CN207828696U - A kind of reinforcing construction preventing non-fragment orbit basement high - Google Patents

A kind of reinforcing construction preventing non-fragment orbit basement high Download PDF

Info

Publication number
CN207828696U
CN207828696U CN201721648378.8U CN201721648378U CN207828696U CN 207828696 U CN207828696 U CN 207828696U CN 201721648378 U CN201721648378 U CN 201721648378U CN 207828696 U CN207828696 U CN 207828696U
Authority
CN
China
Prior art keywords
stake
armored concrete
loading plate
fragment orbit
stratum
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721648378.8U
Other languages
Chinese (zh)
Inventor
吴沛沛
李宁
曾永红
李安洪
姚裕春
周成
龚建辉
唐第甲
陈伟志
陈裕刚
丁兆锋
杨祥容
胡会星
张健
周川滨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Eryuan Engineering Group Co Ltd CREEC
Original Assignee
China Railway Eryuan Engineering Group Co Ltd CREEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Eryuan Engineering Group Co Ltd CREEC filed Critical China Railway Eryuan Engineering Group Co Ltd CREEC
Priority to CN201721648378.8U priority Critical patent/CN207828696U/en
Application granted granted Critical
Publication of CN207828696U publication Critical patent/CN207828696U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

A kind of reinforcing construction preventing non-fragment orbit basement high, the arch effectively to prevent soft rock heavy cut swell, reduce the risk of secondary protuberance, meet requirement of the high-speed railway to Track regularity.It includes armored concrete loading plate, elastic high compression layer and armored concrete anchoring stake, armored concrete anchoring stake, which lays along reinforced concrete loading plate lateral separation and is partitioned into arrangement along circuit extending direction, to be set, and the upper end is rigidly connected with armored concrete loading plate;The top of the armored concrete anchoring stake passes through protuberance stratum, and slides vertically layer along pile body setting;Armored concrete anchoring stake lower anchor increases the ring that rubs in stablizing in rock stratum along pile body setting stake week, in stake bottom setting stake bottom anchorage head;The elasticity high compression layer is set between armored concrete loading plate bottom surface and protuberance surface of stratum.

Description

A kind of reinforcing construction preventing non-fragment orbit basement high
Technical field
The utility model is related to a kind of reinforcing constructions preventing non-fragment orbit basement high, can be used for railway engineering, highway The fields such as engineering, arch pre-reinforcement or training works especially suitable for non-fragment orbit railway soft rock heavy cut.
Background technology
In Mountainous high speed railway construction process, the cross-sectional form of soft rockmass heavy cut is inevitable, and soft rockmass generally has There are off-load rheological behavior and expansion characteristics, the two that can cause the lasting arch of high speed non-fragment orbit railway to a certain extent, this Kind arch trend lasts for several years or even many decades.In recent years, it runs or in the disease for building non-fragment orbit soft rock heavy cut protuberance It frequently occurs, and renovates extremely difficult.It was verified that take the flexible measure such as anchor cable ineffective to resist protuberance, and it is simple Pile slab structure reinforcement measure the shortcomings of growing up there are the long mistake of stake, and there are the risks of secondary protuberance.Therefore it is badly in need of a kind of novel Construction solves such problem.
Utility model content
The technical problem to be solved by the utility model is to provide a kind of reinforcing construction preventing non-fragment orbit basement high, Effectively to prevent the arch protuberance of soft rock heavy cut, the risk of secondary protuberance is reduced, meets high-speed railway to Track regularity It is required that.
Technical solution is as follows used by the utility model solves the technical problem:
A kind of reinforcing construction preventing non-fragment orbit basement high of the utility model, it is characterized in that:It includes that reinforcing bar is mixed Solidifying soil loading plate, elastic high compression layer and armored concrete anchor stake, and armored concrete anchors stake along armored concrete loading plate Lateral separation lays and is partitioned into arrangement along circuit extending direction and sets, and the upper end is rigidly connected with armored concrete loading plate;Institute The top for stating armored concrete anchoring stake passes through protuberance stratum, and slides vertically layer along pile body setting;The reinforced concrete anchors Gu stake lower anchor increases the ring that rubs in stablizing in rock stratum, and along pile body setting stake week, in stake bottom setting stake bottom anchorage head;The elasticity High compression layer is set between armored concrete loading plate bottom surface and protuberance surface of stratum.
The utility model has the beneficial effects that there is the location of protuberance trend for soft rockmass heavy cut, divided into loading plate Elastic high compression layer is set, the influence of soft rockmass heavy cut substrate off-load rheology and expansion characteristics to non-fragment orbit can be solved;In steel Setting slides vertically layer on reinforced concrete anchor pile, can eliminate the upward friction effects that arch stratum generates stake;In reinforcing bar It is arranged on concrete anchor pile and increases rub ring and stake bottom anchorage head in stake week, the breakout capacity of anchor pile can be increased substantially, to solve The certainly long long problem of stake;
Can not only effectively preventing soft rock heavy cut arch protuberance, reduce the risk of secondary protuberance, meet high-speed railway Requirement to Track regularity, and economy increases substantially, and has broad application prospects.
Description of the drawings
This specification includes following three width attached drawing:
Fig. 1 is a kind of cross-sectional view for the reinforcing construction for preventing non-fragment orbit basement high of the utility model;
Fig. 2 is a kind of skiagraph for the reinforcing construction for preventing non-fragment orbit basement high of the utility model;
Fig. 3 is a kind of plan view for the reinforcing construction for preventing non-fragment orbit basement high of the utility model.
Component, toponym and corresponding label are shown in figure:Stratum A is swelled, good ground B, armored concrete are held Support plate 1, elastic high compression layer 2, armored concrete anchoring stake 3, slide vertically layer 4, stake week increases rub ring 5, stake bottom anchorage head 6.
Specific implementation mode
This reality utility model is further illustrated with reference to the accompanying drawings and examples.
Referring to FIG. 1, FIG. 2 and FIG. 3, to prevent the reinforcing construction of non-fragment orbit basement high include steel by the utility model a kind of Reinforced concrete loading plate 1, elastic high compression layer 2 and armored concrete anchor stake 3, and armored concrete anchors stake 3 along reinforced concrete 1 lateral separation of native loading plate lays and is partitioned into arrangement along circuit extending direction and sets, and the upper end is rigid with armored concrete loading plate 1 Property connection.The top of the armored concrete anchoring stake 3 passes through protuberance stratum A, and slides vertically layer 4 along pile body setting, to disappear The upward friction effects that armored concrete anchoring stake 3 is generated except protuberance stratum A.3 lower part of the armored concrete anchoring stake It is anchored in stable rock stratum B, and increases the ring 5 that rubs along pile body setting stake week, in stake bottom setting stake bottom anchorage head 6, to increase substantially Armored concrete anchors the breakout capacity of stake 3, to solve the problems, such as that stake is long long, reduces project cost.The elasticity high pressure Contracting layer 2 is set between 1 bottom surface of armored concrete loading plate and the protuberance stratum surfaces A, is unloaded with eliminating soft rockmass heavy cut substrate The influence of lotus rheology and expansion characteristics to non-fragment orbit.The utility model can not only effectively preventing soft rock heavy cut arch it is grand It rises, reduces the risk of secondary protuberance, meet requirement of the high-speed railway to Track regularity, and economy increases substantially, have Wide application prospect.
Referring to Fig.1, the top for sliding vertically layer 4 and being located on armored concrete anchoring stake 3, is made of graphite material, Or lubricant coating is set between sliding vertically 3 outer surface of 4 inner wall of layer and armored concrete anchoring stake.
With reference to Fig. 2, increase the longitudinally spaced setting in lower part that the ring 5 that rubs anchors stake 3 in armored concrete the stake week.The elasticity High compression layer 2 usually can be used loose sandstone and fill.
The above is a kind of reinforcing construction preventing non-fragment orbit basement high of the utility model that explains through diagrams Some principles are not intended to the utility model type being confined in shown and described concrete structure and the scope of application, therefore every It is possible that the corresponding modification being utilized and equivalent, belong to the apllied the scope of the claims of the utility model.

