CN207846797U - A kind of aluminium Baogang curtain wall construction - Google Patents
A kind of aluminium Baogang curtain wall construction Download PDFInfo
- Publication number
- CN207846797U CN207846797U CN201721776322.0U CN201721776322U CN207846797U CN 207846797 U CN207846797 U CN 207846797U CN 201721776322 U CN201721776322 U CN 201721776322U CN 207846797 U CN207846797 U CN 207846797U
- Authority
- CN
- China
- Prior art keywords
- outline border
- square steel
- steel tube
- front panel
- glass
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Load-Bearing And Curtain Walls (AREA)
Abstract
The utility model is related to a kind of aluminium Baogang curtain wall constructions, the square steel tube is embedded in the integrally formed outline border of a front openings, the front side of the outline border crimps a front panel, the front panel and the side wall at outline border both ends are mating, the front side surface of each end in front panel both ends position opposite with one piece of glass rear side surface, the front side surface of two glass position opposite with the rear side surface at the both ends of a preceding briquetting.In the utility model, outline border one extrusion molding, fin is provided on inner wall, keep outline border firmer, be unlikely to deform, and convenient for assembly, it is easy to operate when whole assembly, it is sturdy and durable after assembly, then whole good airproof performance is made by this adhesive tape being arranged at two between front panel and glass and between preceding briquetting and glass, solve in the prior art it is yielding, be not easy to assembly and the poor defect of leakproofness.
Description
Technical field
The utility model is related to aluminium Baogang curtain wall construction technical field of improvement, especially a kind of aluminium Baogang curtain wall construction.
Background technology
Aluminium Baogang curtain wall is the structure that one layer of aluminum alloy outer frame is wrapped up outside the zinc-plated square steel pipe 7,9 being used to support, this
Sample can will square steel tube external whole masking, whole aesthetics is improved with the shape of aluminum alloy outer frame.In traditional handicraft,
Aluminum alloy outer frame has certain thickness aluminium sheet Bending Processing to form, and square steel tube is wrapped after transporting to scene, installs it on the outside
His aluminium alloy extrusions realizes the whole fixation of glass, aluminum alloy outer frame etc., but finds in actual use, due to aluminium alloy
The plank of outline border is relatively thin, easily occurs the problems such as being deformed caused by storage is bad in transportational process, causes scene that can not make
With if improving the thickness of plank, not only resulting in the increase of weight makes other component be also required to thicken or reinforce, but also increases
Production cost is added, product is made to lack competitiveness.Some producers improve structure, aluminum alloy outer frame are divided into multiple
Then component is sequentially fixed on square steel tube, although reducing volume, reduce the risk of deformation, working efficiency when assembling
It is low, it has a certain impact to the duration.
Utility model content
The purpose of the utility model is to overcome the deficiencies in the prior art, provide integrated model intensity is high, be unlikely to deform and
Assemble a kind of easy aluminium Baogang curtain wall construction.
The technical scheme adopted by the utility model is that:
A kind of aluminium Baogang curtain wall construction, including square steel tube and glass, it is characterised in that:It opens one front side of square steel tube insertion
Mouthful integrally formed outline border in, rear side and the square steel tube of the outline border are fixed, one front panel of the front side of outline border crimping, before this
Plate and the side wall at outline border both ends are mating, the front side surface of each end in front panel both ends and one piece of glass rear side surface
Opposite position, the front side surface of two glass position opposite with the rear side surface at the both ends of a preceding briquetting, the preceding briquetting and square steel tube
It is fixed to each other and the end of two glass, front panel is pressed on outline border and square steel tube.
Moreover, multiple Double-face adhesives are arranged between square steel tube outer rim and outline border inner edge, a recess is made on rear side of outline border, the recess
The end of one Button Block of interior setting, the screw installed on the Button Block is engaged on rear side of square steel tube and Button Block and outline border is pressed on square steel
On the Double-face adhesive of pipe contraposition setting.
Moreover, making a bending respectively on the madial wall at both ends on front side of outline border, each bending is embedded in front panel
Connection, front panel front side surface are engaged with square steel tube in the end of the end of the side of opposite position, the screw of front panel both sides setting
Both ends be respectively set an adhesive tape, which is crimped on the glass rear side surface of opposite position, the madial wall at outline border both ends
Middle part make a fin respectively.
Moreover, an adhesive tape is respectively set in the rear side surface at the both ends of the preceding briquetting, each adhesive tape is crimped on glass
On front side surface, it is viscous that the front side surface in the middle part of inner surface and front panel in the middle part of preceding briquetting was made projects through Double-face adhesive
It connects, a clamping screw is set jointly on middle part to square steel tube from preceding briquetting middle part, protrusion, front panel.
