CN207857198U - A kind of spanner spray-painting plant - Google Patents

A kind of spanner spray-painting plant Download PDF

Info

Publication number
CN207857198U
CN207857198U CN201721906449.XU CN201721906449U CN207857198U CN 207857198 U CN207857198 U CN 207857198U CN 201721906449 U CN201721906449 U CN 201721906449U CN 207857198 U CN207857198 U CN 207857198U
Authority
CN
China
Prior art keywords
spray
spanner
moving block
paint
slide bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721906449.XU
Other languages
Chinese (zh)
Inventor
简国民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaodong Jinwang Hardware Tools Manufacturing Co Ltd
Original Assignee
Shaodong Jinwang Hardware Tools Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaodong Jinwang Hardware Tools Manufacturing Co Ltd filed Critical Shaodong Jinwang Hardware Tools Manufacturing Co Ltd
Priority to CN201721906449.XU priority Critical patent/CN207857198U/en
Application granted granted Critical
Publication of CN207857198U publication Critical patent/CN207857198U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Nozzles (AREA)

Abstract

The utility model discloses a kind of spanner spray-painting plants,Including wind turbine,Mounting table and pedestal,Fixed link is installed at the top of the pedestal,And the side of fixed link is equipped with placement bar,Described one end for placing bar is equipped with spray gun for paint,Fluid hose is installed on the outer wall of the fixed link,High-pressure pump is installed at a side position of fixed link on the pedestal,And the side of high-pressure pump is equipped with canister,The side of the mounting table is provided with slide bar,One end of the fog-spray nozzle is equipped with water pipe,The side of the water pump is equipped with controller,And water tank is provided with below water pump,The bottom of the blending bin is connected with sewage pipe,The utility model, which is provided with, can extract the device painted in air,It solves a large amount of paint to distribute in air,Staff sucks paint has the problem of injury to body,Provided with mounting table,Turn-over spray painting cannot be carried out to spanner by solving spray-painting plant,The problem of two sides spray painting of spanner needs staff to exchange.

