CN207829597U - A kind of municipal works construction coaming plate - Google Patents

A kind of municipal works construction coaming plate Download PDF

Info

Publication number
CN207829597U
CN207829597U CN201721673635.3U CN201721673635U CN207829597U CN 207829597 U CN207829597 U CN 207829597U CN 201721673635 U CN201721673635 U CN 201721673635U CN 207829597 U CN207829597 U CN 207829597U
Authority
CN
China
Prior art keywords
coaming plate
construction
hinge
construction coaming
roller bearing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721673635.3U
Other languages
Chinese (zh)
Inventor
周慧美
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinchang Hongji Electronic Technology Co Ltd
Original Assignee
Xinchang Hongji Electronic Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinchang Hongji Electronic Technology Co Ltd filed Critical Xinchang Hongji Electronic Technology Co Ltd
Priority to CN201721673635.3U priority Critical patent/CN207829597U/en
Application granted granted Critical
Publication of CN207829597U publication Critical patent/CN207829597U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of municipal works construction coaming plate, structure includes:Roller bearing hinge,Hinge grafting mast,First construction coaming plate,Support beam bar,Coaming plate aluminium frame,Second construction coaming plate,Third construction coaming plate,Reflection plaster batten,4th construction coaming plate,5th construction coaming plate,Reflection plaster batten is equipped with more than two and is tightly attached to the first construction coaming plate vertically,Second construction coaming plate,Third construction coaming plate,4th construction coaming plate,After 5th construction coaming plate,First construction coaming plate,Second construction coaming plate,Third construction coaming plate,4th construction coaming plate,5th construction coaming plate is inserted inside coaming plate aluminium frame vertically,The utility model roller bearing hinge is equipped with hinge inner cavity chamber,Net wall roller tube,Elastic rubber fixture block,Roller bearing hinge ring,Realize the adjustment action such as the plugged and fixed of municipal works construction coaming plate and convenient dismounting fold,Coordinate the variation of enclosure landform,Dismantling is efficiently convenient,Mechanical connection rapidly and efficiently coordinates construction.

