CN207817188U - electric energy meter sampling performance testing platform - Google Patents

electric energy meter sampling performance testing platform Download PDF

Info

Publication number
CN207817188U
CN207817188U CN201820110319.3U CN201820110319U CN207817188U CN 207817188 U CN207817188 U CN 207817188U CN 201820110319 U CN201820110319 U CN 201820110319U CN 207817188 U CN207817188 U CN 207817188U
Authority
CN
China
Prior art keywords
test module
platform
electric energy
immunity
energy meter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820110319.3U
Other languages
Chinese (zh)
Inventor
董强
丁荣荣
赵强
祝新荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HANGZHOU DC ENERGY EQUIPMENT Co Ltd
Original Assignee
HANGZHOU DC ENERGY EQUIPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HANGZHOU DC ENERGY EQUIPMENT Co Ltd filed Critical HANGZHOU DC ENERGY EQUIPMENT Co Ltd
Priority to CN201820110319.3U priority Critical patent/CN207817188U/en
Application granted granted Critical
Publication of CN207817188U publication Critical patent/CN207817188U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Electric energy meter sampling performance testing platform, it is related to electric energy meter field, and in particular to electric energy meter sampling performance testing platform.Platform is square structure, and guide rail, which is arranged above the both sides up and down of platform, two guide rails, is designed with supporting rack, and slide plate is equipped between frame supported on both sides, and the bottom of slide plate is equipped with mechanical arm;Feeding buffer setting is on the right side of platform, the right end of platform is equipped with the total electric energy error of indication test module of register, pulse feeding line traverse is arranged in the centre of platform, the both sides of feeding line are equipped with other detection modules, the left end in platform is arranged in esd immunity test module, and quickly impulse train immunity to interference test module is arranged in the lower section of esd immunity test module in passing.After adopting the above technical scheme, the utility model has the beneficial effect that:It includes a variety of detection modules, and feeding cache lines can disposably place six electric energy meters, and manual operation is changed to mechanically actuated, improve work efficiency, detection efficiency.

