CN207759835U - A kind of medium-and-large-sized cable reel pay-off equipment - Google Patents
A kind of medium-and-large-sized cable reel pay-off equipment Download PDFInfo
- Publication number
- CN207759835U CN207759835U CN201721661059.0U CN201721661059U CN207759835U CN 207759835 U CN207759835 U CN 207759835U CN 201721661059 U CN201721661059 U CN 201721661059U CN 207759835 U CN207759835 U CN 207759835U
- Authority
- CN
- China
- Prior art keywords
- support base
- cable reel
- standpipe
- medium
- column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model proposes a kind of medium-and-large-sized cable reel pay-off equipments, support device including being symmetricly set on cable reel both sides, every collateral support arrangement includes pedestal and is fixed on the column of the base side, the column includes two standpipes, the first support base and the second support base that can be moved axially along the standpipe are cased between two standpipes, first support base is located at the lower section of second support base, every standpipe is equipped with multiple pin holes in the axial direction, first support base is fixed on by the axis pin coordinated with the pin hole on the column, first support base is equipped with the jacking apparatus for jacking second support base, the cable reel is rotatably installed in by shaft on second support base.Compared with prior art, the utility model mechanism is simple, can realize cable reel jacking at the construction field (site) and move freely, improve the efficiency of cable laying, increase the safety of construction, have substantive features and progress.
Description
Technical field
The utility model is related to cable installation Technology field, especially a kind of medium-and-large-sized cable reel pay-off equipment.
Background technology
In electromechanical work progress, need to lay a large amount of large-diameter cables, such cable usually requires to coil in cable in advance
On disk, cable reel is integrally then transported to building site again.When construction, need manpower or mechanical equipment that cable reel is transferred to working face
It laid, cut again afterwards, finally carry out cable laying and follow-up work.Since cable disk diameter is big, weight after cable is wound
Can bigger, move at the construction field (site) very inconvenient, on the one hand need a large amount of manpower, it is less economical;On the other hand, due to moving
Dynamic inconvenience, greatly influences speed of application, reduces unwrapping wire efficiency.Therefore, it is badly in need of a kind of cable reel unwrapping wire being moved easily
Equipment.
Utility model content
For deficiencies of the prior art, the utility model proposes a kind of medium-and-large-sized cable reel pay-off equipment, solutions
The certainly prior art inconvenient problem of cable reel movement in cable laying work progress.
What the technical solution of the utility model was realized in:A kind of medium-and-large-sized cable reel pay-off equipment, including symmetrically set
The support device in cable reel both sides is set, every collateral support arrangement includes pedestal and is fixed on the column of the base side, described
Column includes two standpipes, and the first support base that can be moved axially along the standpipe and the second support are cased between two standpipes
Seat, first support base are located at the lower section of second support base, and every standpipe is equipped with multiple pin holes in the axial direction, described
First support base is fixed on by the axis pin coordinated with the pin hole on the column, and first support base is equipped with for pushing up
The jacking apparatus of second support base is risen, the cable reel is rotatably installed in by shaft on second support base.When around
When thering is the cable reel of cable to be transported to construction site, shaft is passed through into cable disk center first, and shaft is rotatably installed in second
On support base;Then the first support base and the second support base are moved up simultaneously, axis pin is used in combination to fix the first support base by pin hole;
Then start jacking apparatus, the second support base is jacked up, cable reel is made to leave ground to suitable position;Finally by axis pin and pin
The second support base is fixed in hole.Cable reel can be freely rotated after being jacked up on the second support base, to facilitate cable laying.
The jacking apparatus is jack.It is respectively equipped with jack on the column of both sides, ensures the stationarity of jacking.
The pedestal is equipped with universal wheel, and the pay-off equipment is facilitated to move freely on construction ground.
First support base includes the first noumenon, the first noumenon both ends set there are two it is parallel and with the standpipe phase
Matched first post holes, the jacking apparatus are fixed between two first post holes.Standpipe is penetrated in the first post holes, the
One support base can be moved along standpipe axis.
Second support base include the second ontology, second ontology both ends set there are two it is parallel and with the standpipe phase
Matched second post holes is equipped with bearing block between two second post holes, bearing is equipped in the bearing block.In use,
Standpipe is penetrated in the second post holes, the second support base can be moved along standpipe axis.Shaft is inserted into bearing, electricity can be made
Cable disk can be freely rotated by shaft on the second support base after being jacked up, and further improve the safety of cable reel and steady
It is qualitative.
