
CN109487792A (en) The interim stress system conversion method and mating adjustable device that lattice column underpins

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant