CN207863430U - A kind of bearing bolt cable-stayed type level overhanging protection system - Google Patents

A kind of bearing bolt cable-stayed type level overhanging protection system Download PDF

Info

Publication number
CN207863430U
CN207863430U CN201721347864.6U CN201721347864U CN207863430U CN 207863430 U CN207863430 U CN 207863430U CN 201721347864 U CN201721347864 U CN 201721347864U CN 207863430 U CN207863430 U CN 207863430U
Authority
CN
China
Prior art keywords
rod
cable
stayed
support
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721347864.6U
Other languages
Chinese (zh)
Inventor
贾林
袁瑞青
绍剑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Group Co Ltd
Original Assignee
China Railway Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Group Co Ltd filed Critical China Railway Construction Group Co Ltd
Priority to CN201721347864.6U priority Critical patent/CN207863430U/en
Application granted granted Critical
Publication of CN207863430U publication Critical patent/CN207863430U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

本实用新型公开了一种支座栓接斜拉式水平悬挑防护体系,包括悬挑杆锚固支座,所述的悬挑杆锚固支座焊接连接螺栓一的一端和伸缩悬挑杆件的一端,所述螺栓一的另一端穿过结构板周边的结构梁一连接有螺帽一,所述伸缩悬挑杆件的另一端与护栏立柱连接,所述伸缩悬挑杆件靠近护栏立柱的一端固定连接斜拉调节杆的一端,所述斜拉调节杆的另一端与所述斜拉杆锚固支座焊接连接,所述的斜拉杆锚固支座焊接连接螺栓二的一端,所述螺栓二的另一端穿过结构板周边的结构梁二连接有螺帽二。本实用新型的防护体系具有安装及拆除简单易行,节省材料,满足不同结构类型,可调节、可周转、安全可靠,不影响后续施工、可工厂化加工生产的优点。

The utility model discloses a support bolted cable-stayed horizontal suspension protection system, which comprises a cantilever rod anchor support. The cantilever rod anchor support is welded to connect one end of the bolt one and the telescopic suspension rod. One end, the other end of the bolt one passes through the structural beam around the structural plate and is connected to the nut one, the other end of the telescopic cantilever rod is connected to the guardrail column, and the telescopic cantilever rod is close to the guardrail column One end is fixedly connected to one end of the cable-stayed adjusting rod, and the other end of the cable-stayed adjusting rod is welded to the anchoring support of the cable-stayed rod, and one end of the anchoring support of the cable-stayed rod is welded to one end of bolt two, and the second end of the bolt two is welded. The second end of the structural beam passing through the periphery of the structural plate is connected with the second nut. The protection system of the utility model has the advantages of simple and easy installation and dismantling, saving materials, meeting different structural types, being adjustable, turnable, safe and reliable, not affecting subsequent construction, and having the advantages of industrialized processing and production.

Description

一种支座栓接斜拉式水平悬挑防护体系A support bolted cable-stayed horizontal cantilever protection system

技术领域technical field

本实用新型涉及建筑施工技术领域,具体来说,涉及一种支座栓接斜拉式水平悬挑防护体系。The utility model relates to the technical field of building construction, in particular to a support bolted cable-stayed horizontal suspension protection system.

背景技术Background technique

传统高层建筑水平悬挑防护体系由U锚环、型钢、钢丝绳等设置组成,需要依靠专业工种进行安装及拆除,悬挑杆件的锚固长度较长,占用较大楼层面积,需要在墙体根部预留较较多较大的洞口,以满足悬挑杆件水平穿过,影响结构安全,同时影响后期装修施工。且安装和拆除及不方便,有时需要破坏结构。水平悬挑杆件的端部采用钢丝绳进行斜拉,易造成钢丝绳松弛,悬挑端部脱钩,存在安全隐患。The horizontal cantilever protection system of traditional high-rise buildings is composed of U anchor rings, section steel, steel wire ropes, etc. It needs to be installed and dismantled by professional workers. More and larger openings are reserved to meet the horizontal passage of cantilevered rods, which will affect the structural safety and affect the later decoration construction. And it is inconvenient to install and dismantle, and sometimes needs to destroy the structure. The ends of the horizontal cantilever rods are cable-stayed by steel wire ropes, which can easily cause the wire ropes to loosen, and the ends of the cantilever will be decoupled, posing potential safety hazards.

实用新型内容Utility model content

针对相关技术中的上述技术问题,本实用新型提出一种支座栓接斜拉式水平悬挑防护体系,能够克服现有技术的上述不足。Aiming at the above-mentioned technical problems in the related art, the utility model proposes a support bolted cable-stayed horizontal suspension protection system, which can overcome the above-mentioned deficiencies in the prior art.