The standpipe is used with the pedestal and is welded and fixed, and reinforcing rib is equipped between the standpipe and the pedestal.
In order to further facilitate pay-off equipment movement, handle is equipped with above the column.
Compared with existing cable disk, the utility model mechanism is simple, can realize cable reel jacking and oneself at the construction field (site)
By moving, the efficiency of cable laying is improved, the safety of construction is increased, has substantive features and progress.
Description of the drawings
It, below will be to attached drawing needed in embodiment description in order to illustrate more clearly of the utility model embodiment
It is briefly described, it should be apparent that, the accompanying drawings in the following description is only some embodiments of the utility model, for ability
For the those of ordinary skill of domain, without creative efforts, it can also be obtained according to these attached drawings other attached
Figure.
Fig. 1 is a kind of medium-and-large-sized cable reel pay-off equipment structure diagram of the utility model;
Fig. 2 is a kind of medium-and-large-sized cable reel pay-off equipment left view of the utility model;
Fig. 3 is the first seat structure schematic diagram;
Fig. 4 is the second seat structure schematic diagram.
It is marked in figure, 1, pedestal;2, standpipe;3, axis pin;4, the first support base;5, shaft shaft;6, cable reel;7, second
Support base;8, jacking apparatus;9, pin hole;10, universal wheel;11, handle;12, column;13, reinforcing rib;14, the first noumenon;15、
First post holes;16, the second ontology;17, the second post holes;18, bearing block;19, bearing.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without creative efforts
The every other embodiment obtained, shall fall within the protection scope of the present invention.
In figure, which is divided into symmetrical two parts, is respectively placed in the two of cable reel 6
Side.Include pedestal 1 and column 12 per part, include two standpipes 2 per heel post 12, every standpipe 2 is welded on pedestal 1
On, in order to improve safety, reinforcing rib 13 is equipped between standpipe 2 and pedestal 1.Every standpipe 2 is uniformly opening up in the axial direction
Multiple pin holes 9.In order to facilitate mobile and carrying, universal wheel 10 is equipped with below pedestal, 12 top of column is equipped with handle 11.
First support base 4 includes the first noumenon 14, and 14 both ends of the first noumenon set that there are two parallel and match with standpipe 2
First post holes 15, jacking apparatus 8 are fixed between two the first post holes 15, which can be used hand jack.Second
Support base 7 includes the second ontology 16, and 16 both ends of the second ontology are set there are two the second post holes 17 that is parallel and matching with standpipe 2,
It is equipped with bearing block 18 between two the second post holes 17, bearing 19 is installed in bearing block 18.
In use, standpipe 2 is penetrated the first post holes 15 and the second post holes 17 successively, that is to say, that ensure the first support base 4
Positioned at the lower section of the second support base 7, and jacking apparatus 8 is between the first support base 4 and the second support base 7.When being wound with cable
Cable reel 6 when being transported to construction site, shaft 5 is sequentially passed through into a side bearing 19, the center of cable reel 6 and another side axle first
Hold 19;Then the first support base 4 and the second support base 7 are moved up simultaneously, and axis pin 3 is inserted into the pin hole 9 below the first support base
It is interior, the first support base 4 is fixed;Then start jacking apparatus 8, the second support base 7 is jacked up, so that cable reel 6 is left ground and arrives
Suitable position;The second support base 7 is fixed finally by the pin hole 9 of 7 lower section of axis pin 3 and the second support base.Cable reel 6 is jacked up
After can be freely rotated in bearing 19 by shaft 5, to facilitate cable laying.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this
Within the spirit and principle of utility model, any modification, equivalent replacement, improvement and so on should be included in the utility model
Protection domain within.
Claims (7)
1. a kind of medium-and-large-sized cable reel pay-off equipment, it is characterised in that:Support including being symmetricly set on cable reel (6) both sides fills
It sets, support device includes pedestal (1) and the column (12) for being fixed on the pedestal (1) side, the column (12) described in every side
Including two standpipes (2), be cased between two standpipes (2) the first support base (4) that can be moved axially along the standpipe (2) and
Second support base (7), first support base (4) are located at the lower section of second support base (7), and every standpipe (2) is along axis
Direction is equipped with multiple pin holes (9), and first support base (4) is fixed on described by the axis pin (3) coordinated with the pin hole (9)
On column (12), first support base (4) is equipped with the jacking apparatus (8) for jacking second support base (7), described
Cable reel (6) is rotatably installed in by shaft (5) on second support base (7).