Description

A kind of municipal works construction coaming plate
Technical field
The utility model is a kind of municipal works construction coaming plate, belongs to construction coaming plate field.
Background technology
Construction site, Guangdong language claim building sites, construction domain, and abbreviation domain is to develop construction project at one, is carried out The place of civil engineering, range often have coaming plate, wire netting or enclosure wall to be closed, and limit personnel and material, machinery and vehicle Disengaging.Design alteration and project signature work are a critically important contents in construction management, because its content is extensive, structure At reason complexity, regularity is poor, and the time of generation is long, it is difficult to determine its cost.Normally due to design alteration and project signature And the project cost adjusted accounts for the ratio of entire construction unit final account for completed project, at most close to 20%, it is few then also 6% or so, especially Proportion bigger has been even up to 40% sometimes mostly 20% or more in technological transformation, technical measures engineering.Therefore, pay attention to and do well This work is a major issue of unit in charge of construction, I thinks that design alteration and the meaning and content of project signature, which is appreciated and understood, is First major issue is just unlikely to do a disservice.
But the structure of prior art municipal works construction coaming plate is square plate, usually integrally welded full wafer area Surround in internal construction, it is solderable after fractionation be a great problem again, dismounting is inconvenient and coaming plate fix it is cumbersome when adjustment It is complicated.
Utility model content
In view of the deficienciess of the prior art, the utility model aim is to provide a kind of municipal works construction coaming plate, Structure to solve municipal works construction coaming plate is square plate, and usual integrally welded full wafer area is surrounded to be built in inside Build construction, it is solderable after fractionation be a great problem again, when dismounting is inconvenient and coaming plate fixes adjustment the problem of very complicated.
To achieve the goals above, the utility model is to realize by the following technical solutions:A kind of municipal works are built Construction coaming plate is built, structure includes:Roller bearing hinge, hinge grafting mast, the first construction coaming plate, support beam bar, coaming plate aluminium side Frame, the second construction coaming plate, third construction coaming plate, reflection plaster batten, the 4th construction coaming plate, the 5th construction coaming plate, the reflection plaster Batten is equipped with more than two and is tightly attached to the first construction coaming plate vertically, the second construction coaming plate, third construction coaming plate, the 4th applies After work coaming plate, the 5th construction coaming plate, the first construction coaming plate, the second construction coaming plate, third construction coaming plate, the 4th construction are enclosed Plate, the 5th construction coaming plate are inserted inside coaming plate aluminium frame vertically, and the roller bearing hinge is equipped with more than two welding vertical respectively At left and right sides of coaming plate aluminium frame and hinge grafting mast extends vertically through roller bearing hinge, and the support beam bar level is welded on Coaming plate aluminium frame stage casing and before being horizontally fixed on the first construction coaming plate, the first construction coaming plate, the second construction coaming plate, third Construction coaming plate, the 4th construction coaming plate, the 5th construction coaming plate passes through roller bearing hinge, hinge grafting mast is mechanically connected, the roller bearing Hinge is equipped with hinge inner cavity chamber, net wall roller tube, elastic rubber fixture block, roller bearing hinge ring, and the net wall roller tube is vertically-mounted Inside hinge inner cavity chamber, it is in alignment and horizontal respectively that the elastic rubber fixture block is equipped with more than two tile verticallies It is fixed at left and right sides of net wall roller tube, the hinge inner cavity chamber is fixed on vertically inside roller bearing hinge ring, the roller bearing hinge It is equipped with more than two be welded on vertically respectively at left and right sides of coaming plate aluminium frame and hinge grafting mast extends vertically through roller bearing conjunction Page ring.
Further, the reflection plaster batten and the 4th construction coaming plate are in the same vertical plane.
Further, the roller bearing hinge is conllinear with the axle center of hinge grafting mast.
Further, the first construction coaming plate and coaming plate aluminium frame are in the same vertical plane.
Further, the support beam bar is mutually perpendicular to hinge grafting mast.
Further, the roller bearing hinge is mechanical fastener, and cooperation roller bearing bar inserts build-in and determines and can flexibly drive Coaming plate is overturn, easy to disassemble and vertical convenient and efficient.
Further, the coaming plate aluminium frame is aluminum alloy materials, and hardness is high, anti-deformation.
Advantageous effect
The utility model roller bearing hinge is equipped with hinge inner cavity chamber, net wall roller tube, elastic rubber fixture block, roller bearing hinge ring, The adjustment action such as the plugged and fixed of municipal works construction coaming plate and convenient dismounting fold is realized, cooperation enclosure landform It changes, dismantling is efficiently convenient, and mechanical connection rapidly and efficiently coordinates construction.
Description of the drawings
Upon reading the detailed description of non-limiting embodiments with reference to the following drawings, other spies of the utility model Sign, objects and advantages will become more apparent upon:
Fig. 1 is a kind of structural schematic diagram of municipal works construction coaming plate of the utility model.
Fig. 2 is a kind of cross-sectional view of municipal works construction coaming plate of the utility model.
Fig. 3 is a kind of cross-sectional view of municipal works construction coaming plate roller bearing hinge of the utility model.
In figure:Roller bearing hinge -1, the construction of hinge grafting mast -2, first coaming plate -3, support beam bar -4, coaming plate aluminium side Frame -5, the second construction coaming plate -6, third construction coaming plate -7, the construction of reflection plaster batten the -8, the 4th coaming plate -9, the 5th construction coaming plate - 10, hinge inner cavity chamber -100, net wall roller tube -101, elastic rubber fixture block -102, roller bearing hinge ring -103.
Specific implementation mode