为实现上述技术目的,本实用新型的技术方案是这样实现的:For realizing above-mentioned technical purpose, technical scheme of the present utility model is realized like this:

一种支座栓接斜拉式水平悬挑防护体系,包括悬挑杆锚固支座,所述的悬挑杆锚固支座焊接连接螺栓一的一端和伸缩悬挑杆件的一端,所述螺栓一的另一端穿过结构板周边的结构梁一连接有螺帽一,所述伸缩悬挑杆件的另一端与护栏立柱连接,所述伸缩悬挑杆件靠近护栏立柱的一端固定连接斜拉调节杆的一端,所述斜拉调节杆的另一端与所述斜拉杆锚固支座焊接连接,所述的斜拉杆锚固支座焊接连接螺栓二的一端,所述螺栓二的另一端穿过结构板周边的结构梁二连接有螺帽二。A support bolted cable-stayed horizontal suspension protection system, comprising a cantilever rod anchor support, one end of the cantilever rod anchor support is welded to connect one end of the bolt one and one end of the telescopic cantilever rod, the bolt The other end of one passes through the structural beam around the structural plate and is connected with a nut. The other end of the telescopic suspension rod is connected to the guardrail column, and the end of the telescopic suspension rod close to the guardrail column is fixedly connected to the cable-stayed One end of the adjusting rod, the other end of the diagonally-stayed adjusting rod is welded to the anchoring support of the diagonally-stayed rod, the anchoring support of the diagonally-stayed rod is welded to one end of the second bolt, and the other end of the second bolt passes through the structure The structural beam two around the plate is connected with the nut two.

进一步的,所述的结构梁一内设有PVC套管一,所述PVC 套管一套在所述螺栓一上。Further, the structural beam 1 is provided with a PVC sleeve 1, and the PVC sleeve is set on the bolt 1.

进一步的,所述的结构梁二内设有PVC套管二,所述PVC 套管二套在所述螺栓二上。Further, the second structural beam is provided with a second PVC sleeve, and the second PVC sleeve is set on the second bolt.

进一步的,所述伸缩悬挑杆件包括方钢一和方钢二,所述方钢一的一端与所述悬挑杆锚固支座固定连接,所述方钢二的一端与所述护栏立柱连接,所述方钢一的另一端和方钢二的另一端均设有若干螺栓孔,所述的方钢一的另一端和方钢二的另一端通过螺栓穿过所述螺栓孔连接。Further, the telescopic suspension rod includes square steel one and square steel two, one end of the square steel one is fixedly connected with the cantilever rod anchoring support, one end of the square steel two is connected with the guardrail column To connect, the other end of the square steel one and the other end of the square steel two are provided with several bolt holes, and the other end of the square steel one and the other end of the square steel two are connected through the bolt holes by bolts.

优选的,所述方钢一与所述悬挑杆锚固支座之间焊接有加强肋一。Preferably, a reinforcing rib is welded between the square steel one and the cantilever rod anchor support.

优选的,所述伸缩悬挑杆件的上方铺设有水平防护板,所述水平防护板与伸缩悬挑杆件之间设有若干方钢横撑。Preferably, a horizontal protective plate is laid above the telescopic suspension rod, and several square steel cross braces are arranged between the horizontal protection board and the telescopic suspension rod.

进一步的,所述的斜拉调节杆包括斜拉调节杆端头一和斜拉调节杆端头二,所述的斜拉调节杆端头一的一端与所述伸缩悬挑杆件固定连接,所述斜拉调节杆端头二的一端与所述斜拉杆锚固支座焊接连接,所述斜拉调节杆端头一的另一端和斜拉调节杆端头二的另一端之间依次连接有可调节丝杠一、紧固玄杆和可调节丝杠二。Further, the cable-stayed adjusting rod includes cable-stayed adjusting rod end one and cable-stayed adjusting rod end two, and one end of the cable-stayed adjusting rod end one is fixedly connected with the telescopic suspension rod, One end of the cable-stayed adjusting rod end two is welded to the cable-stayed rod anchor support, and the other end of the cable-stayed adjusting rod end one and the other end of the cable-stayed adjusting rod end two are sequentially connected with Adjustable leading screw one, fastening mysterious rod and adjustable leading screw two.

