CN207816968U - 大比例尺隧道模型试验开挖装置 - Google Patents

大比例尺隧道模型试验开挖装置 Download PDF

Info

Publication number
CN207816968U
CN207816968U CN201820316228.5U CN201820316228U CN207816968U CN 207816968 U CN207816968 U CN 207816968U CN 201820316228 U CN201820316228 U CN 201820316228U CN 207816968 U CN207816968 U CN 207816968U
Authority
CN
China
Prior art keywords
model
tunnel
bloom
support device
large scale
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820316228.5U
Other languages
English (en)
Inventor
吴梦军
曹鹏
方林
郭鸿雁
丁浩
张琦
胡学兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Merchants Chongqing Communications Research and Design Institute Co Ltd
Original Assignee
China Merchants Chongqing Communications Research and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Merchants Chongqing Communications Research and Design Institute Co Ltd filed Critical China Merchants Chongqing Communications Research and Design Institute Co Ltd
Priority to CN201820316228.5U priority Critical patent/CN207816968U/zh
Application granted granted Critical
Publication of CN207816968U publication Critical patent/CN207816968U/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

本实用新型涉及一种大比例尺隧道模型试验开挖装置,属于隧道勘探领域。该装置包括卸载装置和支撑装置;均设置在模型箱内;所述卸载装置由10块楔形不锈钢块组成,自上而下编号为I~X,彼此错缝咬合形成一个环形整体,钢块厚度为10cm,纵向长度与模型箱纵向尺寸保持一致,而且钢块拼成的环形整体外轮廓与开挖孔轮廓紧密贴合;所述支撑装置由两块长条形钢板组成,钢板重叠放置,在重叠处采用螺栓固定。本实用新型可以很好地模拟实际隧道开挖情况,开挖控制简单,当埋深较大时,模型箱边界对开挖土体的扰动小,对试验结果的准确性影响不大。

Description

大比例尺隧道模型试验开挖装置
技术领域
本实用新型属于隧道勘探领域,涉及大比例尺隧道模型试验开挖装置。
背景技术
随着我国经济建设的繁荣发展,交通隧道等基础设施建设的需求不断增加。隧道由于修建于地下,因地质作用和人为工程活动可能引起一系列工程地质灾害,如突水突泥、围岩坍塌、地面塌陷等,造成巨大人员伤亡和财产损失。因此采用模型试验研究隧道开挖时围岩变形规律,并据此分析推测现场实际状况是一种重要研究手段。
大比例尺模型试验可以更好地模拟实际隧道开挖情况,但存在着跨径大,开挖难以控制的问题,而且当埋深较大时,若采用手工开挖,模型箱边界对开挖土体的扰动较大,对试验结果的准确性影响较大。
实用新型内容
有鉴于此,本实用新型的目的在于提供一种大比例尺隧道模型试验开挖装置。
为达到上述目的,本实用新型提供如下技术方案:
大比例尺隧道模型试验开挖装置,包括卸载装置和支撑装置;均设置在模型箱内;
所述卸载装置由10块楔形不锈钢块组成,自上而下编号为I~X,彼此错缝咬合形成一个环形整体,钢块厚度为10cm,纵向长度与模型箱纵向尺寸保持一致,而且钢块拼成的环形整体外轮廓与开挖孔轮廓紧密贴合;
所述支撑装置由两块长条形钢板组成,钢板重叠放置,在重叠处采用螺栓固定。
本实用新型的有益效果在于:本实用新型可以很好地模拟实际隧道开挖情况,开挖控制简单,当埋深较大时,模型箱边界对开挖土体的扰动小,对试验结果的准确性影响不大。
附图说明
为了使本实用新型的目的、技术方案和有益效果更加清楚,本实用新型提供如下附图进行说明:
图1为模型试验开孔;
图2为模型试验开挖装置;
图3为楔形块开挖顺序。
具体实施方式
下面将结合附图,对本实用新型的优选实施例进行详细的描述。
图1为模型试验开孔;如图2所示,大比例尺隧道模型试验开挖装置,包括卸载装置和支撑装置;卸载装置由10块楔形不锈钢块组成,彼此错缝咬合形成一个环形整体,钢块厚度为10cm,纵向长度与模型箱纵向尺寸保持一致,而且钢块拼成的环形整体外轮廓与开挖孔轮廓紧密贴合;支撑装置由两块长条形钢板组成,钢板重叠放置,在重叠处采用螺栓固定。模拟隧道开挖时,将螺栓拧下,然后取掉钢板进行卸载。而且该装置可以满足不同开挖尺寸的隧道开挖模拟,当断面发生变化时,调整两块钢板重叠处长度,以调整支撑体的整体高度,进而支撑相应的楔形块。
如图3所示,本装置运作具体为:
(1)在进行隧道开挖模型试验时,当填料至开挖孔底部时,将该开挖装置放置与开挖孔处,使开挖装置外轮廓与开孔边缘紧密贴合,各楔形块错缝拼接完好;
(2)将支撑装置放置于中间开孔处,调整支撑装置钢板重叠长度,使其上部抵住Ⅰ楔形钢块,下部抵住Ⅶ楔形钢块,拧紧固定螺栓;
(3)在模型试验开孔外部继续填料并压实,填料直至试验所需高度;
(4)当进行开挖时,将支撑装置的固定螺栓取掉,此时发生卸载效应,取掉支撑钢板;
(5)然后,自上而下,依次按拼接顺序取掉楔形钢块,以完成隧道的开挖过程。
最后说明的是,以上优选实施例仅用以说明本实用新型的技术方案而非限制,尽管通过上述优选实施例已经对本实用新型进行了详细的描述,但本领域技术人员应当理解,可以在形式上和细节上对其作出各种各样的改变,而不偏离本实用新型权利要求书所限定的范围。