Moreover, buckle before preceding briquetting front side surface spiral-lock one.
The advantages of the utility model and good effect are:
In the utility model, outline border one extrusion molding is provided with fin on inner wall, keeps outline border firmer, be unlikely to deform,
And convenient for assembly, bending is provided on the inner wall at both ends on front side of outline border and matched with the end grafting of the side at front panel both ends
It closes, is fixed by screw and square steel tube on rear side of outline border, front panel is fixed and by screw and square steel tube by clamping screw and side
Steel pipe, preceding briquetting are fixed, and when whole assembly is easy to operate, sturdy and durable after assembly, then by between front panel and glass and
This adhesive tape being arranged at two makes whole good airproof performance between preceding briquetting and glass, and it is yielding, inconvenient in the prior art to solve
In the defect assembled and leakproofness is poor.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model.
Specific implementation mode
With reference to embodiment, following embodiments, which are illustrative, are not limited is further illustrated to the utility model
, the scope of protection of the utility model cannot be limited with following embodiments.
A kind of aluminium Baogang curtain wall construction, as shown in Figure 1, including square steel tube 7 and glass 21, the innovation of the utility model exists
In:Square steel tube is embedded in the integrally formed outline border 1 of a front openings, and rear side and the square steel tube of the outline border are fixed, the outline border
Front side crimps a front panel 23, and the front panel and the side wall at outline border both ends are mating, each end in front panel both ends
Front side surface position opposite with one piece of glass rear side surface, the rear side of the front side surface of two glass and the both ends of a preceding briquetting 17
Surface is fixed to each other with square steel tube with respect to position, the preceding briquetting and the end of two glass, front panel is pressed on outline border and square steel
Guan Shang.
In the present embodiment, multiple Double-face adhesives 6,8 are set, it is recessed to make one on rear side of outline border between square steel tube outer rim and outline border inner edge
Sunken 2, the recess is interior to be arranged a Button Block 5, and the end of the screw 4 installed on the Button Block is engaged on rear side of square steel tube and by Button Block and outside
Frame is pressed on the Double-face adhesive 6 of square steel tube contraposition setting, buckle 3 after buckling one in opening of the screw with respect to the recess of position.
A bending 12 is made on the madial wall at the both ends on front side of outline border respectively, it is opposite that each bending is embedded in front panel
The end 13 of the side of position, each side are in contact with the side wall inner edge 14 of outline border herein, the screw 11 of front panel both sides setting
End engage connection with square steel tube and front panel be fixed on square steel tube front side surface, the both ends difference of front panel front side surface
One adhesive tape 22 is set, which is crimped on the glass rear side surface of opposite position, and above-mentioned bending can be thus achieved grafting and match
Close, can also realize increase outline border intensity effect, likewise, the middle part of the madial wall at outline border both ends make respectively one it is convex
Rib 24 can also increase the intensity of outline border.
An adhesive tape is respectively set in the rear side surface at the both ends of preceding briquetting, and each adhesive tape is crimped on the front side surface of glass
On, the inner surface in the middle part of preceding briquetting is be bonded by Double-face adhesive 19 with the protrusion 20 that the front side surface in the middle part of front panel is made, from
In the middle part of preceding briquetting, a clamping screw 18 is set jointly, the end engagement of clamping screw is worn on protrusion, front panel middle part to square steel tube
In the trepanning 10 of square steel tube, which is pressed on preceding briquetting, front panel and glass on the good square steel tube of outline border.Preceding pressure
Buckle 16 before block front side surface spiral-lock one.
In the utility model, outline border one extrusion molding is provided with fin on inner wall, keeps outline border firmer, be unlikely to deform,
And convenient for assembly, bending is provided on the inner wall at both ends on front side of outline border and matched with the end grafting of the side at front panel both ends
It closes, is fixed by screw and square steel tube on rear side of outline border, front panel is fixed and by screw and square steel tube by clamping screw and side
Steel pipe, preceding briquetting are fixed, and when whole assembly is easy to operate, sturdy and durable after assembly, then by between front panel and glass and
This adhesive tape being arranged at two makes whole good airproof performance between preceding briquetting and glass, and it is yielding, inconvenient in the prior art to solve
In the defect assembled and leakproofness is poor.
Claims (5)
1. a kind of aluminium Baogang curtain wall construction, including square steel tube and glass, it is characterised in that:The square steel tube is embedded in a front openings
Integrally formed outline border in, rear side and the square steel tube of the outline border are fixed, and the front side of the outline border crimps a front panel, the front panel
It is mating with the side wall at outline border both ends, the front side surface of each end in front panel both ends and one piece of glass rear side surface phase
Contraposition, the front side surface of two glass position opposite with the rear side surface at the both ends of a preceding briquetting, the preceding briquetting and square steel tube phase
It mutually fixes and the end of two glass, front panel is pressed on outline border and square steel tube.