优选的,所述的斜拉调节杆端头一和可调节丝杠一之间及所述的斜拉调节杆端头二和可调节丝杠二之间均为螺栓连接。优选的,所述斜拉杆锚固支座包括钢板一和钢板二,所述的钢板一与钢板二焊接连接,所述钢板一与螺栓二的一端焊接连接,所述钢板二上设有通孔,所述钢板二通过所述通孔与所述斜拉调节杆端头二的一端连接。Preferably, the first end of the oblique-stay adjustment rod and the first adjustable lead screw, and the second end of the oblique-stay adjustment rod and the second adjustable lead screw are all connected by bolts. Preferably, the anchoring support of the diagonal stay includes a steel plate 1 and a steel plate 2, the steel plate 1 is welded to the steel plate 2, the steel plate 1 is welded to one end of the bolt 2, and the steel plate 2 is provided with a through hole, The second steel plate is connected to one end of the second end of the inclined-stay adjusting rod through the through hole.

优选的,所述钢板一与所述钢板二之间焊接连接有加强肋二。Preferably, the steel plate 1 and the steel plate 2 are connected with a reinforcing rib 2 by welding.

本实用新型的有益效果:本实用新型的防护体系具有安装及拆除简单易行,节省材料,满足不同结构类型,可调节、可周转、安全可靠,不影响后续施工、可工厂化加工生产的优点。Beneficial effects of the utility model: the protection system of the utility model has the advantages of simple installation and dismantling, saving materials, meeting different structural types, adjustable, turnaround, safe and reliable, does not affect subsequent construction, and can be factory-processed and produced. .

附图说明Description of drawings

为了更清楚地说明本实用新型实施例或现有技术中的技术方案,下面将对实施例中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the accompanying drawings required in the embodiments will be briefly introduced below. Obviously, the accompanying drawings in the following description are only the present invention. For some embodiments of the present invention, those of ordinary skill in the art can also obtain other drawings based on these drawings on the premise of not paying creative efforts.

图1是根据本实用新型实施例所述的支座栓接斜拉式水平悬挑防护体系的结构示意图;Fig. 1 is a schematic structural view of a support bolted cable-stayed horizontal suspension protection system according to an embodiment of the present invention;

图2是悬挑杆锚固支座部分的结构示意图;Fig. 2 is a structural schematic diagram of the anchoring support part of the cantilever rod;

图3是斜拉杆锚固支座部分的结构示意图;Fig. 3 is a structural schematic diagram of the anchor support part of the diagonal stay;

图4是伸缩悬挑杆件部分的主视图;Fig. 4 is the front view of telescopic cantilever bar part;

图5是伸缩悬挑杆件部分的俯视图;Figure 5 is a top view of the telescopic suspension rod part;

图6是斜拉调节杆部分的结构示意图;Fig. 6 is a schematic structural view of the cable-stayed adjusting rod part;

图中:1、悬挑杆锚固支座;2、螺栓一;3、伸缩悬挑杆件;4、结构梁一;5、水平防护板;6、方钢横撑;7、护栏立柱;8、斜拉调节杆;9、斜拉杆锚固支座;10、结构梁二;11、螺帽二;12、螺栓二;13、加强肋一;14、加强肋二;15、方钢一;16、方钢二;17、螺栓孔;18、斜拉调节杆端头一;19、斜拉调节杆端头二;20、可调节丝杠一;21、紧固玄杆;22、可调节丝杠二;23、钢板一;24、钢板二;25、通孔;26、螺帽一。In the figure: 1. Cantilever rod anchor support; 2. Bolt 1; 3. Telescopic cantilever rod; 4. Structural beam 1; 5. Horizontal protective plate; 6. Square steel cross brace; 7. Guardrail column; , cable-stayed adjusting rod; 9, cable-stayed rod anchor support; 10, structural beam two; 11, nut two; 12, bolt two; 13, reinforcing rib one; 14, reinforcing rib two; 15, square steel one; 16 , square steel two; 17, bolt hole; 18, cable pull adjustment rod end one; 19, cable pull adjustment rod end two; 20, adjustable lead screw one; 21, fastening rod; 22, adjustable wire Bar two; 23, steel plate one; 24, steel plate two; 25, through hole; 26, nut one.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example. All other embodiments obtained by persons of ordinary skill in the art based on the embodiments of the present invention belong to the protection scope of the present invention.

