CN207794748U - A kind of steel pipe pole ring flange apparatus for examination and repair - Google Patents

A kind of steel pipe pole ring flange apparatus for examination and repair Download PDF

Info

Publication number
CN207794748U
CN207794748U CN201721782459.7U CN201721782459U CN207794748U CN 207794748 U CN207794748 U CN 207794748U CN 201721782459 U CN201721782459 U CN 201721782459U CN 207794748 U CN207794748 U CN 207794748U
Authority
CN
China
Prior art keywords
steel pipe
ring flange
pipe pole
examination
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721782459.7U
Other languages
Chinese (zh)
Inventor
万兵
杜清波
范姚琦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Sichuan Electric Power Co Ltd
Original Assignee
State Grid Sichuan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Sichuan Electric Power Co Ltd filed Critical State Grid Sichuan Electric Power Co Ltd
Priority to CN201721782459.7U priority Critical patent/CN207794748U/en
Application granted granted Critical
Publication of CN207794748U publication Critical patent/CN207794748U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ladders (AREA)

Abstract

It is that fulcrum is mounted on the ring flange of steel pipe pole using the flange screw of ring flange upper surface the utility model discloses a kind of steel pipe pole ring flange apparatus for examination and repair, includes the connection structure being connect with flange screw and the maintenance ladder that is connect with connection structure;The open slot that opening is directed toward maintenance ladder is provided in the connection structure, the open slot is clamped with flange screw.The utility model has the beneficial effects that:It is that service personnel builds upkeep operation platform that the utility model, which can utilize the existing structure of steel pipe pole, enough space for maintenances, step activity space are provided for service personnel, be conducive to improve safety coefficient, ensure the personal safety of service personnel, it reduces and carries out working at height psychology negative effect caused by service personnel in small space, and the attachmentes such as pedal need not be pre-set, disclosure satisfy that the upkeep operation of old steel pipe pole.

