CN207794155U - Pre-buried type bottom offset silk device - Google Patents

Pre-buried type bottom offset silk device Download PDF

Info

Publication number
CN207794155U
CN207794155U CN201820084838.7U CN201820084838U CN207794155U CN 207794155 U CN207794155 U CN 207794155U CN 201820084838 U CN201820084838 U CN 201820084838U CN 207794155 U CN207794155 U CN 207794155U
Authority
CN
China
Prior art keywords
displacement
silk
threaded connector
casing
connector coupling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820084838.7U
Other languages
Chinese (zh)
Inventor
刘军
刘苗
刘森炎
唐丽娟
刘抒豪
孙枫
高鹏
刘开模
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Central Engineering Equipment Technology Nantong Co Ltd
Original Assignee
Central Engineering Equipment Technology Nantong Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Central Engineering Equipment Technology Nantong Co Ltd filed Critical Central Engineering Equipment Technology Nantong Co Ltd
Priority to CN201820084838.7U priority Critical patent/CN207794155U/en
Application granted granted Critical
Publication of CN207794155U publication Critical patent/CN207794155U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Foundations (AREA)

Abstract

The utility model provides a kind of pre-buried type bottom offset silk device; including displacement Threaded Connector Coupling, displacement silk, displacement casing joint and displacement casing; the displacement Threaded Connector Coupling is used for fixed displacement silk; the displacement casing joint is used for fixed displacement casing, and the displacement sleeve pipe is freely up and down run for extraneous concrete protective displacement silk to be isolated in foundation pile.According to pre-buried type bottom offset silk device described in the utility model, for foundation pile self-balanced static-load testing, to solve that the installation of existing displacement pillar is complicated, material cost is high and displacement bar transmits shift perturbation greatly and the insecure technical problem of the big equal displacements transmission of steel strand wires displacement deformation of filament.