如图1-6所示,根据本实用新型实施例所述的一种支座栓接斜拉式水平悬挑防护体系,包括悬挑杆锚固支座1,所述的悬挑杆锚固支座1焊接连接螺栓一2的一端和伸缩悬挑杆件3的一端,所述螺栓一2的另一端穿过结构板周边的结构梁一4连接有螺帽一26,所述伸缩悬挑杆件3的另一端与护栏立柱连接,所述伸缩悬挑杆件3靠近护栏立柱7的一端固定连接斜拉调节杆8的一端,所述斜拉调节杆8的另一端与所述斜拉杆锚固支座9焊接连接,所述的斜拉杆锚固支座9焊接连接螺栓二12的一端,所述螺栓二12的另一端穿过结构板周边的结构梁二10连接有螺帽二11。As shown in Figures 1-6, a support bolted cable-stayed horizontal cantilever protection system according to an embodiment of the present invention includes a cantilever rod anchor support 1, and the cantilever rod anchor support 1 Welding one end of the bolt 2 and one end of the telescopic suspension rod 3, the other end of the bolt 2 passes through the structural beam 4 around the structural plate and is connected with a nut 26, the telescopic suspension rod The other end of 3 is connected with the guardrail column, and one end of the telescopic suspension member 3 close to the guardrail column 7 is fixedly connected to one end of the cable-stayed adjusting rod 8, and the other end of the cable-stayed adjusting rod 8 is anchored with the cable-stayed rod. The seat 9 is connected by welding, and the anchor support 9 of the diagonal stay is welded to one end of the bolt two 12, and the other end of the bolt two 12 passes through the structural beam two 10 around the structural plate and is connected with a nut two 11.

在一具体实施例中,所述的结构梁一4内设有PVC套管一,所述PVC套管一套在所述螺栓一2上。In a specific embodiment, the structural beam one 4 is provided with a PVC sleeve one, and the PVC sleeve is set on the bolt one 2 .

在一具体实施例中,所述的结构梁二10内设有PVC套管二,所述PVC套管二套在所述螺栓二12上。In a specific embodiment, the structural beam 2 10 is provided with a PVC sleeve 2, and the PVC sleeve 2 is set on the bolt 2 12 .

在一具体实施例中,所述伸缩悬挑杆件3包括方钢一15和方钢二16,所述方钢一15的一端与所述悬挑杆锚固支座1固定连接,所述方钢二16的一端与所述护栏立柱连接,所述方钢一15的另一端和方钢二16的另一端均设有若干螺栓孔17,所述的方钢一15的另一端和方钢二16的另一端通过螺栓穿过所述螺栓孔17连接。In a specific embodiment, the telescopic cantilever rod 3 includes a square steel one 15 and a square steel two 16, one end of the square steel one 15 is fixedly connected with the cantilever rod anchoring support 1, and the square One end of steel two 16 is connected with described guardrail column, and the other end of described square steel one 15 and the other end of square steel two 16 are all provided with some bolt holes 17, and the other end of described square steel one 15 and square steel The other end of two 16 passes through described bolt hole 17 and is connected by bolt.

在一具体实施例中,所述方钢一15与所述悬挑杆锚固支座1之间焊接有加强肋一13。In a specific embodiment, a reinforcing rib 13 is welded between the square steel 15 and the cantilever rod anchoring support 1 .

在一具体实施例中,所述伸缩悬挑杆件3的上方铺设有水平防护板5,所述水平防护板5与伸缩悬挑杆件3之间设有若干方钢横撑6。In a specific embodiment, a horizontal protective plate 5 is laid above the telescopic suspension rod 3 , and several square steel cross braces 6 are arranged between the horizontal protection board 5 and the telescopic suspension rod 3 .

在一具体实施例中,所述的斜拉调节杆8包括斜拉调节杆端头一18和斜拉调节杆端头二19,所述的斜拉调节杆端头一18的一端与所述伸缩悬挑杆件3固定连接,所述斜拉调节杆端头二19的一端与所述斜拉杆锚固支座9焊接连接,所述斜拉调节杆端头一18的另一端和斜拉调节杆端头二19的另一端之间依次连接有可调节丝杠一20、紧固玄杆21和可调节丝杠二22。In a specific embodiment, the oblique-stay adjusting rod 8 includes an oblique-stay adjusting rod end one 18 and an oblique-stay adjusting rod end two 19, one end of the oblique-stay adjusting rod end one 18 is connected to the The telescopic cantilever rod 3 is fixedly connected, one end of the cable-stayed adjusting rod end two 19 is welded to the cable-stayed rod anchor support 9, and the other end of the cable-stayed adjusting rod end one 18 is connected to the cable-stayed adjustment rod. The other end of the rod end two 19 is connected with an adjustable leading screw one 20, a fastening black rod 21 and an adjustable leading screw two 22 in sequence.

