CN207817676U - Transforming plant protecting device centralization printing device - Google Patents

Transforming plant protecting device centralization printing device Download PDF

Info

Publication number
CN207817676U
CN207817676U CN201820245658.2U CN201820245658U CN207817676U CN 207817676 U CN207817676 U CN 207817676U CN 201820245658 U CN201820245658 U CN 201820245658U CN 207817676 U CN207817676 U CN 207817676U
Authority
CN
China
Prior art keywords
printing
transforming plant
server
plant protecting
centralization
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820245658.2U
Other languages
Chinese (zh)
Inventor
林晖
刘善春
张思尧
张良
林珊
林芳
陈金星
许仕宝
张鑫
郭茜婷
陈静怡
涂承谦
张婷婷
陈东升
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Fujian Electric Power Co Ltd
Ningde Power Supply Co of State Grid Fujian Electric Power Co Ltd
Original Assignee
State Grid Fujian Electric Power Co Ltd
Ningde Power Supply Co of State Grid Fujian Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Fujian Electric Power Co Ltd, Ningde Power Supply Co of State Grid Fujian Electric Power Co Ltd filed Critical State Grid Fujian Electric Power Co Ltd
Priority to CN201820245658.2U priority Critical patent/CN207817676U/en
Application granted granted Critical
Publication of CN207817676U publication Critical patent/CN207817676U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing And Monitoring For Control Systems (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The utility model proposes a kind of transforming plant protecting device centralization printing devices, including:The printing forwarding server and remote monitoring printing equipment being connected;The printing forwarding server is equipped with independently arranged RAM card;The printing forwarding server is connected to the printing interface of one or more transforming plant protecting devices by RS232.The utility model can allow the significant datas uniform transmission such as all microcomputer protecting device dependent failure information, recording, definite value in substation; to realize centralized printing; each supervision department can also be uploaded to by LAN; realization is remotely had access to and is printed; it allows operation maintenance personnel, technical specialist that can quick, convenient, accurately understand substation fault information and makes correct processing in time, ensure electric power netting safe running.

