CN207751805U - A kind of large section tunnel arch experimental rig - Google Patents

A kind of large section tunnel arch experimental rig Download PDF

Info

Publication number
CN207751805U
CN207751805U CN201820050811.6U CN201820050811U CN207751805U CN 207751805 U CN207751805 U CN 207751805U CN 201820050811 U CN201820050811 U CN 201820050811U CN 207751805 U CN207751805 U CN 207751805U
Authority
CN
China
Prior art keywords
arch
oil cylinder
semi
experimental rig
girder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820050811.6U
Other languages
Chinese (zh)
Inventor
马程昊
油新华
马庆松
杨春英
张伟
张清林
宋福渊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China State Construction Engineering Corp Ltd CSCEC
China State Construction Engineering Research Institute Co Ltd
Original Assignee
China State Construction Engineering Corp Ltd CSCEC
China State Construction Engineering Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China State Construction Engineering Corp Ltd CSCEC, China State Construction Engineering Research Institute Co Ltd filed Critical China State Construction Engineering Corp Ltd CSCEC
Priority to CN201820050811.6U priority Critical patent/CN207751805U/en
Application granted granted Critical
Publication of CN207751805U publication Critical patent/CN207751805U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

A kind of large section tunnel arch experimental rig disclosed by the utility model, including loading frame, semi-girder, oil cylinder, foil gauge and control system;The loading frame is vertically spliced by multilayer truss structure, and section is regular polygon structure;The semi-girder is arranged in the inside of the regular polygon corner of loading frame, and the oil cylinder is fixed on the front end of semi-girder and by the flexible of control system control cylinder, and the external part of oil cylinder is in contact with the outer wall for being arranged in the experiment arch of the inside of loading frame;The foil gauge be attached to experiment arch outer wall on, oil cylinder with experiment arch contact point front, rear and top.Tunnel arch experimental rig provided by the utility model, its is reasonable for structure, to carrying out confined concrete arch entirety stress, deformation, unstability and destructive characteristics research, the action rule of its load and displacement, steel strain etc. is grasped, there is higher engineering research value.

Description

A kind of large section tunnel arch experimental rig
Technical field
The utility model is related to arch experimental technique field more particularly to a kind of large section tunnel arch experimental rigs.
Background technology
In recent years, with national economy fast development, the intercity backbone in developed regions, city expressway and national highway master Dry traffic volume of highway rapid development, two-way four-lane, six-lane highway cannot meet the volume of traffic and increase requirement, it is desirable that two-way Eight lane roads are adapted therewith, so correspondingly will appear two-way eight tracks vcehicular tunnel.Two-way eight tracks vcehicular tunnel is Large section tunnel since the engineering practice sample size in this kind of tunnel is few, and can be constructed without specification with design, so right The key technology of this kind of tunnel arch carries out research and feels more urgent and important.
For tunnel surrounding, on the one hand the especially large cross-section tunnel of complex geologic conditions bears complicated field stress Effect, on the other hand excavate and cause stress concentration and stresses re-distribution, cause the destruction of a certain range country rock, formed and loosened Circle.Crack rock or fragmentation rock mass, these rock mass structures after break wall rock mostly destruction restrict construction safety, are applying thus Various support patterns and supporting construction are taken during work.If excavation method is unreasonable with supporting construction, can cause Break wall rock tunnel generates large deformation, or even generates large volume landslide and prominent water burst.It is needed with the development and traffic of national economy The increasingly increase asked, the construction of complex condition large cross-section tunnel will be more and more, but domestic for two-way 8 track tunnel at present Construction Theory and experience all relative deficiencies under complex geological condition, and the country can instruct such super large disconnected without ready-made specification The design and construction of face vcehicular tunnel, so the surrounding rock stability and support system research to this kind of tunnel are very necessary.
Utility model content
The purpose of this utility model is a kind of large section tunnel arch provided by the utility model in view of the above technical problems Frame experimental rig, it is reasonable for structure, to carrying out confined concrete arch entirety stress, deformation, unstability and destructive characteristics research, grasp The action rule of its load and displacement, steel strain etc., has higher engineering research value.
The technical solution of the utility model
In order to solve the above technical problems, a kind of large section tunnel arch experimental rig provided by the utility model, including Loading frame, semi-girder, oil cylinder, foil gauge and control system;The loading frame is vertically spliced by multilayer truss structure, Section is regular polygon structure;The semi-girder is arranged in the inside of the regular polygon corner of loading frame, and the oil cylinder is fixed on The front end of semi-girder and by the flexible of control system control cylinder, and the external part of oil cylinder and be arranged in the inside of loading frame The outer wall of experiment arch is in contact;The foil gauge is attached on the outer wall of experiment arch, the contact point of oil cylinder and experiment arch Front, rear and top.
Further, the large section tunnel arch experimental rig includes 36 semi-girders and oil cylinder.
Further, the semi-girder is formed by straight section, end face and reinforcing rib welding, and the end face is arranged the two of straight section The junction in straight section and end face is arranged in end, the reinforcing rib.It can stretching according to the size overhead different length of experiment arch Arm, to meet test requirements document.
Further, the straight section is rectangular tube, and end face is welded on the both ends of rectangular tube, on the one hand end face is used for semi-girder It fixes with oil cylinder, on the other hand semi-girder is fixed on loading frame.
Further, the control system includes servo control module and data acquisition module, the servo control module It is connect with the oil cylinder, realizes hydraulic loaded whole process SERVO CONTROL;The data acquisition module and the foil gauge on experiment arch Connection is used for the real-time acquisition of test data.
The utility model advantageous effect:
A kind of large section tunnel arch experimental rig provided by the utility model, it is reasonable for structure, it is mixed to carrying out constraint Solidifying soil arch entirety stress, deformation, unstability and destructive characteristics research, the effect for grasping its load and displacement, steel strain etc. are advised Rule has higher engineering research value.
Description of the drawings
By being described in detail made by conjunction with the following drawings, the above-mentioned advantage of the utility model will be apparent and more hold Readily understood, these attached drawings are only schematical, are not intended to limit the utility model, wherein:
Fig. 1 is a kind of structural schematic diagram of large section tunnel arch experimental rig described in the utility model;
Fig. 2 is the structural schematic diagram of the semi-girder of the utility model;
Fig. 3 is the side view of Fig. 2.
In attached drawing, the component representated by each label is as follows:
1. loading frame;2. semi-girder;2-1. straight section;2-2. end face;2-3. reinforcing rib;3. oil cylinder;4. testing arch.
Specific implementation mode
With reference to specific embodiments and the drawings, a kind of large section tunnel arch experimental rig of the utility model is carried out It is described in detail.
The embodiment recorded herein is the specific specific implementation mode of the utility model, for illustrating the utility model Design, is explanatory and illustrative, should not be construed as the limit to the utility model embodiment and the scope of the utility model System.In addition to the embodiment recorded herein, those skilled in the art can also be based on the application claims and specification institute is public For the content opened using obvious other technical solutions, these technical solutions include doing using the embodiment to recording herein Go out the technical solution of any obvious substitutions and modifications.
The attached drawing of this specification is schematic diagram, aids in illustrating the design of the utility model, it is schematically indicated each section Shape and its correlation.It note that the structure of each component for the ease of clearly showing the utility model embodiment, phase Same reference marker is for indicating identical part.
Fig. 1 to Fig. 3 is a kind of accompanying drawings of herein described large section tunnel arch experimental rig.
A kind of structural schematic diagram of large section tunnel arch experimental rig, as shown in Figure 1 comprising loading frame 1 is stretched Arm 2, oil cylinder 3, foil gauge and control system;The loading frame 1 is vertically spliced by multilayer truss structure, and section is just Polygonized structure;The semi-girder 2 is arranged in the inside of the regular polygon corner of loading frame 1, and the oil cylinder 3 is fixed on semi-girder 2 Front end and by the flexible of control system control cylinder 3, and the external part of oil cylinder 3 and be arranged in the inside of loading frame 1 The outer wall of experiment arch 4 is in contact;The foil gauge be attached to experiment arch 4 outer wall on, oil cylinder 3 with test arch 4 contact Front, rear and the top of point.
In the application, the large section tunnel arch experimental rig includes 36 semi-girders 2 and oil cylinder 3.
Fig. 2 is the structural schematic diagram of the semi-girder of the utility model, and the semi-girder 2 is by straight section 2-1, end face 2-2 and reinforcing rib 2-3 weldings form, and the end face 2-2 is arranged at the both ends of straight section 2-1, and the reinforcing rib 2-3 is arranged in straight section 2-1 and end face 2- 2 junction;It can be according to the semi-girder of the size overhead different length of experiment arch, to meet test requirements document.
Fig. 3 is the side view of semi-girder, and the straight section 2-1 is rectangular tube, and end face 2-2 is welded on the both ends of rectangular tube.It uses High-strength bolt is fixed semi-girder and oil cylinder by end face 2-2, and semi-girder is on the other hand fixed on loading frame by high-strength bolt On.
The control system includes servo control module and data acquisition module, the servo control module and the oil cylinder 3 connections, realize hydraulic loaded whole process SERVO CONTROL;The data acquisition module is connect with the foil gauge on experiment arch, is used for The real-time acquisition of test data.
It, can be with the various types of constraints of design studies using root large section tunnel arch experimental rig provided by the present application Concrete arch and I-steel arch, under the load modes such as pressure, bias, by the load of arch, deformation, stress into Whole stress rule, deformation instability form, local failure feature and the arch of each group arch are furtherd investigate in row system acquisition and analysis Frame joints deformation behaviour.
Specific loading mode includes following several:
(1)Uniformly distributed load:Each oil cylinder load is identical.
(2)Bias loads:According to the difference of horizontal stress and vertical stress, if lateral pressure coefficient is 0.5, i.e., left and right is each Oil cylinder load is 0.5 times that each oil cylinder in top is further applied load;Arch meet with stresses it is asymmetric, using central axis as boundary, if axis Stress suffered by arch is 0.5 times of right side on the left of line, i.e., each oil cylinder in the left side is that each oil cylinder in right side is further applied load 0.5 times.
(3)Loading speed and dwell time:Using hierarchical loading, when load is less than the 90% of estimated ultimate load, 10kN/ Min, per 30kN pressurizes 0.5min;When load is more than the 90% of estimated ultimate load, 5kN/min, per 10kN pressurizes 0.5min;Partially It is identical when pressure load.
(4)Stop load standard:It is loaded in such a way that dullness is pressurizeed, until test specimen destroys.In the process and the moment is observed Test specimen destroys situation, until test specimen integrally enters yield situation or generates apparent destroy.
It is as follows to carry out the step of correlation test is studied using tunnel arch experimental rig described herein:
(1)Each component of testing stand is in place:By loading frame system in specific location assembly, suitable load operations are adjusted Radius;The lower beam of the lateral beam of installation, and adjust lower bolt and so that each beam is all in the same horizontal plane, it is assembled for arch Platform is provided.
(2)Test component assembles:Experiment arch is transported to designated position, is attached each section arch by node, Space is moved in reserved good contracting or installation allows pressure device.
(3)Monitoring collection sensor is installed:Strain rosette is pasted as requested in designated position;Each monitoring sensor is passed through Conducting wire is connected with corresponding monitoring collecting unit.
(4)Upper beam installation:Upper beam is bolted on design position so that arch can only in the horizontal plane into Row movement and deformation.
(5)It preloads:After each section installation terminates, slowly risen by the full servo-hydraulic Loading Control System in 36 channels Pressure so that each equal engaged test arch of oil cylinder, and apply the preload no more than estimated failing load 3%.
(6)Experiment load:It is loaded in such a way that dullness is pressurizeed, until test specimen destroys.According to loading scheme and requirement, if Determine program control parameter, include mainly loading speed and dwell time, then carry out Loading Control by the way of program control, And moment observation test specimen destroys situation, until experiment is completed.
The application is used for the arch mechanical property test of 3 ~ 15m of geometric dimension, by the load of arch, deformation, stress Carry out system acquisition and analysis, further investigate the whole stress rule of each group arch, deformation instability form, local failure feature and Arch joints deformation behaviour, to study different section shape, in the form of different cross section, the constraint coagulation of different connection types The mechanical property of soil, I-steel arch.
Compared with prior art, a kind of large section tunnel arch experimental rig provided by the utility model, structure are closed Reason grasps its load and displacement, steel to carrying out confined concrete arch entirety stress, deformation, unstability and destructive characteristics research The action rule of strain etc. has higher engineering research value.
The utility model is not limited to the above embodiment, anyone can obtain other under the enlightenment of the utility model Various forms of products, however, make any variation in its shape or structure, it is every with identical or similar to the present application Technical solution, all fall within the scope of protection of the utility model.

Claims (5)

1. a kind of large section tunnel arch experimental rig, which is characterized in that including loading frame(1), semi-girder(2), oil cylinder (3), foil gauge and control system;The loading frame(1)It is vertically spliced by multilayer truss structure, section is just polygon Shape structure;The semi-girder(2)It is arranged in loading frame(1)Regular polygon corner inside, the oil cylinder(3)It is fixed on semi-girder (2)Front end and by control system control cylinder(3)Flexible, and oil cylinder(3)External part be arranged in loading frame(1) Inside experiment arch(4)Outer wall be in contact;The foil gauge is attached to experiment arch(4)Outer wall on, oil cylinder(3)With examination Test arch(4)Contact point front, rear and top.
2. large section tunnel arch experimental rig according to claim 1, which is characterized in that the large section tunnel arch Frame experimental rig includes 36 semi-girders(2)And oil cylinder(3).
3. large section tunnel arch experimental rig according to claim 1, which is characterized in that the semi-girder(2)By straight section (2-1), end face(2-2)And reinforcing rib(2-3)Welding forms, the end face(2-2)It is arranged in straight section(2-1)Both ends, it is described Reinforcing rib(2-3)It is arranged in straight section(2-1)With end face(2-2)Junction.
4. large section tunnel arch experimental rig according to claim 3, which is characterized in that the straight section(2-1)For side Shape pipe, end face(2-2)It is welded on the both ends of rectangular tube.
5. large section tunnel arch experimental rig according to claim 1, which is characterized in that the control system includes watching Take control module and data acquisition module, the servo control module and the oil cylinder(3)Connection realizes that hydraulic loaded whole process is watched Clothes control;The data acquisition module is connect with the foil gauge on experiment arch, is used for the real-time acquisition of test data.
CN201820050811.6U 2018-01-12 2018-01-12 A kind of large section tunnel arch experimental rig Expired - Fee Related CN207751805U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820050811.6U CN207751805U (en) 2018-01-12 2018-01-12 A kind of large section tunnel arch experimental rig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820050811.6U CN207751805U (en) 2018-01-12 2018-01-12 A kind of large section tunnel arch experimental rig

Publications (1)

Publication Number Publication Date
CN207751805U true CN207751805U (en) 2018-08-21

Family

ID=63153000

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820050811.6U Expired - Fee Related CN207751805U (en) 2018-01-12 2018-01-12 A kind of large section tunnel arch experimental rig

Country Status (1)

