CN207841210U - A kind of EMU backrest Bolt dismantling tooling - Google Patents

A kind of EMU backrest Bolt dismantling tooling Download PDF

Info

Publication number
CN207841210U
CN207841210U CN201820208093.0U CN201820208093U CN207841210U CN 207841210 U CN207841210 U CN 207841210U CN 201820208093 U CN201820208093 U CN 201820208093U CN 207841210 U CN207841210 U CN 207841210U
Authority
CN
China
Prior art keywords
fixed
welded
mandril
wall
emu
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820208093.0U
Other languages
Chinese (zh)
Inventor
吴尚容
郭锐
李国民
杨袁超
巩向兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan An Ruijie Traffic Equipment Co Ltd
Original Assignee
Wuhan An Ruijie Traffic Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan An Ruijie Traffic Equipment Co Ltd filed Critical Wuhan An Ruijie Traffic Equipment Co Ltd
Priority to CN201820208093.0U priority Critical patent/CN207841210U/en
Application granted granted Critical
Publication of CN207841210U publication Critical patent/CN207841210U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Crushing And Grinding (AREA)

Abstract

The utility model discloses a kind of EMU backrest Bolt dismantling toolings,Including bottom plate,The bottom plate top setting is fixed with fixed block,It is opened up in the middle part of fixed block top fluted,Setting is fixed with bearing in groove,It is plugged in the middle part of bearing and is fixed with bull stick,It is plugged in the middle part of bull stick and is fixed with gear wheel,The side of gear wheel and the side Vertical Meshing of pinion gear,It is plugged in the middle part of pinion gear and is fixed with shaft,Handle is nested and fixed in one end of shaft,The top of bull stick and the bottom end of connector sleeve are welded and fixed,The inner wall laying of connector sleeve is equipped with ball,The outer wall of ball and mandril rolls connection,Fixture block is nested and fixed in the middle part of mandril,The side of fixture block is connected by hinge with one end of telescopic rod,The other end of telescopic rod is connected by hinge with link block,Link block is weldingly fixed on the side of supporting rod,The utility model realizes the jacking effect of EMU backrest Bolt dismantling tooling,Labour is greatly saved.

Description

A kind of EMU backrest Bolt dismantling tooling
Technical field
The utility model is related to EMU the technical field of the seat more particularly to a kind of EMU backrest Bolt dismantling works Dress.
Background technology
Chinese Railway parent company transports a motor-car electricity [2015] 1501《About revision EMU I and II repair quality mark Accurate notice》It is required in technological document to EMU backrest Bolt dismantling, technology requirement hammer or similar means dismounting, To discharge seat attachment mechanism, and then seat is overhauled, and mutual disassembly's EMU backrest bolt it is difficult and There are the risks of personal injury.
Utility model content
Purpose of the utility model is to solve disadvantages existing in the prior art, and a kind of EMU seat proposed Backrest Bolt dismantling tooling.
To achieve the goals above, the utility model uses following technical solution:
A kind of EMU backrest Bolt dismantling tooling, including bottom plate, the bottom plate top setting are fixed with fixed block, Opened up in the middle part of fixed block top it is fluted, in groove setting be fixed with bearing, plugged in the middle part of bearing and be fixed with bull stick, bull stick Middle part plug and be fixed with gear wheel, the side of gear wheel and the side Vertical Meshing of pinion gear plug in the middle part of pinion gear solid Have shaft, one end of shaft that handle is nested and fixed surely, the top of bull stick and the bottom end of connector sleeve are welded and fixed, connector sleeve it is interior Wall laying is equipped with ball, and the outer wall rolling of ball and mandril connects, and fixture block, the side of fixture block is nested and fixed in the middle part of mandril It is connected with one end of telescopic rod by hinge, the other end of telescopic rod is connected by hinge with link block, and link block is welded and fixed In the side of supporting rod, the top setting of supporting rod is fixed with top plate, and the bottom end setting of supporting rod is fixed with bottom plate.
Preferably, the bull stick is socketed in the inside of mandril, and spiral shell mosquito is provided on the outside of bull stick.
Preferably, the inner wall of the mandril is provided with screw thread, and mandril and bull stick are connected through a screw thread.
Preferably, the top of the mandril is welded with head cover, and the middle part setting of head cover is fluted, and groove just on Side is corresponding with through-hole, and through-hole is opened in the middle part of top plate.
Preferably, the fixture block includes two semicircular rings, and two semicircular rings are connected by screw fixation, and the inner wall of fixture block One end and one end of damper be welded and fixed, the other end of damper and the side of retainer plate are welded and fixed.
Preferably, the damper includes spring case, spring and compression bar, and one end welding of the inner wall and spring case of fixture block is solid Fixed, the inner wall of spring case and one end of spring are welded and fixed, and the other end of spring and one end of compression bar are welded and fixed, compression bar it is another One end and the side of retainer plate are welded and fixed, and the outer wall of retainer plate inner wall and mandril is welded and fixed.
The utility model has the beneficial effects that:
1, the utility model drives shaft, shaft that pinion gear rotation, pinion gear is driven to drive gear wheel rotation by handle, Gear wheel drives bull stick rotation, and to which bull stick is slowly jacked up mandril by screw thread lines, mandril jacks up head cover, to realize The jacking of EMU backrest Bolt dismantling tooling acts on, and labour is greatly saved, avoids unnecessary personal injury Risk.
2, when the utility model is rotated by bar, connector sleeve transfer bull stick, the outer wall of the ball of connector sleeve inner wall in mandril It rolls, mandril can be detached from when anti-dog link rotation so that more stablize when tooling uses.
3, the utility model by the fixture block with damper come fixed mandril so that mandril jack up when, alleviate rolling It is dynamic so that more to stablize when tooling uses.
Description of the drawings
Fig. 1 be the utility model proposes a kind of EMU backrest Bolt dismantling tooling structural schematic diagram;
Fig. 2 be the utility model proposes a kind of EMU backrest Bolt dismantling tooling fixture block structural representation Figure;
Fig. 3 be the utility model proposes a kind of EMU backrest Bolt dismantling tooling connector sleeve sectional view.
In figure:1 top plate, 2 supporting rods, 3 bottom plates, 4 head covers, 5 mandrils, 6 bull sticks, 7 connector sleeves, 8 pinion gears, 9 handles, 10 are consolidated Determine block, 11 gear wheels, 12 fixture blocks, 13 telescopic rods, 14 screws, 15 dampers, 16 balls.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.
Referring to Fig.1-3, a kind of EMU backrest Bolt dismantling tooling, including bottom plate 3, the setting of 3 top of bottom plate are fixed Have fixed block 10, opened up in the middle part of 10 top of fixed block it is fluted, in groove setting be fixed with bearing, plugged in the middle part of bearing solid Surely there is bull stick 6, the middle part of bull stick 6, which plugs, is fixed with gear wheel 11, and the side of gear wheel 11 and the side of pinion gear 8 are vertically nibbled It closes, the middle part of pinion gear 8, which plugs, is fixed with shaft, and handle 9 is nested and fixed in one end of shaft, and bull stick 6 is socketed in the interior of mandril 5 The outside in portion, bull stick 6 is provided with screw thread, and the inner wall of mandril 5 is provided with screw thread, and mandril 5 and bull stick 6 are connected through a screw thread, and turns The top of bar 6 and the bottom end of connector sleeve 7 are welded and fixed, and the inner wall laying of connector sleeve 7 is equipped with ball 16, ball 16 and mandril 5 Outer wall roll connection, fixture block 12 is nested and fixed in the middle part of mandril 5, and fixture block 12 includes two semicircular rings, and two semicircular rings are logical Cross screw 14 to be connected and fixed, and one end of the inner wall of fixture block 12 and one end of damper 15 are welded and fixed, damper 15 it is another End and the side of retainer plate are welded and fixed, and damper 15 includes spring case, spring and compression bar, the inner wall of fixture block 12 and spring case One end is welded and fixed, and the inner wall of spring case and one end of spring are welded and fixed, and one end welding of the other end and compression bar of spring is solid Fixed, the other end of compression bar and the side of retainer plate are welded and fixed, and the outer wall of retainer plate inner wall and mandril 5 is welded and fixed, fixture block 12 Side connected with one end of telescopic rod 13 by hinge, the other end of telescopic rod 13 is connected by hinge with link block, connection Block welding is fixed on the side of supporting rod 2, and the top setting of supporting rod 2 is fixed with top plate 1, and the bottom end setting of supporting rod 2 is fixed There are bottom plate 3, the top of mandril 5 to be welded with head cover 4, the middle part setting of head cover 4 is fluted, and is corresponding with right over groove Through-hole, through-hole are opened in the middle part of top plate 1.
In the present embodiment, rotating handle 9, handle 9 drives shaft, shaft that pinion gear 8 is driven to rotate, and pinion gear drives canine tooth 11 rotation of wheel, gear wheel 11 drive bull stick 6 to rotate, at this time under the action of fixture block 12 so that mandril 5 is from transfer bull stick 6, from And bull stick 6 is slowly jacked up mandril 5 by screw thread lines, fixture block 12 follows mandril 5 up to move at this time, and telescopic rod 13 extends, Mandril 5 jacks up head cover 4, while in uphill process, when bull stick 6 rotates, 7 transfer bull stick 6 of connector sleeve, 7 inner wall of connector sleeve Ball 16 is rolled in the outer wall of mandril 5, can be detached from mandril 5 when the rotation of anti-dog link 6.
The preferable specific implementation mode of the above, only the utility model, but the scope of protection of the utility model is not Be confined to this, any one skilled in the art within the technical scope disclosed by the utility model, according to this practicality Novel technical solution and its utility model design are subject to equivalent substitution or change, should all cover the protection model in the utility model Within enclosing.

Claims (6)

1. a kind of EMU backrest Bolt dismantling tooling, including bottom plate (3), which is characterized in that bottom plate (3) top is set Set and be fixed with fixed block (10), opened up in the middle part of fixed block (10) top it is fluted, in groove setting be fixed with bearing, bearing Middle part, which plugs, is fixed with bull stick (6), is plugged in the middle part of bull stick (6) and is fixed with gear wheel (11), the side of gear wheel (11) and small The side Vertical Meshing of gear (8) plugs in the middle part of pinion gear (8) and is fixed with shaft, and handle is nested and fixed in one end of shaft (9), the top of bull stick (6) and the bottom end of connector sleeve (7) are welded and fixed, and the inner wall laying of connector sleeve (7) is equipped with ball (16), The outer wall of ball (16) and mandril (5) rolls connection, is nested and fixed fixture block (12) in the middle part of mandril (5), and the one of fixture block (12) Side is connected by hinge with one end of telescopic rod (13), and the other end of telescopic rod (13) is connected by hinge with link block, connection Block welding is fixed on the side of supporting rod (2), and the top setting of supporting rod (2) is fixed with top plate (1), the bottom end of supporting rod (2) Setting is fixed with bottom plate (3).
2. a kind of EMU backrest Bolt dismantling tooling according to claim 1, which is characterized in that the bull stick (6) it is socketed in the inside of mandril (5), bull stick is provided with screw thread on the outside of (6).
3. a kind of EMU backrest Bolt dismantling tooling according to claim 1 or 2, which is characterized in that the top The inner wall of bar (5) is provided with screw thread, and mandril (5) and bull stick (6) are connected through a screw thread.
4. a kind of EMU backrest Bolt dismantling tooling according to claim 1, which is characterized in that the mandril (5) top is welded with head cover (4), and the middle part setting of head cover (4) is fluted, and through-hole is corresponding with right over groove, Through-hole is opened in the middle part of top plate (1).
5. a kind of EMU backrest Bolt dismantling tooling according to claim 1, which is characterized in that the fixture block (12) include two semicircular rings, two semicircular rings are connected and fixed by screw (14), and one end of the inner wall of fixture block (12) and are subtracted One end of shake device (15) is welded and fixed, and the other end of damper (15) and the side of retainer plate are welded and fixed.
6. a kind of EMU backrest Bolt dismantling tooling according to claim 5, which is characterized in that the damper (15) include spring case, spring and compression bar, the inner wall of fixture block (12) and one end of spring case are welded and fixed, the inner wall of spring case and One end of spring is welded and fixed, and the other end of spring and one end of compression bar are welded and fixed, the other end of compression bar and the one of retainer plate Side is welded and fixed, and the outer wall of retainer plate inner wall and mandril (5) is welded and fixed.
CN201820208093.0U 2018-02-07 2018-02-07 A kind of EMU backrest Bolt dismantling tooling Expired - Fee Related CN207841210U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820208093.0U CN207841210U (en) 2018-02-07 2018-02-07 A kind of EMU backrest Bolt dismantling tooling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820208093.0U CN207841210U (en) 2018-02-07 2018-02-07 A kind of EMU backrest Bolt dismantling tooling

