CN207840744U - A kind of building perforating device based on crossbeam stabilization technique - Google Patents

A kind of building perforating device based on crossbeam stabilization technique Download PDF

Info

Publication number
CN207840744U
CN207840744U CN201820098035.7U CN201820098035U CN207840744U CN 207840744 U CN207840744 U CN 207840744U CN 201820098035 U CN201820098035 U CN 201820098035U CN 207840744 U CN207840744 U CN 207840744U
Authority
CN
China
Prior art keywords
fixedly connected
bottom plate
guide rail
columns
telescopic rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820098035.7U
Other languages
Chinese (zh)
Inventor
朱园园
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Group Electromechanical Installation Co ltd
Original Assignee
Equipment Installation Co Ltd of China Railway Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Equipment Installation Co Ltd of China Railway Construction Group Co Ltd filed Critical Equipment Installation Co Ltd of China Railway Construction Group Co Ltd
Priority to CN201820098035.7U priority Critical patent/CN207840744U/en
Application granted granted Critical
Publication of CN207840744U publication Critical patent/CN207840744U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model discloses a kind of building perforating devices based on crossbeam stabilization technique, including bottom plate, the top of bottom plate is equipped with seat-box and two columns, the top of two columns is equipped with header board, the top end face of header board is symmetrical above and below to be equipped with guide rail, leading screw is equipped between two guide rails, it is arranged on leading screw and the matched Mobile base of guide rail, the bottom end of Mobile base is equipped with electric telescopic rod, telescopic rod in electric telescopic rod is fixedly connected with pedestal, drilling machine is fixedly connected on pedestal, pilot hole is equipped on bottom plate between two columns, the bottom end of bottom plate is uniformly equipped with several supporting legs;The utility model passes through the mutual cooperation that electric telescopic rod and header board is arranged so that drilling machine may be implemented Multidirectional-moving spatially, and position control is flexible, is easy to implement and carries out drilling and drilling to type movable article to ground fixing device;By the mutual cooperation of geometrical clamp and activity folder, can clamping effectively be fixed to article hole to be drilled, ensure the stability of article hole to be drilled, improve drilling quality.