在一具体实施例中,所述的斜拉调节杆端头一18和可调节丝杠一20之间及所述的斜拉调节杆端头二19和可调节丝杠二22之间均为螺栓连接。In a specific embodiment, the distance between the first end 18 of the oblique-stay adjustment rod and the first adjustable screw 20 and between the second end 19 of the oblique-stay adjustment rod and the second adjustable screw 22 are Bolted.

在一具体实施例中,所述斜拉杆锚固支座9包括钢板一23和钢板二24,所述的钢板一23与钢板二24焊接连接,所述钢板一23与螺栓二12的一端焊接连接,所述钢板二24上设有通孔25,所述钢板二24通过所述通孔25与所述斜拉调节杆端头二19的一端连接。In a specific embodiment, the anchoring support 9 of the diagonal stay includes a steel plate 1 23 and a steel plate 2 24, the steel plate 1 23 is welded to the steel plate 2 24, and the steel plate 23 is welded to one end of the bolt 2 12 , The second steel plate 24 is provided with a through hole 25, and the second steel plate 24 is connected to one end of the second end 19 of the cable-stayed adjustment rod through the through hole 25.

在一具体实施例中,所述钢板一23与所述钢板二24之间焊接连接有加强肋二14。In a specific embodiment, the steel plate one 23 and the steel plate two 24 are welded and connected with a reinforcing rib two 14 .

为了方便理解本实用新型的上述技术方案,以下通过具体使用方式上对本实用新型的上述技术方案进行详细说明。In order to facilitate the understanding of the above-mentioned technical solution of the present utility model, the above-mentioned technical solution of the present utility model will be described in detail below through specific usage modes.

在具体使用时,根据本实用新型所述的一种支座栓接斜拉式水平悬挑防护体系,包括悬挑杆锚固支座、斜拉杆锚固支座、斜拉调节杆和伸缩悬挑杆件,所述的悬挑杆锚固支座为20mm厚钢板,其上焊接连接四根直径28mm的螺栓一,螺栓一锚固在结构板周边的梁内或墙内并且拧上垫片一和螺母一,在梁内或墙内预留30mmpvc套管以解悬挑件端部的超长锚固、较大较多预留洞问题;伸缩悬挑杆件采用100mm*100mm的方钢一和80mm*80mm的方钢二,方钢二插入方钢一内通过螺栓进行长度调节和固定,满足可伸缩调节,方钢一的一端与悬挑杆锚固支座固定连接,方钢二的一端与护栏立柱连接;斜拉杆锚固支座为20mm厚钢板,其上焊接连接四根直径28mm的螺栓一,螺栓一锚固在结构板周边的梁内或墙内并且拧上垫片二和螺母二,在梁内或墙内预留30mmpvc套管;斜拉调节杆包括斜拉调节杆端头一和斜拉调节杆端头二,斜拉调节杆端头一的一端与伸缩悬挑杆件固定连接,斜拉调节杆端头二的一端与斜拉杆锚固支座焊接连接,斜拉调节杆端头一的另一端和斜拉调节杆端头二的另一端之间依次连接有可调节丝杠一、紧固玄杆和可调节丝杠二,可调节丝杠一和可调节丝杠二均可以调节其旋入紧固玄杆的长度。In specific use, according to a support bolted cable-stayed horizontal suspension protection system described in the present invention, it includes a suspension rod anchor support, a diagonal stay rod anchor support, a cable-stay adjustment rod and a telescopic suspension rod. The anchoring support of the cantilever rod is a 20mm thick steel plate, and four bolts with a diameter of 28mm are welded on it. , reserve 30mmpvc casing in the beam or wall to solve the problem of super-long anchorage at the end of the cantilever and larger and more reserved holes; the telescopic cantilever rod adopts 100mm*100mm square steel one and 80mm*80mm Square steel 2, square steel 2 is inserted into square steel 1 to adjust and fix the length through bolts, meeting the telescopic adjustment, one end of square steel 1 is fixedly connected to the anchoring support of the cantilever rod, and one end of square steel 2 is connected to the guardrail column ; The anchoring support of the diagonal stay is a 20mm thick steel plate, on which four bolts with a diameter of 28mm are welded and connected. A 30mmpvc casing is reserved in the wall; the cable-stayed adjustment rod includes the first end of the cable-stayed adjustment rod and the second end of the cable-stayed adjustment rod. One end of the rod end 2 is welded to the anchoring support of the cable-stayed rod, and the other end of the cable-stayed adjusting rod end 1 and the other end of the cable-stayed adjusting rod 2 are sequentially connected with an adjustable lead screw 1, fastening xuan Rod and adjustable leading screw two, adjustable leading screw one and adjustable leading screw two all can regulate the length that it is screwed into the fastening dark rod.

