CN207848589U - A kind of spool shifts to an earlier date pre-buried structure - Google Patents
A kind of spool shifts to an earlier date pre-buried structure Download PDFInfo
- Publication number
- CN207848589U CN207848589U CN201721778879.8U CN201721778879U CN207848589U CN 207848589 U CN207848589 U CN 207848589U CN 201721778879 U CN201721778879 U CN 201721778879U CN 207848589 U CN207848589 U CN 207848589U
- Authority
- CN
- China
- Prior art keywords
- pipe laying
- laying portion
- longitudinal
- line wheel
- earlier date
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000007704 transition Effects 0.000 claims abstract description 36
- 238000009434 installation Methods 0.000 claims abstract description 18
- 230000005540 biological transmission Effects 0.000 claims abstract description 11
- 230000015572 biosynthetic process Effects 0.000 claims description 5
- 210000002421 cell wall Anatomy 0.000 claims description 3
- 239000011159 matrix material Substances 0.000 abstract description 4
- 238000010276 construction Methods 0.000 description 3
- 238000009435 building construction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000011835 investigation Methods 0.000 description 1
Landscapes
- Sewage (AREA)
Abstract
The utility model discloses a kind of spools to shift to an earlier date pre-buried structure, including lateral pipe laying portion, longitudinal pipe laying portion and the transition pipe laying portion for being connected to the two, the inverted draw cut being connected to is formed on the transverse direction pipe laying portion, longitudinal pipe laying portion, transition pipe laying portion top, it is provided with lateral line wheel at the slot bottom in the transverse direction pipe laying portion, it is provided with longitudinal line wheel at the slot bottom in the longitudinal direction pipe laying portion, it is cased with transmission line in the transverse direction line wheel, longitudinal line wheel, is the rope section for having threading on the transmission line.The utility model facilitates in-site installation by modular lateral pipe laying portion, transition pipe laying portion, longitudinal pipe laying portion, it is realized by extension plate and is fixed with matrix, the rotation of transmission line is realized by lateral line wheel, longitudinal line wheel, it realizes and is oriented to by No. I guide wheel, No. II guide wheel, the utility model is simple in structure, in-site installation is simplified, ensure that installation quality.
Description
Technical field
The utility model belongs to building installation engineering field, and in particular to a kind of spool shifts to an earlier date pre-buried structure.
Background technology
Construction industry is to specialize in civil engineering, building construction and the production of equipment installation and engineering investigation design work
Department.Its product be various factories, mine, railway, bridge, harbour, road, pipeline, house and communal facility building,
Structures and facility.
Pre-buried operation is operating type more commonly used in constructions work, and in building installation engineering, it is directed to spool
It is pre-buried, the course of work is cumbersome, and usually occur construction it is unqualified directly affect the later stage threading.
Invention content
The utility model proposes in order to solve the problems existing in the prior art, pre-buried in advance the purpose is to provide a kind of spool
Structure.
The technical solution of the utility model is:A kind of spool shifts to an earlier date pre-buried structure, including lateral pipe laying portion, longitudinal pipe laying portion
With the transition pipe laying portion for being connected to the two, the top being connected to is formed on the transverse direction pipe laying portion, longitudinal pipe laying portion, transition pipe laying portion top
Slot is provided with lateral line wheel at the slot bottom in the transverse direction pipe laying portion, longitudinal line wheel is provided at the slot bottom in the longitudinal direction pipe laying portion,
It is cased with transmission line in the transverse direction line wheel, longitudinal line wheel, is the rope section for having threading on the transmission line.
The both ends in transition pipe laying portion are respectively formed left assembly riser, lower assembly riser.
The left assembly riser is connected by bolt with lateral pipe laying portion, and the lower assembly riser is buried by bolt with longitudinal
Pipe portion is connected.
The transverse direction pipe laying portion upper end forms I extra and prolongs plate, and I extra, which prolongs, forms installation No. I mounting hole, institute in plate
It states transition pipe laying portion upper end and forms transition extension plate, installation transition mounting hole, the longitudinal direction are formed in the transition extension plate
Pipe laying portion upper end forms II extra and prolongs plate, and II extra prolongs No. II mounting hole of formation in plate.