Description

Pre-buried type bottom offset silk device
Technical field
The utility model is related to build the detection device technical field of aspect, more particularly to a kind of pre-buried type bottom offset silk dress It sets.
Background technology
In recent years, it is more and more applied in the pile bearing capacity detection of bridge, skyscraper and port and pier engineering Self-balancing approach test for static load technology, the principle of the technology are loaded by the load box being embedded into foundation pile, first basis Material computation test pile bearing capacity and bearing capacity equalization point are surveyed in ground, special loading device-load box are then utilized, by steel reinforcement cage It is divided into after two sections are welded with load box upper and lower side respectively in embedment stake, while by the high-pressure oil pipe of load box and displacement pipe (bar) guides to ground, then pours into a mould pile, and from high-pressure oil pump, into load box, oil-filled load, load box pass power when static test It is delivered to pile body, the bearing capacity of epimere stake and the bearing capacity of hypomere stake balance each other to maintain to load, while being measured by gearshift Upward, the downward displacement of upper and lower section stake, pile bearing capacity is determined according to displacement and loaded value.
At present using the displacement transfer device master of load box when self-balancing approach progress bearingtest in conventional bored concrete pile To be that rigid displacement bar is placed in displacement pillar, as shown in Figure 3.Its implementation connects when being installation load box from load box Two groups of rigid displacement bars are drawn on fishplate bar, and displacement bar is protected in displacement pillar rear and steel reinforcement cage and is put into togerther in stake holes, Then concrete pile is poured into a mould, displacement bar is run up with load box upper junction plate the load of load box case at present, such as Fig. 4 institutes Show.However the displacement bar mounting material is of high cost, process is complex time-consuming, needs to weld intrinsic displacement bar, outer displacement pillar, and And be difficult control construction quality in the long test pile of stake, displacement bar and displacement pillar all can flexural deformation dislocation, displacement is transmitted will It is severely impacted, displacement bar increases with displacement pillar frictional force, and operational process generates disturbance, to can not really transmit position It moves, in some instances it may even be possible to the case where there is welding blow-by spillage, causing displacement that can not transmit at all.
In view of this, need to be improved the prior art, it is displacement transmitted to load box in bored concrete pile at present to meet Requirement.
Utility model content
Technical problem to be solved in the utility model is to overcome the deficiencies of the prior art and provide a kind of pre-buried type bottom offset Silk device is used for foundation pile self-balanced static-load testing, displacement bar material cost is high, installation is complicated to solve in existing bored concrete pile and It transmits unstable, is also easy to produce displacement and transmits insecure technical problem.
To achieve the above object, utility model provides the following technical solutions:
A kind of pre-buried type bottom offset silk device, including displacement Threaded Connector Coupling, displacement silk, displacement casing joint and displacement casing.
Further, it is integrated with displacement casing joint assembly after the displacement Threaded Connector Coupling installation sealing ring.
Further, the displacement silk penetrates in displacement casing, and remains a segment length at both ends;Also, the displacement Silk lower end is packed into fixed in the pilot hole of displacement Threaded Connector Coupling.
Further, the displacement Threaded Connector Coupling after connecting displacement silk for being mounted on load box lower connecting plate.
Further, the displacement casing joint is for connecting displacement Threaded Connector Coupling and displacement casing.
Further, the displacement casing is made of interior lubrication management, intermediate resistance to compression layer and outer side seal layer.
Description of the drawings
Fig. 1 is a kind of pre-buried type bottom offset silk device structural schematic diagram of the utility model embodiment;
Fig. 2 is a kind of pre-buried type bottom offset silk device application schematic diagram of the utility model embodiment;
Fig. 3 is the structural schematic diagram of bottom offset bar in the prior art;
Fig. 4 is the application schematic diagram of bottom offset bar in the prior art.
Reference sign:
1- rolling wheel supports;2- foundation pile beams;3- epimere stakes;31- epimere pile cages;4- tied silks;The pre-buried type bottom offset silks of 5- Device;51- displacement Threaded Connector Couplings;52- displacement silks;53- displacement casing joints;54- displacement casings;Lubrication management in 541-;In 542- Between resistance to compression layer;543- outer side seal layers;55- fluid sealants;56- sealing rings;6- load boxes;61- load box upper junction plates;62- liquid Cylinder pressure;63- load box lower connecting plates;7- hypomere stakes;71- hypomere pile cages;8- bottom offset bars;9- displacement pillars;91- displacements Pipe fitting.
(pay attention to:Shown structure in attached drawing simply to illustrate that utility model feature signal, be not intended to according to attached drawing Shown structure.)
Specific implementation mode
The utility model is described in further detail in the following with reference to the drawings and specific embodiments:
As shown in Figure 1, according to pre-buried type bottom offset silk device 5 described in the utility model, including displacement Threaded Connector Coupling 51, position Move silk 52, displacement casing joint 53 and displacement casing 54.
The displacement Threaded Connector Coupling 51 is cylinder, including the smaller epimere of diameter and the hypomere that is relatively large in diameter, wherein straight The smaller epimere of diameter have pilot hole, and on the outer periphery have accommodate sealing ring 56 recessed portion, install sealing ring 56 after with The assembly of displacement casing joint 53 is integrated.
Displacement Threaded Connector Coupling 51 is by withholding or being welded and fixed 52 lower end of connection displacement silk, displacement casing joint 53 and displacement silk 54 lower end of sealing fixed displacement casing, is then fitted into 6 lower part of load box after connector 51 connects.