Description

Transforming plant protecting device centralization printing device
Technical field
The utility model belongs to power grid security and is printed with protection field more particularly to a kind of transforming plant protecting device centralization Equipment.
Background technology
At present in substation action report, fault waveform, definite value inventory of protective device etc. there are mainly two types of printing type, One is the stylus printers with protective device with screen, and one is the mobile printers in protective chamber.Both the above mode It can not achieve all protective devices of whole station and concentrate printing.
There are two types of the printing devices of existing protective device, and one is the stylus printers with protective device with screen, use It is AC power, one is mobile printers.According to《Fujian Province's relay protection of power system substation automation straight-flow system is anti- Accident measure(Version in 2015)》(Fujian electricity tune (2015) 234)About " must not have in protection screen 380/220V AC powers return The requirement of road and equipment ", protection screen inprinter AC power need to cancel;In addition, there are higher for mobile printing trolley Failure rate, part protective device can not be connected and be printed.Once grid collapses, operation maintenance personnel is needed to scene to correlation Fault message is printed, and the paper material printed is scanned or taken pictures and issues the relevant departments such as scheduling, maintenance, is taken Effort consumptive material, these problems cause that scene protection device printing function is not perfect, printing effect is low, and then affect work Progress.
Although the Chinese patent that document number is CN105353997A discloses a kind of substation relay protection device concentration and beats System and method are printed, but there are still larger rooms for improvement for the technical solution.
Utility model content
In view of the problems of the existing technology, the utility model uses following technical scheme:
A kind of transforming plant protecting device centralization printing device, which is characterized in that including:The printing forwarding service being connected Device and remote monitoring printing equipment;The printing forwarding server is equipped with independently arranged RAM card;The printing forwarding clothes Business device is connected to the printing interface of one or more transforming plant protecting devices by RS232.
Preferably, remote monitoring printing equipment includes concentrating printing display device, remote printer and monitoring backstage service Device;The printing forwarding server is connect with printing display device and monitoring backstage server is concentrated respectively;The monitoring backstage Server is connect with remote printer.
Preferably, the printing forwarding server is connected with remote monitoring printing equipment by Ethernet.
Preferably, it is provided with picture and text conversion module on the monitoring backstage server, will be read from printing forwarding server Type information be converted to picture format.
Preferably, the monitoring backstage server connects internet by safety isolation network gate.
Preferably, the printing forwarding server is provided with as the serial interface of data receiver and is sent as data The network interface interface at end.
The printing that printing forwarding server is directly connected to protective device by RS232 Serial Port Lines by the utility model connects Mouthful, when protective device failure judgement and formed analysis data transmission to device printing interface when, printing forwarding server will be real-time It acquires these data and is saved in RAM card, it at the same time will be in real time that collected data transmission is aobvious to concentration printing on the spot Display screen and monitoring backstage server.In addition, monitoring backstage can also read printing forwarding server RAM card at any time by network Print data realizes long-range reading data and printing.In this way so that substation in all microcomputer protecting device dependent failure information, The significant datas such as recording, definite value can be unified in monitoring backstage server and be transferred, and concentrate printing to realize, avoid moving The problems such as formula printer can not be printed there are higher failure rate and part protective device.
The utility model can allow all microcomputer protecting device dependent failure information, recording, definite value etc. in substation important Data uniform transmission, to realize centralized printing, moreover it is possible to each supervision department is uploaded to by LAN, realization is remotely had access to And printing, it allows operation maintenance personnel, technical specialist that can quick, convenient, accurately understand substation fault information and makes in time just True processing ensures electric power netting safe running.Whole station is realized simultaneously and shares printing device, can reduce the installation of printer, in turn Reduce the cost and daily maintenance of printer.
Description of the drawings
With reference to the accompanying drawings and detailed description to the further details of explanation of the utility model:
Fig. 1 is the utility model embodiment overall structure diagram.
Specific implementation mode
For the feature and advantage of this patent can be clearer and more comprehensible, special embodiment below is described in detail below:
As shown in Figure 1, the utility model embodiment includes:The printing forwarding server that is connected by Ethernet and long-range Monitor printing equipment;Printing forwarding server is equipped with independently arranged RAM card, is provided with the serial ports as data receiver Interface and network interface interface as data sending terminal;Printing forwarding server is connected to multiple transforming plant protectings by RS232 and fills The printing interface set.Wherein, RAM card is TF RAM cards.
Remote monitoring printing equipment includes concentrating printing display device, remote printer and monitoring backstage server;Printing Forwarding server is connect with printing display device and monitoring backstage server is concentrated respectively;Monitoring backstage server and remote printing Machine connects, and control remote printer carries out printing.
When any transforming plant protecting device action print data, printing forwarding server is connect by the printing of protective device Trouble Report and shape information are obtained when cause for gossip, while preserving information to independently arranged RAM card, by data by with Too net is real-time transmitted to remote monitoring printing equipment.
In the present embodiment, the 1U cabinets of standard can be used in printing forwarding server, are installed convenient for live group screen;Also it can adopt It is designed with separate modular, installation site can be flexibly set according to field condition.The present embodiment kind of design scheme before, wherein Each 1U cabinets can access 2 printing interfaces, and use Cortex M4 core processors, and it is high to acquire degree in real time.
For printing the data storage of forwarding server, the present embodiment uses the strategy mostly stored, is on the one hand protecting While depositing information to independently arranged RAM card, data are also in printing forwarding server local storage and monitoring backstage service Device is backed up in realtime, to realize superfluous calamity.
In the present embodiment, printing forwarding server can only passively receive type information, cannot actively read modification protection Any information on device, ensure that the security performance of protective device.
In the present embodiment, concentrate printing display device be one independently of monitoring backstage server display screen, be used for root The above-mentioned Trouble Report of data transmission real-time display according to printing forwarding server and shape information are shown when there is new information generation Also make corresponding prompt in display screen.
It is provided with picture and text conversion module on monitoring backstage server, the type information read from printing forwarding server is turned The picture formats such as JPG are melted into, virtual printing is realized, facilitates the reading of technical staff, and failure wave-recording graphic file can be copied The relevant departments such as scheduling are out sent, avoids printing transmission of taking pictures again, saves time and print paper cost.
Storage through this embodiment and output scheme can also carry out definite value to front and back changed two parts and compare It is right, it can accurately find and change part.It, can be accurate by definite value comparison when carrying out fixed value modification and regular inspection to protective device Judge whether to adjust trouble correct, that reduction artificial nucleus bring definite value, improves the accuracy rate of definite value verification.
In the present embodiment, monitoring backstage server connects internet by safety isolation network gate, and maintenance personnel sets from outside The standby linking Internet monitoring backstage server that accesses can realize safe and reliable long-range access, printing, when being saved for maintenance personnel Between, improve working efficiency.
In the present embodiment, printer on the spot has been may also set up by connecting the printing interface of transforming plant protecting device, profit The required interval printed is switched to switching handle, realization prints on the spot.
This patent is not limited to above-mentioned preferred forms, anyone can obtain other each under the enlightenment of this patent The transforming plant protecting device centralization printing device of kind form, all equivalent changes done according to present utility model application the scope of the claims With modification, it should all belong to the covering scope of this patent.

