CN207805307U - A kind of multistage dust-removing recovery device of neodymium iron boron waste material processing - Google Patents

A kind of multistage dust-removing recovery device of neodymium iron boron waste material processing Download PDF

Info

Publication number
CN207805307U
CN207805307U CN201820041156.8U CN201820041156U CN207805307U CN 207805307 U CN207805307 U CN 207805307U CN 201820041156 U CN201820041156 U CN 201820041156U CN 207805307 U CN207805307 U CN 207805307U
Authority
CN
China
Prior art keywords
dust
recovery device
removing recovery
surge chamber
neodymium iron
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820041156.8U
Other languages
Chinese (zh)
Inventor
吴昊
李大宇
刘忠华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JI'AN XINTAI TECHNOLOGY Co Ltd
Original Assignee
JI'AN XINTAI TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JI'AN XINTAI TECHNOLOGY Co Ltd filed Critical JI'AN XINTAI TECHNOLOGY Co Ltd
Priority to CN201820041156.8U priority Critical patent/CN207805307U/en
Application granted granted Critical
Publication of CN207805307U publication Critical patent/CN207805307U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Cyclones (AREA)

Abstract

The utility model is related to a kind of neodymium iron boron waste materials to process multistage dust-removing recovery device, be related to scrap metal recovery technology field comprising the first dust-removing recovery device and the second dust-removing recovery device;First dust-removing recovery device includes main body and the first disposal box, and the main body wall periphery is equipped with water-cooled jacket;The body interior is equipped with upper surge chamber, dirt pocket and lower surge chamber successively from top to bottom;The lower surge chamber left side wall is equipped with flue dust import, and lower section is connected with the first disposal box, several filter elements are equipped in the dirt pocket;The upper surge chamber right side wall is equipped with exhanst gas outlet;Second dust-removing recovery device includes cyclone dust removal room and the second disposal box, and the cyclone dust removal room is connected to the exhanst gas outlet of upper surge chamber by connecting pipe, is connected with the second disposal box below the cyclone dust removal room, exhaust pipe is fitted in the cyclone dust removal room.The utility model has the function of multistage dedusting recycling, and efficient, is worthy to be popularized.

Description

A kind of multistage dust-removing recovery device of neodymium iron boron waste material processing
Technical field
The utility model is related to scrap metal recovery technology field more particularly to a kind of multistage dedustings of neodymium iron boron waste material processing Retracting device.
Background technology
In numerous permanent-magnet materials, because it is with high remanent magnetism, high-coercive force, height since Nd-Fe-B permanent magnet material self-discovery Magnetic energy product and as the outstanding person in permanent magnetism, be acknowledged as " king of permanent magnetism ".And because it has the advantages that high-energy density, and It is had been widely used in modern industry and electronic technology.Neodymium iron boron in process of production, to the end from the pretreatment of raw material Product testing, each procedure all inevitably will produce many waste materials for being rich in valuable element, therefore reinforce to neodymium iron The recycle of boron waste material, to economizing on resources, the overall economic efficiency for improving enterprise has practical significance.
It is mainly that alloy powder or bulk alloy also contain certain amount due to processing wire cutting in neodymium iron boron waste material Coolant, for the requirement except degreasing and extraction process, it is necessary to roasted, aoxidized to carrying out raw material, roasting oxidation mistake Cheng Zhong generates a large amount of black smoke and dust because of the burning containing greasy dirt and metal in waste material, and the recycling of this part flue dust determines The rate of recovery for the rare metal product of enterprise plays key effect to the economic benefit of enterprise, at the same handle recycling it is bad, it is right Environment also will produce significant impact.Currently, traditional way of recycling is exactly using the method for the water spray of single-stage, this deduster Dust removing effects are general, can not accomplish efficiently using for the energy, the rate of recovery only 85% or so.Therefore, we it is necessary to provide one kind The high new multistage dust-removing recovery device of organic efficiency.
Utility model content
In view of this, the purpose of this utility model is to provide a kind of dedusting recycling is simple and convenient, there is multistage dedusting to return Function is received, the high neodymium iron boron waste material of dedusting organic efficiency processes multistage dust-removing recovery device, while having recycled valuable metal, And reduce environmental pollution.
A kind of multistage dust-removing recovery device of neodymium iron boron waste material processing comprising the first dust-removing recovery device and the second dedusting are returned Receiving apparatus;First dust-removing recovery device includes main body and the first disposal box, and the main body wall periphery is equipped with water-cooled jacket, institute It states water-cooled jacket side wall side lower end and is equipped with water inlet, the water-cooled jacket sidewall upper opposite with side wall where water inlet is equipped with water outlet Mouthful;The body interior is equipped with upper surge chamber, dirt pocket and lower surge chamber successively from top to bottom;The lower surge chamber left side wall is set There are flue dust import, lower section to be connected with the first disposal box, several filter elements are equipped in the dirt pocket;The upper surge chamber is right Side wall is equipped with exhanst gas outlet;Second dust-removing recovery device includes cyclone dust removal room and the second disposal box, the cyclone dust removal Room is connected to the exhanst gas outlet of the upper surge chamber by connecting pipe, and the second disposal box is connected with below the cyclone dust removal room, It is fitted with exhaust pipe in the cyclone dust removal room.
Further, the filter element includes mounting plate and setting porous cartridge filter on a mounting board;The filtering Unit is arranged up and down multiple.
Further, the hole on the cartridge filter is gradually reduced from the bottom to top.
Further, it is equipped with dust-exhausting port I, the dust-exhausting port I below first disposal box and is equipped with electrically-controlled valve I.
Further, it is equipped with dust-exhausting port II, the dust-exhausting port II below second disposal box and is equipped with electrically-controlled valve II.
Further, the exhaust pipe includes inserting paragraph and exhaust section, and the exhaust section end is equipped with flue gas discharge opening.
Further, be equipped with filter layer in the exhaust section, the filter layer by PPS fibers, glass fibre, P84 fibers, Any one or more material composition in PTPE fibers.
Compared with the prior art, the advantageous effect that the utility model reaches includes:While having recycled valuable metal, and Reduce environmental pollution;Using the first dedusting recycling plus the second dedusting recycling setting, multistage dedusting recycling function is realized, greatly Improve efficiency of dust collection and the organic efficiency to rare metal;The setting of filter layer further removes the dust in flue gas, So that flue gas reaches discharge standard, the feature of environmental protection is strong.
Description of the drawings
Fig. 1 is the multistage dust-removing recovery device structural schematic diagram of neodymium iron boron waste material processing of the utility model embodiment.
Specific implementation mode
The utility model is described in detail below with reference to specific embodiments and the drawings.
Referring to Fig. 1, show a kind of embodiment of the utility model, a kind of multistage dedusting recycling of neodymium iron boron waste material processing Device 10 comprising the first dust-removing recovery device 20 and the second dust-removing recovery device 30, first dust-removing recovery device 20 is first The flue dust of larger particles in flue dust is filtered and is recycled, second dust-removing recovery device 30 is that dust-contained airflow is made to rotate Movement is detached from air-flow dust by means of centrifugal force, then makes dust landing recycling by gravity.First dedusting Retracting device 20 includes main body 21 and the first disposal box 22, and 21 sidewall periphery of the main body is equipped with water-cooled jacket 23, the water-cooled jacket 23 side wall lower ends are equipped with water inlet 24, and water-cooled jacket 23 sidewall upper opposite with 24 place side wall of water inlet is equipped with water outlet 25, The cooling water flowed in the water-cooled jacket 23 can cool down high-temperature flue gas, reduce the temperature of flue dust.In the main body 21 It is equipped with upper surge chamber 211, dirt pocket 212 and lower surge chamber 213 successively from top to bottom;213 left side wall of lower surge chamber is equipped with Flue dust import 26, lower section are connected with the first disposal box 22, and 22 are equipped with several filter elements 28 in the dirt pocket;It is described slow It rushes 211 right side wall of room and is equipped with exhanst gas outlet 27;Second dust-removing recovery device 30 includes cyclone dust removal room 31 and the second dust Case 32, the cyclone dust removal room 31 are connected to the exhanst gas outlet 27 of the upper surge chamber 211, the connecting pipe by connecting pipe 40 40 can import the flue dust after coarse filtration progress refined filtration and recycling in the second dust-removing recovery device 30, and second dedusting is returned Receiving apparatus 30 can filter more small dust, and efficiency of dust collection is very high.31 lower section of the cyclone dust removal room is connected with the second collection Dirt case 32 is fitted with exhaust pipe 33 in the cyclone dust removal room 31, which is inserted into 31 center of cyclone dust removal room, and away from Second dust-removing recovery device, 30 bottom end has a certain distance, and the flue gas after can processing is discharged.
Further, as the preferred of the present embodiment, the filter element 28 includes mounting plate 281 and is arranged in mounting plate Porous cartridge filter 282 on 281;The filter element 28 is arranged up and down multiple, and preferably 12-18 is a.
Further, as the preferred of the present embodiment, the hole on the cartridge filter 282 is gradually reduced from the bottom to top, is passed through The multilayer reduced step by step is arranged to filter step by step, greatly improves filter effect.
Further, as the preferred of the present embodiment, first disposal box, 22 lower section is equipped with dust-exhausting port I 221, described Dust-exhausting port I 221 is equipped with electrically-controlled valve I 222.
Further, as the preferred of the present embodiment, second disposal box, 32 lower section is equipped with dust-exhausting port II 321, described Dust-exhausting port II 321 is equipped with electrically-controlled valve II 322.
Further, as the preferred of the present embodiment, the exhaust pipe 33 includes inserting paragraph 321 and exhaust section 322, described 322 end of exhaust section is equipped with flue gas discharge opening 3211.
Further, as the preferred of the present embodiment, the exhaust section 322 is interior to be equipped with filter layer 3212, the filter layer 3212 be final step dust removal step, ensures that flue gas can reach discharge standard, the filter layer 3212 is by PPS fibers, glass Any one or more material composition in fiber, P84 fibers, PTPE fibers.
The operation principle of the utility model:When work, the flue dust of high temperature passes through the cigarette of the first dust-removing recovery device 20 first Dirt import 26 enters in lower surge chamber 213, then passes through the cooling effect of water-cooled jacket 23, and most of flue dust collides main body 21 Side wall and bottom and be collected into the first disposal box 22, the flue gas containing part dust is continued through containing filter element 28 Dirt pocket 212, after dust removal by filtration enter upper surge chamber 211, through dust removal by filtration, part flue dust is collected again;Then Flue gas comes out through exhanst gas outlet 27, and is entered in the second dedusting recovery room 31 by connecting pipe 40, carries out refined filtration whirlwind and removes Dirt falls in the second disposal box 32 through the flue dust that cyclonic separation is got off and stores, and then flue gas is using the mistake in exhaust pipe 33 Filtering layer 3312 carries out last filtering, after from flue gas discharge opening 3311 be discharged, in this way by multistage filtering dedusting, can reach non- Often good dust removing effects, make the flue gas of free from dust reach discharge standard;Finally open the electrically-controlled valve I 222 on dust-exhausting port I 221 With the electrically-controlled valve II 322 on dust-exhausting port II 321, flue dust is discharged from the first disposal box 22 and the second disposal box 32, is carried out Recycling.So far, the utility model aim is accomplished.
Above disclosed is only a kind of the utility model preferred embodiment, cannot limit this practicality with this certainly Novel interest field, therefore equivalent variations made according to the claim of the utility model still belong to what the utility model was covered Range.

