CN207812847U - A kind of high fire-retardance heat preservation color steel - Google Patents

A kind of high fire-retardance heat preservation color steel Download PDF

Info

Publication number
CN207812847U
CN207812847U CN201721600759.9U CN201721600759U CN207812847U CN 207812847 U CN207812847 U CN 207812847U CN 201721600759 U CN201721600759 U CN 201721600759U CN 207812847 U CN207812847 U CN 207812847U
Authority
CN
China
Prior art keywords
color steel
heat
wall
steel
insulation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721600759.9U
Other languages
Chinese (zh)
Inventor
宋高峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Luoyang Baisheng Color Steel Engineering Co Ltd
Original Assignee
Luoyang Baisheng Color Steel Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Luoyang Baisheng Color Steel Engineering Co Ltd filed Critical Luoyang Baisheng Color Steel Engineering Co Ltd
Priority to CN201721600759.9U priority Critical patent/CN207812847U/en
Application granted granted Critical
Publication of CN207812847U publication Critical patent/CN207812847U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Devices For Warming Or Keeping Food Or Tableware Hot (AREA)

Abstract

The utility model discloses a kind of high fire-retardances to keep the temperature color steel,Including the first color steel and the second color steel,The outer wall of first color steel and the second color steel is socketed with color steel substrate,The left side wall riveting of the coloured silk steel substrate has link slot,It is plugged with connecting pole at the center of the link slot outer wall,The inner cavity that first color steel and the second color steel surround is installed with honeycomb heat-insulation and heat-preservation case,The two side up and down of the honeycomb heat-insulation and heat-preservation box cavity is welded with two strengthening steel slabs,It is installed with buffering sponge plate at the center of the honeycomb heat-insulation and heat-preservation box cavity,The bottom of second color steel is fixedly connected with splash guard,The outer wall of the splash guard is socketed with heat transfer baffler,The bottom of the heat transfer baffler is fixedly connected with yielding rubber pad,The utility model enhances the anti-impact force of color steel buffering,Ensure color steel heat insulating ability by pacifying resistance wire and heat-insulation and heat-preservation case on device.