Claims (6)

1. a kind of transforming plant protecting device centralization printing device, which is characterized in that including:The printing forwarding server being connected With remote monitoring printing equipment;The printing forwarding server is equipped with independently arranged RAM card;The printing forwarding service Device is connected to the printing interface of one or more transforming plant protecting devices by RS232.
2. transforming plant protecting device centralization printing device according to claim 1, it is characterised in that:Remote monitoring prints Device includes concentrating printing display device, remote printer and monitoring backstage server;The printing forwarding server respectively with Printing display device is concentrated to be connected with monitoring backstage server;The monitoring backstage server is connect with remote printer.
3. transforming plant protecting device centralization printing device according to claim 1, it is characterised in that:The printing forwarding Server is connected with remote monitoring printing equipment by Ethernet.
4. transforming plant protecting device centralization printing device according to claim 2, it is characterised in that:The monitoring backstage It is provided with picture and text conversion module on server, the type information read from printing forwarding server is converted to picture format.
5. transforming plant protecting device centralization printing device according to claim 3, it is characterised in that:The monitoring backstage Server connects internet by safety isolation network gate.
6. transforming plant protecting device centralization printing device according to claim 3, it is characterised in that:The printing forwarding Server is provided with the serial interface as data receiver and the network interface interface as data sending terminal.
CN201820245658.2U 2018-02-11 2018-02-11 Transforming plant protecting device centralization printing device Active CN207817676U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820245658.2U CN207817676U (en) 2018-02-11 2018-02-11 Transforming plant protecting device centralization printing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820245658.2U CN207817676U (en) 2018-02-11 2018-02-11 Transforming plant protecting device centralization printing device

Publications (1)

Publication Number Publication Date
CN207817676U true CN207817676U (en) 2018-09-04

Family

ID=63321332

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820245658.2U Active CN207817676U (en) 2018-02-11 2018-02-11 Transforming plant protecting device centralization printing device

Country Status (1)

Country Link
CN (1) CN207817676U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115379062A (en) * 2022-08-25 2022-11-22 广东电网有限责任公司 Transformer substation protection device fault data printing conversion device and method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115379062A (en) * 2022-08-25 2022-11-22 广东电网有限责任公司 Transformer substation protection device fault data printing conversion device and method

Similar Documents

Publication Publication Date Title
CN106026405A (en) Relay protection on-line monitoring and analyzing system based on EMS system
CN206237204U (en) System and power communication system for monitoring communication state in power system
CN101854078A (en) Monitoring system and method of operation condition of digitalized substation secondary device
CN106532935A (en) Method and system used for carrying out intelligent substation secondary system fault diagnosis
CN111413905A (en) Management system of energy consumption monitoring equipment
CN101707528B (en) Method for transmitting alarm data of centralized monitoring system
CN206115422U (en) Long -range print system of relay protection information
CN207817676U (en) Transforming plant protecting device centralization printing device
CN211014619U (en) Fixed value checking system for portable protection device of digital transformer substation
CN108181845A (en) A kind of intelligent electric meter information acquisition system
CN202798138U (en) Intelligent transformer station
CN110009889A (en) Holographic perception power information nonredundancy effective transmission technique towards the full direct-current micro-grid of intelligent building
CN109544895A (en) A kind of data acquisition and dissemination system for the monitoring of Intelligent unattended ship
CN202550680U (en) Electric energy collection and operation management system
CN105021054A (en) Intelligent electric furnace combining internet-of-things technology and mobile management application
CN102847720A (en) Hot-rolling production line power consumption classification acquisition and analysis system
CN209448750U (en) Urban track traffic communication information wisdom room system
CN205992169U (en) A kind of industry spot service data, the long distance control system of energy management
CN207233185U (en) A kind of collaborative kilowatt meter reading-out system
CN109539379A (en) A kind of remote data monitoring device of heating plant
CN206322014U (en) A kind of power station remote supervision system
CN109799962A (en) Printer, print system and method having data processing function
CN204497845U (en) Dispatching of power netwoks control system
CN109494872A (en) A kind of distribution terminal is from register method and system
CN204758723U (en) Measurement automatic system terminal communication protocol test platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant