CN207739633U - A kind of pre-buried channel flow fixing device for concrete formation - Google Patents
A kind of pre-buried channel flow fixing device for concrete formation Download PDFInfo
- Publication number
- CN207739633U CN207739633U CN201721867283.5U CN201721867283U CN207739633U CN 207739633 U CN207739633 U CN 207739633U CN 201721867283 U CN201721867283 U CN 201721867283U CN 207739633 U CN207739633 U CN 207739633U
- Authority
- CN
- China
- Prior art keywords
- channel flow
- buried channel
- bar
- fixing device
- concrete formation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Reinforcement Elements For Buildings (AREA)
Abstract
The utility model is related to a kind of pre-buried channel flow fixing devices for concrete formation, including bar-mat reinforcement, bar-mat reinforcement is formed by more orthogonal bar connectings, mounting bracket is provided on bar-mat reinforcement, mounting bracket includes the connecting rod for installing the card slot of pre-buried channel flow He being set to card slot both sides, and connecting rod is removably joined together with mounting bracket.The pre-buried channel flow fixing device for concrete formation of the utility model is easily installed and pre-buried quality is high, does not destroy bar-mat reinforcement zinc coat.
Description
Technical field
The utility model is related to the positioning devices of a kind of concrete embedded part more particularly to a kind of for concrete formation
Pre-buried channel flow fixing device.
Background technology
In concrete cast-in-situ or prefabricated construction, the pre-buried of built-in groove requires its outer surface to be flushed with concrete outer surface,
Bottom end cannot sink to that concrete is too deep, top cannot protrude concrete outer surface or it is whole generate it is crooked.Existing built-in groove is consolidated
Determine that built-in groove is fixed in template by method generally by steel nail, bolt or that built-in groove is welded on structure reinforcing bars is online, and
These methods are not only difficult to ensure pre-buried quality, and angular deflection is easy tod produce after built-in groove is pre-buried, sink to too deep, prominent coagulation
It the problems such as native surface, and built-in groove is difficult to install, can not recycling after template punching so that cost is higher and safe
Property is low, this external welding can influence the antiseptic property of zinc coat.
In view of the above shortcomings, the designer, is actively subject to research and innovation, to found, one kind is new structural to be used for
The pre-buried channel flow fixing device of concrete formation makes it with more the utility value in industry.
Utility model content
In order to solve the above technical problems, the purpose of this utility model is to provide, one kind is easily installed and pre-buried quality is high, no
Destroy the pre-buried channel flow fixing device for concrete formation of zinc coat.
The pre-buried channel flow fixing device for concrete formation of the utility model, including bar-mat reinforcement, the bar-mat reinforcement by
More orthogonal bar connectings form, and mounting bracket is provided on the bar-mat reinforcement, and the mounting bracket includes for pacifying
It fills the card slot of pre-buried channel flow and is set to the connecting rod of card slot both sides, the connecting rod is detachably connected to one with mounting bracket
It rises.
Preferably, the mounting bracket is bundled in by bandage on steel wire.
Preferably, the bandage is iron wire or steel wire.
Preferably, the mounting bracket is bent by spring steel wire.
Preferably, being provided with template on the outside of the bar-mat reinforcement, multiple split bolts are set in the template, it is described right
One end of bolt is drawn to be set on one piece of plank, the other end of split bolt is set in another piece of template corresponding thereto, institute
It states and is provided with supporting rod on the outside of template, the supporting rod intersects with template inclination.
Preferably, the mounting bracket is also connect by bolt with bar-mat reinforcement.
According to the above aspect of the present invention, the utility model has at least the following advantages:The utility model for concrete formation
Pre-buried channel flow fixing device passes through the setting of mounting bracket so that pre-buried channel flow can be connected with bar-mat reinforcement indirectly by mounting bracket
It connects, mounting support structure is simple in structure, and easy to manufacture and installation is simple, and precision is higher, and when use does not injure building template
And bar-mat reinforcement increases die life to improve the safety of building.In conclusion the utility model is used for
The pre-buried channel flow fixing device of concrete formation is easily installed and pre-buried quality is high, does not destroy zinc coat.
The above description is merely an outline of the technical solution of the present invention, in order to better understand the skill of the utility model
Art means, and can be implemented in accordance with the contents of the specification, below on the preferred embodiment of the present invention and the accompanying drawings in detail
It describes in detail bright as after.