Description

A kind of building perforating device based on crossbeam stabilization technique
Technical field
The utility model is related to build punch device technical field, specially a kind of building based on crossbeam stabilization technique is beaten Aperture apparatus.
Background technology
Architectural engineering, refer to by construction to all kinds of building constructions and its affiliated facility and the circuit mating with it, pipeline, The installation activity of equipment is formed by engineering entity.Wherein " building construction ", which refers to, head cover, beam column, wall, basis and can Inner space is formed, meets people's production, lives, learns, the engineering that public activity needs.
Architectural engineering is the planning carried out for newly-built, reconstruction or enlarging building construction and auxiliary construction facility, surveys It the engineering entity and the circuit mating with it, pipeline, equipment of every technical work and completion such as examines, design and constructs, be completed Installing engineering.Also refer to the construction engineering of various houses, building, also known as building operation amount.This part investment must emerging work Dynamic material, could be realized by construction activities.
The construction engineering of wherein " building construction " includes workshop, theater, hotel, shop, school, hospital and house etc., Its newly-built, reconstruction or the dynamic material of the necessary emerging work of enlarging, could be realized by construction activities;" auxiliary construction facility " refers to and is built with house Build mating water tower, shed for bicycle, pond etc.." installation of circuit, pipeline, equipment " refers to and building construction and its affiliated facility phase The installation activity of the circuits such as mating electrical, plumbing, HVAC, communication, intelligence, elevator, pipeline, equipment.
Perforating device is the tool that modern construction engineering field must be indispensable.Existing perforating device when in use, is Stabilization punches object, generally by screwing bolts by object clamping, although can stablize punching, screws spiral shell Bolt is time-consuming and laborious, causes to use inconvenience, and puncher is after having beaten hole, it has not been convenient to be detached from object, lead again Puncher is caused to use difficult;And existing puncher punching it is generally necessary to which the puncher of hand-held has come to ground fixing device At operation, still, the puncher of this hand-held may be only available for aperture drilling, just can not be complete for some holes bigger than normal At, and the puncher of hand-held usually requires human assistance completion, it is dangerous relatively high, it is easy to which that the case where injuring makes With being inconvenient.
Utility model content
It is above-mentioned to solve the purpose of this utility model is to provide a kind of building perforating device based on crossbeam stabilization technique The problem of being proposed in background technology.
To achieve the above object, the utility model provides the following technical solutions:
The top of a kind of building perforating device based on crossbeam stabilization technique, including bottom plate, bottom plate is equipped with seat-box and two Column, two columns are symmetrical to be set up separately at left and right sides of the top end face of bottom plate, and the top of two columns is equipped with header board, horizontal The top end face of beam slab is symmetrical above and below to be equipped with guide rail, leading screw is equipped between two guide rails, one end of leading screw is fixed by bearing block to be connected It is connected on header board, the other end of leading screw is fixedly connected on the motor shaft of motor, and motor is fixedly connected on header board, on leading screw Be arranged with the matched Mobile base of guide rail, be to be threadedly coupled between leading screw and guide rail, be between guide rail and Mobile base sliding connect It connects, the bottom end of Mobile base is equipped with electric telescopic rod, and the telescopic rod in electric telescopic rod is fixedly connected with pedestal, is fixedly connected on pedestal Drilling machine is arranged with guide sleeve on telescopic rod, is to be slidably connected between telescopic rod and guide sleeve, the periphery of guide sleeve is uniform Equipped with several holders, guide sleeve, which is fixed by the bracket, to be connected on Mobile base, and seat-box is located between two columns, is equipped in seat-box The top of orbit hole, orbit hole is equipped with slide opening, is equipped with screw rod in orbit hole, one end of screw rod is rotatablely connected orbit hole by swivel base Inner wall on, the other end of screw rod passes through the side wall of orbit hole and is fixedly connected on the motor shaft of feeding motor, screw rod and seat It is rotation connection between case, the top of sliding block is equipped with connecting rod, and the top of connecting rod passes through slide opening and is fixedly connected with movable folder, even It is to be slidably connected between extension bar and slide opening, is fixedly connected on the left of the top end face of seat-box and presss from both sides matched geometrical clamp, bottom with activity Pilot hole is equipped on plate between two columns, pilot hole is located at the left side of seat-box, and the bottom end of bottom plate is uniformly equipped with several Leg.
Further, guide rail is T-type guide rail.
Further, it is the relationship being mutually parallel before guide rail and leading screw.
Further, the periphery of guide sleeve is uniformly equipped with 2~4 holders.
Further, the bottom end of bottom plate is uniformly set there are four supporting leg.
Further, supporting leg is U-shaped structure, and the bottom end of supporting leg is uniformly equipped with several universal wheels, and universal wheel is equipped with foot It stops.
Further, the bottom end of supporting leg is uniformly set there are two universal wheel.
Compared with prior art, the mutual cooperation that the utility model passes through setting electric telescopic rod and header board so that bore Hole machine may be implemented Multidirectional-moving spatially, and position control is flexible, be easy to implement to ground fixing device carry out drilling and Drilling to type movable article;By the mutual cooperation of geometrical clamp and activity folder, can folder effectively be fixed to article hole to be drilled It holds, ensures the stability of article hole to be drilled, improve drilling quality.
Description of the drawings
Fig. 1 is a kind of structural schematic diagram of the building perforating device based on crossbeam stabilization technique of the utility model;
