CN207844996U - A kind of construction intelligent elevator - Google Patents

A kind of construction intelligent elevator Download PDF

Info

Publication number
CN207844996U
CN207844996U CN201721823182.8U CN201721823182U CN207844996U CN 207844996 U CN207844996 U CN 207844996U CN 201721823182 U CN201721823182 U CN 201721823182U CN 207844996 U CN207844996 U CN 207844996U
Authority
CN
China
Prior art keywords
elevator
elevator ontology
ontology
fixedly connected
lift
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721823182.8U
Other languages
Chinese (zh)
Inventor
杨芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yuhua Henan Construction And Installation Engineering Co Ltd
Original Assignee
Yuhua Henan Construction And Installation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yuhua Henan Construction And Installation Engineering Co Ltd filed Critical Yuhua Henan Construction And Installation Engineering Co Ltd
Priority to CN201721823182.8U priority Critical patent/CN207844996U/en
Application granted granted Critical
Publication of CN207844996U publication Critical patent/CN207844996U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Types And Forms Of Lifts (AREA)

Abstract

The utility model discloses a kind of construction intelligent elevators,Including elevator ontology,The front lower portion insertion of the elevator ontology is connected with accumulator,And it is connected with lifting belt in the middle part of the middle-end of elevator ontology,The top of the lifting belt is provided with solar energy electric supplier,And the upper front end insertion of elevator ontology is connected with solar panel,The right upper portion of the elevator ontology is provided with controller,And the top of elevator ontology is fixedly connected with workbench,The upper front end of the workbench is welded with Antiskid handle,And the top of workbench is provided with antiskid plate,The working condition of elevator ontology is controlled by solar energy electric supplier,And play the role of protection and over to accumulator,Movement and the movement speed of elevator ontology can be controlled using controller,The lifting of elevator ontology can also be controlled,Easy to remove and lifting,It prevents from slipping due to there is water on the table using antiskid plate,Have the function of anti-skidding.

