CN207727588U - A kind of attachment device of steel pipe support part - Google Patents

A kind of attachment device of steel pipe support part Download PDF

Info

Publication number
CN207727588U
CN207727588U CN201721688291.3U CN201721688291U CN207727588U CN 207727588 U CN207727588 U CN 207727588U CN 201721688291 U CN201721688291 U CN 201721688291U CN 207727588 U CN207727588 U CN 207727588U
Authority
CN
China
Prior art keywords
connector
steel pipe
support part
pipe support
guide groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721688291.3U
Other languages
Chinese (zh)
Inventor
陈萧挺
顾海娟
张逸雯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HAIMEN EQUIPMENT INSTALLATION ENGINEERING Co Ltd
Original Assignee
HAIMEN EQUIPMENT INSTALLATION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HAIMEN EQUIPMENT INSTALLATION ENGINEERING Co Ltd filed Critical HAIMEN EQUIPMENT INSTALLATION ENGINEERING Co Ltd
Priority to CN201721688291.3U priority Critical patent/CN207727588U/en
Application granted granted Critical
Publication of CN207727588U publication Critical patent/CN207727588U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a kind of attachment device of steel pipe support part, it is related to construction and installation field, it includes the first connector and the second connector for being cylindrical in shape setting, first connector one end is equipped with guide groove in one week around the first connector periphery wall, the guide groove slot cross-section is trapezoidal setting, and the outer wall of second connector one end is equipped with and the guide pad of guide groove cooperation;The end of first connector and the second connector is respectively equipped with locking device, and the locking device of first connector is located at end of first connector far from guide groove, and the locking device of second connector is located at end of second connector far from guide pad;First connector and the second connector are spliced by two pieces of arc panels respectively.Using the first connector and the second connector of folding setting, coordinate guide groove and guide pad, while realizing steel pipe alignment, realizes the recycling of connector, reduce installation cost.

Description

A kind of attachment device of steel pipe support part
Technical field
The utility model is related to a kind of construction and installation field, more particularly to a kind of attachment device of steel pipe support part.
Background technology
Bracing members refer to the stability with the enhancement engineerings structure such as steel pipe, H profile steel, angle steel, and ordinary circumstance is inclined company Connection member, most commonly herringbone and cross shaped head.Bracing members are widely used in terms of subway, foundation pit enclosure at present.Cause The recyclable recycling of bracing members, the features such as economical, feature of environmental protection.And steel pipe support is a kind of supporting way of bracing members, Extensive use is built in building.
Currently, notification number is a kind of connection structure of steel pipe support part of Chinese utility model patent of CN206256551U, Including the first steel pipe, the second steel pipe and connector, the diameter of first steel pipe is more than the diameter of the second steel pipe, first steel Pipe is equipped with the first mounting hole of a circle and the first steel pipe coaxial line arrangement, and the connector is equipped with corresponding with the first mounting hole the One through-hole, the connector further include the first locating piece for rotating freely on the first steel pipe madial wall, the first through hole and Positioning piece is arranged with the first steel pipe coaxial line;Second steel pipe is equipped with the second of a circle and the second steel pipe coaxial line arrangement Mounting hole, the connector are equipped with the second through-hole corresponding with the second mounting hole, and the connector further includes rotating freely on the Second locating piece of two steel pipe madial walls, second through-hole and the second locating piece are arranged with the second steel pipe coaxial line.
Although the connection structure of this steel pipe support part realizes that two steel pipes and the mutual of connector are consolidated by inserting mode It is fixed, achieve the purpose that facilitate alignment;But it when alignment of this connector for two steel pipes of same diameter, needs to connect Connector stays in the coupling part of steel pipe, and steel pipe is more, and the use of connector is more, with high costs.
Utility model content
The purpose of this utility model is to provide a kind of attachment device of steel pipe support part, and attachment device open-close type is arranged, Realize the multiple utilization of attachment device, it is cost-effective.
The above-mentioned technical purpose of the utility model technical scheme is that:A kind of steel pipe support part Attachment device, including it is cylindrical in shape the first connector and the second connector of setting, first connector one end is around the first connection Part periphery wall one week is equipped with guide groove, and the guide groove slot cross-section is set as trapezoidal setting, second connector one end it is outer Wall is equipped with and the guide pad of guide groove cooperation;The end of first connector and the second connector is respectively equipped with locking dress It sets, the locking device of first connector is located at end of first connector far from guide groove, the lock of second connector Tight device is located at end of second connector far from guide pad;First connector and the second connector are respectively by two pieces of arcs Plate is spliced.
By using above-mentioned technical proposal, when docking two steel pipes, need two steel pipes are perfectly aligned, could be to two Installation bolt in the mounting hole of root steel tube end part setting, to fix two steel pipes;By the first connector and the second connector profit It is separately fixed at the end of two steel pipes with locking device, using the clamping of mutually matched guide groove and guide pad, realizes two The alignment of root steel tube end part;In addition, in order to realize being used for multiple times for connector, the first connector and the second connector by two pieces of arcs Shape plate is put together, and can not only facilitate staff that the first connector and the second connector are installed on steel pipe, moreover it is possible to incite somebody to action After two steel pipes are aligned and fix, arc panel is opened, the first connector and the second connector are removed.
Further, the locking device is included in the electromagnet of arc panel end set, is also equipped on the arc panel Battery component, the electromagnet are communicated on battery component.
By using above-mentioned technical proposal, the first connector and the second connector slide and shadow on steel pipe in order to prevent The alignment to two steel pipes is rung, loads onto electromagnet in arc panel end, electromagnet is powered by the battery component installed in arc panel; First connector and the second connector can be adsorbed on steel pipe by electromagnet after being powered, can be to the first connector after power-off It is adjusted with the position of the second connector, or opens arc panel and remove connector, it is very convenient.