Claims (7)

1. a kind of multistage dust-removing recovery device of neodymium iron boron waste material processing, it is characterised in that:Including the first dust-removing recovery device and Two dust-removing recovery devices;First dust-removing recovery device includes main body and the first disposal box, and the main body wall periphery is equipped with Water-cooled jacket, water-cooled jacket side wall side lower end are equipped with water inlet, the water-cooled jacket sidewall upper opposite with side wall where water inlet Equipped with water outlet;The body interior is equipped with upper surge chamber, dirt pocket and lower surge chamber successively from top to bottom;The lower surge chamber Left side wall is equipped with flue dust import, and lower section is connected with the first disposal box, several filter elements are equipped in the dirt pocket;On described Surge chamber right side wall is equipped with exhanst gas outlet;Second dust-removing recovery device includes cyclone dust removal room and the second disposal box, described Cyclone dust removal room is connected to the exhanst gas outlet of the upper surge chamber by connecting pipe, and second is connected with below the cyclone dust removal room Disposal box is fitted with exhaust pipe in the cyclone dust removal room.
2. the multistage dust-removing recovery device of neodymium iron boron waste material processing as described in claim 1, it is characterised in that:The filter element Including mounting plate and porous cartridge filter on a mounting board is set;The filter element is arranged up and down multiple.
3. the multistage dust-removing recovery device of neodymium iron boron waste material processing as claimed in claim 2, it is characterised in that:On the cartridge filter Hole be gradually reduced from the bottom to top.
4. the multistage dust-removing recovery device of neodymium iron boron waste material processing as described in claim 1, it is characterised in that:First dust It is equipped with dust-exhausting port I, the dust-exhausting port I below case and is equipped with electrically-controlled valve I.
5. the multistage dust-removing recovery device of neodymium iron boron waste material processing as described in claim 1, it is characterised in that:Second dust It is equipped with dust-exhausting port II, the dust-exhausting port II below case and is equipped with electrically-controlled valve II.
6. the multistage dust-removing recovery device of neodymium iron boron waste material processing as described in claim 1, it is characterised in that:The exhaust pipe packet Inserting paragraph and exhaust section are included, the exhaust section end is equipped with flue gas discharge opening.
7. the multistage dust-removing recovery device of neodymium iron boron waste material processing as claimed in claim 6, it is characterised in that:In the exhaust section Equipped with filter layer, the filter layer is by any one or more material in PPS fibers, glass fibre, P84 fibers, PTPE fibers Material composition.
CN201820041156.8U 2018-01-10 2018-01-10 A kind of multistage dust-removing recovery device of neodymium iron boron waste material processing Expired - Fee Related CN207805307U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820041156.8U CN207805307U (en) 2018-01-10 2018-01-10 A kind of multistage dust-removing recovery device of neodymium iron boron waste material processing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820041156.8U CN207805307U (en) 2018-01-10 2018-01-10 A kind of multistage dust-removing recovery device of neodymium iron boron waste material processing