Description

Electric energy meter sampling performance testing platform
Technical field
The utility model is related to electric energy meter fields, and in particular to electric energy meter sampling performance testing platform.
Background technology
In existing electric energy meter product sampling performance detection experiment, each detection device of manual operation is mainly used, and check inspection Measured data judges to measure product sampling performance detection conclusion by way of manually comparing, since sampling performance detection experiment is each The link flow duration is longer, while manually replacing tedious process, the detection efficiency of product can be caused relatively low, and detected The detection zone of Cheng Zhong, product are handed over extensively, and range is handed over wide between each region, and working efficiency is not high.
Utility model content
The purpose of this utility model is that it is in view of the drawbacks of the prior art and insufficient, it is flat to provide electric energy meter sampling performance test Platform, it includes a variety of detection modules, and feeding cache lines can disposably place six electric energy meters, and manual operation is changed to machine Tool operates, and improves work efficiency, detection efficiency.
To achieve the above object, the utility model is using following technical scheme:It includes platform 1, guide rail 2, mechanical arm 3, the total electric energy error of indication test module 6 of slide plate 4, feeding cache lines 5, register, pulse voltage test module 7, static discharge Immunity to interference test module 8, Clusters immunity to interference test module 9, decaying Sasser immunity to interference test module 10, surge Immunity to interference test module 11, the conduction interference immunity to interference test module 12 of radiofrequency field induction, supporting rack 13, feeding line 15, platform 1 For square structure, guide rail 2 is arranged in the both sides up and down of platform 1, and the top of two guide rails 2 is designed with supporting rack 13, supported on both sides Slide plate 4 is equipped between frame 13, the bottom of slide plate 4 is equipped with mechanical arm 3;Feeding cache lines 5 are arranged on the right side of platform 1, platform 1 Right end is equipped with the total electric energy error of indication test module 6 of register, and 15 traverse of pulse feeding line is arranged in the centre of platform 1, feeding The both sides of line 15 are respectively equipped with pulse voltage test module 7, decaying Sasser immunity to interference test module 10, surge immunity test Module 11, the conduction interference immunity to interference test module 12 of radiofrequency field induction, esd immunity test module 8 are arranged in platform Left end, quickly impulse train immunity to interference test module 9 is arranged in the lower section of esd immunity test module 8 in passing.
The bottom of support frame as described above 13 is equipped with motor 14.
The guide rail 2 of 1 both sides of the platform is mutually parallel with platform.
The total electric energy error of indication test module of the register 6 is high-low temperature chamber.
The operation principle of the utility model:The electric energy meter for installing switching table support is placed into feeding cache lines by worker, 6 tables can disposably be placed, control the mechanical arm on guide rail once can catch feeding area by electric energy meter, and mechanical arm is by electric energy meter Crawl is placed into the total electric energy error of indication test module 6 of register, pulse voltage test module 7, esd immunity successively Test module 8, Clusters immunity to interference test module 9, decaying Sasser immunity to interference test module 10, surge immunity Test module 11, the conduction interference immunity to interference test module 12 of radiofrequency field induction are detected, the job area covering of mechanical arm Whole detection module positions.
After adopting the above technical scheme, the utility model has the beneficial effect that:It includes a variety of detection modules, feeding cache lines Six electric energy meters can be disposably placed, and manual operation is changed to mechanically actuated, are improved work efficiency, detection efficiency.
Description of the drawings
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only It is some embodiments of the utility model, for those of ordinary skill in the art, before not making the creative labor property It puts, other drawings may also be obtained based on these drawings.
Fig. 1 is the structural schematic diagram of the utility model.
Reference sign:The total electric energy indicating value of platform 1, guide rail 2, mechanical arm 3, slide plate 4, feeding cache lines 5, register is missed Poor test module 6, pulse voltage test module 7, esd immunity test module 8, Clusters immunity to interference are surveyed The conduction interference that die trial block 9, decaying Sasser immunity to interference test module 10, surge immunity test module 11, radiofrequency field incude Immunity to interference test module 12, supporting rack 13, motor 14, feeding line 15.
Specific implementation mode