Description

A kind of construction intelligent elevator
Technical field
The utility model is related to elevator technology field, specially a kind of construction intelligent elevator.
Background technology
Elevator elevating mechanism of the platform or semiclosed platform of carrying people or cargo lifting on vertically channel is set Standby or device is by platform and to manipulate the entirety that their equipment, motor, cable and other ancillary equipments constitute, Oil pump is driven by motor, the flat lifting of hydraulic lifting Cargo Lift is driven by hydraulic oil cylinder driving heavy-duty chain, due to using hydraulic pressure conduct Lifting drive has loading capacity big, lifts the features such as steady, and cargo vertically transports between being widely used in building high level.
Current construction intelligent elevator, however the movement of used construction intelligent elevator is inconvenient, by In elevator during construction, elevator often will be lifted and be moved, however elevator operation all passes through mostly Power grid is powered, and keeps it larger using electricity, and movement needs construction personnel to be moved in the air to ground from height, leads to work Make efficiency reduction.
So how to design a kind of construction intelligent elevator, becoming us will currently solve the problems, such as.
Utility model content
The purpose of this utility model is to provide a kind of construction intelligent elevators, are proposed with solving above-mentioned background technology Mobile inconvenience, use the larger equal problem of electricity.
To achieve the above object, the utility model provides the following technical solutions:A kind of construction intelligent elevator, including The front lower portion insertion of elevator ontology, the elevator ontology is connected with accumulator, and living in the middle part of the middle-end of elevator ontology Dynamic to be connected with lifting belt, the top of the lifting belt is provided with solar energy electric supplier, and the upper front end insertion of elevator ontology It is connected with solar panel, the right upper portion of the elevator ontology is provided with controller, and the top of elevator ontology is solid Surely it is connected with workbench, the upper front end of the workbench is welded with Antiskid handle, and the top of workbench is provided with antiskid plate, The top movable of the antiskid plate is connected with lamppost, and the top of lamppost is electrically connected with LED light, under the elevator ontology Portion is fixedly connected with lateral frame, and the lower part of lateral frame is fixedly connected with support leg, and the lower rotational of the support leg is connected with Universal wheel, and the upper left-hand of support leg is closely connected with lift pedestal, the upper left-hand activity of the lift pedestal connects It is connected to baffle, and lift is provided on the left of the middle part of elevator ontology, the top of the lift is fixedly connected with handrail.
Further, the solar energy electric supplier is in " square " shape, and elevator ontology and solar energy electric supplier are solid Fixed connection.
Further, the controller is in " rectangle " shape, and elevator ontology is fixedly connected with controller.
Further, the lift shape is in " rectangle " shape, and elevator ontology is flexibly connected with lift.
Further, the antiskid plate is in " rectangle " shape, and workbench is fixedly connected with antiskid plate.
Compared with prior art the utility model has the beneficial effects that:This kind of construction intelligent elevator, by building The improvement of construction intelligent elevator is built, the solar energy electric supplier is in " square " shape, and elevator ontology is supplied with solar energy Electric appliance is fixedly connected, and the working condition of elevator ontology is controlled by solar energy electric supplier, and plays protection and mistake to accumulator The effect of discharge prevention, the controller is in " rectangle " shape, and elevator ontology is fixedly connected with controller, utilizes control Device can control movement and the movement speed of elevator ontology, can also control the lifting of elevator ontology, and with startup, tune Speed, braking effect, it is easy to remove and lifting, the lift shape be in " rectangle " shape, and elevator ontology with lifting Construction personnel and cargo are transported by lift, and have anti-fall, overload protective device, institute by ladder flexible connection up and down It is in " rectangle " shape to state antiskid plate, and workbench is fixedly connected with antiskid plate, anti-using antiskid plate if encounter rainy weather It only slips due to there is water on the table, has the function of anti-skidding, this kind of construction intelligent elevator can be carried effectively High working efficiency.
Description of the drawings
Fig. 1 is the utility model overall structure diagram;
Fig. 2 is the partial structural diagram of utility model works platform;
In figure:1- elevator ontologies;2- lifting belts;3- solar energy electric suppliers;4- controllers;5- solar panels;6- Workbench;7- Antiskid handles;8- handrails;9- lifts;10- baffles;11- lift pedestals;12- lateral frames;13- support legs; 14- accumulators;15- universal wheels;16- antiskid plates;17- lampposts;18-LED lamps.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work The every other embodiment obtained, shall fall within the protection scope of the present invention.
- 2 are please referred to Fig.1, the utility model provides a kind of technical solution:A kind of construction intelligent elevator, including rise The front lower portion insertion of drop machine ontology 1, the elevator ontology 1 is connected with accumulator 14, and in the middle part of the middle-end of elevator ontology 1 It is connected with lifting belt 2, the top of the lifting belt 2 is provided with solar energy electric supplier 3, and on the front end of elevator ontology 1 Portion's insertion is connected with solar panel 5, and the right upper portion of the elevator ontology 1 is provided with controller 4, and elevator ontology 1 top is fixedly connected with workbench 6, and the upper front end of the workbench 6 is welded with Antiskid handle 7, and the top of workbench 6 It is provided with antiskid plate 16, the top movable of the antiskid plate 16 is connected with lamppost 17, and the top of lamppost 17 is electrically connected with LED The lower part of lamp 18, the elevator ontology 1 is fixedly connected with lateral frame 12, and the lower part of lateral frame 12 is fixedly connected with support leg 13, the lower rotational of the support leg 13 is connected with universal wheel 15, and the upper left-hand of support leg 13 is closely connected with lift The upper left-hand of pedestal 11, the lift pedestal 11 is connected with baffle 10, and setting on the left of the middle part of elevator ontology 1 There are lift 9, the top of the lift 9 to be fixedly connected with handrail 8.
Further, the solar energy electric supplier 3 is in " square " shape, and elevator ontology 1 and solar energy electric supplier 3 It is fixedly connected, the working condition of elevator ontology 1 is controlled by solar energy electric supplier 3, and protection and mistake are played to accumulator 14 The effect of discharge prevention.
Further, the controller 4 is in " rectangle " shape, and elevator ontology 1 is fixedly connected with controller 4, profit Movement and the movement speed that elevator ontology 1 can be controlled with controller 4, can also control the lifting of elevator ontology 1, and have There are startup, speed governing, braking, easy to remove and lifting.
Further, 9 shape of the lift is in " rectangle " shape, and elevator ontology 1 connects with 9 activity of lift It connects, is transported construction personnel and cargo up and down by lift 9, and there is anti-fall, overload protective device.
Further, the antiskid plate 16 is in " rectangle " shape, and workbench 6 is fixedly connected with antiskid plate 16, is utilized Antiskid plate anti-16 only slips due to there is water on the table, has the function of anti-skidding.
Operation principle:When using this kind of construction intelligent elevator, it should to whole building construction intelligent elevator Structure simply understood, first, converted solar energy into electrical energy by solar panel 5 and be stored to accumulator 14 In, then utilize solar energy electric supplier 3 to control the working condition of elevator ontology 1, followed by controller 4 and universal wheel 15 Cooperation controls movement and the movement speed of elevator ontology 1, can also control using the cooperation of controller 4 and lifting belt 2 come Construction personnel and cargo are transported by lift 9, are then prevented using handrail 8 by the lifting for controlling elevator ontology 1 up and down It falls, construction working is then carried out by workbench 6, when at dusk or when working at night, being shone by LED light 18 It is bright, if encounter rainy weather, finally prevent from slipping due to having water on workbench 6 using antiskid plate 16.
Although the utility model is described in detail with reference to the foregoing embodiments, those skilled in the art is come Say, still can with technical scheme described in the above embodiments is modified, or to which part technical characteristic into Row equivalent replacement, within the spirit and principle of the utility model, any modification, equivalent replacement, improvement and so on should all It is included within the scope of protection of this utility model.