2. a kind of aluminium Baogang curtain wall construction according to claim 1, it is characterised in that:Square steel tube outer rim and outline border inner edge it
Between multiple Double-face adhesives are set, make a recess on rear side of outline border, a Button Block, the end of the screw installed on the Button Block be set in the recess
End is engaged on rear side of square steel tube and Button Block and outline border is pressed on the Double-face adhesive of square steel tube contraposition setting.
3. a kind of aluminium Baogang curtain wall construction according to claim 2, it is characterised in that:The inside at the both ends on front side of outline border
A bending is made on wall respectively, each bending is embedded in end of the front panel with respect to the side of position, the setting of front panel both sides
The end of screw engages connection with square steel tube, and an adhesive tape is respectively set in the both ends of front panel front side surface, which is crimped on
On the glass rear side surface of opposite position, a fin is made respectively at the middle part of the madial wall at outline border both ends.
4. a kind of aluminium Baogang curtain wall construction according to claim 3, it is characterised in that:The rear side at the both ends of the preceding briquetting
An adhesive tape is respectively set in surface, and each adhesive tape is crimped on the front side surface of glass, and the inner surface in the middle part of preceding briquetting is with before
What the front side surface of middle panel was made projects through Double-face adhesive bonding, from the middle part of preceding briquetting middle part, protrusion, front panel to square steel
One clamping screw is set jointly on pipe.
5. a kind of aluminium Baogang curtain wall construction according to claim 4, it is characterised in that:Before preceding briquetting front side surface spiral-lock one
Buckle.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721776322.0U CN207846797U (en) | 2017-12-19 | 2017-12-19 | A kind of aluminium Baogang curtain wall construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721776322.0U CN207846797U (en) | 2017-12-19 | 2017-12-19 | A kind of aluminium Baogang curtain wall construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207846797U true CN207846797U (en) | 2018-09-11 |
Family
ID=63421289
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721776322.0U Expired - Fee Related CN207846797U (en) | 2017-12-19 | 2017-12-19 | A kind of aluminium Baogang curtain wall construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207846797U (en) |
-
2017
- 2017-12-19 CN CN201721776322.0U patent/CN207846797U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111200713B (en) | Television receiver | |
CN207846797U (en) | A kind of aluminium Baogang curtain wall construction | |
CN202300036U (en) | Corner connecting component for aluminum alloy casement door or window | |
CN205617609U (en) | A aluminium alloy for aluminum -wood is compound | |
CN205001824U (en) | Luminous horizontal bar aluminium alloy | |
CN209413739U (en) | A kind of good aluminum profile of air-tightness | |
CN210659761U (en) | Glass mounting structure of air shower door | |
CN104131754A (en) | Door and window decoration lattice bar | |
CN207683300U (en) | A kind of B columns guide rail gasket structure | |
CN204578450U (en) | A kind of back side adhesive-spill-preventing photovoltaic aluminium frame | |
CN205718168U (en) | Refrigerator doors and possess its refrigerator | |
CN201103317Y (en) | Groove type section bar of wall board of movable house sliding window | |
CN204040798U (en) | 135 degree of aluminium wood composite window corner structures | |
CN209523671U (en) | A kind of sealing joint strip being installed on environmentally friendly interior door | |
CN220370650U (en) | High-adaptability filter frame | |
CN219298644U (en) | Double-groove type veneer | |
CN210457974U (en) | Double-layer diaphragm sound tempering functional glass | |
CN216072666U (en) | Sealing strip for elevator door | |
CN216690916U (en) | Hollow louver glass capable of preventing butyl rubber from deforming | |
CN202810519U (en) | Wrapped aluminum-plastic composite section bar | |
CN106965656B (en) | PC glass clamping structure of automobile skylight | |
CN211808964U (en) | Automobile triangular window glass assembly structure | |
CN110855227B (en) | Frame section bar of crystalline silicon solar energy dual-glass component | |
CN211421515U (en) | Curtain wall with vertical aluminum sealing edge | |
CN204718059U (en) | Housing unit and there is its indoor apparatus of air conditioner |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 300350 Balitai Town Industrial Park, Jinnan District, Tianjin Patentee after: Tianjin Haiglite Intelligent Technology Co., Ltd. Address before: 300350 Balitai Town Industrial Park, Jinnan District, Tianjin Patentee before: Tianjin sea glitter Decoration Engineering Limited by Share Ltd |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180911 Termination date: 20201219 |