Further, the slot bottom of the guide groove is provided with bayonet, locking device of the guide pad far from the second connector End cooperation be equipped with fixture block.
By using above-mentioned technical proposal, it is provided with bayonet in guide groove slot bottom, the fixture block in guide pad end set is mobile Steel pipe makes fixture block inject in guide groove, and is gradually slid to slot bottom in the guide groove that slot cross-section is trapezoidal setting, until fixture block It sticks into bayonet, at this point, the end of two steel pipes is mutually aligned, to facilitate staff to fix steel pipe.
Further, it is provided with fixing port on the guide pad peripheral wall.
By using above-mentioned technical proposal, it is provided with fixing port on guide pad, staff can be facilitated in alignment steel pipe Afterwards, i.e., two steel pipes are fixed using bolt, avoided after taking the first connector and the second connector away, steel pipe position occurs inclined It moves.
Further, it is provided with rolling groove on the arc panel inner wall, is rotated in the rolling groove and is provided with ball.
By using above-mentioned technical proposal, it is provided with the rolling groove equipped with ball in arc panel, is fixed by fixing port After a upper bolt, arc panel is rotated, adjustment the second connection Board position fixes upper bolt in the mounting hole of remaining position, from And it is fixed on steel pipe position, avoid the steel pipe that a bolt is only housed from shifting after taking connector away, and influence follow-up The installation of bolt.
Further, on institute's arc panel periphery wall push handle is equipped at intervals with around periphery wall.
By using above-mentioned technical proposal, push handle is loaded onto on arc panel periphery wall, staff can not only be facilitated to turn Dynamic arc panel, adjustment fixing port position, moreover it is possible to facilitate staff to push arc panel, adjust the first connector and the second connector Position.
Further, one piece of arc panel side is equipped with rotation axis, and another piece of arc panel is rotatably connected on rotation On axis.
By using above-mentioned technical proposal, two pieces of arc panels are rotatably connected by rotation axis, facilitate work work Make personnel and mounts and dismounts arc panel.
Further, edge cooperation of two pieces of arc panels far from rotation axis is equipped with hasp.
By using above-mentioned technical proposal, two pieces of arc panels are realized by hasp in edge of the arc panel far from rotation axis Folding connection be stuck in outside steel pipe to facilitate staff to open the first connector and the second connector, recycle hasp The first connector and the second connector are blocked, the first connector and the second connector is avoided to be detached from steel pipe.
In conclusion the utility model has the advantages that:
1. realizing the recycling of connector by the first connector and the second connector that open and close setting;
2. by the setting of guide groove and guide pad, the alignment of two steel pipes is realized.
Description of the drawings
Fig. 1 is a kind of overall structure diagram of the attachment device of steel pipe support part of the utility model, for showing first State when connector and the second connector do not splice;
Fig. 2 is a kind of overall structure diagram of the attachment device of steel pipe support part of the utility model, for showing first State when connector and the second connector splice;
Fig. 3 is the sectional view of the first connector and the second connector;
Fig. 4 is the enlarged drawing of part A in Fig. 3.
In figure, the 1, first connector;11, guide groove;111, bayonet;2, the second connector;21, guide pad;211, fixture block; 212, fixing port;3, arc panel;31, rotation axis;32, hasp;33, rolling groove;331, ball;34, push handle;4, locking device; 41, electromagnet;42, battery component;5, the first steel pipe;51, the second steel pipe;52, mounting disc;53, mounting hole.
Specific implementation mode
The utility model is described in further detail below in conjunction with attached drawing.
Embodiment:A kind of attachment device of steel pipe support part, as shown in Figure 1, the first connector 1 including being cylindrical in shape setting With the second connector 2, one end of the first connector 1 and the second connector 2 is separately provided for fixing the first connector 1 and The locking device 4 of two connectors, 2 position is provided perpendicular to the flange of periphery wall in 1 other end of the first connector around periphery wall, It is connected with the guide groove 11 of the trapezoidal setting of slot cross-section in flange end, and the opening direction of guide groove 11 is backwards to the first connector 1 locking device 4 is arranged;It is provided perpendicular to around periphery wall the flange of periphery wall in the other end of the second connector 2, in flange End is connected with and 11 matched guide pad 21 of guide groove backwards to the locking device 4 of the second connector 2;And the first connector 1 It is spliced respectively by two pieces of arc panels 3 with the second connector 2.Here, the internal diameter of the first connector 1 and the second connector 2 with The outer diameter of steel pipe is equal;And guide groove 11 is equipped with into two valves with 21 part of guide pad, and guide groove 11 is stretched with guide pad 21 The mounting disc 52 for going out steel pipe is arranged.