To make the technical means, creative features, achievement of purpose, and effectiveness of the utility model be easy to understand, below In conjunction with specific implementation mode, the utility model is expanded on further.
- Fig. 3 is please referred to Fig.1, the utility model provides a kind of municipal works construction coaming plate:Its structure includes:Roller bearing Hinge 1, the construction of hinge grafting mast 2, first coaming plate 3, support beam bar 4, the construction of coaming plate aluminium frame 5, second coaming plate 6, third Construct coaming plate 7, reflection plaster batten the 8, the 4th construct coaming plate the 9, the 5th construct coaming plate 10, the reflection plaster batten 8 set there are two with It is upper and be tightly attached to the first construction coaming plate 3, second construction coaming plate 6, third construction coaming plate 7, the 4th construction coaming plate 9, the vertically After five construction coaming plates 10, the first construction coaming plate 3, second is constructed coaming plate 6, third construction coaming plate 7, the 4th construction coaming plate 9, the Five construction coaming plates 10 are inserted inside coaming plate aluminium frame 5 vertically, and the roller bearing hinge 1 is equipped with two or more and is welded on vertically respectively 5 left and right sides of coaming plate aluminium frame and hinge grafting mast 2 extend vertically through roller bearing hinge 1, the horizontal welding of the support beam bar 4 In 5 stage casing of coaming plate aluminium frame and before being horizontally fixed on the first construction coaming plate 3, the first construction coaming plate 3, second construction coaming plate 6, third construction coaming plate the 7, the 4th construction coaming plate the 9, the 5th construction coaming plate 10 is connected by roller bearing hinge 1,2 machinery of hinge grafting mast It connects, the roller bearing hinge 1 is equipped with hinge inner cavity chamber 100, net wall roller tube 101, elastic rubber fixture block 102, roller bearing hinge ring 103, the net wall roller tube 101 is vertically arranged to inside hinge inner cavity chamber 100, there are two the elastic rubber fixture block 102 is set The above tile vertically is in alignment and is horizontally fixed on 101 left and right sides of net wall roller tube, the hinge inner cavity respectively Room 100 is fixed on vertically inside roller bearing hinge ring 103, and the roller bearing hinge ring 103 is equipped with two or more and is welded on vertically respectively The left and right sides of coaming plate aluminium frame 5 and hinge grafting mast 2 extend vertically through roller bearing hinge ring 103, the reflection plaster batten 8 and the Four construction coaming plates 9 are in the same vertical plane, and the roller bearing hinge 1 is conllinear with the axle center of hinge grafting mast 2, and described first applies Work coaming plate 3 and coaming plate aluminium frame 5 are in the same vertical plane, and the support beam bar 4 is mutually perpendicular to hinge grafting mast 2, The roller bearing hinge 1 is mechanical fastener, and cooperation roller bearing bar inserts build-in and determines and flexibly coaming plate can be driven to overturn, easy to disassemble And vertical convenient and efficient, the coaming plate aluminium frame 5 are aluminum alloy materials, hardness is high, anti-deformation.
During the use of municipal works construction coaming plate, pass through the hinge inner cavity chamber 100 of roller bearing hinge 1, net wall Roller tube 101, elastic rubber fixture block 102, roller bearing hinge ring 103 are clamped hinge grafting mast 2 and connect the first construction coaming plate 3, the Two construction coaming plates 6, the third construction construction construction coaming plate 10 of coaming plate the 9, the 5th of coaming plate the 7, the 4th etc. each coaming plate, are closed by roller bearing Page 1 reaches the adjustment action such as the plugged and fixed of municipal works construction coaming plate and convenient dismounting fold, coordinates enclosure landform Variation, dismantling efficiently it is convenient, mechanical connection rapidly and efficiently coordinate construction.
Roller bearing hinge 1 also known as hinge described in the utility model, formal name is hinge, often forms two foldings, is connection Two parts of object simultaneously can be allowed to movable component, and ready-made hinge is for cupboard door, window, door etc..
Its structure and principle, which are all this technology personnel, can be learnt by technical manual or be known by routine experiment method, The utility model solves the problems, such as to be the structure of municipal works construction coaming plate to be square plate, usual integrally welded full wafer Area is surrounded in internal construction, it is solderable after fractionation be a great problem again, when dismounting is inconvenient and coaming plate fixes adjustment Very complicated, the utility model are combined with each other by above-mentioned component, can reach the grafting of municipal works construction coaming plate The adjustment actions such as fixed and convenient dismounting fold, coordinate the variation of enclosure landform, and dismantling is efficiently convenient, are mechanically connected quickly high Effect cooperation construction, it is described in detail below:
The net wall roller tube 101 is vertically arranged to inside hinge inner cavity chamber 100, and the elastic rubber fixture block 102 is equipped with More than two tile verticallies are in alignment and are horizontally fixed on 101 left and right sides of net wall roller tube, the hinge respectively Inner cavity chamber 100 is fixed on vertically inside roller bearing hinge ring 103, and the roller bearing hinge ring 103 is equipped with more than two welderings vertical respectively It is connected on 5 left and right sides of coaming plate aluminium frame and hinge grafting mast 2 extends vertically through roller bearing hinge ring 103.
The advantages of basic principles and main features and the utility model of the utility model have been shown and described above, for For those skilled in the art, it is clear that the present invention is not limited to the details of the above exemplary embodiments, and without departing substantially from this In the case of the spirit or essential attributes of utility model, the utility model can be realized in other specific forms.Therefore, no matter From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the utility model is by institute Attached claim rather than above description limit, it is intended that will fall within the meaning and scope of the equivalent requirements of the claims All changes are embraced therein.Any reference numeral in claim should not be considered as to the involved right of limitation It is required that.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art The other embodiment being appreciated that.