Fig. 2 is a kind of structural representation of the guide sleeve of the building perforating device based on crossbeam stabilization technique of the utility model Figure;
Fig. 3 is a kind of structural schematic diagram of the seat-box of the building perforating device based on crossbeam stabilization technique of the utility model.
In figure:1- bottom plates, 2- columns, 3- header boards, 4- guide rails, 5- bearing blocks, 6- leading screws, 7- motors, 8- Mobile bases, 9- Electric telescopic rod, 10- telescopic rods, 11- guide sleeves, 12- holders, 13- pedestals, 14- drilling machines, 15- pilot holes, 16- seat-boxs, 17- orbit holes, 18- swivel bases, 19- screw rods, 20- sliding blocks, 21- connecting rods, 22- feed motor, 23- slide openings, 24- activities folder, 25- Geometrical clamp, 26- clip tooths, 27- skid resistant courses, 28- supporting legs, 29- universal wheels.
Specific implementation mode
It should be noted that in the absence of conflict, the feature in the embodiments of the present invention and embodiment can To be combined with each other.
In the description of the present invention, it should be understood that term "center", " longitudinal direction ", " transverse direction ", "upper", "lower", The orientation or positional relationship of the instructions such as "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outside" is It is based on the orientation or positional relationship shown in the drawings, is merely for convenience of describing the present invention and simplifying the description, rather than indicate Or imply that signified device or element must have a particular orientation, with specific azimuth configuration and operation, therefore cannot understand For limitations of the present invention.In addition, term " first ", " second " etc. are used for description purposes only, and should not be understood as indicating Or it implies relative importance or implicitly indicates the quantity of indicated technical characteristic." first ", " second " etc. are defined as a result, Feature can explicitly or implicitly include one or more this feature.It is in the description of the present invention, unless another It is described, the meaning of " plurality " is two or more.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " is pacified Dress ", " connected ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integrally Connection;It can be mechanical connection, can also be electrical connection;Can be directly connected, can also indirectly connected through an intermediary, It can be the connection inside two elements.For the ordinary skill in the art, on being understood by concrete condition State the concrete meaning of term in the present invention.
The technical solution of this patent is described in more detail With reference to embodiment.
Please refer to Fig.1~3, a kind of building perforating device based on crossbeam stabilization technique, including bottom plate 1, the bottom plate 1 Top is equipped with seat-box 16 and two columns 2, and two columns 2 are symmetrical to be set up separately at left and right sides of the top end face of bottom plate 1, The top of two columns 2 is equipped with header board 3, and the top end face of the header board 3 is symmetrical above and below to be equipped with guide rail 4, and the guide rail 4 is T Type guide rail, leading screw 6 is equipped between two guide rails 4, is the relationship being mutually parallel before guide rail 4 and leading screw 6, and the one of the leading screw 6 End is fixedly connected on by bearing block 5 on header board 3, and the other end of leading screw 6 is fixedly connected on the motor shaft of motor 7, the electricity Machine 7 is fixedly connected on header board 3, be arranged on leading screw 6 with 4 matched Mobile base 8 of guide rail, be between leading screw 6 and guide rail 4 It is threadedly coupled, is to be slidably connected between the guide rail 4 and Mobile base 8, the bottom end of the Mobile base 8 is equipped with electric telescopic rod 9, institute It states the telescopic rod 10 in electric telescopic rod 9 and is fixedly connected with pedestal 13, drilling machine 14 is fixedly connected on the pedestal 13, it is described flexible It is arranged with guide sleeve 11 on bar 10, is to be slidably connected between telescopic rod 10 and guide sleeve 11, the periphery of guide sleeve 11 is uniform Equipped with several holders 12, guide sleeve 11 is fixedly connected on by holder 12 on Mobile base 8, and the seat-box 16 is located at two columns 2 Between, orbit hole 17 is equipped in seat-box 16, the top of the orbit hole 17 is equipped with slide opening 23, screw rod 19 is equipped in orbit hole 17, One end of the screw rod 19 is rotatablely connected by transposase 11 8 on the inner wall of orbit hole 17, and the other end of the screw rod 19 passes through track The side wall in hole 17 and be fixedly connected on feeding motor 22 motor shaft on, be between screw rod 19 and seat-box 16 rotation connection, it is described The top of sliding block 20 is equipped with connecting rod 21, and the top of the connecting rod 21 passes through slide opening 23 and is fixedly connected with activity folder 24, connection It is to be slidably connected between bar 21 and slide opening 23, is fixedly connected on the left of the top end face of the seat-box 16 matched with activity folder 24 Geometrical clamp 25 is equipped with pilot hole 15 on the bottom plate 1 between two columns 2, and the pilot hole 15 is located at the left side of seat-box 16, The bottom end of the bottom plate 1 is uniformly equipped with several supporting legs 28, and the supporting leg 28 is U-shaped structure, and the bottom end of supporting leg 28 is uniformly set There are several universal wheels 29, the universal wheel 29 to be equipped with service brake.
For utility model in use, when needing to drill to ground fixing device, it is hole to be drilled right that whole device is moved to The top of elephant, and the position to drill is needed by the calibration of pilot hole 15,14 transverse shifting of drilling machine is then driven by motor 7, Make 14 alignment guide hole 15 of drilling machine, and drilling machine 14 is fallen by electric telescopic rod 9, drills, the pilot hole 15 Pore size be more than drilling machine 14 size, to ensure that bore motor 15 can lower;When needing to bore to other articles Kong Shi drives the rotation of screw rod 19, and then sliding block 20 is pushed to be moved left and right along orbit hole 17, realizes by feeding motor 22 Activity folder 24 moves left and right so that activity folder 24 is matched with geometrical clamp 25, and article is clamped, and ensures the firm of article, then sharp It is punched with drilling machine 14.
The better embodiment of this patent is explained in detail above, but this patent is not limited to above-mentioned embodiment party Formula, one skilled in the relevant art within the scope of knowledge, can also be under the premise of not departing from this patent objective Various changes can be made.

