CN207771664U - A kind of frock clamp of pipe clamp assembly - Google Patents

A kind of frock clamp of pipe clamp assembly Download PDF

Info

Publication number
CN207771664U
CN207771664U CN201820114817.5U CN201820114817U CN207771664U CN 207771664 U CN207771664 U CN 207771664U CN 201820114817 U CN201820114817 U CN 201820114817U CN 207771664 U CN207771664 U CN 207771664U
Authority
CN
China
Prior art keywords
pipe
welded
plate
clamp assembly
frock clamp
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820114817.5U
Other languages
Chinese (zh)
Inventor
曾文杰
鲁念军
周解明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Li You Auto Parts Co Ltd
Original Assignee
Zhejiang Li You Auto Parts Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Li You Auto Parts Co Ltd filed Critical Zhejiang Li You Auto Parts Co Ltd
Priority to CN201820114817.5U priority Critical patent/CN207771664U/en
Application granted granted Critical
Publication of CN207771664U publication Critical patent/CN207771664U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Clamps And Clips (AREA)

Abstract

The utility model provides a kind of frock clamp of pipe clamp assembly, including placement plate, and fixing pipe, telescopic rod, adjusting bolt, holding frame, hitching frame, movable stand, protective plate, hook, connecting rope and draw ring, the placement plate are bolted to the top of movable stand;The fixing pipe is welded on the right side of placement plate;The telescopic rod is plugged on the right side of fixing pipe;The adjusting bolt is threaded in the junction of fixing pipe and telescopic rod;The holding frame is bolted to the left and right sides on placement plate top;The hitching frame is bolted to the centre position on placement plate top.The U-shaped frame of the utility model, installing pipe, adjusting rod, the setting of baffle and spring are conducive to more convenient clamping pipe clamp assembly;The setting of support plate, supporting block, non-slip mat, mounting blocks, movable pulley and handle is conducive to more convenient Mobile tool fixture.