Claims (4)

1. a kind of reinforcing construction preventing non-fragment orbit basement high, it is characterized in that:It include armored concrete loading plate (1), Elastic high compression layer (2) and armored concrete anchoring stake (3), armored concrete anchor stake (3) along armored concrete loading plate (1) Lateral separation lays and is partitioned into arrangement along circuit extending direction and sets, and the upper end is rigidly connected with armored concrete loading plate (1); The top of the armored concrete anchoring stake (3) passes through protuberance stratum (A), and slides vertically layer (4) along pile body setting;The steel Reinforced concrete anchor pile (3) lower anchor is interior in stablizing rock stratum (B), and increases the ring (5) that rubs along pile body setting stake week, is arranged in stake bottom Stake bottom anchorage head (6);The elasticity high compression layer (2) is set to armored concrete loading plate (1) bottom surface and protuberance stratum (A) table Between face.
2. a kind of reinforcing construction preventing non-fragment orbit basement high as described in claim 1, it is characterized in that:It is described to slide vertically Layer (4) be located on armored concrete anchoring stake (3) top, be made of graphite material, or in slide vertically layer (4) inner wall with Lubricant coating is arranged between stake (3) outer surface in armored concrete anchoring.
3. a kind of reinforcing construction preventing non-fragment orbit basement high as described in claim 1, it is characterized in that:Increase in the stake week and rubs Ring (5) is in the longitudinally spaced setting in lower part of armored concrete anchoring stake (3).
4. a kind of reinforcing construction preventing non-fragment orbit basement high as described in claim 1, it is characterized in that:The elasticity high pressure Contracting layer (2) is filled using loose sandstone.
CN201721648378.8U 2017-12-01 2017-12-01 A kind of reinforcing construction preventing non-fragment orbit basement high Active CN207828696U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721648378.8U CN207828696U (en) 2017-12-01 2017-12-01 A kind of reinforcing construction preventing non-fragment orbit basement high

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721648378.8U CN207828696U (en) 2017-12-01 2017-12-01 A kind of reinforcing construction preventing non-fragment orbit basement high

Publications (1)

Publication Number Publication Date
CN207828696U true CN207828696U (en) 2018-09-07

Family

ID=63386983

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721648378.8U Active CN207828696U (en) 2017-12-01 2017-12-01 A kind of reinforcing construction preventing non-fragment orbit basement high

Country Status (1)

Country Link
CN (1) CN207828696U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108179664A (en) * 2017-12-01 2018-06-19 中铁二院工程集团有限责任公司 A kind of reinforcing construction for preventing non-fragment orbit basement high

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108179664A (en) * 2017-12-01 2018-06-19 中铁二院工程集团有限责任公司 A kind of reinforcing construction for preventing non-fragment orbit basement high

Similar Documents

Publication Publication Date Title
CN108179664A (en) A kind of reinforcing construction for preventing non-fragment orbit basement high
CN103741683B (en) A kind of pouch expands end rigid-flexible mechanical arm and construction method
CN208072090U (en) A kind of lower soil property cutting high-speed railway ruggedized construction of bearing capacity
CN207436092U (en) Multistage pin-connected panel L-type greening barricade construction
CN204875409U (en) Joint geogrid reinforced structure of powder fine sand road bed microorganism grout
CN207828696U (en) A kind of reinforcing construction preventing non-fragment orbit basement high
CN101550669A (en) Reinforced geogrid for earthwork
CN104196037B (en) A kind of environmental protection slope reinforcement structure
CN103821038B (en) High-speed railway subgrade arch repairing and reinforcement structure
CN111535079B (en) End-stabbing anchoring force enhancing structure and construction method
CN110080282A (en) A kind of self-anchored type band tooth grid reinforced retaining wall structure and its reinforcement means
KR101055410B1 (en) Method constructing retaining wall for cutting part the ground
CN2663516Y (en) Back pressing slurry injecting device to side and bottom of pile in drilling caisson pile procession
CN105297737A (en) Grouting scope-controllable bag type micro bearing pile
CN204225147U (en) Concrete half gravity reinforced retaining wall
CN208415244U (en) Anchor pole suitable for the karst area with connected pore channel
CN206245323U (en) Open-pit mine blast slope reinforcement device
CN209703485U (en) A kind of manually digging hole friction pile of different cross section structure
CN205876364U (en) Cavity intelligence slip casting stock
CN211057766U (en) Limestone compaction pile
CN201010902Y (en) Plastic tube with partially smooth and partially threaded surface used for cast-in-place concrete pile
CN208056058U (en) Impact driving into type covering layer slope slip casting anchor system
CN113882425A (en) Hole digging foundation structure for high and steep slope and construction method
CN107227742B (en) A kind of megalith mixture landslide micro combination pile group rib body Retaining Wall Reinforcement method
CN103670444B (en) Roadway floor supporting and protection structure and construction method thereof