Claims (7)

1. a kind of building perforating device based on crossbeam stabilization technique, which is characterized in that including bottom plate(1), bottom plate(1)Top Equipped with seat-box(16)With two columns(2), two columns(2)Symmetrical sets up separately in bottom plate(1)Top end face at left and right sides of, Two columns(2)Top be equipped with header board(3), header board(3)Top end face it is symmetrical above and below be equipped with guide rail(4), two guide rails (4)Between be equipped with leading screw(6), leading screw(6)One end pass through bearing block(5)It is fixedly connected on header board(3)On, leading screw(6)'s The other end is fixedly connected with motor(7)Motor shaft on, motor(7)It is fixedly connected on header board(3)On, leading screw(6)On be arranged with With guide rail(4)Matched Mobile base(8), leading screw(6)With guide rail(4)Between be threadedly coupled, guide rail(4)With Mobile base(8) Between be to be slidably connected, Mobile base(8)Bottom end be equipped with electric telescopic rod(9), electric telescopic rod(9)On telescopic rod(10)Gu Surely pedestal is connected(13), pedestal(13)On be fixedly connected with drilling machine(14), telescopic rod(10)On be arranged with guide sleeve(11), stretch Bar(10)With guide sleeve(11)Between be to be slidably connected, guide sleeve(11)Periphery uniformly be equipped with several holders(12), lead To set(11)Pass through holder(12)It is fixedly connected on Mobile base(8)On, seat-box(16)It is located at two columns(2)Between, seat-box (16)It is interior to be equipped with orbit hole(17), orbit hole(17)Top be equipped with slide opening(23), orbit hole(17)It is interior to be equipped with screw rod(19), spiral shell Bar(19)One end pass through swivel base(18)It is rotatablely connected orbit hole(17)Inner wall on, screw rod(19)The other end pass through orbit hole (17)Side wall and be fixedly connected on feeding motor(22)Motor shaft on, screw rod(19)With seat-box(16)Between be rotation connect It connects, sliding block(20)Top be equipped with connecting rod(21), connecting rod(21)Top pass through slide opening(23)And it is fixedly connected with movable folder (24), connecting rod(21)With slide opening(23)Between be to be slidably connected, seat-box(16)Top end face on the left of be fixedly connected with activity Folder(24)Matched geometrical clamp(25), bottom plate(1)On in two columns(2)Between be equipped with pilot hole(15), pilot hole(15) It is located at seat-box(16)Left side, bottom plate(1)Bottom end uniformly be equipped with several supporting legs(28).
2. a kind of building perforating device based on crossbeam stabilization technique according to claim 1, which is characterized in that guide rail (4)It is T-type guide rail.
3. a kind of building perforating device based on crossbeam stabilization technique according to claim 2, which is characterized in that guide rail (4)With leading screw(6)It is the relationship being mutually parallel before.
4. a kind of building perforating device based on crossbeam stabilization technique according to claim 1, which is characterized in that guide sleeve (11)Periphery uniformly be equipped with 2~4 holders(12).
5. a kind of building perforating device based on crossbeam stabilization technique according to claim 1, which is characterized in that bottom plate (1)Bottom end uniformly set there are four supporting leg(28).
6. a kind of building perforating device based on crossbeam stabilization technique according to claim 5, which is characterized in that supporting leg (28)It is U-shaped structure, supporting leg(28)Bottom end uniformly be equipped with several universal wheels(29), universal wheel(29)It is equipped with service brake.
7. a kind of building perforating device based on crossbeam stabilization technique according to claim 6, which is characterized in that supporting leg (28)Bottom end uniformly set there are two universal wheel(29).
CN201820098035.7U 2018-01-22 2018-01-22 A kind of building perforating device based on crossbeam stabilization technique Active CN207840744U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820098035.7U CN207840744U (en) 2018-01-22 2018-01-22 A kind of building perforating device based on crossbeam stabilization technique