Claims (1)

1.大比例尺隧道模型试验开挖装置,其特征在于:包括卸载装置和支撑装置;均设置在模型箱内;
所述卸载装置由10块楔形不锈钢块组成,自上而下编号为I~X,彼此错缝咬合形成一个环形整体,钢块厚度为10cm,纵向长度与模型箱纵向尺寸保持一致,而且钢块拼成的环形整体外轮廓与开挖孔轮廓紧密贴合;
所述支撑装置由两块长条形钢板组成,钢板重叠放置,在重叠处采用螺栓固定。
CN201820316228.5U 2018-03-06 2018-03-06 大比例尺隧道模型试验开挖装置 Expired - Fee Related CN207816968U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820316228.5U CN207816968U (zh) 2018-03-06 2018-03-06 大比例尺隧道模型试验开挖装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820316228.5U CN207816968U (zh) 2018-03-06 2018-03-06 大比例尺隧道模型试验开挖装置

Publications (1)

Publication Number Publication Date
CN207816968U true CN207816968U (zh) 2018-09-04

Family

ID=63320620

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820316228.5U Expired - Fee Related CN207816968U (zh) 2018-03-06 2018-03-06 大比例尺隧道模型试验开挖装置

Country Status (1)

Country Link
CN (1) CN207816968U (zh)

Similar Documents

Publication Publication Date Title
Peng et al. Physical simulation of ground fissures triggered by underground fault activity
Yu et al. Surface settlement of subway station construction using pile-beam-arch approach
Peng et al. Field measurements and finite-element method simulation of a tunnel shaft constructed by pneumatic caisson method in Shanghai soft ground
Zhang et al. Cause investigation of damages in existing building adjacent to foundation pit in construction
Talmon et al. Calculation of longitudinal bending moment and shear force for Shanghai Yangtze River Tunnel: Application of lessons from Dutch research
CN103117020B (zh) 盾构隧道动态掘进诱发地层损失及地表沉陷试验装置
CN207730761U (zh) 一种模拟盾构隧道施工的试验装置
CN108625865A (zh) 一种模拟盾构隧道施工的试验方法
CN108303514B (zh) 一种用于模拟煤矿地下封闭空间的试验装置
CN105137488B (zh) 基于人工注液的地下水流场描述方法
CN105421461B (zh) 土岩地质条件下邻近既有隧道的建筑基坑开挖工法
Zhou et al. A 3D model of coupled hydro-mechanical simulation of double shield TBM excavation
CN110195598A (zh) 一种公路隧道施工一体化控制方法
Wang et al. The origin and impact of the Shizhuang ground fissure, Yingxian area, Datong Basin, China
CN102733812A (zh) 城市江底分岔段小净距隧道侧壁扩挖的隧道施工方法
CN107152038A (zh) 一种土工离心模型试验设备及开挖模拟方法
CN107724399A (zh) 中等富水地区开挖受限地段深基坑开挖施工的方法
Islam et al. Ground settlement caused by perpendicularly crossing twin tunnels, a parametric study
Liu et al. A new construction method for a metro station in Beijing
Li et al. Collapse mechanism and treatments of a deep tunnel in the weathered granite fault zone
CN107165640B (zh) 隧道及地下工程自稳修建法
CN207816968U (zh) 大比例尺隧道模型试验开挖装置
CN108333332A (zh) 大比例尺隧道模型试验开挖装置
CN207278251U (zh) 不同卸荷速率下围岩开挖响应测试结构
Zheng et al. SEM deformation prediction and observation by 3D numerical analysis

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180904

Termination date: 20210306

CF01 Termination of patent right due to non-payment of annual fee