CN207816968U - 大比例尺隧道模型试验开挖装置 - Google Patents
大比例尺隧道模型试验开挖装置 Download PDFInfo
- Publication number
- CN207816968U CN207816968U CN201820316228.5U CN201820316228U CN207816968U CN 207816968 U CN207816968 U CN 207816968U CN 201820316228 U CN201820316228 U CN 201820316228U CN 207816968 U CN207816968 U CN 207816968U
- Authority
- CN
- China
- Prior art keywords
- model
- tunnel
- bloom
- support device
- large scale
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
本实用新型涉及一种大比例尺隧道模型试验开挖装置,属于隧道勘探领域。该装置包括卸载装置和支撑装置;均设置在模型箱内;所述卸载装置由10块楔形不锈钢块组成,自上而下编号为I~X,彼此错缝咬合形成一个环形整体,钢块厚度为10cm,纵向长度与模型箱纵向尺寸保持一致,而且钢块拼成的环形整体外轮廓与开挖孔轮廓紧密贴合;所述支撑装置由两块长条形钢板组成,钢板重叠放置,在重叠处采用螺栓固定。本实用新型可以很好地模拟实际隧道开挖情况,开挖控制简单,当埋深较大时,模型箱边界对开挖土体的扰动小,对试验结果的准确性影响不大。
Description
技术领域
本实用新型属于隧道勘探领域,涉及大比例尺隧道模型试验开挖装置。
背景技术
随着我国经济建设的繁荣发展,交通隧道等基础设施建设的需求不断增加。隧道由于修建于地下,因地质作用和人为工程活动可能引起一系列工程地质灾害,如突水突泥、围岩坍塌、地面塌陷等,造成巨大人员伤亡和财产损失。因此采用模型试验研究隧道开挖时围岩变形规律,并据此分析推测现场实际状况是一种重要研究手段。
大比例尺模型试验可以更好地模拟实际隧道开挖情况,但存在着跨径大,开挖难以控制的问题,而且当埋深较大时,若采用手工开挖,模型箱边界对开挖土体的扰动较大,对试验结果的准确性影响较大。
实用新型内容
有鉴于此,本实用新型的目的在于提供一种大比例尺隧道模型试验开挖装置。
为达到上述目的,本实用新型提供如下技术方案:
大比例尺隧道模型试验开挖装置,包括卸载装置和支撑装置;均设置在模型箱内;
所述卸载装置由10块楔形不锈钢块组成,自上而下编号为I~X,彼此错缝咬合形成一个环形整体,钢块厚度为10cm,纵向长度与模型箱纵向尺寸保持一致,而且钢块拼成的环形整体外轮廓与开挖孔轮廓紧密贴合;
所述支撑装置由两块长条形钢板组成,钢板重叠放置,在重叠处采用螺栓固定。
本实用新型的有益效果在于:本实用新型可以很好地模拟实际隧道开挖情况,开挖控制简单,当埋深较大时,模型箱边界对开挖土体的扰动小,对试验结果的准确性影响不大。
附图说明
为了使本实用新型的目的、技术方案和有益效果更加清楚,本实用新型提供如下附图进行说明:
图1为模型试验开孔;
图2为模型试验开挖装置;
图3为楔形块开挖顺序。
具体实施方式
下面将结合附图,对本实用新型的优选实施例进行详细的描述。
图1为模型试验开孔;如图2所示,大比例尺隧道模型试验开挖装置,包括卸载装置和支撑装置;卸载装置由10块楔形不锈钢块组成,彼此错缝咬合形成一个环形整体,钢块厚度为10cm,纵向长度与模型箱纵向尺寸保持一致,而且钢块拼成的环形整体外轮廓与开挖孔轮廓紧密贴合;支撑装置由两块长条形钢板组成,钢板重叠放置,在重叠处采用螺栓固定。模拟隧道开挖时,将螺栓拧下,然后取掉钢板进行卸载。而且该装置可以满足不同开挖尺寸的隧道开挖模拟,当断面发生变化时,调整两块钢板重叠处长度,以调整支撑体的整体高度,进而支撑相应的楔形块。
如图3所示,本装置运作具体为:
(1)在进行隧道开挖模型试验时,当填料至开挖孔底部时,将该开挖装置放置与开挖孔处,使开挖装置外轮廓与开孔边缘紧密贴合,各楔形块错缝拼接完好;
(2)将支撑装置放置于中间开孔处,调整支撑装置钢板重叠长度,使其上部抵住Ⅰ楔形钢块,下部抵住Ⅶ楔形钢块,拧紧固定螺栓;
(3)在模型试验开孔外部继续填料并压实,填料直至试验所需高度;
(4)当进行开挖时,将支撑装置的固定螺栓取掉,此时发生卸载效应,取掉支撑钢板;
(5)然后,自上而下,依次按拼接顺序取掉楔形钢块,以完成隧道的开挖过程。
最后说明的是,以上优选实施例仅用以说明本实用新型的技术方案而非限制,尽管通过上述优选实施例已经对本实用新型进行了详细的描述,但本领域技术人员应当理解,可以在形式上和细节上对其作出各种各样的改变,而不偏离本实用新型权利要求书所限定的范围。
Claims (1)
1.大比例尺隧道模型试验开挖装置,其特征在于:包括卸载装置和支撑装置;均设置在模型箱内;
所述卸载装置由10块楔形不锈钢块组成,自上而下编号为I~X,彼此错缝咬合形成一个环形整体,钢块厚度为10cm,纵向长度与模型箱纵向尺寸保持一致,而且钢块拼成的环形整体外轮廓与开挖孔轮廓紧密贴合;
所述支撑装置由两块长条形钢板组成,钢板重叠放置,在重叠处采用螺栓固定。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820316228.5U CN207816968U (zh) | 2018-03-06 | 2018-03-06 | 大比例尺隧道模型试验开挖装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820316228.5U CN207816968U (zh) | 2018-03-06 | 2018-03-06 | 大比例尺隧道模型试验开挖装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207816968U true CN207816968U (zh) | 2018-09-04 |