2. a kind of medium-and-large-sized cable reel pay-off equipment according to claim 1, it is characterised in that:The jacking apparatus (8)
For jack.
3. a kind of medium-and-large-sized cable reel pay-off equipment according to claim 2, it is characterised in that:It is set on the pedestal (1)
There is universal wheel (10).
4. a kind of medium-and-large-sized cable reel pay-off equipment according to claim 3, it is characterised in that:First support base
(4) include the first noumenon (14), the first noumenon (14) both ends set there are two it is parallel and match with the standpipe (2) the
One post holes (15), the jacking apparatus (8) are fixed between two first post holes (15).
5. a kind of medium-and-large-sized cable reel pay-off equipment according to claim 3, it is characterised in that:Second support base
(7) include the second ontology (16), the second ontology (16) both ends set there are two it is parallel and match with the standpipe (2) the
Two post holes (17) are equipped with bearing block (18) between two second post holes (17), bearing are equipped in the bearing block (18)
(19)。
6. according to a kind of medium-and-large-sized cable reel pay-off equipment of claim 1 ~ 5 any one of them, it is characterised in that:The standpipe
(2) it uses and is welded and fixed with the pedestal (1), and be equipped with reinforcing rib (13) between the standpipe (2) and the pedestal (1).
7. a kind of medium-and-large-sized cable reel pay-off equipment according to claim 6, it is characterised in that:Above the column (12)
Equipped with handle (11).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721661059.0U CN207759835U (en) | 2017-12-04 | 2017-12-04 | A kind of medium-and-large-sized cable reel pay-off equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721661059.0U CN207759835U (en) | 2017-12-04 | 2017-12-04 | A kind of medium-and-large-sized cable reel pay-off equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207759835U true CN207759835U (en) | 2018-08-24 |
Family
ID=63189367
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721661059.0U Expired - Fee Related CN207759835U (en) | 2017-12-04 | 2017-12-04 | A kind of medium-and-large-sized cable reel pay-off equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207759835U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113572080A (en) * | 2021-06-18 | 2021-10-29 | 北京万兴建筑集团有限公司 | Construction device and construction method for laying large-diameter cable in constructional engineering |
-
2017
- 2017-12-04 CN CN201721661059.0U patent/CN207759835U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113572080A (en) * | 2021-06-18 | 2021-10-29 | 北京万兴建筑集团有限公司 | Construction device and construction method for laying large-diameter cable in constructional engineering |
CN113572080B (en) * | 2021-06-18 | 2022-10-18 | 北京万兴建筑集团有限公司 | Construction device and construction method for laying large-diameter cable in constructional engineering |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103818784A (en) | Electric outlet-direction-adjustable pay-off and take-up automobile | |
CN207759835U (en) | A kind of medium-and-large-sized cable reel pay-off equipment | |
CN203922326U (en) | Wire draw off gear | |
CN209786648U (en) | Universal subway communication signal optical cable laying device | |
CN107867604A (en) | A kind of cable-coiling drum | |
CN107352327A (en) | Formula wire releasing box is put in a kind of interior-change-exterior | |
CN105846358A (en) | Portable cable conductor paying off device | |
CN104627743A (en) | Bidirectional take-up and pay-off cable reel | |
CN203824980U (en) | Toxic gas detector | |
CN202353086U (en) | Setting out bracket for construction of linear high-voltage cable | |
CN215159822U (en) | Constant tension stable uninterrupted paying-off equipment for power transmission | |
CN206060147U (en) | The simple pay off rack of low pressure | |
CN105967005A (en) | Stay wire winder | |
CN203131225U (en) | Adjustable movable rotary-type combined support | |
CN205906829U (en) | Portable scattered line unwrapping wire ware | |
CN202726296U (en) | Arc welding machine | |
CN207008154U (en) | A kind of Optical hanger with upper arm and clamp | |
CN204740915U (en) | Take simple lay machine of guy anchor | |
CN215580046U (en) | Distribution engineering scaffold wire device | |
CN206769780U (en) | Emergency staircase and maintenance of equipment | |
CN204162176U (en) | Cable holder for distribution | |
CN210418680U (en) | Cable paying-off support | |
CN204615275U (en) | A kind of wiring draw-gear | |
CN203398618U (en) | Hydraulic pay-off rack | |
CN203781497U (en) | Stay wire winding device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180824 Termination date: 20181204 |