No. I guide wheel, No. II guide wheel are provided on the slot bottom of transition pipe laying portion transition position.
It is provided with lateral vertical shaft at the slot bottom in the transverse direction pipe laying portion, the x wire wheel is sleeved on lateral vertical shaft, described
Longitudinal vertical shaft is provided at the slot bottom in longitudinal pipe laying portion, the vertical line wheel is sleeved on longitudinal vertical shaft.
It is provided with support ring between the longitudinal direction line wheel lower end and the slot bottom in longitudinal pipe laying portion, the support ring is sleeved on longitudinal direction
On vertical shaft.
The longitudinal direction line wheel side-walls form transverse groove.
Mounting groove is formed at the cell wall in the longitudinal direction pipe laying portion, is slided in the mounting groove and is incorporated with cover board.
The longitudinal direction vertical shaft upper end forms external screw thread, and the external screw thread is meshed with the nut of the longitudinal line wheel of limit, described
The fitting groove for accommodating longitudinal vertical shaft is formed on cover board bottom.
The utility model facilitates in-site installation by modular lateral pipe laying portion, transition pipe laying portion, longitudinal pipe laying portion, leads to
The realization of extension plate is crossed to fix with matrix, by lateral line wheel, the rotation of longitudinal line wheel realization transmission line, by No. I guide wheel, No. II
Guide wheel, which is realized, to be oriented to, and the utility model is simple in structure, simplifies in-site installation, ensure that installation quality.
Description of the drawings
Fig. 1 is the front view of the utility model;
Fig. 2 is the sectional view of longitudinal pipe laying body in the utility model;
Wherein:
1 lateral pipe laying portion, 2 transition pipe laying portion
3 longitudinal pipe laying portion, 4 lateral vertical shaft
56 fitting grooves of lateral line wheel
7 longitudinal vertical shaft, 8 longitudinal line wheel
9 No. I guide wheels, 10 No. II guide wheels
11 left assembly risers 12 times assemble riser
13 I extras prolong 14 No. I mounting holes of plate
15 transition extension plate, 16 transition mounting hole
17 II extras prolong 18 No. II mounting holes of plate
19 transverse groove, 20 support ring
21 nut, 22 mounting groove
23 cover boards.
Specific implementation mode
Hereinafter, the utility model is described in detail with reference to drawings and examples:
As shown in Figure 1 and 2, a kind of spool shifts to an earlier date pre-buried structure, including lateral pipe laying portion 1, longitudinal pipe laying portion 3 be connected to two
The inverted draw cut being connected to, institute are formed on the transition pipe laying portion 2 of person, the transverse direction pipe laying portion 1, longitudinal pipe laying portion 3,2 top of transition pipe laying portion
It states and is provided with lateral line wheel 5 at the slot bottom in lateral pipe laying portion 1, longitudinal line wheel 8 is provided at the slot bottom in the longitudinal direction pipe laying portion 3,
It is cased with transmission line in the transverse direction line wheel 5, longitudinal line wheel 8, is the rope section for having threading on the transmission line.
The both ends in transition pipe laying portion 2 are respectively formed left assembly riser 11, lower assembly riser 12.
The left assembly riser 11 is connected by bolt with lateral pipe laying portion 1, the lower assembly riser 12 by bolt and
Longitudinal pipe laying portion 3 is connected.
1 upper end of transverse direction pipe laying portion forms I extra and prolongs plate 13, and I extra, which prolongs, forms installation with No. I installation in plate 13
Hole 14,2 upper end of transition pipe laying portion form transition extension plate 15, and form installation in the transition extension plate 15 is installed with transition
Hole 16,3 upper end of longitudinal direction pipe laying portion form II extra and prolong plate 17, and II extra prolongs No. II mounting hole 18 of formation in plate 17.
9, No. II guide wheels 10 of No. I guide wheel are provided on the slot bottom of 2 transition position of transition pipe laying portion.