Description

A kind of spanner spray-painting plant
Technical field
The utility model belongs to spray-painting plant technical field, and in particular to a kind of spanner spray-painting plant.
Background technology
Spraying equipment is also referred to as coating equipment, is specifically defined to the special of metal and nonmetallic surface protective mulch or decorative layer With tool, be divided into three kinds from the material of sprayed on material, be respectively handware spraying equipment, plastic cement spraying equipment, woodenware spraying set Standby, porcelain spraying equipment, is divided into manual spray equipment and automatic spraying equipment from automatic degree, is divided into paint from the oil plant of spraying Spraying equipment and powder spray coating device.
But spanner spray-painting plant currently on the market cannot meet requirement, in use, the spray painting on spray-painting plant After rifle sprays paint, a large amount of paint distributes in air, and staff sucks paint has injury to body, and uses When, spray-painting plant cannot carry out spanner turn-over spray painting, and the two sides spray painting of spanner needs staff to exchange, increases work Make personnel's amount of labour, the problem of based on appearing above, proposes a kind of spanner spray-painting plant.
Utility model content
The purpose of this utility model is to provide a kind of spanner spray-painting plants, to solve spray mentioned above in the background art After painting the spray gun for paint ejection paint on device, a large amount of paint distributes in air, and staff, which sucks to paint, body Injury, spray-painting plant cannot carry out spanner turn-over spray painting, and the two sides spray painting of spanner needs staff to exchange, increases The problem of staff's amount of labour.
To achieve the above object, the utility model provides the following technical solutions:A kind of spanner spray-painting plant, including wind turbine, Mounting table and pedestal are equipped with fixed link at the top of the pedestal, and the side of fixed link is equipped with placement bar, the placement bar One end spray gun for paint is installed, fluid hose is installed, close to the side of fixed link on the pedestal on the outer wall of the fixed link High-pressure pump is installed, and the side of high-pressure pump is equipped with canister at position, the side of the mounting table is provided with slide bar, and sliding The side of bar is connected with the first bottom plate and the second bottom plate, and the first moving block, and first turn are equipped with above first bottom plate The side of motion block is equipped with slide bar, and one end of the slide bar is provided with pressure ram, and one end of first moving block is equipped with One end of one motor, the slide bar is equipped with spanner, and the second moving block, and the second bottom plate are equipped with above second bottom plate Inside lead screw is installed, and one end of lead screw is equipped with the second motor, the side of the wind turbine is provided with bellows, and bellows Side is provided with blending bin, and the outer wall of the blending bin is equipped with paint entrance, and the inside of blending bin is equipped with fog-spray nozzle, institute The one end for stating fog-spray nozzle is equipped with water pipe, and one end of water pipe is equipped with water pump, and the side of the water pump is equipped with controller, and Water tank is provided with below water pump, the bottom of the blending bin is connected with sewage pipe, and one end of sewage pipe is connected with foul water tank, The wind turbine, first motor, high-pressure pump, the second motor and water pump are electrically connected with controller.
Preferably, first moving block is rectangular parallelepiped structure.
Preferably, the outer wall of the blending bin is provided with rust-proof coating.
Preferably, there are four the slide bar is arranged altogether, and four slide bars be symmetricly set in pairs the first moving block and The both sides of second moving block.
Preferably, the pressure ram is cylindrical structure.
Compared with prior art, the utility model has the beneficial effects that:
(1) the utility model, which is provided with, can extract the device painted in air, in use, user opens wind turbine, wind Air containing paint is sucked blending bin by machine from paint entrance, and fog-spray nozzle, and one end of fog-spray nozzle are equipped with inside blending bin It is connected with water pump, water pump takes out the water inside water tank toward at fog-spray nozzle, is then sprayed from fog-spray nozzle, and the water that fog-spray nozzle sprays becomes Water mist, the paint mixing in water mist and air, then flows to foul water tank from sewage pipe, solves a large amount of paint and distributes in air In, staff sucks paint has the problem of injury to body, is conducive to the safety of staff, ensures the quality of air, carry Supply good working environment to staff.
(2) the utility model is provided with mounting table, and the fixture of holding spanners is equipped on mounting table, when spraying spanner, pulls After the one side of hand is spray coated, first motor drives the rotation of the first moving block, the rotation of the first moving block to drive the rotation of the second moving block, Spanner is also driven simultaneously, another face of spanner, which is rotated through, to be come, and turn-over spray cannot be carried out to spanner by solving spray-painting plant The problem of paint, the two sides spray painting of spanner needs staff to exchange, the labor intensity of staff is reduced, dress is realized The automatic turnover spraying set, accelerates the efficiency of spraying.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the vertical view of the utility model mounting table;
Fig. 3 is the internal structure schematic diagram of the utility model mounting table;
Fig. 4 is the circuit block diagram of the utility model;
In figure:1- wind turbines;2- bellows;3- blending bins;4- paints entrance;5- first motors;6- mounting tables;7- spray guns for paint; 8- fixed links;9- places bar;10- fluid hoses;11- canisters;12- high-pressure pumps;13- pedestals;14- water tanks;15- foul water tanks;16- Sewage pipe;17- water pipes;18- pressure rams;19- slide bars;The first moving blocks of 20-;21- spanners;The first bottom plates of 22-;The second bottoms 23- Plate;The second moving blocks of 24-;The second motors of 25-;26- lead screws;27- fog-spray nozzles;28- water pumps;29- controllers.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work The every other embodiment obtained, shall fall within the protection scope of the present invention.
- 4 are please referred to Fig.1, the utility model provides the following technical solutions:A kind of spanner spray-painting plant, including wind turbine 1, put Platform 6 and pedestal 13 are set, the top of pedestal 13 is equipped with fixed link 8, and the side of fixed link 8 is equipped with and places bar 9, places bar 9 One end spray gun for paint 7 is installed, fluid hose 10 is installed, close to the side of fixed link 8 position on pedestal 13 on the outer wall of fixed link 8 The place of setting is equipped with high-pressure pump 12, and the side of high-pressure pump 12 is equipped with canister 11, and the side of mounting table 6 is provided with slide bar 19, Spanner 21 cannot be carried out turn-over spray painting by solving spray-painting plant, and the two sides spray painting of spanner 21 needs staff to be exchanged Problem, and the side of slide bar 19 is connected with the first bottom plate 22 and the second bottom plate 23, the top of the first bottom plate 22 is equipped with first turn Motion block 20, and the side of the first moving block 20 is equipped with slide bar 19, one end of slide bar 19 is provided with pressure ram 18, the first moving block 20 one end is equipped with first motor 5, and one end of slide bar 19 is equipped with spanner 21, and the top of the second bottom plate 23 is equipped with second turn Motion block 24, and the inside of the second bottom plate 23 is equipped with lead screw 26, and one end of lead screw 26 is equipped with the second motor 25, wind turbine 1 Side is provided with bellows 2, solves a large amount of paint and distributes in air, staff, which sucks paint, has injury to ask body Topic, and the side of bellows 2 is provided with blending bin 3, the outer wall of blending bin 3 is equipped with paint entrance 4, and the inside peace of blending bin 3 Equipped with fog-spray nozzle 27, the water mist that fog-spray nozzle 27 sprays can be mixed with the water mist in air, after paint is mixed, along pipeline Flowing into foul water tank 15, one end of fog-spray nozzle 27 is equipped with water pipe 17, and one end of water pipe 17 is equipped with water pump 28, and the one of water pump 28 Side is equipped with controller 29, and the lower section of water pump 28 is provided with water tank 14, and the bottom of blending bin 3 is connected with sewage pipe 16, and dirty One end of water pipe 16 is connected with foul water tank 15, wind turbine 1, first motor 5, high-pressure pump 12, the second motor 25 and water pump 28 with control Device 29 processed is electrically connected, and controller 29 uses FOK-11S controllers, first motor 5 and the second motor 25 using ZLDB-5T electricity Machine.
For the ease of the installation of pressure ram 18, in the present embodiment, it is preferred that the first moving block 20 is rectangular parallelepiped structure.
For the ease of the antirust of blending bin 3, in the present embodiment, it is preferred that the outer wall of blending bin 3 is provided with rust-proof coating.
Stablize for the installation of the first moving block 20 and the second moving block 24, in the present embodiment, it is preferred that slide bar 19 is set altogether There are four setting, and four slide bars 19 are symmetricly set on the both sides of the first moving block 20 and the second moving block 24 in pairs.
It is used for the ease of user, in the present embodiment, it is preferred that pressure ram 18 is cylindrical structure.
Utility model works flow:In use, device is connected external power supply by user, user starts the second motor 25 power knob, 25 main axis of the second motor, 25 main shaft of the second motor drive lead screw 26 to rotate, at this time 22 He of the first bottom plate Second bottom plate 23 separates, and pressure ram 18 is stuck in the both ends of spanner 21 by user, and user is again started up the electricity of the second motor 25 Source button, the reversion of 25 main shaft of the second motor, 25 main shaft of the second motor drive lead screw 26 to rotate, the first bottom plate 22 and the second bottom plate 23 It is closed, spanner 21 is installed on mounting table 6, and user starts the power knob of high-pressure pump 12, and controller 29 controls high-pressure pump 12 work, high-pressure pump 12 take out the paint inside canister 11 toward at spray gun for paint 7, and paint is sprayed from spray gun for paint 7, and paint is sprayed on On spanner 21, after first face of spanner 21 is sprayed-on, user starts 5 power knob of first motor, and controller 29 controls First motor 5 works, and 5 main shaft of first motor drives the rotation of the first moving block 20, the rotation of the first moving block 20 to drive the second rotation Block 24 rotates, and spanner 21 is also driven simultaneously, another face of spanner 21, which is rotated through, to be come, and user starts 1 He of wind turbine simultaneously Air is pumped into bellows 2 by the power knob of water pump 28, the work of wind turbine 1 from paint entrance 4, and the air containing paint passes through blending bin 3, at this time controller 29 control water pump 28 and work, water water tank 14 inside is taken out past fog-spray nozzle 27 by water pump 28, and fog-spray nozzle 27 is by water It is sprayed on inside blending bin 3, after the paint in air is mixed with water mist, foul water tank 15, the sky in air is flowed into from sewage pipe 16 Gas is purified.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is appreciated that can these embodiments be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (5)