Description

A kind of steel pipe pole ring flange apparatus for examination and repair
Technical field
It is specifically a kind of steel pipe pole ring flange apparatus for examination and repair the utility model is related to steel pipe pole maintenance field.
Background technology
Steel pipe pole utilization rate in the power transmission network of city is more and more.It is limited by the conditions such as processing, transporting, steel pipe rod segment is most Big design length control is within 12.0 meters.Each section of steel pipe pole is positioned using ring flange and is fixedly connected with screw, until reaching To required height.
《Aerial power transmission line Designing Steel Tube Pole technical stipulation(DL/T5130)》" manufacture and installation requirement " chapters and sections in, Installation suspension centre should be arranged by requiring nothing more than steel pipe pole, and the clip for facilitating construction should be arranged in failed call steel pipe pole.
And hang vertical assembling and maintenance repair work daily, it needs that the flange plate bolt of steel pipe pole is fastened and examined It looks into.Since flange disk diameter is too big, the human body radius of clean-up is had exceeded, and steel pipe pole itself is without the construction prewelding for supporting to stand Part so that service personnel can not be fastened and be examined to the flange plate bolt beyond human body operating radius routine by fixed cat ladder It repaiies, the flange plate bolt for checking and fastening steel pipe pole can not be also removed by conventional pole ascending operation method.
Excessive, safety belt failure that there are bar diameters by investigation, in existing steel pipe pole Inspection, personnel psychology factor, The normalities influence factor such as operating environment.And because of historical reasons, steel pipe pole continuously improves attachment in the fabrication process so that before The steel pipe pole of construction without meet personnel overhaul ring flange during personnel's erect-position, indexing iron fitting, lead to day-to-day operation process In the connection of the bolt of steel pipe pole is not easy to overhaul.
Utility model content
The purpose of this utility model is to provide a kind of steel pipe pole ring flange apparatus for examination and repair, utilize the structure of steel pipe pole itself It realizes and fixes, and working space that is safe and reliable, stablizing is provided for service personnel, reduce the difficulty of maintenance and improve and actively pacify Overall coefficient.
The utility model is achieved through the following technical solutions:A kind of steel pipe pole ring flange apparatus for examination and repair, with ring flange upper table The flange screw in face be fulcrum be mounted on steel pipe pole ring flange on, include the connection structure being connect with flange screw and with connect The maintenance ladder of structure connection;Be provided in the connection structure opening be directed toward maintenance ladder open slot, the open slot with Flange screw is clamped.This programme is attached using connection structure and flange screw to which maintenance ladder to be fixed on steel pipe pole, Safe maintenance environment is provided for service personnel using maintenance ladder.And the flange screw inherently having using steel pipe pole, and Other attachmentes need not be preset so that this programme is suitable for various steel pipe poles, increases the scope of application of this programme.
The connection structure includes interconnecting piece and the connecting hook that is arranged on interconnecting piece;The connecting hook is in J-type;Institute The maintenance ladder stated is fixedly connected with interconnecting piece;There are two the interconnecting piece settings, and the maintenance ladder is arranged to be connected at two Between portion.Using J-type connecting hook can make the contact area of connecting hook and flange screw side half and improve connecting hook with The bonding strength of flange screw, and be conducive to improve stability whole after this programme is installed.Two interconnecting pieces of setting also can Enough improve the bonding strength and stability of this programme and flange screw.
The interconnecting piece is hinged with connecting hook.Flange screw spacing on the ring flange of different-diameter is different, and spacing is solid Fixed connecting hook is difficult to adapt to the ring flange of different-diameter.Keep interconnecting piece and connecting hook hinged, can by adjust interconnecting piece with The angle of connecting hook adapts to the ring flange of different-diameter.Therefore the scope of application for improving this programme is conducive to reduce use Cost.
The lower support being connect with ring flange lower surface is provided in the maintenance ladder;The lower support with The following table plane-plane contact of ring flange.Maintenance ladder can be supported using lower support with this, so as to improve we The stability and resistance to capsizing of case.
It is provided with support base in the maintenance ladder;The lower support is slidably arranged on support base.Lower part branch Support member upper surface and the fixed words of connecting hook following table interplanar distance, it is difficult to meet ring flange with different thickness, make lower support Part is slidably arranged on support base, can be adjusted under lower support upper surface and connecting hook using the sliding of lower support The spacing on surface can improve the scope of application of this programme with this to adapt to the ring flange with different-thickness size.
It is threaded with adjusting screw on the support base;The adjusting screw is sequentially connected with lower support. It is convenient for providing chucking power using adjusting screw with this, makes lower support and connecting hook clamping flange disk, so as to improves this The bonding strength and stability of scheme and ring flange.
Support slot is provided on the support base, the lower support is arranged in support slot.Utilize support slot The position that lower support can be limited, the phenomenon that preventing lower support from loosening, to improve the stabilization of this programme Property and safety coefficient.