Lateral vertical shaft 4 is provided at the slot bottom in the transverse direction pipe laying portion 1, the transverse direction line wheel 5 is sleeved on lateral vertical shaft 4,
Longitudinal vertical shaft 7 is provided at the slot bottom in the longitudinal direction pipe laying portion 3, the longitudinal direction line wheel 8 is sleeved on longitudinal vertical shaft 7.
It is provided with support ring 20,20 sets of the support ring between longitudinal direction 8 lower end of line wheel and the slot bottom in longitudinal pipe laying portion 3
On longitudinal vertical shaft 7.
Longitudinal direction 8 side-walls of line wheel form transverse groove 19.
Mounting groove 22 is formed at the cell wall in the longitudinal direction pipe laying portion 3, is slided in the mounting groove 22 and is incorporated with cover board 23.
Longitudinal direction 7 upper end of vertical shaft forms external screw thread, and the external screw thread is meshed with the nut 21 of limit longitudinal direction line wheel 8,
The fitting groove 6 for accommodating longitudinal vertical shaft 7 is formed on 23 bottom of the cover board.
It is again provided with support ring, the support ring set between transverse direction 5 lower end of line wheel and the slot bottom in lateral pipe laying portion 1
On lateral vertical shaft 4.
Transverse direction 5 side-walls of line wheel are similarly formed sidewall channels, and the sidewall channels, transverse groove 19 are arc groove.
It is again provided with upper cover in the transverse direction pipe laying portion 1, the upper cover is identical as the fixed form of cover board 23.
The longitudinal plate of the transverse plate and longitudinal sliding motion that slide laterally is provided in transition pipe laying portion 2.
16, No. II No. I mounting hole 14, transition mounting hole mounting holes 18 are bolted with matrix, and fixation is laggard
Row pours operation.
The utility model facilitates in-site installation by modular lateral pipe laying portion, transition pipe laying portion, longitudinal pipe laying portion, leads to
The realization of extension plate is crossed to fix with matrix, by lateral line wheel, the rotation of longitudinal line wheel realization transmission line, by No. I guide wheel, No. II
Guide wheel, which is realized, to be oriented to, and the utility model is simple in structure, simplifies in-site installation, ensure that installation quality.
Claims (10)
1. a kind of spool shifts to an earlier date pre-buried structure, including lateral pipe laying portion(1), longitudinal pipe laying portion(3)It is buried with the transition for being connected to the two
Pipe portion(2), it is characterised in that:The transverse direction pipe laying portion(1), longitudinal pipe laying portion(3), transition pipe laying portion(2)Connection is formed on top
Inverted draw cut, the transverse direction pipe laying portion(1)Slot bottom at be provided with lateral line wheel(5), the longitudinal direction pipe laying portion(3)Slot bottom at set
It is equipped with longitudinal line wheel(8), the transverse direction line wheel(5), longitudinal line wheel(8)On be cased with transmission line, be to have threading on the transmission line
Rope section.
2. a kind of spool according to claim 1 shifts to an earlier date pre-buried structure, it is characterised in that:Transition pipe laying portion(2)'s
Both ends are respectively formed left assembly riser(11), lower assembly riser(12).
3. a kind of spool according to claim 2 shifts to an earlier date pre-buried structure, it is characterised in that:The left assembly riser(11)It is logical
Cross bolt and lateral pipe laying portion(1)It is connected, the lower assembly riser(12)Pass through bolt and longitudinal pipe laying portion(3)It is connected.
4. a kind of spool according to claim 2 shifts to an earlier date pre-buried structure, it is characterised in that:The transverse direction pipe laying portion(1)On
End forms I extra and prolongs plate(13), I extra prolongs plate(13)No. I mounting hole is installed in middle formation(14), transition pipe laying portion
(2)Upper end forms transition extension plate(15), the transition extension plate(15)Middle formation installation transition mounting hole(16), described vertical
To pipe laying portion(3)Upper end forms II extra and prolongs plate(17), II extra prolongs plate(17)No. II mounting hole of middle formation(18).
5. a kind of spool according to claim 4 shifts to an earlier date pre-buried structure, it is characterised in that:Transition pipe laying portion(2)It crosses
No. I guide wheel is provided on the slot bottom at the place of crossing(9), No. II guide wheel(10).