1. a kind of spanner spray-painting plant, including wind turbine (1), mounting table (6) and pedestal (13), it is characterised in that:The pedestal (13) fixed link (8) is installed, and the side of fixed link (8) is equipped with and places bar (9) at the top of, it is described to place the one of bar (9) End is equipped with spray gun for paint (7), is equipped with fluid hose (10) on the outer wall of the fixed link (8), close to solid on the pedestal (13) High-pressure pump (12) is installed, and the side of high-pressure pump (12) is equipped with canister (11) at one side position of fixed pole (8), it is described to put The side for setting platform (6) is provided with slide bar (19), and the side of slide bar (19) is connected with the first bottom plate (22) and the second bottom plate (23), First moving block (20) is installed, and the side of the first moving block (20) is equipped with slide bar above first bottom plate (22) (19), one end of the slide bar (19) is provided with pressure ram (18), and one end of first moving block (20) is equipped with the first electricity One end of machine (5), the slide bar (19) is equipped with spanner (21), and the second moving block is equipped with above second bottom plate (23) (24), and the inside of the second bottom plate (23) is equipped with lead screw (26), and one end of lead screw (26) is equipped with the second motor (25), institute The side for stating wind turbine (1) is provided with bellows (2), and the side of bellows (2) is provided with blending bin (3), the blending bin (3) it is outer Wall is equipped with paint entrance (4), and the inside of blending bin (3) is equipped with fog-spray nozzle (27), one end peace of the fog-spray nozzle (27) One end equipped with water pipe (17), and water pipe (17) is equipped with water pump (28), and the side of the water pump (28) is equipped with controller (29), it and below water pump (28) is provided with water tank (14), the bottom of the blending bin (3) is connected with sewage pipe (16), and dirty One end of water pipe (16) is connected with foul water tank (15), the wind turbine (1), first motor (5), high-pressure pump (12), the second motor (25) it is electrically connected with controller (29) with water pump (28).
2. a kind of spanner spray-painting plant according to claim 1, it is characterised in that:First moving block (20) is rectangular Body structure.
3. a kind of spanner spray-painting plant according to claim 1, it is characterised in that:The outer wall of the blending bin (3) is arranged There is rust-proof coating.
4. a kind of spanner spray-painting plant according to claim 1, it is characterised in that:The slide bar (19) is provided with four altogether It is a, and four slide bars (19) are symmetricly set on the both sides of the first moving block (20) and the second moving block (24) in pairs.
5. a kind of spanner spray-painting plant according to claim 1, it is characterised in that:The pressure ram (18) is cylinder knot Structure.
CN201721906449.XU 2017-12-29 2017-12-29 A kind of spanner spray-painting plant Expired - Fee Related CN207857198U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721906449.XU CN207857198U (en) 2017-12-29 2017-12-29 A kind of spanner spray-painting plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721906449.XU CN207857198U (en) 2017-12-29 2017-12-29 A kind of spanner spray-painting plant