The displacement silk 52 is flexible single steel wire, has certain tension deformability, the displacement silk 52 penetrates position It moves in casing 54, and a segment length is remained at both ends.Also, 52 lower end of the displacement silk is packed into the pilot hole of displacement Threaded Connector Coupling 51 Interior fixation.
The displacement Threaded Connector Coupling 51 after connecting displacement silk 52 for being mounted on load box lower connecting plate 63.
The displacement casing joint 53 is for connecting displacement Threaded Connector Coupling 51 and displacement casing 54.The displacement casing joint 53 For hollow circular pipe, inside can accommodate displacement Threaded Connector Coupling 51.
The sealing installation displacement of displacement casing joint 53 casing 54, and displacement casing joint 53 is easy-to-draw with displacement Threaded Connector Coupling 51 The sealed connection opened, when use, do not influence displacement Threaded Connector Coupling 51 and drive displacement silk 52 with load box lower connecting plate 63 to bottom offset.
The displacement casing 54 is made of interior lubrication management 541, intermediate resistance to compression layer 542 and outer side seal layer 543, is a kind of tool The flexible pipe of standby critical external compressive resistance and sealing function, being embedded in foundation pile concrete can ensure displacement silk 52 in displacement casing 54 up and down Free-running operation.
As shown in Fig. 2, in the concrete application of practice of construction, first by epimere pile cages 31 and load box upper junction plate 61 welding, hypomere pile cages 71 and load box lower connecting plate 63 are welded, and pre-buried type bottom offset silk device 5 is then passed through lotus The preformed hole for carrying case upper junction plate 61 is placed on load box lower connecting plate 63, then will be connected under displacement Threaded Connector Coupling 51 and load box 63 spot welding of plate is installed, and displacement casing joint 53 and 61 spot welding of load box upper junction plate is fixed, then by the displacement casing on top 54 (there is displacement silk 52 in inside) against epimere pile cages 31 a main reinforcement stretch along and with tied silk 4 interruption banding fixed, one It rises and is put into stake holes, until test pile top ground of extending out, then coils the displacement silk of remaining portion 52 and displacement casing 53 It neatly protects, you can cast concrete pile.
Remaining displacement silk 52 is stretched when being tested after the solidifying phase, is then attached on rolling wheel support 1, rolling wheel support 1 It is fixed on datum line beam 2, the displacements test equipments such as displacement meter is set up on datum line beam 2.It is generated respectively when load box 6, which loads, to be opened Displacement up and down, load box upper junction plate 61 are run up together with displacement casing joint 53, load box lower connecting plate 63 Displacement Threaded Connector Coupling 51 is driven to run down, and displacement silk 52 is then displaced by the traction of Threaded Connector Coupling 51 and runs down synchronous transmission load box 6 to bottom offset, simultaneous displacement Threaded Connector Coupling 51 has the stroke of one section of sealing with displacement casing joint 53, ensures displacement silk 52 not It can be interfered by substances such as extraneous silts, the interior lubrication management 541 of displacement casing 54 and the frictional force very little of displacement silk 52, displacement silk 6 bottom offset of load box accurately can be transferred to stake top by 52 in real time in displacement casing 54, and further be connected by rolling wheel support 1 It connects and passes to the bottom offset measurement reading that the completion of the displacements test equipment such as displacement meter loads every time, improve the real-time of displacement measurement And accuracy, so that self-balancing approach static test is become more reasonable effective detection technique, promotes the hair of foundation pile dead-load detection technology Exhibition.
According to a kind of pre-buried type bottom offset silk device described in the utility model, compared with existing displacement bar, have with Lower feature:
(1) material cost is saved, pre-buried displacement bar test needs to arrange that interior reinforcing bar or steel pipe, displacement pillar are also steel pipe, Wherein displacement bar and displacement pillar specification need to meet some strength requirement, and reinforcing bar and the conjunction of steel pipe off-gauge will produce when requiring and disturb Song deformation, therefore the displacement silk device of the remote over dimensioning specification very little of material cost;
(2) installation is simple and fast, and pre-buried type bottom offset silk device only needs a little to be welded on load box lower connecting plate, then will be whole Root include displacement silk displacement casing stretch with main reinforcement banding fixed, and displacement bar needs will often save displacement bar and pierce into displacement It places often to save in steel reinforcement cage after pillar and fix, the abutting joint for carrying out often saving displacement bar is needed when then steel reinforcement cage docks, then Displacement pillar is docked again, and working hour is long, complicated for operation;
(3) success rate is high, and pre-buried type bottom offset silk device has multi-layer sealed compressive property, can effectively ensure that displacement silk Normal operation, and the welding of displacement bar installation is limited by field condition, and the sealing welding quality of displacement pillar is difficult to control, behaviour The case where work is susceptible to the leakage phenomenons such as solder skip, slag inclusion accidentally, and displacement bar is caused to be closed, and experiment can not be carried out effectively;
(4) displacement is transmitted accurate and reliable, and pre-buried type displacement silk is single steel wire, and performance is good, light-weight, pliability is high can be with It stretches and does not generate secondary deformation, and is small with the lubrication pipe friction in displacement casing, displacement transmission is accurate sensitive, and displacement bar is conducted oneself with dignity Greatly, in displacement pillar there are flexural deformation, there is disturbance in when operation, and frictional force is big, and it is unreliable that displacement transmission is easily distorted.
The above, the only preferred embodiment of utility model, are not intended to limit the protection domain of utility model, It is all within the spirit and principle of utility model made by all any modification, equivalent and improvement etc., should be included in practical new Within the protection domain of type.