The lower support is rod-like piece, and the lower support is provided at both ends with towards opposite and under making The S-type protrusion of portion's support element, one of protrusion is towards the lower surface of ring flange, another protrusion is towards the bottom of support slot Face.
Direction supports the outer surface of the protrusion of groove bottom for cylindrical surface in the lower support, and the axis on cylindrical surface It is vertical with the length direction of lower support.
The maintenance ladder support element being connect with steel pipe pole is provided in the maintenance ladder.It is whole to be conducive to raising this programme with this The stability and rigidity of body.
The utility model compared with prior art, has the following advantages and advantageous effect:
It is that service personnel builds upkeep operation platform that the utility model, which can utilize the existing structure of steel pipe pole, to overhaul people Member provides enough space for maintenances, step activity space, is conducive to improve safety coefficient, ensures the personal safety of service personnel, It reduces and carries out working at height psychology negative effect caused by service personnel in small space, and pedal need not be pre-set Equal attachmentes, disclosure satisfy that the upkeep operation of old steel pipe pole.
Description of the drawings
Fig. 1 is the structural schematic diagram of this programme;
Fig. 2 is the vertical view of embodiment 2;
Fig. 3 is the structural schematic diagram that structure connects in embodiment 2;
Fig. 4 is the structural schematic diagram of embodiment 4;
Fig. 5 is the structural schematic diagram of embodiment 6;
Fig. 6 is the structural schematic diagram of embodiment 8;
Fig. 7 is the structural schematic diagram of maintenance ladder;
Fig. 8 is the structural schematic diagram of maintenance ladder support element in embodiment 10;
Fig. 9 is the structural schematic diagram of embodiment 10;
Wherein 1- steel pipe poles, 2- ring flanges, 3- flange screws, the connection of 4- structures, 41- connecting hooks, 42- interconnecting pieces, 43- inspections Repair ladder, 431- maintenance ladder support elements, 44- lower supports, 45- support bases, 46- adjusting screws.
Specific implementation mode
The utility model is described in further detail with reference to embodiment, but the embodiment of the utility model is not It is limited to this.
Embodiment 1:
As shown in Figure 1, Figure 7 shows, in the present embodiment, a kind of steel pipe pole ring flange apparatus for examination and repair, with the method for 2 upper surface of ring flange Blue screw 3 be fulcrum be mounted on steel pipe pole 1 ring flange 2 on, include the connection structure 4 being connect with flange screw 3 and with connect The maintenance ladder 43 that structure 4 connects.The open slot that opening is directed toward maintenance ladder 43 is provided in the connection structure 4, described opens Mouth slot is clamped with flange screw 3.This programme realizes connection structure 4 and flange screw 3 using open slot and the clamping of flange screw 3 Connection, and connection structure 4 under gravity, is made to be contacted with 2 upper surface of ring flange, maintenance ladder 43 is affected by gravity oriented The trend of lower movement, and connection structure 4 is pulled to be displaced outwardly along the radius of ring flange 2, using flange screw 3 blocking and The support of 2 upper surface of ring flange makes what this programme stablized to be mounted on ring flange 2, and is provided for service personnel using maintenance ladder 43 The maintenance environment of safety, enough space for maintenances, step activity space are provided for service personnel, are conducive to improve safety coefficient, Ensure the personal safety of service personnel.This programme utilizes the flange screw 3 that steel pipe pole 1 inherently has, without presetting it His attachment so that this programme is suitable for various steel pipe poles, increases the scope of application of this programme.
Embodiment 2:
As shown in Figure 2 and Figure 3, on the basis of the above embodiments, in the present embodiment, the connection structure 4 includes connection Portion 42 and the connecting hook 41 being arranged on interconnecting piece 42.The connecting hook 41 is in J-type.The maintenance ladder 43 and interconnecting piece 42 It is fixedly connected.Using J-type connecting hook 41 can make connecting hook 41 and 3 side half of flange screw contact area and the company of improving The bonding strength of hook 41 and flange screw 3 is connect, and is conducive to improve stability whole after this programme is installed.
There are two the settings of interconnecting piece 42, and the maintenance ladder 43 is arranged between two interconnecting pieces 42.Utilize two A interconnecting piece 42 connects the bonding strength that can improve this programme and flange screw 3 and surely from different flange screw 3 simultaneously It is qualitative.To improve the safety coefficient of this programme.In the present embodiment, the content phase of other parts not described and above-described embodiment Together, it therefore does not repeat.
Embodiment 3:
On the basis of above-described embodiment 2, in the present embodiment, the interconnecting piece 42 is hinged with connecting hook 41.It is different straight Flange screw 3 spacing on the ring flange 2 of diameter is different, and the fixed connecting hook of spacing 41 is difficult to adapt to the ring flange 2 of different-diameter. Keep interconnecting piece 42 hinged with connecting hook 41, different-diameter can be adapted to by adjusting the angle of interconnecting piece 42 and connecting hook 41 Ring flange 2.Therefore the scope of application for improving this programme is conducive to reduce use cost.In the present embodiment, what other were not described Part is identical as the content of above-described embodiment, therefore does not repeat.
Embodiment 4:
As shown in figure 4, on the basis of the above embodiments, in the present embodiment, it is provided in the maintenance ladder 43 and method The lower support 44 of 2 lower surface of blue disk connection.The following table plane-plane contact of the lower support 44 and ring flange 2.Work as people Member stands in maintenance ladder 43, can once increase the heavy burden of maintenance ladder 3, making maintenance ladder 3, there are one the trend deflected.By under setting Portion's support element 44 can be supported maintenance ladder 43 using lower support 44, to offset the trend of the deflection of maintenance ladder 43. The stability and resistance to capsizing of this programme can be improved with this.In the present embodiment, other parts not described and above-mentioned reality The content for applying example is identical, therefore does not repeat.