在具体施工时,根据楼层结构平面图进行悬挑杆锚固支座和斜拉杆锚固支座设置,确定位置后,在结构周边的板下梁内或板下墙内留设直径30mmpvc套管,此套管需根据螺栓一和螺栓二的设计进行布置,准备工作完成后,悬挑钢筋组装后,调节到要求长度,采用塔吊吊起安装,端部采用螺栓紧固,在安装斜拉调节杆后,进行卸载,最后铺设水平防护板,整个施工过程,组装和栓接结合,操作简单方便。During the specific construction, the cantilever rod anchor support and the diagonal stay rod anchor support are set according to the floor structure plan. The pipe needs to be arranged according to the design of bolt 1 and bolt 2. After the preparatory work is completed, the cantilevered steel bars are assembled and adjusted to the required length. The tower crane is used for hoisting and installation, and the ends are fastened with bolts. After installing the cable-stayed adjustment rod, Unloading is carried out, and finally the horizontal protective board is laid. The whole construction process is combined with assembly and bolting, and the operation is simple and convenient.

综上所述,本实用新型的防护体系具有安装及拆除简单易行,节省材料,满足不同结构类型,可调节、可周转、安全可靠,不影响后续施工、可工厂化加工生产的优点。To sum up, the protection system of the present invention has the advantages of simple installation and dismantling, saving materials, meeting different structural types, adjustable, turnaround, safe and reliable, without affecting subsequent construction, and can be factory-processed and produced.

以上所述仅为本实用新型的较佳实施例而已,并不用以限制本实用新型,凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。The above descriptions are only preferred embodiments of the present utility model, and are not intended to limit the present utility model. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present utility model shall be included in the Within the protection scope of the present utility model.

Claims (10)

