- CN207759898U CN207759898U CN201721499850.6U CN201721499850U CN207759898U CN 207759898 U CN207759898 U CN 207759898U CN 201721499850 U CN201721499850 U CN 201721499850U CN 207759898 U CN207759898 U CN 207759898U
- Authority
- CN
- China
- Prior art keywords
- strain insulator
- connecting plate
- mounting hole
- fixture
- series board
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000012211 strain insulator Substances 0.000 claims abstract description 39
- 239000004575 stone Substances 0.000 claims abstract description 18
- 238000009434 installation Methods 0.000 claims abstract description 17
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 17
- 238000010276 construction Methods 0.000 claims abstract description 7
- 230000000994 depressogenic effect Effects 0.000 claims description 3
- 238000010586 diagram Methods 0.000 description 5
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 description 2
- 230000007547 defect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000000007 visual effect Effects 0.000 description 1
Landscapes
- Insulators (AREA)
Abstract
The utility model is related to power construction equipment technical fields, are related to a kind of strain insulator-string clamping and hoisting tool.It includes that stone tongs includes fixture interconnecting piece, and a fixture lifting portion is equipped at fixture interconnecting piece;Fixture interconnecting piece includes the first connecting plate, and the opposite both ends of the first connecting plate are vertically bent respectively to form the second connecting plate and third connecting plate to the same side;Installation card slot is collectively formed in first connecting plate, the second connecting plate and third connecting plate, and installation card slot is for being arranged at the bottom edge of strain insulator series board;Fixture lifting portion is set at the back side of third connecting plate, and fixture lifting portion includes the first reinforcing plate and the second reinforcing plate of orthogonal setting;Along installation card slot extending direction setting, the first reinforcing plate is located at one end at nearly installation card channel opening and is equipped with ring mounting hole second reinforcing plate, and a hanging ring is equipped at ring mounting hole.The utility model can preferably realize the lifting to strain insulator-string.
Description
Technical field
The utility model is related to power construction equipment technical fields, specifically, being related to a kind of strain insulator-string clamping and hoisting tool.
Background technology
Strain insulator-string hangs conducting wire to shaft tower for hanging conducting wire to bear wire tension.In power construction, strain insulator
String needs to lift to installation point.In the prior art, it there is no the tool for being exclusively used in that strain insulator-string being fixed in lifting.
Utility model content
The content of the utility model is to provide a kind of strain insulator-string clamping and hoisting tool, can overcome the prior art certain or
Certain defects.
Strain insulator-string clamping and hoisting tool according to the present utility model comprising the hanging clamp for coordinating with strain insulator series board
Tool, stone tongs include integrally formed fixture interconnecting piece, and a fixture lifting portion is equipped at fixture interconnecting piece;Fixture interconnecting piece packet
The first connecting plate is included, the opposite both ends of the first connecting plate are vertically bent respectively to form the second connecting plate to the same side and are connected with third
Plate;Installation card slot is collectively formed in first connecting plate, the second connecting plate and third connecting plate, and installation card slot is for being arranged in strain insulator-string
At the bottom edge of yoke plate;Second connecting plate and third connecting plate correspond at the first mounting hole being set at strain insulator series board bottom edge
It is equipped with the second mounting hole, stone tongs passes through the connection bolt also cross corresponding first mounting hole and the second mounting hole
It is connect with strain insulator series board;Fixture lifting portion is set at the back side of third connecting plate, and fixture lifting portion includes the of orthogonal setting
One reinforcing plate and the second reinforcing plate;Second reinforcing plate is located at nearly installation card along installation card slot extending direction setting, the first reinforcing plate
One end at channel opening is equipped with ring mounting hole, and a hanging ring is equipped at ring mounting hole.
In the utility model, so as to have preferable intensity, first reinforces for the design of fixture interconnecting piece integral type
The setting of plate and the second reinforcing plate can preferably increase the intensity in fixture lifting portion, so that stone tongs can integrally have
Standby preferable intensity, so as to preferably meet construction requirement.Also, the design of the first mounting hole and the second mounting hole, makes
Detachable connection can be carried out by connecting bolt with strain insulator series board by obtaining stone tongs, thereby using convenient and operation spirit
It is living.At the same time, the design of hanging ring so that stone tongs can preferably be coordinated with suspender.