Embodiment 5:
On the basis of above-described embodiment 4, in the present embodiment, support base 45 is provided in the maintenance ladder 43.It is described Lower support 44 be slidably arranged on support base 45.44 upper surface of lower support is fixed with 41 following table interplanar distance of connecting hook If, it is difficult to meet ring flange 2 with different thickness, so that lower support 44 is slidably arranged on support base 45, Neng Gouli The spacing of 44 upper surface of lower support and 41 lower surface of connecting hook is adjusted with the sliding of lower support 44, to adapt to have The ring flange 2 for having different-thickness size, the scope of application of this programme can be improved with this.In the present embodiment, the sliding is set It is set to the customary means of those skilled in the art, the content combination common knowledge energy that those skilled in the art record according to this programme It enough realizes said effect, the concrete structure of sliding setting is not repeated herein.In the present embodiment, other parts not described It is identical as the content of above-described embodiment, therefore do not repeat.
Embodiment 6:
As shown in figure 5, on the basis of above-described embodiment 5, in the present embodiment, it is threaded on the support base 45 Adjusting screw 46.The adjusting screw 46 is sequentially connected with lower support 44.Utilized with this, the precession of adjusting screw 46 and Driving lower support 44 is screwed out to slide relative to support base 45.Chucking power is provided using adjusting screw 46, makes lower support 44 with 41 clamping flange disk 2 of connecting hook, so as to improve the bonding strength and stability of this programme and ring flange 2.This reality It applies in example, other parts not described are identical as the content of above-described embodiment, therefore do not repeat.
Embodiment 7:
On the basis of above-described embodiment 6, in the present embodiment, it is provided with support slot on the support base 45, it is described Lower support 44 is arranged in support slot.The position that lower support 44 can be limited using support slot, prevents lower support There is the phenomenon that loosening, being detached from part 44, to improve the stability and safety coefficient of this programme.In the present embodiment, other The part not described is identical as the content of above-described embodiment, therefore does not repeat.
Embodiment 8:
As shown in fig. 6, on the basis of above-described embodiment 7, in the present embodiment, the lower support 44 is rod-shaped zero Part, the lower support 44 are provided at both ends with towards protrusion that is opposite and keeping lower support 44 S-type, one of them Protrusion is towards the lower surface of ring flange 2, another protrusion is towards the bottom surface of support slot.The convex of direction support groove bottom is utilized with this Portion forms support, and ring flange 2 is resisted using towards the protrusion of 2 lower surface of ring flange, with this convenient for making lower support 44 from perpendicular Histogram exerts a force to ring flange 2, to improve the utilization rate of 46 provided clamping force of adjusting screw, is conducive to improve this programme Stability.In the present embodiment, other parts not described are identical as the content of above-described embodiment, therefore do not repeat.
Embodiment 9:
On the basis of above-described embodiment 8, in the present embodiment, towards support groove bottom in the lower support 44 The outer surface of protrusion is cylindrical surface, and the axis on cylindrical surface is vertical with the length direction of lower support 44.Using cylindrical surface with Support slot contacts so that the relative rotation of lower support 44 is more smooth.In the present embodiment, other parts not described with it is upper The content for stating embodiment is identical, therefore does not repeat.
Embodiment 10:
As shown in Figure 8, Figure 9, on the basis of the above embodiments, it in the present embodiment, is provided in the maintenance ladder 43 The maintenance ladder support element 431 being connect with steel pipe pole 1.It is contacted, is avoided the formation of hanging with steel pipe pole 1 using maintenance ladder support element 431 Structure can offset the trend of toppling of maintenance ladder 43, to be conducive to improve the stability and rigidity of this programme entirety.This reality It applies in example, other parts not described are identical as the content of above-described embodiment, therefore do not repeat.
Embodiment 11:
On the basis of above-described embodiment 10, in the present embodiment, the maintenance ladder support element 431 is hinged on maintenance ladder 43 On, it is convenient for according to maintenance ladder 43 and the spacing of steel pipe pole 1 adjustment maintenance ladder support element 431 to suitable angle, to suitable with this It should avoid the length of maintenance ladder support element 431 that from can not enough being contacted with steel pipe pole 1 with 1 structure of steel pipe pole of different tapers, Or the length of maintenance ladder support element 431 is excessive and cause this programme integral inclined so that bad stability.In the present embodiment, institute What is stated is hingedly the customary means of those skilled in the art, and the content that those skilled in the art record according to this programme is in conjunction with known in Common sense can realize said effect, not repeat herein hinged concrete structure.In the present embodiment, other portions not described It is point identical as the content of above-described embodiment, therefore do not repeat.
The above is only the preferred embodiment of the utility model, not does limit in any form to the utility model System, any simple modification made by the above technical examples according to the technical essence of the present invention, equivalent variations, each falls within Within the scope of protection of the utility model.