Description

A kind of high fire-retardance heat preservation color steel
Technical field
The utility model is related to color steel technical field, specially a kind of high fire-retardance keeps the temperature color steel.
Background technology
The more and more novel uniqueness of modern architecture moulding, it is at the same time also more harsh to the performance of roofing, both required Building materials are specious, again durable convenient, are convenient for in-site installation, color steel is high from heavy and light, intensity with it, becomes present usage amount Big wide construction material still needs have excellent flame retardant property and guarantor in being applied in the workshop of some particular/special requirements Warm nature energy, but in actual use, since its compressive property is poor, color steel is caused easily to damage, cause the heat preservation of color steel Performance declines, and is based on problem above, and we have proposed a kind of high fire-retardances to keep the temperature color steel.
Utility model content
The purpose of this utility model is to provide a kind of high fire-retardances to keep the temperature color steel, to solve to propose in above-mentioned background technology The problem of.
To achieve the above object, the utility model provides the following technical solutions:A kind of high fire-retardance heat preservation color steel, including the The outer wall of one color steel and the second color steel, first color steel and the second color steel is socketed with color steel substrate, the coloured silk steel The left side wall riveting of substrate has a link slot, and the left side wall of the link slot inner cavity is welded with power supply, in the link slot outer wall Connecting pole is plugged at the heart, the bottom of the connecting pole is socketed with sealing cap, bolt, the company are socketed at the top of the connecting pole The right side wall grafting having heaters of access slot, and heater runs through honeycomb heat-insulation and heat-preservation case, the inner cavity of the heater is fixedly mounted There is resistance wire, is welded with twisted plate in the top groove of the coloured silk steel substrate, first color steel and the second color steel surround Inner cavity recklessly be installed with honeycomb heat-insulation and heat-preservation case, the two side up and down of the honeycomb heat-insulation and heat-preservation box cavity is welded with two The madial wall of strengthening steel slab, two strengthening steel slabs is installed with deformation arc panel, the madial wall of the deformation arc panel It is welded with support column, buffering sponge plate is installed at the center of the honeycomb heat-insulation and heat-preservation box cavity, and buffer sponge plate The upper and lower ends of outer wall are fixedly connected with deformation arc panel, the left and right ends grafting of first color steel and the second color steel inner cavity There is connecting rod, and connecting rod is through the first color steel, strengthening steel slab, honeycomb heat-insulation and heat-preservation case, buffering sponge plate and the second color steel The bottom of plate, second color steel is fixedly connected with splash guard, and the outer wall of the splash guard is socketed with heat transfer baffler, institute The bottom for stating heat transfer baffler is fixedly connected with yielding rubber pad, and the power supply is electrically connected with heater.
Preferably, the outer wall of the color steel substrate is coated with electrostatic prevention film.
Preferably, the top outer wall of the connecting pole offers external screw thread, and the madial wall of the bolt offers internal thread.
Compared with prior art, the utility model has the beneficial effects that:The utility model passes through the first color steel, the second coloured silk Steel plate, the cooperation for buffering sponge plate and deformation arc panel enhance anti-impact force when color steel buffering, by pacifying on device Resistance wire and heat-insulation and heat-preservation case are filled to ensure the heat insulating ability of color steel, ensures the anti-flammability of color steel by the way that splash guard is arranged.
Description of the drawings
FIG. 1 is a schematic structural view of the utility model.
In figure:1, the first color steel, 2, color steel substrate, 3, twisted plate, 4, strengthening steel slab, 5, honeycomb heat-insulation and heat-preservation case, 6, Deformation arc panel, 7, support column, 8, buffering sponge plate, the 9, second color steel, 10, connecting rod, 11, link slot, 12, power supply, 13, Connecting pole, 14, sealing cap, 15, bolt, 16, heater, 1601, resistance wire, 17, splash guard, 18, heat transfer baffler, 19, subtract Shake rubber pad.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work The every other embodiment obtained, shall fall within the protection scope of the present invention.
Referring to Fig. 1, the utility model provides a kind of technical solution:A kind of high fire-retardance heat preservation color steel, including the first coloured silk The outer wall of steel plate 1 and the second color steel 9, first color steel, 1 and second color steel 9 is socketed with color steel substrate 2, the coloured silk steel The left side wall riveting of substrate 2 has link slot 11, the left side wall of 11 inner cavity of the link slot to be welded with power supply 12, the link slot 11 Connecting pole 13 is plugged at the center of outer wall, the bottom of the connecting pole 13 is socketed with sealing cap 14, the top of the connecting pole 13 It is socketed with bolt 15, the right side wall grafting having heaters 16 of the link slot 11, and heater 16 and runs through honeycomb heat-insulation and heat-preservation case 5, the inner cavity of the heater 16 is installed with resistance wire 1601, and bending is welded in the top groove of the coloured silk steel substrate 2 Plate 3, the inner cavity that first color steel, 1 and second color steel 9 surrounds are installed with honeycomb heat-insulation and heat-preservation case 5, the bee recklessly The two side up and down of 5 inner cavity of nest heat-insulation and heat-preservation case is welded with two strengthening steel slabs 4, and the madial wall of two strengthening steel slabs 4 is solid Dingan County is equipped with deformation arc panel 6, and the madial wall of the deformation arc panel 6 is welded with support column 7, the honeycomb heat-insulation and heat-preservation case 5 Buffering sponge plate 8 is installed at the center of inner cavity, and the upper and lower ends for buffering 8 outer wall of sponge plate are fixedly connected with deformation arc Plate 6, the left and right ends of 1 and second color steel of the first color steel, 9 inner cavity are plugged with connecting rod 10, and connecting rod 10 is through the One color steel 1, strengthening steel slab 4, honeycomb heat-insulation and heat-preservation case 5, buffering sponge plate 8 and the second color steel 9, second color steel 9 Bottom be fixedly connected with splash guard 17, the outer wall of the splash guard 17 is socketed with heat transfer baffler 18, the heat transfer resistance The bottom of partition board 18 is fixedly connected with yielding rubber pad 19, and the power supply 12 is electrically connected with heater 16.
Specifically, the electrostatic in air, the outer wall of the coloured silk steel substrate 2 are coated with electrostatic prevention film in order to prevent.
Specifically, in order to enable connecting pole 13 and bolt 15 are closer to link together, the connecting pole 13 Top outer wall offers external screw thread, and the madial wall of the bolt 15 offers internal thread.
Operation principle:The utility model is compound plane skylight, by being installed among the first plane skylight 1 and plane skylight 9 Strengthening steel slab 4, honeycomb heat-insulation and heat-preservation case 5 and buffering sponge plate 8 come the crushing resistance and heat insulating ability of intensifier, when utility model by When to weight, deformation arc panel 6 can deform upon, and so that deformation arc panel 6 is squeezed buffering sponge plate 8, squeezed for buffering, work as temperature When spending low, startup power supply 12 makes power supply 12 control the resistance wire 1601 in heater 16 and heats, makes honeycomb heat-insulation and heat-preservation case 5 Interior temperature increases, and prevents temperature to scatter and disappear with heat transfer baffler 18, it is ensured that the heat insulating ability of device is installed in the present invention Splash guard, make surname with it is novel can be fire-retardant.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is appreciated that can these embodiments be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (3)