Claims (7)

1. a kind of pre-buried type bottom offset silk device (5), including displacement Threaded Connector Coupling (51), displacement silk (52), displacement casing joint (53) and displacement casing (54), it is characterised in that:
Displacement Threaded Connector Coupling (51) the installation sealing ring (56) is integrated with displacement casing joint (53) assembly afterwards;
The displacement silk (52) penetrates in displacement casing (54), and remains a segment length at both ends;Also, the displacement silk (52) Lower end is packed into fixed in the pilot hole of displacement Threaded Connector Coupling (51);
The displacement Threaded Connector Coupling (51) is mounted on load box lower connecting plate (63) afterwards for connecting displacement silk (52);
The displacement casing joint (53) is for connecting displacement Threaded Connector Coupling (51) and displacement casing (54);
The displacement casing (54) is made of interior lubrication management (541), intermediate resistance to compression layer (542) and outer side seal layer (543).
2. pre-buried type bottom offset silk device (5) according to claim 1, it is characterised in that:
The displacement Threaded Connector Coupling (51) is cylinder, including the smaller epimere of diameter and the hypomere that is relatively large in diameter, wherein in diameter Smaller epimere has pilot hole, and has the recessed portion for accommodating sealing ring (56) on the outer periphery.
3. pre-buried type bottom offset silk device (5) according to claim 2, it is characterised in that:
The displacement silk (52) is flexible single steel wire, has certain tension deformability.
4. pre-buried type bottom offset silk device (5) according to claim 3, it is characterised in that:
The displacement casing joint (53) be hollow circular pipe, inside can accommodate displacement Threaded Connector Coupling (51).
5. pre-buried type bottom offset silk device (5) according to claim 4, it is characterised in that:
Displacement Threaded Connector Coupling (51) is by withholding or being welded and fixed connection displacement silk (52) lower end, displacement casing joint (53) and displacement Fixed displacement casing (54) lower end is sealed after Threaded Connector Coupling (51) connection, is then fitted into load box (6) lower part.
6. pre-buried type bottom offset silk device (5) according to claim 5, it is characterised in that:
Displacement casing joint (53) sealing installation displacement casing (54), and displacement casing joint (53) is with displacement Threaded Connector Coupling (51) The sealed connection of Easy open, when use, do not influence displacement Threaded Connector Coupling (51) and drive displacement silk (52) with load box lower connecting plate (63) To bottom offset.
7. pre-buried type bottom offset silk device (5) according to claim 6, it is characterised in that:
The displacement casing (54) is a kind of flexible pipe having critical external compressive resistance and sealing function, and being embedded to can be true in foundation pile concrete Displacement silk (52) is protected freely up and down to run in displacement casing (54).
CN201820084838.7U 2018-01-18 2018-01-18 Pre-buried type bottom offset silk device Expired - Fee Related CN207794155U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820084838.7U CN207794155U (en) 2018-01-18 2018-01-18 Pre-buried type bottom offset silk device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820084838.7U CN207794155U (en) 2018-01-18 2018-01-18 Pre-buried type bottom offset silk device

Publications (1)

Publication Number Publication Date
CN207794155U true CN207794155U (en) 2018-08-31

Family

ID=63272835

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820084838.7U Expired - Fee Related CN207794155U (en) 2018-01-18 2018-01-18 Pre-buried type bottom offset silk device

Country Status (1)

Country Link
CN (1) CN207794155U (en)

Similar Documents

Publication Publication Date Title
CN111636898B (en) Shield segment stress testing device in connection channel construction process of shield tunnel
CN103926383B (en) Tunnel gushing water is dashed forward mud and Grouting three-dimensional model pilot system and test method thereof
CN103215974B (en) Foundation pile deflection measurement method based on distributed fiber sensing technique
CN206038341U (en) Test device of simulation tunnel internal water pressure
CN204738324U (en) Clump of piles basis single pile vertical bearing capacity detecting system
CN211315808U (en) Oil gas pipeline fault early warning and leakage monitoring system
CN102134860A (en) Self counter force balance loading test method of engineering pile bearing capacity
CN203011415U (en) Monitoring device suitable for using underground or under water
CN216664253U (en) Double-load-box test structure of ultra-long test pile
CN116677453A (en) Round TBM tunnel surrounding rock stability monitoring method and system
CN207794156U (en) Displacement silk device in pre-buried type
CN207794155U (en) Pre-buried type bottom offset silk device
CN102828533B (en) Vertical pressure resistance static load test pile head advanced processing node of cast-in-place pile and construction method
CN109029338A (en) A kind of embedded type concrete strain gauge means and its construction method
CN205718937U (en) Multinode overlength deep soils device based on acceleration transducer array
CN211042900U (en) Hollow model pile and pouring device thereof
CN105040752A (en) Foundation pile self-reaction force balance test integrated device
Zhong et al. Stress and deformation mechanism of jacking prestressed concrete cylinder pipe under axial jacking force
CN209277217U (en) Deposited reinforced concrete pile internal force test test tube
CN203881737U (en) Rack device for tunnel excavating and grouting model test
CN109914490A (en) A kind of club-footed pile vertical compression bearingtest system and method
CN204080780U (en) for tunnel earth pressure gauge embedding device
CN207685875U (en) Increase steady type load box
CN107247287B (en) Hydraulic support type microseismic sensor device
CN205718830U (en) Multinode overlength deep soils system based on RS485 bussing technique

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180831