Claims (10)

1. a kind of steel pipe pole ring flange apparatus for examination and repair, with ring flange(2)The flange screw of upper surface(3)It is mounted on steel pipe for fulcrum Bar(1)Ring flange(2)On, it is characterised in that:Including with flange screw(3)The connection structure of connection(4)With with connection structure (4)The maintenance ladder of connection(43);The connection structure(4)On be provided with opening be directed toward maintenance ladder(43)Open slot, it is described Open slot and flange screw(3)Clamping.
2. a kind of steel pipe pole ring flange apparatus for examination and repair according to claim 1, it is characterised in that:The connection structure (4)Including interconnecting piece(42)With setting in interconnecting piece(42)On connecting hook(41);The connecting hook(41)In J-type;It is described Maintenance ladder(43)With interconnecting piece(42)It is fixedly connected;The interconnecting piece(42)There are two settings, the maintenance ladder(43) It is arranged in two interconnecting pieces(42)Between.
3. a kind of steel pipe pole ring flange apparatus for examination and repair according to claim 2, it is characterised in that:The interconnecting piece(42) With connecting hook(41)It is hinged.
4. a kind of steel pipe pole ring flange apparatus for examination and repair according to claim 1,2, any one of 3, it is characterised in that:It is described Maintenance ladder(43)On be provided with and ring flange(2)The lower support of lower surface connection(44);The lower support (44)With ring flange(2)Following table plane-plane contact.
5. a kind of steel pipe pole ring flange apparatus for examination and repair according to claim 4, it is characterised in that:The maintenance ladder(43) On be provided with support base(45);The lower support(44)It is slidably arranged in support base(45)On.
6. a kind of steel pipe pole ring flange apparatus for examination and repair according to claim 5, it is characterised in that:The support base(45) On be threaded with adjusting screw(46);The adjusting screw(46)With lower support(44)It is sequentially connected.
7. a kind of steel pipe pole ring flange apparatus for examination and repair according to claim 6, it is characterised in that:The support base(45) On be provided with support slot, the lower support(44)It is arranged in support slot.
8. a kind of steel pipe pole ring flange apparatus for examination and repair according to claim 7, it is characterised in that:The lower support (44)For rod-like piece, the lower support(44)Be provided at both ends with towards opposite and make lower support(44)In S The protrusion of type, one of protrusion is towards ring flange(2)Lower surface, another protrusion is towards the bottom surface of support slot.
9. a kind of steel pipe pole ring flange apparatus for examination and repair according to claim 8, it is characterised in that:The lower support (44)The outer surface of the upper protrusion towards support groove bottom is cylindrical surface, and the axis and lower support on cylindrical surface(44)Length It is vertical to spend direction.
10. a kind of steel pipe pole ring flange apparatus for examination and repair according to claim 1,2,3,5,6,7,8, any one of 9, special Sign is:The maintenance ladder(43)On be provided with and steel pipe pole(1)The maintenance ladder support element of connection(431).
CN201721782459.7U 2017-12-19 2017-12-19 A kind of steel pipe pole ring flange apparatus for examination and repair Expired - Fee Related CN207794748U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721782459.7U CN207794748U (en) 2017-12-19 2017-12-19 A kind of steel pipe pole ring flange apparatus for examination and repair

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721782459.7U CN207794748U (en) 2017-12-19 2017-12-19 A kind of steel pipe pole ring flange apparatus for examination and repair

Publications (1)

Publication Number Publication Date
CN207794748U true CN207794748U (en) 2018-08-31

Family

ID=63281503

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721782459.7U Expired - Fee Related CN207794748U (en) 2017-12-19 2017-12-19 A kind of steel pipe pole ring flange apparatus for examination and repair

Country Status (1)

Country Link
CN (1) CN207794748U (en)

Similar Documents

Publication Publication Date Title
CN207794748U (en) A kind of steel pipe pole ring flange apparatus for examination and repair
CN207453462U (en) Hang mould support device in cigarette air passage
CN104016220B (en) The adjustable handling suspension bracket of waste heat boiler module
CN210151984U (en) Be used for building antidetonation a gallows structure
CN208474662U (en) A kind of pipe-hanger support facilitating up and down adjustment
CN105060154B (en) Hang load formula transformer suspended fixing apparatus
CN215558334U (en) Auxiliary device for hoisting high-large-space long-distance pipeline
CN209427981U (en) A kind of clamping device for electromechanical equipment maintenance installation
CN208869184U (en) A kind of boom hoisting of gantry
CN209309469U (en) Adjustable type pipeline elevator
CN109599812B (en) Tubular bus suspension fitting
CN217082091U (en) Liftable spring supporting and hanging frame
CN210195311U (en) Safety rope fixing support
CN207113271U (en) A kind of thermal-collecting tube installation tool
CN206781568U (en) A kind of pre- assembling platform of bracket
CN215331828U (en) Cement pole anti-falling device
CN218005775U (en) Electromechanical spool gallows with adjustable antidetonation
CN208345634U (en) Electric pole is got on the bus hoisting bracket
CN207609152U (en) A kind of steel pipe pole flange bolt fastening operation holder
CN209876146U (en) Flat spring support hanger
CN205034887U (en) Portable electric power multiplexer utensil linkage
CN108972128A (en) A kind of device and method installed and adjusted for large-sized annular beveling machine
CN207253223U (en) A kind of dismountable stainless steel frame
CN215488059U (en) Novel antidetonation gallows
CN219429477U (en) Vertical hoisting equipment for concrete prefabricated part

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180831

Termination date: 20191219