Claims (5)

1. a kind of construction intelligent elevator, including elevator ontology (1), it is characterised in that:The elevator ontology (1) Front lower portion insertion is connected with accumulator (14), and is connected with lifting belt (2), institute in the middle part of the middle-end of elevator ontology (1) The top for stating lifting belt (2) is provided with solar energy electric supplier (3), and the upper front end insertion of elevator ontology (1) is connected with too Positive energy solar panel (5), the right upper portion of the elevator ontology (1) is provided with controller (4), and elevator ontology (1) is upper Portion is fixedly connected with workbench (6), and the upper front end of the workbench (6) is welded with Antiskid handle (7), and workbench (6) Top is provided with antiskid plate (16), and the top movable of the antiskid plate (16) is connected with lamppost (17), and the top of lamppost (17) It is electrically connected with LED light (18), the lower part of the elevator ontology (1) is fixedly connected with lateral frame (12), and lateral frame (12) Lower part be fixedly connected with support leg (13), the lower rotational of the support leg (13) is connected with universal wheel (15), and support leg (13) upper left-hand is closely connected with lift pedestal (11), and the upper left-hand of the lift pedestal (11) is connected with Baffle (10), and it is provided with lift (9) on the left of the middle part of elevator ontology (1), the top of the lift (9) is fixedly connected There is handrail (8).
2. a kind of construction intelligent elevator according to claim 1, it is characterised in that:The solar energy electric supplier (3) it is in " square " shape, and elevator ontology (1) is fixedly connected with solar energy electric supplier (3).
3. a kind of construction intelligent elevator according to claim 1, it is characterised in that:The controller (4) is in " long It is rectangular " shape, and elevator ontology (1) is fixedly connected with controller (4).
4. a kind of construction intelligent elevator according to claim 1, it is characterised in that:Lift (9) shape In " rectangle " shape, and elevator ontology (1) is flexibly connected with lift (9).
5. a kind of construction intelligent elevator according to claim 1, it is characterised in that:The antiskid plate (16) is in " rectangle " shape, and workbench (6) is fixedly connected with antiskid plate (16).
CN201721823182.8U 2017-12-24 2017-12-24 A kind of construction intelligent elevator Expired - Fee Related CN207844996U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721823182.8U CN207844996U (en) 2017-12-24 2017-12-24 A kind of construction intelligent elevator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721823182.8U CN207844996U (en) 2017-12-24 2017-12-24 A kind of construction intelligent elevator

Publications (1)

Publication Number Publication Date
CN207844996U true CN207844996U (en) 2018-09-11

Family

ID=63421875

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721823182.8U Expired - Fee Related CN207844996U (en) 2017-12-24 2017-12-24 A kind of construction intelligent elevator

Country Status (1)

Country Link
CN (1) CN207844996U (en)

Similar Documents

Publication Publication Date Title
CN207313026U (en) A kind of civil engineering lifting gear
CN207550222U (en) Lifting electric stairs-mover
CN207090941U (en) A kind of multi-angle installation equipment of measurement and control instrument
CN206108841U (en) Elevating gear for building small -size
CN207844996U (en) A kind of construction intelligent elevator
CN211396532U (en) A lift bench for engineering fitment is decorated
CN211245539U (en) Special stage property lifting device for live-action stage
CN209291873U (en) A kind of intelligence carries the device of lift maintaining
CN216549486U (en) Indoor and outdoor electrician installation and overhaul operating platform
CN205737547U (en) A kind of ferry-boat transfer system for plate material
CN202099025U (en) Maintaining trolley for vacuum chamber
CN210313320U (en) Shear force formula lift platform convenient to remove
CN207792550U (en) Hoisting mechanism for engineering machinery
CN105174114A (en) Lifting device used for solar panel
CN207146249U (en) A kind of solar street light of novel lifting
CN111099516A (en) Remote control lifting trolley
CN206607001U (en) A kind of moveable lifting platform
CN204823977U (en) A hoisting device for solar cell panel
CN215160580U (en) Movable component lifting device for steel structure factory building
CN209721405U (en) A kind of intelligent construction hanging device
CN215764872U (en) Solar street lamp convenient to overhaul
CN203922508U (en) A kind of Portable crane device
CN216872586U (en) Emergency fault power frequency bypass box
CN203451141U (en) Electric lifting and dropping control mechanism for oil engine
CN212002151U (en) Protection device for construction safety management

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180911

Termination date: 20181224

CF01 Termination of patent right due to non-payment of annual fee