Publications (1)

Publication Number Publication Date
CN207805307U true CN207805307U (en) 2018-09-04

Family

ID=63326805

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820041156.8U Expired - Fee Related CN207805307U (en) 2018-01-10 2018-01-10 A kind of multistage dust-removing recovery device of neodymium iron boron waste material processing

Country Status (1)

Country Link
CN (1) CN207805307U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111659220A (en) * 2020-06-22 2020-09-15 信丰县包钢新利稀土有限责任公司 Cloth bag dust removal device and dust removal method for waste gas of neodymium iron boron waste processing technology
CN112892056A (en) * 2021-01-26 2021-06-04 安徽金三隆再生资源有限公司 Neodymium iron boron waste material extract filter equipment

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111659220A (en) * 2020-06-22 2020-09-15 信丰县包钢新利稀土有限责任公司 Cloth bag dust removal device and dust removal method for waste gas of neodymium iron boron waste processing technology
WO2021258870A1 (en) * 2020-06-22 2021-12-30 信丰县包钢新利稀土有限责任公司 Bag dust removal device and method for process offgas of neodymium iron boron waste material processing
CN111659220B (en) * 2020-06-22 2022-02-18 信丰县包钢新利稀土有限责任公司 Cloth bag dust removal device and dust removal method for waste gas of neodymium iron boron waste processing technology
CN112892056A (en) * 2021-01-26 2021-06-04 安徽金三隆再生资源有限公司 Neodymium iron boron waste material extract filter equipment
CN112892056B (en) * 2021-01-26 2022-08-16 安徽金三隆再生资源有限公司 Neodymium iron boron waste material extract filter equipment

Similar Documents

Publication Publication Date Title
CN207805307U (en) A kind of multistage dust-removing recovery device of neodymium iron boron waste material processing
CN107377575A (en) Useless circuit board processing system and its processing method
CN106268156A (en) A kind of metal disintegrating machine dust arrester
CN110496691A (en) The recovery method of copper in a kind of old circuit board
CN105328115A (en) Reclaiming method for cast waste sand hot plasmas
CN205700002U (en) A kind of rare earth waste high-temperature smoke retracting device
CN219766026U (en) Dangerous waste treatment crushed aggregates recycling and sorting device convenient to collect dust
CN211513935U (en) Dust collector is used in compound brick production of carborundum
CN211676767U (en) Cloth bag dust removal device
CN206028299U (en) Abandonment circuit board comprehensive recovery utilization device
CN206631379U (en) A kind of environment-friendly type air dust separation equipment
CN206588264U (en) A kind of quick export mechanism of computer housing face component die processing waste material
CN205097056U (en) Sandblast two -stage separation device
CN202962209U (en) Metal powder crushing and screening combined type dust collection system
CN213559071U (en) Concrete raw material detects uses fly ash collection device
CN206793304U (en) A kind of dust-absorbing filtering device being used in circuit board substrate cutting action
CN203564929U (en) Dust removal system adopting two-stage filtering
CN207446751U (en) The classification processing structure of building waste
CN206153266U (en) Solid waste material multilevel processing equipment
CN219324282U (en) Dust removal mechanism
CN218890156U (en) Petroleum ether recycling device
CN213375532U (en) Ultra-clean dust remover
CN202893081U (en) Dedusting chamber
CN209204928U (en) Shot-blasting machine gas sampling processing unit
CN205236169U (en) Shot copper material edulcoration device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180904

Termination date: 20200110