1. a kind of high fire-retardance keeps the temperature color steel, including the first color steel(1)With the second color steel(9), first color steel(1) With the second color steel(9)Outer wall be socketed with color steel substrate(2), it is characterised in that:The coloured silk steel substrate(2)Left side wall riveting There is link slot(11), the link slot(11)The left side wall of inner cavity is welded with power supply(12), the link slot(11)In outer wall Connecting pole is plugged at the heart(13), the connecting pole(13)Bottom be socketed with sealing cap(14), the connecting pole(13)Top It is socketed with bolt(15), the link slot(11)Right side wall grafting having heaters(16), and heater(16)Through honeycomb every Hot incubator(5), the heater(16)Inner cavity be installed with resistance wire(1601), the coloured silk steel substrate(2)Top Twisted plate is welded in groove(3), first color steel(1)With the second color steel(9)The inner cavity surrounded is installed with recklessly Honeycomb heat-insulation and heat-preservation case(5), the honeycomb heat-insulation and heat-preservation case(5)The two side up and down of inner cavity is welded with two strengthening steel slabs(4), Two strengthening steel slabs(4)Madial wall be installed with deformation arc panel(6), the deformation arc panel(6)Madial wall It is welded with support column(7), the honeycomb heat-insulation and heat-preservation case(5)Buffering sponge plate is installed at the center of inner cavity(8), and it is slow Rush sponge plate(8)The upper and lower ends of outer wall are fixedly connected with deformation arc panel(6), first color steel(1)With the second color steel (9)The left and right ends of inner cavity are plugged with connecting rod(10), and connecting rod(10)Through the first color steel(1), strengthening steel slab(4)、 Honeycomb heat-insulation and heat-preservation case(5), buffering sponge plate(8)With the second color steel(9), second color steel(9)Bottom fix connect It is connected to splash guard(17), the splash guard(17)Outer wall be socketed with heat transfer baffler(18), the heat transfer baffler (18)Bottom be fixedly connected with yielding rubber pad(19), the power supply(12)With heater(16)Electrical connection.
2. a kind of high fire-retardance according to claim 1 keeps the temperature color steel, it is characterised in that:The coloured silk steel substrate(2)It is outer Wall is coated with electrostatic prevention film.
3. a kind of high fire-retardance according to claim 1 keeps the temperature color steel, it is characterised in that:The connecting pole(13)Top Outer wall offers external screw thread, the bolt(15)Madial wall offer internal thread.
CN201721600759.9U 2017-11-27 2017-11-27 A kind of high fire-retardance heat preservation color steel Expired - Fee Related CN207812847U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721600759.9U CN207812847U (en) 2017-11-27 2017-11-27 A kind of high fire-retardance heat preservation color steel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721600759.9U CN207812847U (en) 2017-11-27 2017-11-27 A kind of high fire-retardance heat preservation color steel

Publications (1)

Publication Number Publication Date
CN207812847U true CN207812847U (en) 2018-09-04

Family

ID=63333752

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721600759.9U Expired - Fee Related CN207812847U (en) 2017-11-27 2017-11-27 A kind of high fire-retardance heat preservation color steel

Country Status (1)

Country Link
CN (1) CN207812847U (en)

Similar Documents

Publication Publication Date Title
CN207812847U (en) A kind of high fire-retardance heat preservation color steel
CN207776188U (en) A kind of curtain wall aluminum veneer that environmental protection is heat-insulated
CN205259512U (en) Decoration hanging plate for outer wall of building
CN105882014A (en) Novel environment-friendly composite SMC board
CN208111939U (en) A kind of outer Special distribution cabinet of power room and mounting assembly
CN211899006U (en) Structure integration building heat preservation system
CN103422601A (en) Energy-saving waterproof curtain wall
CN204402266U (en) Industrial door demist window
CN207536518U (en) A kind of thermal insulation barrel for welding rods
CN209619540U (en) Heating energy-saving device
CN209179384U (en) A kind of novel calcium silicate board
CN207638214U (en) American Unit Substation babinet
CN204850893U (en) Multipurpose aluminum alloy window frame section bar
CN205705525U (en) A kind of novel environment friendly combination S MC plate
CN205210505U (en) Lampshade camera
CN205343964U (en) Electric heat wallboard for building
CN204983195U (en) Foam thermal insulation board of area accuse temperature function
CN203452236U (en) Energy-saving waterproof curtain wall
CN208685894U (en) A kind of roofing skylight structure
CN209104710U (en) Novel nylon sheathed cable
CN206769274U (en) A kind of fire-proof and thermal-insulation type aluminum veneer
CN213919927U (en) Polycrystal mullite fiber with strong fire resistance
CN207934220U (en) A kind of green building environment-friendly insulating wall
CN202866050U (en) Energy-saving double-glass high partition
CN202424859U (en) Protective cover of monitoring video camera capable of running in severely cold environment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180904

Termination date: 20191127