Shown in Fig. 1, present embodiment the technical solution adopted is that:It include platform 1, guide rail 2, mechanical arm 3, The total electric energy error of indication test module 6 of slide plate 4, feeding cache lines 5, register, pulse voltage test module 7, static discharge are anti- Degree of disturbing test module 8, Clusters immunity to interference test module 9, decaying Sasser immunity to interference test module 10, surge are anti- Degree of disturbing test module 11, the conduction interference immunity to interference test module 12 of radiofrequency field induction, supporting rack 13, feeding line 15, platform 1 are Square structure, guide rail 2 are arranged in the both sides up and down of platform 1, and the top of two guide rails 2 is designed with supporting rack 13, frame supported on both sides Slide plate 4 is equipped between 13, the bottom of slide plate 4 is equipped with mechanical arm 3;Feeding cache lines 5 are arranged on the right side of platform 1, the right side of platform 1 End is equipped with the total electric energy error of indication test module 6 of register, and 15 traverse of pulse feeding line is arranged in the centre of platform 1, feeding line 15 both sides are respectively equipped with pulse voltage test module 7, decaying Sasser immunity to interference test module 10, surge immunity test mould The conduction interference immunity to interference test module 12 that block 11, radiofrequency field incude, esd immunity test module 8 is arranged in platform Left end, quickly impulse train immunity to interference test module 9 is arranged in the lower section of esd immunity test module 8 in passing.
The bottom of support frame as described above 13 is equipped with motor 14.
The guide rail 2 of 1 both sides of the platform is mutually parallel with platform.
The total electric energy error of indication test module of the register 6 is high-low temperature chamber.
The operation principle of the utility model:The electric energy meter for installing switching table support is placed into feeding cache lines by worker, 6 tables can disposably be placed, control the mechanical arm on guide rail once can catch feeding area by electric energy meter, and mechanical arm is by electric energy meter Crawl is placed into the total electric energy error of indication test module 6 of register, pulse voltage test module 7, esd immunity successively Test module 8, Clusters immunity to interference test module 9, decaying Sasser immunity to interference test module 10, surge immunity Test module 11, the conduction interference immunity to interference test module 12 of radiofrequency field induction are detected, the job area covering of mechanical arm Whole detection module positions.
The detection detailed process of electric energy meter is as follows:
(1)《Ambient temperature effect》With《Influence of the environment temperature to error of time of day》Module
Electric energy meter is put into high-low temperature chamber by mechanical arm system, and passes through fast automatic termination wiring, high-low temperature chamber The bad border temperature of interior Quick Connect Kit maximum functional should meet -25 ~ 60 degrees Celsius of requirement, and host computer is to electric in high-low temperature chamber Table carries out function monitor test, after being completed, is taken out electric energy meter in case by mechanical arm system, and high-low temperature chamber works by program Control, the door of high-low temperature chamber should be by electricapparatus coordinated signals.
(2)《The total electric energy error of indication of register》
Electric energy meter is transferred load to test platform and completes to crimp by mechanical arm, and inspection software is automatically finished corresponding detection work To make, test terminates → and electric energy meter removes test platform by mechanical arm, and wait for next group electric energy meter to enter test.
(3)Power consumption
With《The total electric energy error of indication of register》It is carried out at the same time in experiment;Inspection software is by reading power consumption test module The power consumption number of reading, it was therefore concluded that.
(4)Impulse test
Electric energy meter is transferred load to test platform and completes crimping → inspection software by mechanical arm is automatically finished corresponding detection work Make, electric energy meter is removed test platform by test completion → mechanical arm, and next group electric energy meter is waited for enter test.
(5)Esd immunity is tested
Electric energy meter is transferred load to test platform and completes crimping → inspection software by mechanical arm is automatically finished corresponding detection work Make, be completed → electric energy meter removes test platform by mechanical arm, wait for next group electric energy meter to enter test.
(6)Clusters immunity experiment
Electric energy meter is transferred load to the test station by mechanical arm, and crimp → inspection software is automatically finished corresponding detection work → be completed → electric energy meter removes test platform by mechanical arm, wait for next group electric energy meter to enter test.
(7)Decaying Sasser immunity experiment
Electric energy meter is transferred load to the test station by mechanical arm, and crimp → inspection software is automatically finished corresponding detection work → enter next test event.
(8)Surge immunity is tested
Electric energy meter is transferred load to the test station by mechanical arm, and crimp → inspection software is automatically finished corresponding detection work → enter next test event.
(9)The conduction interference immunity experiment of radiofrequency field induction
Electric energy meter is transferred load to the test station by mechanical arm, and is crimped completion → inspection software and be automatically finished corresponding detection Work.
After adopting the above technical scheme, the utility model has the beneficial effect that:It includes a variety of detection modules, feeding cache lines Six electric energy meters can be disposably placed, and manual operation is changed to mechanically actuated, are improved work efficiency, detection efficiency.
The above is merely intended for describing the technical solutions of the present application, but not for limiting the present application, those of ordinary skill in the art couple The other modifications or equivalent replacement that the technical solution of the utility model is made, without departing from technical solutions of the utility model Spirit and scope should all cover in the right of the utility model.