Description of the drawings
Fig. 1 is the structural schematic diagram of the pre-buried channel flow fixing device for concrete formation of the utility model;
Fig. 2 is the cooperation schematic diagram of bar-mat reinforcement, mounting bracket, split bolt;
Fig. 3 is the stereogram of mounting bracket.
In figure, 1:Bar-mat reinforcement;2:Mounting bracket;3:Pre-buried channel flow;4:Card slot;5:Connecting rod;6:Template;7:To drawing spiral shell
Bolt;8:Supporting rod.
Specific implementation mode
With reference to the accompanying drawings and examples, specific embodiment of the present utility model is described in further detail.Below
Embodiment is not intended to limit the scope of the present invention for illustrating the utility model.
Referring to Fig. 1 to Fig. 3, a kind of pre-buried channel flow for concrete formation of one preferred embodiment of the utility model is fixed
Device, including bar-mat reinforcement 1, bar-mat reinforcement are formed by more orthogonal bar connectings, and mounting bracket 2 is provided on bar-mat reinforcement,
Mounting bracket includes connecting rod and installation branch for installing the card slot 4 of pre-buried channel flow 3 and being set to the connecting rod 5 of card slot both sides
Frame is removably joined together.Preferably, mounting bracket is bundled in by bandage on steel wire.Bandage can be iron wire or
Steel wire.Preferably, mounting bracket is bent by spring steel wire.Preferably, being provided with template 6, mould on the outside of bar-mat reinforcement
Multiple split bolts 7 are set on plate, one end of split bolt is set on one piece of plank, the other end of split bolt be set to
In its another piece of opposite template, supporting rod 8 is provided on the outside of template, supporting rod intersects with template inclination.Preferably, peace
Dress holder is also connect by bolt with bar-mat reinforcement.
When it is implemented, mounting bracket makes built-in groove be clamped in card slot using the elasticity and three-dimensional structure of spring steel, and
So that template is close in built-in groove end face.Operating personnel block built-in groove with mounting bracket first, then by mounting bracket and bar-mat reinforcement
Bind securely with thin wire, it is thus indirectly that built-in groove is online fixed to structure reinforcing bars.Then two side templates are consolidated
It is fixed, it is used in combination supporting rod or split bolt to regulate the spacing between template, then placing concrete, can make built-in groove accurate after dry
It determines position and lateral surface is in a plane with concrete surface just.
It is obvious to a person skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and
And without departing substantially from the spirit or essential attributes of the utility model, those skilled in the art can be with other specific shapes
Formula realizes the utility model.Therefore, in all respects, the embodiments should be taken as exemplary, and it is non-limit
Property processed, the scope of protection of the utility model is indicated by the appended claims rather than the foregoing description.
In addition, the above is only the preferred embodiment of the utility model, it is not intended to limit the utility model, it should
It points out, for those skilled in the art, without deviating from the technical principle of the utility model, may be used also
To make several improvements and modifications, these improvements and modifications also should be regarded as the scope of protection of the utility model.Meanwhile it should manage
Solution, although this specification is described in terms of embodiments, but not each embodiment only includes an independent technical side
Case, this description of the specification is merely for the sake of clarity, and those skilled in the art should be whole using specification as one
Body, the technical solutions in the various embodiments may also be suitably combined, formed it will be appreciated by those skilled in the art that other implementation
Mode.
Claims (6)
1. a kind of pre-buried channel flow fixing device for concrete formation, including bar-mat reinforcement, the bar-mat reinforcement is mutually hung down by more
Straight bar connecting forms, it is characterised in that:Mounting bracket is provided on the bar-mat reinforcement, the mounting bracket includes for pacifying
It fills the card slot of pre-buried channel flow and is set to the connecting rod of card slot both sides, the connecting rod is detachably connected to one with mounting bracket
It rises.
2. the pre-buried channel flow fixing device according to claim 1 for concrete formation, it is characterised in that:The installation
Holder is bundled in by bandage on steel wire.
3. the pre-buried channel flow fixing device according to claim 2 for concrete formation, it is characterised in that:The bandage
For iron wire or steel wire.
4. the pre-buried channel flow fixing device according to claim 1 for concrete formation, it is characterised in that:The installation
Holder is bent by spring steel wire.