Description

A kind of frock clamp of pipe clamp assembly
Technical field
The utility model belongs to clamp art more particularly to a kind of frock clamp of pipe clamp assembly.
Background technology
Frock clamp is often used to that some component or product is clamped, to facilitate the assembly or fastening of product.Current tooling Fixture mostly has there are two fixture block, and two fixture blocks are typically to adjust the distance between two fixture blocks using screw drive and realize and clamp Article between two fixture blocks.This frock clamp in use, needs rotary screw when clamping article, causes to clamp It is complicated for operation, when especially the frequent clamping of progress is with operation is unclamped, working efficiency can be caused low.
But there is also be inconvenient to be clamped for existing frock clamp, it has not been convenient to move and be inconvenient to mount a variety of pipe clamp groups The problem of part.
Therefore, a kind of frock clamp of pipe clamp assembly is invented to be very necessary.
Utility model content
In order to solve the above-mentioned technical problem, the utility model provides a kind of frock clamp of pipe clamp assembly, existing to solve Frock clamp be inconvenient to be clamped, it has not been convenient to it is mobile and the problem of be inconvenient to mount a variety of pipe clamp assemblies.A kind of pipe clamp assembly Frock clamp, including placement plate, fixing pipe, telescopic rod, adjusting bolt, holding frame, hitching frame, movable stand, protective plate, hook, Connecting rope and draw ring, the placement plate are bolted to the top of movable stand;The fixing pipe is welded on the right side of placement plate Side;The telescopic rod is plugged on the right side of fixing pipe;The adjusting bolt is threaded in the company of fixing pipe and telescopic rod Meet place;The holding frame is bolted to the left and right sides on placement plate top respectively;The hitching frame, which is bolted to, to be put Set the centre position on plate top;The protective plate is welded on the right side of telescopic rod;The hook from left to right welds successively In the lower part of telescopic rod;The connecting rope is glued to the lower part of protective plate;The draw ring system is connected on the lower part of connecting rope;Institute The holding frame stated includes U-shaped frame, installing pipe, adjusting rod, baffle and spring, and the installing pipe is welded on U-shaped frame inner wall or so Adjusting rod described in the centre position of both sides is plugged on the inside of installing pipe;The baffle is welded among the inside of installing pipe Position;The spring one end is welded on the inner wall of U-shaped frame, and the other end is welded on the inside of baffle.
Preferably, the hitching frame includes support tube, connecting rod, fastening bolt, mounting plate and partition board, and the connecting rod is inserted It is connected on the top of support tube;The fastening bolt is threaded in the junction of support tube and connecting rod;The mounting plate weldering It is connected on the top of connecting rod;The partition board is from left to right welded on the top of mounting plate successively.
Preferably, the movable stand includes support plate, supporting block, non-slip mat, mounting blocks, movable pulley and handle, described Supporting block be welded on the lower left quarter of support plate;The non-slip mat is glued to the lower part of supporting block;The installation block welding In the right lower quadrant of support plate;The movable pulley is bolted to the lower part of mounting blocks;The handle welds successively from top to bottom It is connected on the left side of support plate.
Preferably, the handle is provided with protective jacket, and the protective jacket is socketed in the lower left quarter of handle.
Preferably, the spring is socketed on the outer wall of installing pipe and adjusting rod.
Preferably, the non-slip mat uses thickness for six millimeters to eight millimeters of silicagel pad.
Preferably, the protective jacket is specifically using the rubber sleeve with a word anti-skid chequer.
Preferably, the spring specifically uses the stainless steel spring of cylinder.
Compared with prior art, the beneficial effects of the utility model are:
1. in the utility model, the U-shaped frame, installing pipe, adjusting rod, the setting of baffle and spring is conducive to more Convenient clamping pipe clamp assembly.
2. in the utility model, the support plate, supporting block, non-slip mat, mounting blocks, the setting of movable pulley and handle, Be conducive to more convenient Mobile tool fixture.
3. in the utility model, the setting of the mounting plate and partition board is conducive to more convenient mounting pipe clamp.
4. in the utility model, the spring is socketed on the outer wall of installing pipe and adjusting rod, be conducive to more convenient It plays to the fixed effect of pipe clamp.
5. in the utility model, the non-slip mat uses thickness for six millimeters to eight millimeters of silicagel pad, is conducive to prevent Only supporting block is slided.
6. in the utility model, the protective jacket specifically using the rubber sleeve with a word anti-skid chequer, is conducive to prevent Handle falls off in the hand.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model.
Fig. 2 is the structural schematic diagram of the holding frame of the utility model.
Fig. 3 is the structural schematic diagram of the hitching frame of the utility model.
Fig. 4 is the structural schematic diagram of the movable stand of the utility model.
In figure:
1, placement plate;2, fixing pipe;3, telescopic rod;4, adjusting bolt;5, holding frame;51, U-shaped frame;52, installing pipe;53、 Adjusting rod;54, baffle;55, spring;6, hitching frame;61, support tube;62, connecting rod;63, fastening bolt;64, mounting plate;65, every Plate;7, movable stand;71, support plate;72, supporting block;73, non-slip mat;74, mounting blocks;75, movable pulley;76, handle;761, prevent Sheath;8, protective plate;9, it links up with;10, connecting rope;11, draw ring.
Specific implementation mode
The utility model is described further below in conjunction with attached drawing:
Embodiment:
As shown in attached drawing 1 to attached drawing 4
The utility model provides a kind of frock clamp of pipe clamp assembly, including placement plate 1, fixing pipe 2, and telescopic rod 3 is adjusted Bolt 4, holding frame 5, hitching frame 6, movable stand 7, protective plate 8, hook 9, connecting rope 10 and draw ring 11,1 spiral shell of placement plate Tether the top for being connected on movable stand 7;The fixing pipe 2 is welded on the right side of placement plate 1;The telescopic rod 3 is plugged on solid The right side of fixed tube 2;The adjusting bolt 4 is threaded in the junction of fixing pipe 2 and telescopic rod 3;The holding frame 5 divides It is not bolted to the left and right sides on 1 top of placement plate;The hitching frame 6 is bolted to the interposition on 1 top of placement plate It sets;The protective plate 8 is welded on the right side of telescopic rod 3;The hook 9 is from left to right welded under telescopic rod 3 successively Portion;The connecting rope 10 is glued to the lower part of protective plate 8;11 system of draw ring is connected on the lower part of connecting rope 10;Described Holding frame 5 includes U-shaped frame 51, installing pipe 52, adjusting rod 53, baffle 54 and spring 55, and the installing pipe 52 is welded on U-shaped frame Centre position at left and right sides of 51 inner walls;The adjusting rod 53 is plugged on the inside of installing pipe 52;The baffle 54 welds In the inside centre position of installing pipe 52;Described 55 one end of spring is welded on the inner wall of U-shaped frame 51, and the other end is welded on gear The inside of plate 54.
In above-described embodiment, specifically, the hitching frame 6 includes support tube 61, connecting rod 62, fastening bolt 63, installation Plate 64 and partition board 65, the connecting rod 62 are plugged on the top of support tube 61;The fastening bolt 63 is threaded in support The junction of pipe 61 and connecting rod 62;The mounting plate 64 is welded on the top of connecting rod 62;The partition board 65 from left to right according to The secondary top for being welded on mounting plate 64.
In above-described embodiment, specifically, the movable stand 7 includes support plate 71, supporting block 72, non-slip mat 73, installation Block 74, movable pulley 75 and handle 76, the supporting block 72 are welded on the lower left quarter of support plate 71;The non-slip mat 73 is glued In the lower part of supporting block 72;The mounting blocks 74 are welded on the right lower quadrant of support plate 71;The movable pulley 75 is bolted In the lower part of mounting blocks 74;The handle 76 is welded on the left side of support plate 71 successively from top to bottom.
In above-described embodiment, specifically, the handle 76 is provided with protective jacket 761, the protective jacket 761 is socketed in The lower left quarter of handle 76.
In above-described embodiment, specifically, the spring 55 is socketed on the outer wall of installing pipe 52 and adjusting rod 53.
In above-described embodiment, specifically, the non-slip mat 73 uses thickness for six millimeters to eight millimeters of silicagel pad.
In above-described embodiment, specifically, the protective jacket 761 is specifically using the rubber sleeve with a word anti-skid chequer.
In above-described embodiment, specifically, the spring 55 specifically uses the stainless steel spring of cylinder.
Operation principle
In the utility model, in use, pipe clamp is placed on the intermediate position of baffle 54 and baffle 54, or partition board 65 is hung over On stored, secondly do not use frock clamp when, using movable pulley 75 coordinate handle 76 frock clamp is moved, utilize Hook 9 can mount waste and old pipe clamp, and the setting of fixing pipe 2, telescopic rod 3 and adjusting bolt 4 can be according to the number of waste and old pipe clamp Amount is adjusted.
Using technical solution described in the utility model or those skilled in the art in technical solutions of the utility model Under inspiration, similar technical solution is designed, and reaches above-mentioned technique effect, is the protection model for falling into the utility model It encloses.