In this way, opening the first connector 1, the first connector 1 is installed to the end of the first steel pipe 5, guide groove 11 is made to stretch The mounting disc 52 for going out the first steel pipe 5 is arranged, and the locking device 4 on the first connector 1 is recycled to fix the first connector 1 the Position on one steel pipe 5;The second connector 2 is opened, the second connector 2 is installed to the end of the second steel pipe 51, makes guide pad 21 mounting discs 52 for stretching out the second steel pipe 51 are arranged, and the locking device 4 on the second connector 2 is recycled to fix the second connector 2 position on the second steel pipe 51;Mobile second steel pipe 51, makes guide pad 21 inject in guide groove 11, guide pad 21 is being oriented to It is slid in 11 inclined inner wall of slot, drives the fine tuning of two steel pipes, subject-oriented piece 21 when being against 11 slot bottom of guide groove, two steel pipes Mounting disc 52 is mutually aligned.Arc panel 3 is opened, the first connector 1 and the second connector 2 is removed, reuses bolt and intert into peace In mounting hole 53 in sabot 52, the position of two steel pipes can be fixed.
In order to realize the fixed function of locking device 4, as shown in Figures 2 and 3, set on the internal perisporium of one end of arc panel 3 It is equipped with electromagnet 41;It is provided with groove on the periphery wall of the arc panel 3 of 41 side of electromagnet, battery component 42 is housed in a groove (Including battery portion and cell switch part), battery component 42 is connected to electromagnet 41.In this way, by 1 He of the first connector It after second connector 2 is mounted on steel pipe, is powered to electromagnet 41, electromagnet 41 can be utilized the first connector 1 and second What connector 2 fastened is adsorbed on steel pipe, and the first connector 1 and the second connector 2 is avoided to be slid on steel pipe.
In order to realize the folding setting of the first connector 1 and the second connector 2, as shown in Figures 2 and 3, one piece of arc panel 3 The edge of side is rotatably connected to rotation axis 31, and another piece of arc panel 3 is rotatably connected in rotation axis 31;In two pieces of arc panels 3 edges far from rotation axis 31 are equipped with hasp 32, and hasp 32 is arranged in the first connector 1 and the second connector 2 Periphery wall on.In this way, the first connector 1 and the second connector 2 can be stuck on steel pipe by rotation arc panel 3, the is recycled The hasp 32 being arranged on a connection piece 1 and the second connector 2 can fix the first connector 1 and the second connector 2, avoid A connection piece 1 and the second connector 2 are detached from steel pipe.
In order to avoid after removing the first connector 1 and the second connector 2, steel pipe position shifts, and influences spiral shell The installation of bolt, as shown in Fig. 2, being provided with fixing port 212 on the peripheral wall of guide pad 21, here, it is two that fixing port 212, which is symmetrical arranged, It is a and be arranged at 52 position of mounting disc of steel pipe.In this way, can be passed through without removing the first connector 1 and the second connector 2 212 installation bolt of fixing port, fixed steel pipe position.
When 212 misalignment 53 position of mounting hole of fixing port, needs to rotate the second connector 2, adjust fixing port 212 Therefore position as shown in Figures 2 and 3, is provided with rolling groove 33 on 3 inner wall of arc panel, is rotated by shaft in rolling groove 33 It is provided with ball 331;Multiple push handles are housed around the periphery wall of the first connector 1 and the second connector 2 on 3 outer wall of arc panel 34.In this way, staff after closing electromagnet 41, can rotate the second connector by the cooperation of push handle 34 and ball 331 2,212 position of adjustment fixing port, to facilitate staff's installation bolt, in addition, the first connection of staff's adjustment can also be facilitated 2 position of part 1 and the second connector.
In order to avoid when adjusting the first connector 1 and the second 2 position of connector, guide pad 21 is detached from guide groove 11, such as Shown in Fig. 3 and Fig. 4, it is provided with bayonet 111 in 11 slot bottom of guide groove, in locking device 4 of the guide pad 21 far from the second connector 2 End is equipped with fixture block 211.In this way, after guide pad 21 is inserted into 11 slot bottom of guide groove, fixture block 211 sticks into bayonet 111, i.e., Guide pad 21 and guide groove 11 can be fixed.
The above is only the preferred embodiment of the utility model, and the scope of protection of the utility model is not limited merely to Above-described embodiment, technical solution belonging to the idea of the present invention belong to the scope of protection of the utility model.It should refer to Go out, for those skilled in the art, it is without departing from the principle of the utility model it is several improvement and Retouching, these improvements and modifications also should be regarded as the scope of protection of the utility model.

Claims (8)

1. a kind of attachment device of steel pipe support part, it is characterised in that:The first connector including being cylindrical in shape setting(1)With second Connector(2), first connector(1)One end is around the first connector(1)Periphery wall is equipped with guide groove in one week(11), described to lead To slot(11)Slot cross-section is set as trapezoidal setting, second connector(2)The outer wall of one end is equipped with and guide groove(11)Match The guide pad of conjunction(21);First connector(1)With the second connector(2)End be respectively equipped with locking device(4), described First connector(1)Locking device(4)Positioned at the first connector(1)Far from guide groove(11)End, it is described second connection Part(2)Locking device(4)Positioned at the second connector(2)Far from guide pad(21)End;First connector(1)With Two connectors(2)Respectively by two pieces of arc panels(3)It is spliced.
2. a kind of attachment device of steel pipe support part according to claim 1, it is characterised in that:The locking device(4) It is included in arc panel(3)The electromagnet of end set(41), the arc panel(3)On be also equipped with battery component(42), the electricity Magnet(41)It is communicated to battery component(42)On.
3. a kind of attachment device of steel pipe support part according to claim 1, it is characterised in that:The guide groove(11)'s Slot bottom is provided with bayonet(111), the guide pad(21)Far from the second connector(2)Locking device(4)End cooperation be equipped with Fixture block(211).
4. a kind of attachment device of steel pipe support part according to claim 1, it is characterised in that:The guide pad(21)Week Fixing port is provided on wall(212).
5. a kind of attachment device of steel pipe support part according to claim 4, it is characterised in that:The arc panel(3)It is interior Rolling groove is provided on wall(33), the rolling groove(33)Middle rotation is provided with ball(331).
6. according to a kind of attachment device of steel pipe support part described in claim 5, it is characterised in that:The arc panel(3)On around Periphery wall is equipped at intervals with push handle(34).
7. a kind of attachment device of steel pipe support part according to claim 1, it is characterised in that:One piece of arc panel (3)Side is equipped with rotation axis(31), another piece of arc panel(3)It is rotatably connected on rotation axis(31)On.
8. a kind of attachment device of steel pipe support part according to claim 7, it is characterised in that:Two pieces of arc panels (3)Far from rotation axis(31)Edge cooperation be equipped with hasp(32).
CN201721688291.3U 2017-12-06 2017-12-06 A kind of attachment device of steel pipe support part Expired - Fee Related CN207727588U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721688291.3U CN207727588U (en) 2017-12-06 2017-12-06 A kind of attachment device of steel pipe support part

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721688291.3U CN207727588U (en) 2017-12-06 2017-12-06 A kind of attachment device of steel pipe support part

Publications (1)

Publication Number Publication Date
CN207727588U true CN207727588U (en) 2018-08-14

Family

ID=63097840

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721688291.3U Expired - Fee Related CN207727588U (en) 2017-12-06 2017-12-06 A kind of attachment device of steel pipe support part

Country Status (1)

Country Link
CN (1) CN207727588U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108756018A (en) * 2018-08-30 2018-11-06 刘晓峰 A kind of attachment device and building brick curtain wall of building brick

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108756018A (en) * 2018-08-30 2018-11-06 刘晓峰 A kind of attachment device and building brick curtain wall of building brick
CN108756018B (en) * 2018-08-30 2023-10-27 刘晓峰 Building brick connecting device and building brick curtain wall

Similar Documents

Publication Publication Date Title
CN204942171U (en) Furniture connecting component
CN207727588U (en) A kind of attachment device of steel pipe support part
CN204827176U (en) Concatenation cantilever translation door
CN101740733A (en) Battery cover blocking structure
CN210149345U (en) Safety contact manual switch device applied to electric switch machine
CN208142334U (en) Yagi aerial device for installing and adjusting
CN208231836U (en) A kind of robot head rotational locking device
CN211009452U (en) Be applied to furniture connection structure subassembly
US20170343036A1 (en) Device for preventing component from loosening caused by reverse travel
CN205805267U (en) Concealed door pivot hinge and use the door body structure of this hinge
CN205092422U (en) Device that hangs down is prevented to simple and easy switch board door
CN210887592U (en) Folding shop
CN207437110U (en) Spaced anchorage mechanical rock bolt
CN207000213U (en) A kind of easy-to-dismount support meanss of charging pile
CN212154397U (en) Protector for building engineering
CN107829770A (en) Spaced anchorage mechanical rock bolt
CN211806055U (en) A electric power overhauls device for municipal works
CN211596982U (en) Cover plate for drainage pipeline in municipal engineering
CN216690160U (en) Area is refuted and is connect claw formula stainless steel guardrail stand
CN204419250U (en) For combining the rotating disk adopting fully mechanized coal face
CN210111328U (en) Assembled low-voltage distribution cabinet
CN217362891U (en) Frequency converter protection device and frequency converter thereof
KR20220033767A (en) Apparatus for manufacturing a double wall pipe having expansion
CN219262565U (en) Fixing mechanism for tidal power generation
CN218829541U (en) Track for winding inserting

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180814

Termination date: 20201206