Country Link
CN (1) CN207751805U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109752204A (en) * 2019-01-28 2019-05-14 成都理工大学 One kind can contracting steel arch-shelf asymmetrical loading simulation experiment method and device
CN109975120A (en) * 2019-04-18 2019-07-05 中国建筑材料科学研究总院有限公司 Concrete restraint stress and deformational stress measuring device and measuring method
CN111610101A (en) * 2020-04-28 2020-09-01 中铁工程服务有限公司 Steel bow member compression experiment platform
CN116908017A (en) * 2023-09-06 2023-10-20 中国矿业大学(北京) Underground engineering arch structure dynamic and static coupling performance test and evaluation method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109752204A (en) * 2019-01-28 2019-05-14 成都理工大学 One kind can contracting steel arch-shelf asymmetrical loading simulation experiment method and device
CN109975120A (en) * 2019-04-18 2019-07-05 中国建筑材料科学研究总院有限公司 Concrete restraint stress and deformational stress measuring device and measuring method
CN109975120B (en) * 2019-04-18 2021-07-20 中国建筑材料科学研究总院有限公司 Concrete constraint stress and deformation stress measuring device and measuring method
CN111610101A (en) * 2020-04-28 2020-09-01 中铁工程服务有限公司 Steel bow member compression experiment platform
CN111610101B (en) * 2020-04-28 2023-10-24 中铁工程服务有限公司 Steel arch compression experiment table
CN116908017A (en) * 2023-09-06 2023-10-20 中国矿业大学(北京) Underground engineering arch structure dynamic and static coupling performance test and evaluation method
CN116908017B (en) * 2023-09-06 2023-11-28 中国矿业大学(北京) Underground engineering arch structure dynamic and static coupling performance test and evaluation method

Similar Documents

Publication Publication Date Title
CN207751805U (en) A kind of large section tunnel arch experimental rig
CN108072570B (en) Device and method for testing soil pressure of anchor plate retaining wall under different displacement modes
Wang et al. Comparative experimental study on mechanical mechanism of combined arches in large section tunnels
CN206832583U (en) It is a kind of to be used for the experimental rig of anchor pole stretching and shearing in jointed rock mass
Zhou et al. Laboratory evaluation of buried high-density polyethylene pipes subjected to localized ground subsidence
CN109083655A (en) A kind of high-ground stress environment stratiform surrounding rock tunnel orientation support reinforcement method
CN209280028U (en) Measure the experimental provision of the distribution of tunnel Water And Earth Pressures and tunnel deformation rule
Fu et al. Stress state and failure path of a tension tower in a transmission line under multiple loading conditions
Ding et al. Flexural behavior of segmental joint containing double rows of bolts: Experiment and simulation
Zhou et al. Experimental testing on ductile-iron joint panels for high-stiffness segmental joints of deep-buried drainage shield tunnels
CN106525707A (en) Anchorage bedding slope model test system and method for simulating corrosive environment
CN108824497A (en) Large-scale original position friction pile model test apparatus and its method
US11473262B2 (en) Bailey support system applied to cross protection of complex pipes and cables and construction method thereof
Gao et al. Influence of Benoto bored pile construction on nearby existing tunnel: A case study
CN205067080U (en) Extending anchor bolt support's of deep tunnel high resistant physical simulation experimental system
CN206607613U (en) A kind of bored concrete pile displacement acquisition device
CN104032720B (en) It is applicable to test method and the device of deep supporting course bearing capacity
CN206223625U (en) A kind of anchoring bedding rock sloper model assay systems that can simulate corrosive environment
Long et al. Results of lateral load tests on micropiles
CN111735705B (en) Flexible muscle material net piece deformation characteristic tester under normal load effect
CN109668747A (en) Mechanical Method service channel development machine receives model test platform and its test method
CN205654380U (en) Existing tunnel of double -line tunnel excavation simulation monitoring devices
CN107167289A (en) A kind of great cantilever precast assembly bent cap load test method
CN103105333B (en) Cross-fault leveling buried pipeline in-situ test measurement system
Wang et al. Mechanical Testing and Application of Steel-plastic Geogrid Instead of Metal Mesh in Supporting Engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180821

Termination date: 20200112

CF01 Termination of patent right due to non-payment of annual fee