Claims (4)

  1. The performance testing platform 1. electric energy meter is sampled, it is characterised in that:It includes platform (1), guide rail (2), mechanical arm (3), slide plate (4), the total electric energy error of indication test module (6) of feeding cache lines (5), register, pulse voltage test module (7), electrostatic are put Electric immunity to interference test module (8), Clusters immunity to interference test module (9), decaying Sasser immunity to interference test module (10), surge immunity test module (11), the conduction interference immunity to interference test module (12) of radiofrequency field induction, supporting rack (13), feeding line (15), platform (1) are square structure, and guide rail (2) is arranged in the both sides up and down of platform (1), two guide rails (2) Top be designed with supporting rack (13), slide plate (4) is equipped between frame (13) supported on both sides, the bottom of slide plate (4) is equipped with mechanical arm (3);Feeding cache lines (5) setting is equipped with the total electric energy error of indication of register and surveys in the right side of platform (1), the right end of platform (1) Die trial block (6), pulse feeding line (15) traverse are arranged in the centre of platform (1), and the both sides of feeding line (15) are respectively equipped with pulse Voltage test module (7), decaying Sasser immunity to interference test module (10), surge immunity test module (11), radiofrequency field sense The left end in platform is arranged in the conduction interference immunity to interference test module (12) answered, esd immunity test module (8), quickly Lower section of impulse train immunity to interference test module (9) setting in esd immunity test module (8) in passing.
  2. The performance testing platform 2. electric energy meter according to claim 1 is sampled, it is characterised in that:The bottom of support frame as described above (13) Portion is equipped with motor (14).
  3. The performance testing platform 3. electric energy meter according to claim 1 is sampled, it is characterised in that:It leads 1 both sides of the platform Rail (2) is mutually parallel with platform.
  4. The performance testing platform 4. electric energy meter according to claim 1 is sampled, it is characterised in that:The total electric energy of the register Error of indication test module (6) is high-low temperature chamber.
CN201820110319.3U 2018-01-23 2018-01-23 electric energy meter sampling performance testing platform Active CN207817188U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820110319.3U CN207817188U (en) 2018-01-23 2018-01-23 electric energy meter sampling performance testing platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820110319.3U CN207817188U (en) 2018-01-23 2018-01-23 electric energy meter sampling performance testing platform

Publications (1)

Publication Number Publication Date
CN207817188U true CN207817188U (en) 2018-09-04

Family

ID=63323543

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820110319.3U Active CN207817188U (en) 2018-01-23 2018-01-23 electric energy meter sampling performance testing platform

Country Status (1)

Country Link
CN (1) CN207817188U (en)

Similar Documents

Publication Publication Date Title
CN207164093U (en) A kind of electric capacity automatic testing equipment
CN103394565A (en) Semi-automatic bending equipment of work tips
CN201322796Y (en) Full-automatic standard apparatus of electric energy meter
CN204228064U (en) A kind of connector height measurer
CN213715390U (en) CCS detects frock
CN207817188U (en) electric energy meter sampling performance testing platform
CN108196219A (en) Intelligent electric energy meter sampling performance test automatic detection system
CN205691681U (en) A kind of electronic component multifunction flexible test machine
CN104502831A (en) Circuit board debugging and detecting system and application method thereof
CN207764368U (en) Intelligent electric energy meter sampling performance test automatic detection system
CN107192882A (en) A kind of fingerprint module automatic impedance-testing mechanism
CN204989372U (en) Half automatic test equipment that locking switch reliably switched on
CN208420983U (en) Device for testing circuit board function
CN204074564U (en) The detection sorting mechanism of moulding
CN205720629U (en) A kind of mutual inductor measuring test system with left and right handoff functionality
CN216979181U (en) Inductance coil detection jig
CN205982547U (en) Circuit board testing tool
CN205562747U (en) Automatic IC chip test fixture
CN210181091U (en) Full-automatic electric inspection tool
CN209471190U (en) BMS plate test fixture
CN204536276U (en) A kind of Low Voltage Electrical Apparatus ultrasonic nondestructive test Work fixing device
CN209416818U (en) More test positions mechanical arm for wiring board voltage-withstand test
CN206920556U (en) Full-automatic flexible-cable test equipment
CN102879693B (en) Auxiliary testing jig
CN206146625U (en) Cell -phone screen tool of nai aging testing

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant