CN207739633U - A kind of pre-buried channel flow fixing device for concrete formation - Google Patents

A kind of pre-buried channel flow fixing device for concrete formation Download PDF

Info

Publication number
CN207739633U
CN207739633U CN201721867283.5U CN201721867283U CN207739633U CN 207739633 U CN207739633 U CN 207739633U CN 201721867283 U CN201721867283 U CN 201721867283U CN 207739633 U CN207739633 U CN 207739633U
Authority
CN
China
Prior art keywords
channel flow
buried channel
bar
fixing device
concrete formation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721867283.5U
Other languages
Chinese (zh)
Inventor
孙龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi Rui De Metal Products Co Ltd
Original Assignee
Wuxi Rui De Metal Products Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Rui De Metal Products Co Ltd filed Critical Wuxi Rui De Metal Products Co Ltd
Priority to CN201721867283.5U priority Critical patent/CN207739633U/en
Application granted granted Critical
Publication of CN207739633U publication Critical patent/CN207739633U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

The utility model is related to a kind of pre-buried channel flow fixing devices for concrete formation, including bar-mat reinforcement, bar-mat reinforcement is formed by more orthogonal bar connectings, mounting bracket is provided on bar-mat reinforcement, mounting bracket includes the connecting rod for installing the card slot of pre-buried channel flow He being set to card slot both sides, and connecting rod is removably joined together with mounting bracket.The pre-buried channel flow fixing device for concrete formation of the utility model is easily installed and pre-buried quality is high, does not destroy bar-mat reinforcement zinc coat.

Description

A kind of pre-buried channel flow fixing device for concrete formation
Technical field
The utility model is related to the positioning devices of a kind of concrete embedded part more particularly to a kind of for concrete formation Pre-buried channel flow fixing device.
Background technology
In concrete cast-in-situ or prefabricated construction, the pre-buried of built-in groove requires its outer surface to be flushed with concrete outer surface, Bottom end cannot sink to that concrete is too deep, top cannot protrude concrete outer surface or it is whole generate it is crooked.Existing built-in groove is consolidated Determine that built-in groove is fixed in template by method generally by steel nail, bolt or that built-in groove is welded on structure reinforcing bars is online, and These methods are not only difficult to ensure pre-buried quality, and angular deflection is easy tod produce after built-in groove is pre-buried, sink to too deep, prominent coagulation It the problems such as native surface, and built-in groove is difficult to install, can not recycling after template punching so that cost is higher and safe Property is low, this external welding can influence the antiseptic property of zinc coat.
In view of the above shortcomings, the designer, is actively subject to research and innovation, to found, one kind is new structural to be used for The pre-buried channel flow fixing device of concrete formation makes it with more the utility value in industry.
Utility model content
In order to solve the above technical problems, the purpose of this utility model is to provide, one kind is easily installed and pre-buried quality is high, no Destroy the pre-buried channel flow fixing device for concrete formation of zinc coat.
The pre-buried channel flow fixing device for concrete formation of the utility model, including bar-mat reinforcement, the bar-mat reinforcement by More orthogonal bar connectings form, and mounting bracket is provided on the bar-mat reinforcement, and the mounting bracket includes for pacifying It fills the card slot of pre-buried channel flow and is set to the connecting rod of card slot both sides, the connecting rod is detachably connected to one with mounting bracket It rises.
Preferably, the mounting bracket is bundled in by bandage on steel wire.
Preferably, the bandage is iron wire or steel wire.
Preferably, the mounting bracket is bent by spring steel wire.
Preferably, being provided with template on the outside of the bar-mat reinforcement, multiple split bolts are set in the template, it is described right One end of bolt is drawn to be set on one piece of plank, the other end of split bolt is set in another piece of template corresponding thereto, institute It states and is provided with supporting rod on the outside of template, the supporting rod intersects with template inclination.
Preferably, the mounting bracket is also connect by bolt with bar-mat reinforcement.
According to the above aspect of the present invention, the utility model has at least the following advantages:The utility model for concrete formation Pre-buried channel flow fixing device passes through the setting of mounting bracket so that pre-buried channel flow can be connected with bar-mat reinforcement indirectly by mounting bracket It connects, mounting support structure is simple in structure, and easy to manufacture and installation is simple, and precision is higher, and when use does not injure building template And bar-mat reinforcement increases die life to improve the safety of building.In conclusion the utility model is used for The pre-buried channel flow fixing device of concrete formation is easily installed and pre-buried quality is high, does not destroy zinc coat.
The above description is merely an outline of the technical solution of the present invention, in order to better understand the skill of the utility model Art means, and can be implemented in accordance with the contents of the specification, below on the preferred embodiment of the present invention and the accompanying drawings in detail It describes in detail bright as after.
Description of the drawings
Fig. 1 is the structural schematic diagram of the pre-buried channel flow fixing device for concrete formation of the utility model;
Fig. 2 is the cooperation schematic diagram of bar-mat reinforcement, mounting bracket, split bolt;
Fig. 3 is the stereogram of mounting bracket.
In figure, 1:Bar-mat reinforcement;2:Mounting bracket;3:Pre-buried channel flow;4:Card slot;5:Connecting rod;6:Template;7:To drawing spiral shell Bolt;8:Supporting rod.
Specific implementation mode
With reference to the accompanying drawings and examples, specific embodiment of the present utility model is described in further detail.Below Embodiment is not intended to limit the scope of the present invention for illustrating the utility model.
Referring to Fig. 1 to Fig. 3, a kind of pre-buried channel flow for concrete formation of one preferred embodiment of the utility model is fixed Device, including bar-mat reinforcement 1, bar-mat reinforcement are formed by more orthogonal bar connectings, and mounting bracket 2 is provided on bar-mat reinforcement, Mounting bracket includes connecting rod and installation branch for installing the card slot 4 of pre-buried channel flow 3 and being set to the connecting rod 5 of card slot both sides Frame is removably joined together.Preferably, mounting bracket is bundled in by bandage on steel wire.Bandage can be iron wire or Steel wire.Preferably, mounting bracket is bent by spring steel wire.Preferably, being provided with template 6, mould on the outside of bar-mat reinforcement Multiple split bolts 7 are set on plate, one end of split bolt is set on one piece of plank, the other end of split bolt be set to In its another piece of opposite template, supporting rod 8 is provided on the outside of template, supporting rod intersects with template inclination.Preferably, peace Dress holder is also connect by bolt with bar-mat reinforcement.
When it is implemented, mounting bracket makes built-in groove be clamped in card slot using the elasticity and three-dimensional structure of spring steel, and So that template is close in built-in groove end face.Operating personnel block built-in groove with mounting bracket first, then by mounting bracket and bar-mat reinforcement Bind securely with thin wire, it is thus indirectly that built-in groove is online fixed to structure reinforcing bars.Then two side templates are consolidated It is fixed, it is used in combination supporting rod or split bolt to regulate the spacing between template, then placing concrete, can make built-in groove accurate after dry It determines position and lateral surface is in a plane with concrete surface just.
It is obvious to a person skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and And without departing substantially from the spirit or essential attributes of the utility model, those skilled in the art can be with other specific shapes Formula realizes the utility model.Therefore, in all respects, the embodiments should be taken as exemplary, and it is non-limit Property processed, the scope of protection of the utility model is indicated by the appended claims rather than the foregoing description.
In addition, the above is only the preferred embodiment of the utility model, it is not intended to limit the utility model, it should It points out, for those skilled in the art, without deviating from the technical principle of the utility model, may be used also To make several improvements and modifications, these improvements and modifications also should be regarded as the scope of protection of the utility model.Meanwhile it should manage Solution, although this specification is described in terms of embodiments, but not each embodiment only includes an independent technical side Case, this description of the specification is merely for the sake of clarity, and those skilled in the art should be whole using specification as one Body, the technical solutions in the various embodiments may also be suitably combined, formed it will be appreciated by those skilled in the art that other implementation Mode.

Claims (6)