Claims (8)

1. a kind of frock clamp of pipe clamp assembly, which is characterized in that the frock clamp of the pipe clamp assembly includes placement plate (1), Gu Fixed tube (2), telescopic rod (3), adjusting bolt (4), holding frame (5), hitching frame (6), movable stand (7), protective plate (8), hook (9), connecting rope (10) and draw ring (11), the placement plate (1) are bolted to the top of movable stand (7);The fixation Pipe (2) is welded on the right side of placement plate (1);The telescopic rod (3) is plugged on the right side of fixing pipe (2);The adjusting spiral shell Bolt (4) is threaded in the junction of fixing pipe (2) and telescopic rod (3);The holding frame (5) is bolted to placement respectively The left and right sides on plate (1) top;The hitching frame (6) is bolted to the centre position on placement plate (1) top;Described is anti- Backplate (8) is welded on the right side of telescopic rod (3);The hook (9) is from left to right welded on the lower part of telescopic rod (3) successively; The connecting rope (10) is glued to the lower part of protective plate (8);Described draw ring (11) system is connected on the lower part of connecting rope (10);Institute The holding frame (5) stated includes U-shaped frame (51), installing pipe (52), adjusting rod (53), baffle (54) and spring (55), the peace Tubulature (52) is welded on the centre position at left and right sides of U-shaped frame (51) inner wall;The adjusting rod (53) is plugged on installing pipe (52) inside;The baffle (54) is welded on the inside centre position of installing pipe (52);Spring (55) one end weldering It is connected on the inner wall of U-shaped frame (51), the other end is welded on the inside of baffle (54).
2. the frock clamp of pipe clamp assembly as described in claim 1, which is characterized in that the hitching frame (6) includes support It manages (61), connecting rod (62), fastening bolt (63), mounting plate (64) and partition board (65), the connecting rod (62) are plugged on support tube (61) top;The fastening bolt (63) is threaded in the junction of support tube (61) and connecting rod (62);The peace Loading board (64) is welded on the top of connecting rod (62);The partition board (65) is from left to right welded on the upper of mounting plate (64) successively Portion.
3. the frock clamp of pipe clamp assembly as described in claim 1, which is characterized in that the movable stand (7) includes support Plate (71), supporting block (72), non-slip mat (73), mounting blocks (74), movable pulley (75) and handle (76), the supporting block (72) It is welded on the lower left quarter of support plate (71);The non-slip mat (73) is glued to the lower part of supporting block (72);The mounting blocks (74) it is welded on the right lower quadrant of support plate (71);The movable pulley (75) is bolted to the lower part of mounting blocks (74);It is described Handle (76) be welded on the left sides of support plate (71) successively from top to bottom.
4. the frock clamp of pipe clamp assembly as claimed in claim 3, which is characterized in that the handle (76) is provided with protection It covers (761), the protective jacket (761) is socketed in the lower left quarter of handle (76).
5. the frock clamp of pipe clamp assembly as described in claim 1, which is characterized in that the spring (55) is socketed in installation On the outer wall for managing (52) and adjusting rod (53).
6. the frock clamp of pipe clamp assembly as claimed in claim 3, which is characterized in that the non-slip mat (73) uses thickness For six millimeters to eight millimeters of silicagel pad.
7. the frock clamp of pipe clamp assembly as claimed in claim 4, which is characterized in that the protective jacket (761) is specifically adopted With the rubber sleeve with a word anti-skid chequer.
8. the frock clamp of pipe clamp assembly as described in claim 1, which is characterized in that the spring (55) is specifically using circle The stainless steel spring of column.
CN201820114817.5U 2018-01-24 2018-01-24 A kind of frock clamp of pipe clamp assembly Expired - Fee Related CN207771664U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820114817.5U CN207771664U (en) 2018-01-24 2018-01-24 A kind of frock clamp of pipe clamp assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820114817.5U CN207771664U (en) 2018-01-24 2018-01-24 A kind of frock clamp of pipe clamp assembly