6. a kind of spool according to claim 5 shifts to an earlier date pre-buried structure, it is characterised in that:The transverse direction pipe laying portion(1)'s
Lateral vertical shaft is provided at slot bottom(4), the transverse direction line wheel(5)It is sleeved on lateral vertical shaft(4)On, the longitudinal direction pipe laying portion(3)'s
Longitudinal vertical shaft is provided at slot bottom(7), the longitudinal direction line wheel(8)It is sleeved on longitudinal vertical shaft(7)On.
7. a kind of spool according to claim 6 shifts to an earlier date pre-buried structure, it is characterised in that:The longitudinal direction line wheel(8)Lower end
With longitudinal pipe laying portion(3)Slot bottom between be provided with support ring(20), the support ring(20)It is sleeved on longitudinal vertical shaft(7)On.
8. a kind of spool according to claim 6 shifts to an earlier date pre-buried structure, it is characterised in that:The longitudinal direction line wheel(8)Side wall
Place forms transverse groove(19).
9. a kind of spool according to claim 6 shifts to an earlier date pre-buried structure, it is characterised in that:The longitudinal direction pipe laying portion(3)'s
Mounting groove is formed at cell wall(22), the mounting groove(22)Middle sliding is incorporated with cover board(23).
10. a kind of spool according to claim 9 shifts to an earlier date pre-buried structure, it is characterised in that:The longitudinal direction vertical shaft(7)Upper end
Form external screw thread, the external screw thread and the longitudinal line wheel of limit(8)Nut(21)It is meshed, the cover board(23)Bottom, which is formed, to hold
Receive longitudinal vertical shaft(7)Fitting groove(6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721778879.8U CN207848589U (en) | 2017-12-19 | 2017-12-19 | A kind of spool shifts to an earlier date pre-buried structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721778879.8U CN207848589U (en) | 2017-12-19 | 2017-12-19 | A kind of spool shifts to an earlier date pre-buried structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207848589U true CN207848589U (en) | 2018-09-11 |
Family
ID=63421369
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721778879.8U Expired - Fee Related CN207848589U (en) | 2017-12-19 | 2017-12-19 | A kind of spool shifts to an earlier date pre-buried structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207848589U (en) |
-
2017
- 2017-12-19 CN CN201721778879.8U patent/CN207848589U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107503440A (en) | For 3-dimensional boxlike structure with assembled lightweight steel multi-module structure and its connected mode | |
CN206722843U (en) | A kind of built-in sliding chute formula precast concrete lining segment | |
CN207848589U (en) | A kind of spool shifts to an earlier date pre-buried structure | |
CN208183449U (en) | Suspension type monorail precast concrete rail beam | |
CN105914650B (en) | The adjustment plate of included reserve protection | |
CN2858835Y (en) | Opening brick | |
CN205371806U (en) | Adjustable channel -section steel base | |
CN202703844U (en) | Girder face plate of transverse bulkhead of container ship | |
CN209482352U (en) | Upper straddle type pipe gallery flowing line confluence node structure | |
CN203173667U (en) | Right-angle door sleeve of H-type structure | |
CN205355709U (en) | Metal cable combination pipeline | |
CN203770841U (en) | Cable bridge hoisting part | |
CN207079761U (en) | A kind of keel of partition wall | |
CN206190647U (en) | Many functional type material connecting piece | |
CN203684103U (en) | Tie bar steering gear | |
CN204919306U (en) | Roof beam connection structure is moved about freely and quickly to I -steel | |
CN205657379U (en) | From adjusting plate of taking backup protection equipment | |
CN207283125U (en) | A kind of cable duct arrangement for wearing wharf portal crane track | |
CN205259352U (en) | Building template structure | |
CN202731100U (en) | Section welding type steel roof truss used for convertor station valve hall | |
CN204357861U (en) | A kind of side direction fixed installation sector | |
CN204456188U (en) | A kind of underground construction special pair of rib concrete edge wall member and superimposed wall | |
CN202266187U (en) | Vehicle ladder structure | |
CN206562664U (en) | Bridge support-beam-end oblique pull part | |
CN206568107U (en) | A kind of electric hammer auxiliary length adjuster |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180911 |