5. the pre-buried channel flow fixing device according to claim 1 for concrete formation, it is characterised in that:The reinforcing bar
It is provided with template on the outside of net, multiple split bolts are set in the template, one end of the split bolt is set to one block of wood
On plate, the other end of split bolt is set in another piece of template corresponding thereto, and supporting rod is provided on the outside of the template,
The supporting rod intersects with template inclination.
6. the pre-buried channel flow fixing device according to claim 1 for concrete formation, it is characterised in that:The installation
Holder is also connect by bolt with bar-mat reinforcement.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721867283.5U CN207739633U (en) | 2017-12-27 | 2017-12-27 | A kind of pre-buried channel flow fixing device for concrete formation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721867283.5U CN207739633U (en) | 2017-12-27 | 2017-12-27 | A kind of pre-buried channel flow fixing device for concrete formation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207739633U true CN207739633U (en) | 2018-08-17 |
Family
ID=63120078
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721867283.5U Active CN207739633U (en) | 2017-12-27 | 2017-12-27 | A kind of pre-buried channel flow fixing device for concrete formation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207739633U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110629889A (en) * | 2019-10-12 | 2019-12-31 | 中冶天工集团有限公司 | Installation device for channel of pre-buried bracket of concrete wall and use method of installation device |
CN110905197A (en) * | 2019-12-04 | 2020-03-24 | 唐明利 | Easily-disassembled aluminum product combined template for building water and electricity pressure tank |
-
2017
- 2017-12-27 CN CN201721867283.5U patent/CN207739633U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110629889A (en) * | 2019-10-12 | 2019-12-31 | 中冶天工集团有限公司 | Installation device for channel of pre-buried bracket of concrete wall and use method of installation device |
CN110905197A (en) * | 2019-12-04 | 2020-03-24 | 唐明利 | Easily-disassembled aluminum product combined template for building water and electricity pressure tank |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207739633U (en) | A kind of pre-buried channel flow fixing device for concrete formation | |
CN104947798A (en) | Assembly type housing embedded hoisting components and anchoring method | |
CN207283096U (en) | A kind of scalable wire box being embedded in shear wall | |
CN107313587A (en) | Template fixing system of building waterproof structure and construction method of waterproof structure | |
CN201865053U (en) | Continuous steel beam template | |
CN103821351A (en) | Retention device and method for floor plate post-cast strip | |
CN206873932U (en) | A kind of flooring service sleeve fixing device for installing | |
CN106400687B (en) | A kind of pier stud reinforcing bar positioning auxiliary moulding bed | |
CN204875549U (en) | Device is buried underground to precast box girder tabula girder iron muscle | |
CN209653398U (en) | The outer beam side structure of included double quarter bend back cords | |
CN203097282U (en) | Floorslab concrete ridge platform whole-pouring formwork support | |
CN209780239U (en) | Beam-penetrating sleeve pre-embedding device | |
CN110409820B (en) | Formwork supporting device for construction of cantilever structure and construction method thereof | |
CN204418666U (en) | A kind of building site is with there being side wall stair template | |
CN205502244U (en) | Pre -buried structure that light -duty embedding slot said | |
CN206220263U (en) | Built-in fitting | |
CN205997103U (en) | Omnibearing beat die for lock hole | |
CN205711762U (en) | A kind of No. 0 section support of rigid frame bridge | |
CN204920161U (en) | Wall flattening chi for building | |
CN203795855U (en) | Formwork levelness adjusting hook | |
CN104264989A (en) | Device for fixing split metal rod piece and use method thereof | |
CN207553640U (en) | A kind of angle bar frame for being used to mend floor hole | |
CN205047980U (en) | Pre -buried elevator of PVC cover seat | |
CN210288889U (en) | Floor thickness control module | |
CN207032869U (en) | A kind of beam form supporting construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: 9 niqiao South Street, Xilai Town, Jingjiang City, Taizhou City, Jiangsu Province Patentee after: Jiangsu ruizhongde metal products Co.,Ltd. Address before: 214000 Hongshan Road, Hongshan street, new Wu District, Wuxi, Jiangsu, 35 Patentee before: WUXI RUIZHONGDE METAL PRODUCTS Co.,Ltd. |