Publications (1)

Publication Number Publication Date
CN207771664U true CN207771664U (en) 2018-08-28

Family

ID=63211241

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820114817.5U Expired - Fee Related CN207771664U (en) 2018-01-24 2018-01-24 A kind of frock clamp of pipe clamp assembly

Country Status (1)

Country Link
CN (1) CN207771664U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109066497A (en) * 2018-09-29 2018-12-21 贵州勇斌电线电缆有限公司 A kind of cable transferring head installation corrector

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109066497A (en) * 2018-09-29 2018-12-21 贵州勇斌电线电缆有限公司 A kind of cable transferring head installation corrector
CN109066497B (en) * 2018-09-29 2024-04-30 中钛线缆集团(贵州)有限公司 Cable adapter installation corrector

Similar Documents

Publication Publication Date Title
CN207810218U (en) A kind of adjustable pipe clamp holder
CN207771664U (en) A kind of frock clamp of pipe clamp assembly
CN208231170U (en) Long distance pipeline welds aligning tool
CN209943687U (en) Fixing device for indoor pipelines
CN208774545U (en) A kind of new energy car battery case base support device
CN205310232U (en) Stock anchor clamps of flip -chip radiation source
CN208528934U (en) A kind of machining universal bracket
CN207087216U (en) A kind of tool for welding fixture
CN202123382U (en) Milling fixture capable of clamping rapidly
CN212168646U (en) Steel pipe bending device
CN210189566U (en) Detection tool for automobile spare and accessory parts
CN209593958U (en) A kind of not damaged frock clamp of wiring board parts mounting process
CN202861814U (en) Installing support
CN214290498U (en) Hot stamping device of draw-bar box production
CN110354412A (en) A kind of portable transformer maintenance safety band suspension arrangement and application method
CN216780842U (en) Adjustable flange positioner
CN209273253U (en) A kind of follow-on clamping device for steel washer processing
CN218455072U (en) Pipeline protective sleeve device for automobile
CN213145594U (en) Natural gas line strutting arrangement
CN209960218U (en) Medical metal bottle and medical non-metal bottle clamping groove type fixing device
CN220610937U (en) Pipe bracket for spraying ductile cast iron pipe
CN208560540U (en) A kind of clamping device for radiator sheet end
CN209886996U (en) Automatic welding equipment with fixed clamping structure
CN215546406U (en) Fixing device for pipeline welding
CN219591855U (en) Prevent electrical equipment fixing device that punches

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180828

Termination date: 20220124