Publications (1)

Publication Number Publication Date
CN207841210U true CN207841210U (en) 2018-09-11

Family

ID=63411277

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820208093.0U Expired - Fee Related CN207841210U (en) 2018-02-07 2018-02-07 A kind of EMU backrest Bolt dismantling tooling

Country Status (1)

Country Link
CN (1) CN207841210U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113745943A (en) * 2021-07-20 2021-12-03 江西昌河航空工业有限公司 Aviation plug dismounting device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113745943A (en) * 2021-07-20 2021-12-03 江西昌河航空工业有限公司 Aviation plug dismounting device
CN113745943B (en) * 2021-07-20 2023-06-27 江西昌河航空工业有限公司 Aviation plug dismounting device

Similar Documents

Publication Publication Date Title
CN207841210U (en) A kind of EMU backrest Bolt dismantling tooling
CN209098109U (en) A kind of rotatable lift up of steel structure device
CN208323303U (en) A kind of printing color proofing proof platform
CN206166548U (en) Wall formula lift supporter
CN108099747A (en) A kind of moveable support guarantee vehicle service station
CN108311254A (en) A kind of Chinese medicine grinding device and its grinding method
CN201914882U (en) Jack
CN107618050A (en) A kind of overturning-preventing base for robot
CN206088772U (en) Portable longmen lifting bracket
CN110700919B (en) Automobile oil discharging equipment
CN107362495A (en) A kind of flywheel damper adjusting means of exercycle
CN206012225U (en) The attachment structure of vehicle bridge
CN208035869U (en) A kind of automobile tears tire equipment open
CN206408502U (en) A kind of road of energy damping removes line apparatus
CN205360398U (en) Electronic treadmill that can draw in in
CN207915414U (en) A kind of apparatus for examination and repair of camera
CN210893915U (en) Detection device for loader drive axle
CN206028313U (en) Roll pipe production line and use adjustable saddle
CN220629961U (en) Agricultural planting soil turning device
CN218861269U (en) Road repairing and flattening equipment
CN206551710U (en) A kind of Medical image printing device easy to use
CN206475934U (en) A kind of Novel tractor articulated body of achievable articulated steering
CN218893924U (en) Cement road surface embossing device for machine tillage road construction
CN203972465U (en) A kind of steel pipe cold rolling device
CN205927818U (en) Many period number tractor drive line interfacing apparatus

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180911

Termination date: 20210207