Claims (5)

1. a kind of municipal works construction coaming plate, structure include:Roller bearing hinge(1), hinge grafting mast(2), first apply Work coaming plate(3), support beam bar(4), coaming plate aluminium frame(5), second construction coaming plate(6), third construct coaming plate(7), reflection plaster Batten(8), the 4th construction coaming plate(9), the 5th construction coaming plate(10), the reflection plaster batten(8)Equipped with more than two and equal It is tightly attached to the first construction coaming plate vertically(3), second construction coaming plate(6), third construct coaming plate(7), the 4th construction coaming plate(9), Five construction coaming plates(10)Afterwards, the first construction coaming plate(3), second construction coaming plate(6), third construct coaming plate(7), the 4th construction Coaming plate(9), the 5th construction coaming plate(10)Vertical insert is embedded in coaming plate aluminium frame(5)It is internal, it is characterised in that:
The roller bearing hinge(1)It is welded on coaming plate aluminium frame vertically respectively equipped with two or more(5)The left and right sides and hinge are inserted Connect mast(2)Extend vertically through roller bearing hinge(1), the support beam bar(4)Level is welded on coaming plate aluminium frame(5)Stage casing and It is horizontally fixed on the first construction coaming plate(3)Before, the first construction coaming plate(3), second construction coaming plate(6), third construct coaming plate (7), the 4th construction coaming plate(9), the 5th construction coaming plate(10)Pass through roller bearing hinge(1), hinge grafting mast(2)Mechanical connection;
The roller bearing hinge(1)Equipped with hinge inner cavity chamber(100), net wall roller tube(101), elastic rubber fixture block(102), roller bearing Hinge ring(103), the net wall roller tube(101)It is vertically arranged to hinge inner cavity chamber(100)Inside, the elastic rubber fixture block (102)Equipped with two or more, tile verticallies are in alignment and are horizontally fixed on net wall roller tube respectively(101)Left and right two Side, the hinge inner cavity chamber(100)It is fixed on roller bearing hinge ring vertically(103)Inside, the roller bearing hinge ring(103)Equipped with two It is welded on coaming plate aluminium frame vertically respectively more than a(5)The left and right sides and hinge grafting mast(2)Extend vertically through roller bearing hinge Ring(103).
2. a kind of municipal works construction coaming plate according to claim 1, it is characterised in that:The reflection plaster batten (8)With the 4th construction coaming plate(9)It is in the same vertical plane.
3. a kind of municipal works construction coaming plate according to claim 1, it is characterised in that:The roller bearing hinge(1) With hinge grafting mast(2)Axle center it is conllinear.
4. a kind of municipal works construction coaming plate according to claim 1, it is characterised in that:The first construction coaming plate (3)With coaming plate aluminium frame(5)It is in the same vertical plane.
5. a kind of municipal works construction coaming plate according to claim 1, it is characterised in that:The support beam bar (4)With hinge grafting mast(2)It is mutually perpendicular to.
CN201721673635.3U 2017-12-05 2017-12-05 A kind of municipal works construction coaming plate Expired - Fee Related CN207829597U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721673635.3U CN207829597U (en) 2017-12-05 2017-12-05 A kind of municipal works construction coaming plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721673635.3U CN207829597U (en) 2017-12-05 2017-12-05 A kind of municipal works construction coaming plate

Publications (1)

Publication Number Publication Date
CN207829597U true CN207829597U (en) 2018-09-07

Family

ID=63385798

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721673635.3U Expired - Fee Related CN207829597U (en) 2017-12-05 2017-12-05 A kind of municipal works construction coaming plate

Country Status (1)

Country Link
CN (1) CN207829597U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112412170A (en) * 2020-11-21 2021-02-26 江苏赛愽智能制造研究院有限公司 Protective fence for casting workshop

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112412170A (en) * 2020-11-21 2021-02-26 江苏赛愽智能制造研究院有限公司 Protective fence for casting workshop

Similar Documents

Publication Publication Date Title
CN106592775B (en) A kind of high-accuracy built-in fitting reinforces mounting device and method, purposes
CN207829597U (en) A kind of municipal works construction coaming plate
CN203129605U (en) Concrete pouring hopper for construction column
CN207700844U (en) Construction enclosing unit and construction guard fender
CN205713084U (en) Cast-in-situ template
CN206815618U (en) A kind of broken line staggered joint type cell curtain wall attachment structure
CN106869379A (en) A kind of assembling type steel structure Side fascia subiculum upper hanging type attachment structure
CN206495414U (en) A kind of concrete filled steel tube combined special-shaped column of anti-buckling cant timber connection
CN203808316U (en) Structure of concave-convex glass curtain wall
CN208472734U (en) A kind of bracing members for base pit engineering stay support joint structure
CN105178618B (en) A kind of band floats the working protective frame of the prefabricated out-hung panel of window
CN205637338U (en) Multi -chamber concatenation type steel pipe -concrete composite post
CN203855285U (en) Lifting device used for buildings and driven by winch
CN206678769U (en) Weld group frame
CN206319438U (en) A kind of special bracing means of shear wall
CN206205728U (en) Hollow module novel environment friendly radioresistance door
CN204551502U (en) A kind of mixing steel sheet pile cofferdam structure
CN104088580B (en) A kind of Combined gate having enough to meet the need use and preparation method thereof
CN104963487B (en) For the adjustable sawtooth wing external corner backplate of plastering process
CN104594645B (en) The construction method of wall panel fixed mount
CN212026720U (en) Integrated K-bracing module type wall
CN204627055U (en) Intelligent high/low-voltage prepackage formula transformer station
CN207381935U (en) A kind of town road line protecting apparatus
CN203483181U (en) Modularized combined cash counter for bank
CN207959524U (en) A kind of removable building structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180907

Termination date: 20181205