1.一种支座栓接斜拉式水平悬挑防护体系,其特征在于,包括悬挑杆锚固支座(1),所述的悬挑杆锚固支座(1)焊接连接螺栓一(2)的一端和伸缩悬挑杆件(3)的一端,所述螺栓一(2)的另一端穿过结构板周边的结构梁一(4)连接有螺帽一(26),所述伸缩悬挑杆件(3)的另一端与护栏立柱连接,所述伸缩悬挑杆件(3)靠近护栏立柱(7)的一端固定连接斜拉调节杆(8)的一端,所述斜拉调节杆(8)的另一端与所述斜拉杆锚固支座(9)焊接连接,所述的斜拉杆锚固支座(9)焊接连接螺栓二(12)的一端,所述螺栓二(12)的另一端穿过结构板周边的结构梁二(10)连接有螺帽二(11)。1. A support bolted cable-stayed horizontal suspension protection system, characterized in that it comprises a cantilever rod anchor support (1), and the cantilever rod anchor support (1) is welded with one (2) bolts ) and one end of the telescopic suspension rod (3), the other end of the bolt one (2) passes through the structural beam one (4) around the structural plate and is connected with a nut one (26), the telescopic suspension The other end of the pole member (3) is connected to the guardrail column, and one end of the telescopic suspension member (3) close to the guardrail column (7) is fixedly connected to one end of the cable-stayed adjusting rod (8), and the cable-stayed adjusting rod The other end of (8) is welded and connected with the anchor support (9) of the inclined stay rod, and one end of the anchor support (9) of the inclined stay rod (9) is welded and connected to the bolt two (12), and the other end of the bolt two (12) The second structural beam (10) whose one end passes through the periphery of the structural plate is connected with the second nut (11). 2.根据权利要求1所述的一种支座栓接斜拉式水平悬挑防护体系,其特征在于,所述的结构梁一(4)内设有PVC套管一,所述PVC套管一套在所述螺栓一(2)上。2. A kind of support bolted cable-stayed horizontal cantilever protection system according to claim 1, characterized in that, said structural beam one (4) is provided with PVC casing one, and said PVC casing One set on said bolt one (2). 3.根据权利要求1所述的一种支座栓接斜拉式水平悬挑防护体系,其特征在于,所述的结构梁二(10)内设有PVC套管二,所述PVC套管二套在所述螺栓二(12)上。3. A support bolted cable-stayed horizontal overhang protection system according to claim 1, characterized in that, said structural beam two (10) is provided with a PVC casing two, said PVC casing Two are enclosed within on described bolt two (12). 4.根据权利要求1所述的一种支座栓接斜拉式水平悬挑防护体系,其特征在于,所述伸缩悬挑杆件(3)包括方钢一(15)和方钢二(16),所述方钢一(15)的一端与所述悬挑杆锚固支座(1)固定连接,所述方钢二(16)的一端与所述护栏立柱连接,所述方钢一(15)的另一端和方钢二(16)的另一端均设有若干螺栓孔(17),所述的方钢一(15)的另一端和方钢二(16)的另一端通过螺栓穿过所述螺栓孔(17)连接。4. A kind of support bolted cable-stayed horizontal suspension protection system according to claim 1, characterized in that, said telescopic suspension rod (3) comprises square steel one (15) and square steel two ( 16), one end of the square steel one (15) is fixedly connected with the cantilever rod anchor support (1), one end of the square steel two (16) is connected with the guardrail column, and the square steel one The other end of (15) and the other end of square steel two (16) are all provided with some bolt holes (17), and the other end of described square steel one (15) and the other end of square steel two (16) pass through bolt Connect through the bolt holes (17). 5.根据权利要求4所述的一种支座栓接斜拉式水平悬挑防护体系,其特征在于,所述方钢一(15)与所述悬挑杆锚固支座(1)之间焊接有加强肋一(13)。5. A support bolted cable-stayed horizontal overhang protection system according to claim 4, characterized in that, between the square steel one (15) and the cantilever rod anchor support (1) Welding has reinforcing rib one (13). 6.根据权利要求5所述的一种支座栓接斜拉式水平悬挑防护体系,其特征在于,所述伸缩悬挑杆件(3)的上方铺设有水平防护板(5),所述水平防护板(5)与伸缩悬挑杆件(3)之间设有若干方钢横撑(6)。6. A support bolted cable-stayed horizontal suspension protection system according to claim 5, characterized in that a horizontal protection plate (5) is laid above the telescopic suspension rod (3), so that Several square steel cross braces (6) are arranged between the horizontal protective plate (5) and the telescopic suspension rod (3). 7.根据权利要求1所述的一种支座栓接斜拉式水平悬挑防护体系,其特征在于,所述的斜拉调节杆(8)包括斜拉调节杆端头一(18)和斜拉调节杆端头二(19),所述的斜拉调节杆端头一(18)的一端与所述伸缩悬挑杆件(3)固定连接,所述斜拉调节杆端头二(19)的一端与所述斜拉杆锚固支座(9)焊接连接,所述斜拉调节杆端头一(18)的另一端和斜拉调节杆端头二(19)的另一端之间依次连接有可调节丝杠一(20)、紧固玄杆(21)和可调节丝杠二(22)。7. A support bolted cable-stayed horizontal overhang protection system according to claim 1, characterized in that the cable-stayed adjusting rod (8) comprises a cable-stayed adjusting rod end one (18) and Two ends (19) of the cable-stayed adjusting rod, one end of the first (18) of the cable-stayed adjusting rod is fixedly connected with the telescopic suspension rod (3), and the two ends (18) of the cable-stayed adjusting rod ( One end of 19) is welded to the anchoring support (9) of the inclined stay rod, and the other end of the end one (18) of the inclined stay adjustment rod and the other end of the end two (19) of the oblique stay adjustment rod are in turn It is connected with adjustable leading screw one (20), fastening mysterious rod (21) and adjustable leading screw two (22). 8.根据权利要求7所述的一种支座栓接斜拉式水平悬挑防护体系,其特征在于,所述的斜拉调节杆端头一(18)和可调节丝杠一(20)之间及所述的斜拉调节杆端头二(19)和可调节丝杠二(22)之间均为螺栓连接。8. A support bolted cable-stayed horizontal overhang protection system according to claim 7, characterized in that said cable-stay adjusting rod end one (18) and adjustable lead screw one (20) Between and between the two ends of the cable-stayed adjusting rod (19) and the adjustable lead screw two (22) are all bolt connections. 9.根据权利要求7所述的一种支座栓接斜拉式水平悬挑防护体系,其特征在于,所述斜拉杆锚固支座(9)包括钢板一(23)和钢板二(24),所述的钢板一(23)与钢板二(24)焊接连接,所述钢板一(23)与螺栓二(12)的一端焊接连接,所述钢板二(24)上设有通孔(25),所述钢板二(24)通过所述通孔(25)与所述斜拉调节杆端头二(19)的一端连接。9. A support bolted cable-stayed horizontal overhang protection system according to claim 7, characterized in that, said cable-stay anchor support (9) comprises a steel plate one (23) and a steel plate two (24) , the steel plate one (23) is welded with the steel plate two (24), the steel plate one (23) is welded with one end of the bolt two (12), and the steel plate two (24) is provided with a through hole (25 ), the steel plate two (24) is connected with one end of the inclined-stay adjusting rod end two (19) through the through hole (25). 10.根据权利要求9所述的一种支座栓接斜拉式水平悬挑防护体系,其特征在于,所述钢板一(23)与所述钢板二(24)之间焊接连接有加强肋二(14)。10. A support bolted cable-stayed horizontal overhang protection system according to claim 9, characterized in that there are reinforcing ribs welded between the first steel plate (23) and the second steel plate (24) Two (14).
CN201721347864.6U 2017-10-19 2017-10-19 A kind of bearing bolt cable-stayed type level overhanging protection system Expired - Fee Related CN207863430U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721347864.6U CN207863430U (en) 2017-10-19 2017-10-19 A kind of bearing bolt cable-stayed type level overhanging protection system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721347864.6U CN207863430U (en) 2017-10-19 2017-10-19 A kind of bearing bolt cable-stayed type level overhanging protection system