Publications (1)

Publication Number Publication Date
CN207857198U true CN207857198U (en) 2018-09-14

Family

ID=63463706

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721906449.XU Expired - Fee Related CN207857198U (en) 2017-12-29 2017-12-29 A kind of spanner spray-painting plant

Country Status (1)

Country Link
CN (1) CN207857198U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112221773A (en) * 2020-09-25 2021-01-15 湖南恒岳重钢钢结构工程有限公司 Paint spraying device suitable for wind power tower cylinder japanning

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112221773A (en) * 2020-09-25 2021-01-15 湖南恒岳重钢钢结构工程有限公司 Paint spraying device suitable for wind power tower cylinder japanning

Similar Documents

Publication Publication Date Title
CN203355955U (en) Closed spray device
CN207325136U (en) A kind of outdoor spray-painting plant used in ad production industry
CN206763221U (en) The outdoor true mineral varnish spraying equipment of one kind building
CN204396307U (en) Powder spraying device
CN202447232U (en) Automatic steel member paint spraying production line
CN200942381Y (en) Simple environment-protecting energy-saving type spray box
CN207857198U (en) A kind of spanner spray-painting plant
CN209145240U (en) A kind of adjustable buildings decoration flush coater of spray range
CN203972211U (en) Two dimension automatic paint spraying apparatus
CN209423915U (en) A kind of architectural engineering panel material spray-painting plant
CN209438881U (en) A kind of metal product air hose outer wall spray-painting plant
CN201660826U (en) Spray painting machine
CN208554752U (en) A kind of construction plate spray-painting plant
CN217341902U (en) Fixing structure with high-temperature-resistant effect for spraying device
CN206168625U (en) Paint spraying device with shelter from function
CN112916263A (en) Intelligent copper-nickel alloy spraying anti-corrosion robot
CN210947620U (en) Building coating construction equipment
CN209006015U (en) Spray-painting plant is used in a kind of processing of folding container room
CN206951522U (en) Automatic quickly upper paint roller brush
CN202438425U (en) Novel slurry sprayer
CN207905318U (en) A kind of Large Electric wall spray equipment
CN206707223U (en) A kind of new painting wall device of indoor decoration
CN204638429U (en) A kind of Novel chemical spray equipment
CN221453052U (en) Coating device for power equipment
CN205288756U (en) Flush coater for plastic course

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180914

Termination date: 20201229