Preferably, the first mounting hole is equipped with two rows, often row is 4 and is arranged along strain insulator series board bottom edge interval.
So that can have preferably bonding strength between stone tongs and strain insulator series board.
Preferably, hanging ring is made of one piece and integrally constructed " u "-shaped, hanging ring both ends are equipped with hanging ring mounting portion,
Bearing pin mounting hole is equipped in the middle part of hanging ring mounting portion;Hanging ring by one also cross ring mounting hole and bearing pin mounting hole connecting pin
It is located at fixture lifting portion, connection axis pin and ring mounting hole clearance fit, connection axis pin are interference fitted with bearing pin mounting hole.
The design of hanging ring integral type is so as to have preferable self-strength, so as to preferably meet construction requirement.Connection
Axis pin is interference fitted with bearing pin mounting hole, so that hanging ring can be more firmly set at fixture lifting portion.Connect axis pin with
Ring mounting hole clearance fit, so that hanging ring can have preferably activity surplus, consequently facilitating lifting.
Preferably, the integrally constructed isosceles triangle shape of strain insulator series board, strain insulator series board is located at vertex and is equipped with use
In the hole for hoist coordinated with suspender, strain insulator series board is located at the portion that hangs being equipped at the both ends of bottom edge for hanging strain insulator-string, hangs
If portion both sides are depressed in the respective side of strain insulator series board.Hanging for strain insulator series board can be used in hanging strain insulator-string at portion,
It can be used in being coordinated with suspender at hole for hoist and stone tongs, so as to preferably realize the lifting to strain insulator-string.
Wherein, the setting of hole for hoist makes, when the strain insulator-string to reduced size lifts, can not install stone tongs, at this time
Suspender directly coordinates with hole for hoist, thereby using convenient.Wherein, when the strain insulator-string to large-size lifts, Neng Gouan
Stone tongs is filled, suspender is coordinated with stone tongs at this time, so as to preferably increase the stroke of hanging point side, consequently facilitating
Construction.
Preferably, hanging the hangers for being formed at portion and protruding from strain insulator series board bottom edge, it is equipped at hangers and runs through hangers
Hanging hole.Consequently facilitating strain insulator-string is hung.
Description of the drawings
Fig. 1 is the schematic diagram of the strain insulator series board in embodiment 1;
Fig. 2 is the schematic diagram of the stone tongs in embodiment 1;
Fig. 3 is the schematic diagram at another visual angle of the stone tongs in embodiment 1;
Fig. 4 is the schematic diagram of the hanging ring in embodiment 1;
Fig. 5 is the schematic diagram of the adapter in embodiment 1.
Specific implementation mode
To further appreciate that the content of the utility model, the utility model is described in detail in conjunction with the accompanying drawings and embodiments.
It should be understood that embodiment be only to the utility model explain and and it is non-limiting.
Embodiment 1
Present embodiments provide a kind of strain insulator-string clamping and hoisting tool comprising for being hung with what strain insulator series board 100 coordinated
A kind of strain insulator-string clamping and hoisting tool of clamps 200, the present embodiment can preferably realize the lifting to strain insulator-string.
As shown in Figure 1,100 integrally constructed isosceles triangle shape of strain insulator series board, strain insulator series board 100 are located at apex angle
Place is equipped with the hole for hoist 110 for coordinating with suspender, and strain insulator series board 100, which is located at the both ends of bottom edge, to be equipped with for hanging strain insulator
String hangs portion 120;Strain insulator series board 100 is located at bottom edge center equipped with the jig-attachment part for installing stone tongs 200
130, jig-attachment part 130 includes at least one the first mounting hole 131 through strain insulator series board 100.
In the present embodiment, the first mounting hole 131 is equipped with two rows, and often row is 4 and along 100 bottom edge of strain insulator series board
Interval setting.
In the present embodiment, the respective side that 120 both sides of portion are depressed in strain insulator series board 100 is hung.
In the present embodiment, the hangers 121 for being formed at portion 120 and protruding from 100 bottom edge of strain insulator series board, hangers 121 are hung
Place is equipped with the hanging hole 121a through hangers 121.