1. a kind of pre-buried channel flow fixing device for concrete formation, including bar-mat reinforcement, the bar-mat reinforcement is mutually hung down by more Straight bar connecting forms, it is characterised in that:Mounting bracket is provided on the bar-mat reinforcement, the mounting bracket includes for pacifying It fills the card slot of pre-buried channel flow and is set to the connecting rod of card slot both sides, the connecting rod is detachably connected to one with mounting bracket It rises.
2. the pre-buried channel flow fixing device according to claim 1 for concrete formation, it is characterised in that:The installation Holder is bundled in by bandage on steel wire.
3. the pre-buried channel flow fixing device according to claim 2 for concrete formation, it is characterised in that:The bandage For iron wire or steel wire.
4. the pre-buried channel flow fixing device according to claim 1 for concrete formation, it is characterised in that:The installation Holder is bent by spring steel wire.
5. the pre-buried channel flow fixing device according to claim 1 for concrete formation, it is characterised in that:The reinforcing bar It is provided with template on the outside of net, multiple split bolts are set in the template, one end of the split bolt is set to one block of wood On plate, the other end of split bolt is set in another piece of template corresponding thereto, and supporting rod is provided on the outside of the template, The supporting rod intersects with template inclination.
6. the pre-buried channel flow fixing device according to claim 1 for concrete formation, it is characterised in that:The installation Holder is also connect by bolt with bar-mat reinforcement.
CN201721867283.5U 2017-12-27 2017-12-27 A kind of pre-buried channel flow fixing device for concrete formation Active CN207739633U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721867283.5U CN207739633U (en) 2017-12-27 2017-12-27 A kind of pre-buried channel flow fixing device for concrete formation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721867283.5U CN207739633U (en) 2017-12-27 2017-12-27 A kind of pre-buried channel flow fixing device for concrete formation

Publications (1)

Publication Number Publication Date
CN207739633U true CN207739633U (en) 2018-08-17

Family

ID=63120078

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721867283.5U Active CN207739633U (en) 2017-12-27 2017-12-27 A kind of pre-buried channel flow fixing device for concrete formation

Country Status (1)

Country Link
CN (1) CN207739633U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110629889A (en) * 2019-10-12 2019-12-31 中冶天工集团有限公司 Installation device for channel of pre-buried bracket of concrete wall and use method of installation device
CN110905197A (en) * 2019-12-04 2020-03-24 唐明利 Easily-disassembled aluminum product combined template for building water and electricity pressure tank

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110629889A (en) * 2019-10-12 2019-12-31 中冶天工集团有限公司 Installation device for channel of pre-buried bracket of concrete wall and use method of installation device
CN110905197A (en) * 2019-12-04 2020-03-24 唐明利 Easily-disassembled aluminum product combined template for building water and electricity pressure tank

Similar Documents

Publication Publication Date Title
CN207739633U (en) A kind of pre-buried channel flow fixing device for concrete formation
CN104947798A (en) Assembly type housing embedded hoisting components and anchoring method
CN207283096U (en) A kind of scalable wire box being embedded in shear wall
CN107313587A (en) Template fixing system of building waterproof structure and construction method of waterproof structure
CN201865053U (en) Continuous steel beam template
CN103821351A (en) Retention device and method for floor plate post-cast strip
CN206873932U (en) A kind of flooring service sleeve fixing device for installing
CN106400687B (en) A kind of pier stud reinforcing bar positioning auxiliary moulding bed
CN204875549U (en) Device is buried underground to precast box girder tabula girder iron muscle
CN209653398U (en) The outer beam side structure of included double quarter bend back cords
CN203097282U (en) Floorslab concrete ridge platform whole-pouring formwork support
CN209780239U (en) Beam-penetrating sleeve pre-embedding device
CN110409820B (en) Formwork supporting device for construction of cantilever structure and construction method thereof
CN204418666U (en) A kind of building site is with there being side wall stair template
CN205502244U (en) Pre -buried structure that light -duty embedding slot said
CN206220263U (en) Built-in fitting
CN205997103U (en) Omnibearing beat die for lock hole
CN205711762U (en) A kind of No. 0 section support of rigid frame bridge
CN204920161U (en) Wall flattening chi for building
CN203795855U (en) Formwork levelness adjusting hook
CN104264989A (en) Device for fixing split metal rod piece and use method thereof
CN207553640U (en) A kind of angle bar frame for being used to mend floor hole
CN205047980U (en) Pre -buried elevator of PVC cover seat
CN210288889U (en) Floor thickness control module
CN207032869U (en) A kind of beam form supporting construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 9 niqiao South Street, Xilai Town, Jingjiang City, Taizhou City, Jiangsu Province

Patentee after: Jiangsu ruizhongde metal products Co.,Ltd.

Address before: 214000 Hongshan Road, Hongshan street, new Wu District, Wuxi, Jiangsu, 35

Patentee before: WUXI RUIZHONGDE METAL PRODUCTS Co.,Ltd.