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820098035.7U CN207840744U (en) 2018-01-22 2018-01-22 A kind of building perforating device based on crossbeam stabilization technique

Publications (1)

Publication Number Publication Date
CN207840744U true CN207840744U (en) 2018-09-11

Family

ID=63415445

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820098035.7U Active CN207840744U (en) 2018-01-22 2018-01-22 A kind of building perforating device based on crossbeam stabilization technique

Country Status (1)

Country Link
CN (1) CN207840744U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108311727A (en) * 2018-01-22 2018-07-24 朱园园 A kind of building perforating device based on crossbeam stabilization technique
CN109226820A (en) * 2018-11-20 2019-01-18 岳西县宏胜铸造有限公司 A kind of drill jig for the processing of U-board through-hole
CN113172772A (en) * 2021-05-24 2021-07-27 中启胶建集团有限公司 Perforating device for building based on multidirectional drilling technique

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108311727A (en) * 2018-01-22 2018-07-24 朱园园 A kind of building perforating device based on crossbeam stabilization technique
CN108311727B (en) * 2018-01-22 2019-10-22 宜昌泰和建筑工程有限公司 A kind of building perforating device based on crossbeam stabilization technique
CN109226820A (en) * 2018-11-20 2019-01-18 岳西县宏胜铸造有限公司 A kind of drill jig for the processing of U-board through-hole
CN113172772A (en) * 2021-05-24 2021-07-27 中启胶建集团有限公司 Perforating device for building based on multidirectional drilling technique

Similar Documents

Publication Publication Date Title
CN108311727A (en) A kind of building perforating device based on crossbeam stabilization technique
CN207840744U (en) A kind of building perforating device based on crossbeam stabilization technique
CN106001242B (en) A kind of fully automatic hydraulic perforating press
CN207840219U (en) A kind of perforating device for building based on electric up-down technology
CN108274028B (en) A kind of perforating device for building based on electric up-down technology
CN211606343U (en) Device for assembling and disassembling permanent magnet motor rotor
CN214532778U (en) Punching and positioning device for building engineering
CN207857898U (en) A kind of perforating device for building based on multidirectional drilling technique
CN205927921U (en) Anchor clamps convenient to drilling
CN208556063U (en) A kind of perforating assistor for electric armour clamp
CN111906335A (en) Forming and processing system for wiring terminal strip of distribution cabinet
CN106671192B (en) A kind of decorative panel installation perforating device
CN205254171U (en) Fastening type tubular metal resonator drilling machine
CN215631787U (en) Auxiliary positioning device for mounting prefabricated wall
CN204892618U (en) Portable municipal steel pipe alignment device
CN205063353U (en) Mechanical type is buried bolt location installation component in advance
CN205362753U (en) Fastening type tubular metal resonator drilling equipment
CN203156744U (en) Mobile multifunctional electric appliance mounting working vehicle
CN204747598U (en) Location drilling template
CN113458228A (en) Full-automatic dotting device for filter screen of air conditioner filter pipe fitting
CN204711477U (en) Multifunctional universal angle tube gripper
CN207223471U (en) A kind of numerical control machining center diclinic hole drilling equipment
CN112982475A (en) Auxiliary mounting tool for prefabricated foundation of power transmission line
CN205096582U (en) Large -scale motor housing suspension type directional motion drilling equipment
CN220306870U (en) Multi-functional strutting arrangement of cascaded cable

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: Room 901-2, No. 20, Shijingshan Road, Shijingshan District, Beijing 100040

Patentee after: China Railway Construction Group electromechanical installation Co.,Ltd.

Address before: 100043 room 901-2, 20 Shijingshan Road, Shijingshan District, Beijing

Patentee before: CHINA RAILWAY CONSTRUCTION GROUP EQUIPMENT CO.,LTD.

CP03 Change of name, title or address