As shown in Figures 2 and 3, stone tongs 200 includes integrally formed fixture interconnecting piece 210, is set at fixture interconnecting piece 210
There is a fixture lifting portion 220;Fixture interconnecting piece 210 includes the first connecting plate 211, and the opposite both ends of the first connecting plate 211 are to same
Side is vertically bent respectively to form the second connecting plate 212 and third connecting plate 213;First connecting plate 211, the second connecting plate 212
Installation card slot 215 is collectively formed with third connecting plate 213, installation card slot 215 is used to be arranged in the bottom edge of strain insulator series board 100
Place;Second connecting plate 212 and third connecting plate 213 correspond to and are equipped with the second mounting hole 214, hanging clamp at the first mounting hole 131
Tool 200 passes through the connection bolt and strain insulator series board also cross 131 and second mounting hole 214 of corresponding first mounting hole
100 connections;Fixture lifting portion 220 is set at the back side of third connecting plate 213, and fixture lifting portion 220 includes the of orthogonal setting
One reinforcing plate 221 and the second reinforcing plate 222;Second reinforcing plate 222 is along installation 215 extending direction of card slot setting, the first reinforcing plate
221 one end for being located at nearly installation 215 opening of card slot are equipped with ring mounting hole 223, and a hanging ring is equipped at ring mounting hole 223
400。
As shown in figure 4, hanging ring 400 is made of one piece and integrally constructed " u "-shaped, 400 both ends of hanging ring are equipped with hanging ring
Mounting portion 410,410 middle part of hanging ring mounting portion are equipped with bearing pin mounting hole 411;Hanging ring 400 is by one also cross ring mounting hole
223 and the connecting pin of bearing pin mounting hole 411 be located at fixture lifting portion 220, connection axis pin and 223 gap of ring mounting hole
Cooperation, connection axis pin are interference fitted with bearing pin mounting hole 411.
When being coordinated with strain insulator-string, strain insulator-string is set strain insulator series board 100 in the present embodiment by an adapter 500
At the portion that hangs 120.
As shown in figure 5, adapter 500 includes adapter pedestal 510,510 both sides of adapter pedestal are respectively equipped with the first company
Joint chair 520 and the second connecting seat 530.First connecting seat, 520 middle part is equipped with the first card slot 521, and 530 middle part of the second connecting seat is equipped with
The extending direction of second card slot 531, the first card slot 521 and the second card slot 531 is mutually orthogonal.The is equipped at first connecting seat 520
One axis hole 522 is equipped with the second axis hole 532 at second connecting seat 530.
The present embodiment the first card slot 521 or the second card slot 531 can be stuck at hangers 121, can be incited somebody to action by bolt later
Adapter 500 is set at hangers 121.Strain insulator-string can be also set to by bolt at the second card slot 531 or the first card slot 521, from
And preferably realize the cooperation of strain insulator-string and strain insulator series board 100.
Schematically the utility model and embodiments thereof are described above, description is not limiting, attached drawing
Shown in also be the utility model one of embodiment, actual structure is not limited to this.So if this field
Those of ordinary skill enlightened by it, without deviating from the purpose of the present invention, not inventively design
Frame mode similar with the technical solution and embodiment, all should belong to the protection range of the utility model.
Claims (5)
1. strain insulator-string clamping and hoisting has, it is characterised in that:Including the stone tongs for being used to coordinate with strain insulator series board (100)
(200), stone tongs (200) includes integrally formed fixture interconnecting piece (210), and a fixture is equipped at fixture interconnecting piece (210)
Lifting portion (220);Fixture interconnecting piece (210) includes the first connecting plate (211), and the opposite both ends of the first connecting plate (211) are to same
Side is vertically bent respectively to form the second connecting plate (212) and third connecting plate (213);First connecting plate (211), the second connection
Installation card slot (215) is collectively formed in plate (212) and third connecting plate (213), and installation card slot (215) is for being arranged in strain insulator series connection
At the bottom edge of plate (100);Second connecting plate (212) and third connecting plate (213) are corresponding through set on strain insulator series board (100) bottom
The second mounting hole (214) is equipped at the first mounting hole (131) at side, stone tongs (200) is by also cross corresponding
The first mounting hole (131) and the connection bolt of the second mounting hole (214) connect with strain insulator series board (100);Fixture lifting portion
(220) it is set at the back side of third connecting plate (213), fixture lifting portion (220) includes the first reinforcing plate (221) of orthogonal setting
With the second reinforcing plate (222);Second reinforcing plate (222) is along installation card slot (215) extending direction setting, the first reinforcing plate (221)
It is equipped with ring mounting hole (223) positioned at one end of nearly installation card slot (215) opening, ring mounting hole is hung at (223) equipped with one
Ring (400).