Family
ID=63320620
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820316228.5U Expired - Fee Related CN207816968U (zh) | 2018-03-06 | 2018-03-06 | 大比例尺隧道模型试验开挖装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207816968U (zh) |
-
2018
- 2018-03-06 CN CN201820316228.5U patent/CN207816968U/zh not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Peng et al. | Physical simulation of ground fissures triggered by underground fault activity | |
Yu et al. | Surface settlement of subway station construction using pile-beam-arch approach | |
Peng et al. | Field measurements and finite-element method simulation of a tunnel shaft constructed by pneumatic caisson method in Shanghai soft ground | |
Zhang et al. | Cause investigation of damages in existing building adjacent to foundation pit in construction | |
Talmon et al. | Calculation of longitudinal bending moment and shear force for Shanghai Yangtze River Tunnel: Application of lessons from Dutch research | |
CN103117020B (zh) | 盾构隧道动态掘进诱发地层损失及地表沉陷试验装置 | |
CN207730761U (zh) | 一种模拟盾构隧道施工的试验装置 | |
CN108625865A (zh) | 一种模拟盾构隧道施工的试验方法 | |
CN108303514B (zh) | 一种用于模拟煤矿地下封闭空间的试验装置 | |
CN105137488B (zh) | 基于人工注液的地下水流场描述方法 | |
CN105421461B (zh) | 土岩地质条件下邻近既有隧道的建筑基坑开挖工法 | |
Zhou et al. | A 3D model of coupled hydro-mechanical simulation of double shield TBM excavation | |
CN110195598A (zh) | 一种公路隧道施工一体化控制方法 | |
Wang et al. | The origin and impact of the Shizhuang ground fissure, Yingxian area, Datong Basin, China | |
CN102733812A (zh) | 城市江底分岔段小净距隧道侧壁扩挖的隧道施工方法 | |
CN107152038A (zh) | 一种土工离心模型试验设备及开挖模拟方法 | |
CN107724399A (zh) | 中等富水地区开挖受限地段深基坑开挖施工的方法 | |
Islam et al. | Ground settlement caused by perpendicularly crossing twin tunnels, a parametric study | |
Liu et al. | A new construction method for a metro station in Beijing | |
Li et al. | Collapse mechanism and treatments of a deep tunnel in the weathered granite fault zone | |
CN107165640B (zh) | 隧道及地下工程自稳修建法 | |
CN207816968U (zh) | 大比例尺隧道模型试验开挖装置 | |
CN108333332A (zh) | 大比例尺隧道模型试验开挖装置 | |
CN207278251U (zh) | 不同卸荷速率下围岩开挖响应测试结构 | |
Zheng et al. | SEM deformation prediction and observation by 3D numerical analysis |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180904 Termination date: 20210306 |
|
CF01 | Termination of patent right due to non-payment of annual fee |