Publications (1)

Publication Number Publication Date
CN207863430U true CN207863430U (en) 2018-09-14

Family

ID=63475284

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721347864.6U Expired - Fee Related CN207863430U (en) 2017-10-19 2017-10-19 A kind of bearing bolt cable-stayed type level overhanging protection system

Country Status (1)

Country Link
CN (1) CN207863430U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110080528A (en) * 2019-04-30 2019-08-02 中国二十冶集团有限公司 The construction method of outer builder's jack I-steel
CN110984553A (en) * 2019-12-20 2020-04-10 浙江宝业建设集团有限公司 Detachable turnover high-altitude large-cantilever formwork and construction method
CN112832502A (en) * 2021-02-25 2021-05-25 浙江筑才教育科技有限公司 A kind of tie rod type prestressed cantilever outer frame and its construction method
CN113389365A (en) * 2021-07-01 2021-09-14 江苏中南建设装饰有限公司 Protective structure is kept apart to assembled stereoplasm

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110080528A (en) * 2019-04-30 2019-08-02 中国二十冶集团有限公司 The construction method of outer builder's jack I-steel
CN110984553A (en) * 2019-12-20 2020-04-10 浙江宝业建设集团有限公司 Detachable turnover high-altitude large-cantilever formwork and construction method
CN112832502A (en) * 2021-02-25 2021-05-25 浙江筑才教育科技有限公司 A kind of tie rod type prestressed cantilever outer frame and its construction method
CN113389365A (en) * 2021-07-01 2021-09-14 江苏中南建设装饰有限公司 Protective structure is kept apart to assembled stereoplasm
CN113389365B (en) * 2021-07-01 2022-11-15 江苏中南建设装饰有限公司 Protective structure is kept apart to assembled stereoplasm

Similar Documents

Publication Publication Date Title
CN207863430U (en) A kind of bearing bolt cable-stayed type level overhanging protection system
CN107100187B (en) Tower crane steel girder erection structure and installation method
CN209244226U (en) A cable-stayed I-beam cantilever beam for scaffolding
CN111236621A (en) Fixing system for beam-side embedded overhanging scaffold
CN102561669A (en) Cantilever scaffold and construction method thereof
CN201078091Y (en) Combined scaffold
CN213268820U (en) Pull rod type I-steel cantilever beam
CN115977108B (en) Fish belly sill device for increasing prestress
CN206319597U (en) A kind of cantilever steel girder erecting device
CN208088827U (en) The detachable earth anchor of iron on floor beam
CN215055324U (en) A high-rise building construction device
CN109457934A (en) A kind of T-type anchorage element built-in type wall-connecting piece and its construction method
CN108718058A (en) A kind of cantilever crossing frame from lifting rotary type
CN209742404U (en) assembled building stand bearing diagonal structure
CN219548428U (en) Positioning device for assembled hybrid limb wall construction
CN209413271U (en) Casing wall-through pull rod formula connects wall fixed Combination device
CN216038325U (en) Tower crane internal climbing frame fixing frame
CN206753017U (en) A kind of pull-back cable Superimposed fastener
CN214575517U (en) Cantilever operation platform
CN209244224U (en) An external scaffold cantilever I-beam with bolts to lock the oblique tie rods
CN206636170U (en) A kind of shaped steel cantilever frame for being used for structural supporter and external scaffolding
CN212428008U (en) Lower supporting type overhanging scaffold construction device
CN213742260U (en) Pull-up type cantilever frame beam convenient to mount and dismount
CN214785808U (en) Assembled steel pipe bearing type outer frame-free wall-attached construction protection system
CN209837748U (en) A top-supporting protective frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180914

CF01 Termination of patent right due to non-payment of annual fee