2. strain insulator-string clamping and hoisting tool according to claim 1, it is characterised in that:First mounting hole (131) is equipped with two rows,
Often row is 4 and is arranged along strain insulator series board (100) bottom edge interval.
3. strain insulator-string clamping and hoisting tool according to claim 1, it is characterised in that:Hanging ring (400) be made of one piece and
Integrally constructed " u "-shaped, hanging ring (400) both ends are equipped with hanging ring mounting portion (410), pin are equipped in the middle part of hanging ring mounting portion (410)
Shaft mounting hole (411);Hanging ring (400) by one also cross ring mounting hole (223) and bearing pin mounting hole (411) connecting pin
It is located at fixture lifting portion (220), connection axis pin and ring mounting hole (223) clearance fit, connection axis pin are installed with axis pin
Hole (411) is interference fitted.
4. strain insulator-string clamping and hoisting tool according to claim 1, it is characterised in that:Strain insulator series board (100) overall construction
At isosceles triangle shape, strain insulator series board (100) is located at vertex equipped with the hole for hoist (110) for coordinating with suspender, strain insulator
Series board (100) is located to be equipped at the both ends of bottom edge hangs portion (120) for hang strain insulator-string, and it is equal to hang portion (120) both sides
It is depressed in the respective side of strain insulator series board (100).
5. strain insulator-string clamping and hoisting tool according to claim 1, it is characterised in that:It hangs and is formed with protrusion at portion (120)
Hangers (121) in strain insulator series board (100) bottom edge is equipped with the hanging hole (121a) through hangers (121) at hangers (121).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721499850.6U CN207759898U (en) | 2017-11-13 | 2017-11-13 | Strain insulator-string clamping and hoisting has |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721499850.6U CN207759898U (en) | 2017-11-13 | 2017-11-13 | Strain insulator-string clamping and hoisting has |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207759898U true CN207759898U (en) | 2018-08-24 |
Family
ID=63188607
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721499850.6U Active CN207759898U (en) | 2017-11-13 | 2017-11-13 | Strain insulator-string clamping and hoisting has |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207759898U (en) |
-
2017
- 2017-11-13 CN CN201721499850.6U patent/CN207759898U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204823667U (en) | Steel sheet lifts by crane with couple | |
CN109095343A (en) | Assembled hanger | |
CN207759898U (en) | Strain insulator-string clamping and hoisting has | |
CN102381623B (en) | Special lifting tool for circuit breaker | |
CN204597384U (en) | Aluminium hydraulic pressed connecting pipe adjuster | |
CN206569904U (en) | A kind of suspender for lifting steel plate | |
CN209242475U (en) | A kind of suspender | |
CN210366642U (en) | Large-scale bearing hanging device | |
CN202897773U (en) | Combined balance beam | |
CN208948679U (en) | Assembled hanger | |
CN110155871A (en) | Wall bushing hoisting tooling | |
CN206457161U (en) | A kind of heat treatment suspender | |
CN202449717U (en) | Rotatable lifting tool for clutch inner core | |
CN207483230U (en) | A kind of fixed A seating electric block | |
CN214828330U (en) | Vertical lifting appliance | |
CN210528278U (en) | Lifting appliance of gantry crane | |
CN210214532U (en) | Connecting device for engine lifting appliance and bracket | |
CN208648544U (en) | A kind of horizontal hoisting fixture of H profile steel | |
CN211694136U (en) | Device for installing ceiling electric appliance | |
CN203434522U (en) | Dedicated tool for positioning and installation of cross arm | |
CN207451425U (en) | A kind of pure electric vehicle battery bracket installs auxiliary lifting appliance | |
CN210577528U (en) | Cable bridge frame | |
CN210950409U (en) | Convenient stifled cap of dismantling | |
CN211619736U (en) | Novel lifting device for assembly type building construction | |
CN212893435U (en) | Oil drum lifting appliance |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |