CN207715996U - A kind of sustainable and erecting by overhang of big load - Google Patents
A kind of sustainable and erecting by overhang of big load Download PDFInfo
- Publication number
- CN207715996U CN207715996U CN201721833643.XU CN201721833643U CN207715996U CN 207715996 U CN207715996 U CN 207715996U CN 201721833643 U CN201721833643 U CN 201721833643U CN 207715996 U CN207715996 U CN 207715996U
- Authority
- CN
- China
- Prior art keywords
- bearing
- disc spring
- bolt
- main body
- fastening component
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Vibration Prevention Devices (AREA)
Abstract
The utility model is related to a kind of sustainable and erectings by overhang of big load, belong to jumbo or structure auxiliary mounting tool technical field.Described device is mainly made of bolt installation element, main body disc spring bearing structure, adjusting bearing and the mating bolt fastening component that can transmit pressure and pulling force;Bolt installation element includes bolt, section nut and upper branching holder;Main body disc spring bearing structure includes shell, disc spring piece, fulcrum bearing, protection cap and scale-board, and bolt fastening component is more than two, and every group is made of more than two bolt fasteners.Described device has a wide range of application, can vertical support installation or hanging installation;Small using disc spring structure, bearing capacity is strong, has certain buffering and damping capacity;Described device is compact-sized, convenient for disassembly and assembly, good manufacturability.
Description
Technical field
The utility model is related to a kind of sustainable and erecting by overhang of big load, hanging down for jumbo or structure can be applied to
It is installed to support, also can be used for the vertical hanging installation of jumbo or structure, belong to jumbo or structure auxiliary erector
Has technical field.
Background technology
With the development of modernization industry, the Enlargement Tendency, jumbo or structure is presented in all kinds of mechanical equipments or structure
Auxiliary erectility be also required to constantly be promoted.Meanwhile along with equipment or structure large-scale, to the oscillation ring of equipment or structure
Border requires to be also higher and higher, and auxiliary mounting structure is also required to have stronger buffering and vibration damping while bearing capacity is promoted
Ability.
The rigidity installation of jumbo or structure cannot be satisfied shock resistance and the vibration isolation requirement of equipment or structure, be conventionally used to
The auxiliary mounting structure of jumbo or structure is mostly single vertical carrying or single vertical hanging structure, application range
It is limited.Rubber shock absorber can support and hang installation equipment, have preferable vibration isolating effect to vibration equipment, but carry energy
Power is relatively low, cannot be satisfied jumbo or the installation requirement of structure.Air spring changes bearing capacity, bearing capacity by internal pressure
By force, isolation vibrating effect is good, but air spring tension state rigidity is low, can not complete the hanging installation of equipment, and air
Spring mounting process is complicated, safeguards that reparation is relatively difficult.
So designing a kind of large carrying capacity, shock resistance and damping capacity are strong, can support the bogey tool of also suspended
There is certain foreground.
Invention content
In view of this, the purpose of this utility model is to provide a kind of sustainable and erecting by overhang of big load, the dress
The support installation of jumbo or structure can either be completed by setting, while can be satisfied with the hanging installation of jumbo or structure again,
The device is convenient for disassembly and assembly, and bearing capacity is strong, has certain anti-impact and damping effect.
To realize the purpose of this utility model, following technical scheme is provided.
A kind of sustainable and erecting by overhang of big load, described device are mainly installed by the bolt that can transmit pressure and pulling force
Part, main body disc spring bearing structure adjust bearing and mating bolt fastening component composition, can be used for jumbo or structure
Vertical support installation and hanging installation.
Wherein, bolt installation element includes bolt, adjusting nut and upper branching holder;Main body disc spring bearing structure include shell,
Disc spring piece, fulcrum bearing, protection cap and scale-board, bolt fastening component are more than two, and every group is fastened by more than two bolts
Part forms.
Fulcrum bearing is cylinder, by steel superstructure, lower part steel construction, is composed by the middle part vulcanization of rubber, lower part
Be tapped with internal thread inside steel construction, form the structure of an inner thread sleeve, coordinate with bolt, for transmit vertical pressure or
Pulling force, while there is certain cushioning effect.It polishes flat, and is carried out at antirust at the top of the nut that bolt connects with fulcrum bearing
Reason.Shell has circular hole, the lower part steel construction of fulcrum bearing may pass through in " circle is recessed " shape structure, bottom, and shell loin is equipped with rectangular
Mounting plate, the bolt hole with there are four can be fastened by bolts component and be connect with pedestal or adjusting bearing.It is upper and lower to adjust bearing
Mounting surface is rectangular, is composed by the welding of columnar steel construction piece, upper mounting surface has big opening, can pass through one group of spiral shell
Bolt fastening assembly is connect with shell, and lower mounting surface is connect by another group of bolt fastening component with pedestal or ground.
Before jumbo or structure installation, the disc spring piece of a piece of above cirque structure is stacked successively and is sleeved on bearing
On the screw shell of seat lower part steel construction, then fulcrum bearing and disc spring piece are buckled in the shell of " circle is recessed " type, disc spring piece, bearing
All there is gap, ease of assembly dismounting between seat and shell;Circular ring shape protection cap is reversely buckled on fulcrum bearing steel superstructure simultaneously
Fixed, scale-board is fixed on housing outer surface, and combination installation obtains main body disc spring bearing structure.
When jumbo or the vertical support of structure are installed, first upper branching holder is mounted on by one group of bolt fastening component
On jumbo or structure, then bolt and adjusting nut are mounted on to the mounting hole of upper branching holder and jumbo or structure
It is interior, finally main body disc spring bearing structure is fixed on by another group of bolt fastening component on ground or pedestal.By adjusting spiral shell
The distance between female adjusting bolt and sub-body disc spring bearing structure complete the horizontal support installation of equipment or structure.When
It, can be by one group of bolt fastening component by main body disc spring bearing structure and tune when being not allow for big trepanning on ground or pedestal
Then the upper mounting surface connection for saving bearing adjusts mounting surface under bearing and is connected by another group of bolt fastening component and ground or pedestal
It connects, that is, completes the transition installation of main body disc spring bearing structure.
When jumbo or the vertical hanging of structure are installed, main body disc spring bearing structure is constant, and bolt is worn from the bottom up
Jumbo or the mounting surface of structure are crossed, and is screwed into fulcrum bearing internal whorl sleeve from main body disc spring bearing structure bottom, and
It is fixed by adjusting nut and gasket.Then bearing will be adjusted and be reversely sleeved on main body disc spring bearing structure top, and pass through one group
Bolt fastening component fixes locking.Finally positioning adjusts mounting hole of the holder top on pedestal, and tight by another group of bolt
Gu component is connect with pedestal.
A kind of sustainable and erecting by overhang the working method of big load described in the utility model is as follows:
1. in vertical support installation condition, bolt transmits jumbo or structure on main body disc spring bearing structure top
Pressure, main body disc spring bearing structure can be directly mounted on ground or pedestal, or be indirectly attached to ground by adjusting seat structure
On base or pedestal.In vertical hanging installation condition, bolt is in main body disc spring structural bearing structure bottom, for fastening jumbo
Or structure and downward pulling force is transmitted, main body disc spring bearing structure is mounted on by adjusting seat structure hanging on pedestal.Support and
Hanging state utilizes identical part, simple in construction, easy to disassemble and assemble;
2. disk spring is the core of entire support hanging apparatus, disk spring rigidity is big, shock resistance damping capacity
By force, big load can be born with small deformation.It can be according to the various combination mode of disk spring, to increase entire support hanging dress
The carrying range set, support hanging apparatus can be designed to the type new product of different bearer ability.
3. described device, in normal use, protection cap is supported or hangs equipment in shell scale-board position real-time display
The loaded state of structure.Scale on scale-board is that support hanging apparatus is obtained by load-deflection experimental test, same type
Support hanging apparatus carrying range it is consistent, meter full scale is also consistent.
Advantageous effect
1. sustainable and erecting by overhang, described device that the utility model provides a kind of big load have a wide range of application, can
Vertical support installation, can also vertical hanging installation;
2. the utility model provides a kind of sustainable and erecting by overhang of big load, described device uses disc spring structure,
Small, bearing capacity is strong, has certain buffering and damping capacity;
3. the utility model provides a kind of sustainable and erecting by overhang of big load, described device is compact-sized, dismounting
It is convenient, good manufacturability.
Description of the drawings
Fig. 1 is a kind of sustainable cross section structure signal with erecting by overhang under holding state of big load in embodiment
Figure.
Fig. 2 is a kind of sustainable cross section structure signal with erecting by overhang under hanging state of big load in embodiment
Figure.
Wherein, 1-bolt, 2-adjusting nuts, 3-upper branching holders, 4-shells, 5-disc spring pieces, 6-fulcrum bearings, 7-
Protection cap, 8-screws, 9-scale-boards, 10-adjust bearing, 11-gaskets, 12-bolt fastening components
Specific implementation mode
Below in conjunction with the accompanying drawings and example, the utility model is described in further detail.
Embodiment 1
As illustrated in fig. 1 and 2, the sustainable and erecting by overhang of a kind of big load, described device mainly by can transmit pressure and
The bolt installation element of pulling force, adjusts bearing 10 and mating bolt fastening component 12 composition at main body disc spring bearing structure, can use
Vertical support installation in jumbo or structure and hanging installation.
Wherein, bolt installation element includes bolt 1, adjusting nut 2 and upper branching holder 3;Main body disc spring bearing structure includes shell
Body 4, disc spring piece 5, fulcrum bearing 6, protection cap 7 and scale-board 9, bolt fastening component 12 are more than two, and every group by two or more
Bolt fastener composition.
Fulcrum bearing 6 is cylinder, by steel superstructure, lower part steel construction, is composed by the middle part vulcanization of rubber, lower part
It is tapped with internal thread inside steel construction, forms the structure of an inner thread sleeve, coordinates with bolt 1, for transmitting vertical pressure
Or pulling force, while there is certain cushioning effect.It polishes flat at the top of the nut that bolt 1 connects with fulcrum bearing 6, and carries out antirust
Processing.Shell 4 has circular hole, the lower part steel construction of fulcrum bearing 6 may pass through in " circle is recessed " shape structure, bottom, and 4 loin of shell is equipped with
Square installing plate, the bolt hole with there are four can be fastened by bolts component 12 and be connect with pedestal or adjusting bearing 10.Adjust branch
10 upper and lower mounting surfaces of seat are rectangular, are composed by the welding of columnar steel construction piece, upper mounting surface has big opening, can
It is connect with shell 4 by one group of bolt fastening component 12, lower mounting surface passes through another group of bolt fastening component 12 and pedestal or ground
Base connects.
Before jumbo or structure installation, the disc spring piece 5 of six cirque structures is stacked successively and is sleeved under fulcrum bearing 6
On the screw shell of portion's steel construction, then fulcrum bearing 6 and disc spring piece 5 are buckled in the shell 4 of " circle is recessed " type, disc spring piece 5, bearing
All there is gap, ease of assembly dismounting between seat 6 and shell 4;Circular ring shape protection cap 7 is reversely buckled in 6 steel superstructure of fulcrum bearing
It above and by screw 8 fixes, scale-board 9 is fixed on 4 outer surface of shell by screw 8, totally three, point 90 degree of arranged for interval, group
It closes installation and obtains main body disc spring bearing structure.
As shown in Figure 1, when jumbo or the vertical support of structure are installed, it is first that upper branching holder 3 is tight by one group of bolt
Gu component 12 is fixed in jumbo or structure, bolt 1 and adjusting nut 2 are then mounted on upper branching holder 3 and heavy type is set
In standby or structure mounting hole, finally by main body disc spring bearing structure by another group of bolt fastening component 12 be fixed on ground or
On pedestal.By the distance between 2 adjusting bolt 1 of adjusting nut and sub-body disc spring bearing structure, that is, complete equipment or knot
The horizontal support installation of structure.When being not allow for big trepanning on ground or pedestal, one group of bolt fastening component 12 can be passed through
Main body disc spring bearing structure is connected with the upper mounting surface for adjusting bearing 10,10 times mounting surfaces of bearing is then adjusted and passes through another group
Bolt fastening component 12 is connect with ground or pedestal, that is, completes the transition installation of main body disc spring bearing structure.
As shown in Fig. 2, when jumbo or the vertical hanging of structure are installed, main body disc spring bearing structure is constant, by bolt 1
Jumbo or the mounting surface of structure are passed through from the bottom up, and are screwed into 6 inside spiral shell of fulcrum bearing from main body disc spring bearing structure bottom
In line sleeve, and fixed by adjusting nut 2 and gasket 11.Then bearing 10 will be adjusted and be reversely sleeved on main body disc spring bearing structure
Top, and locking is fixed by one group of bolt fastening component 12.Finally positioning adjusts mounting hole of 10 top of bearing on pedestal,
And it is connect with pedestal by another group of bolt fastening component 12.
A kind of sustainable and erecting by overhang working method of big load described in the present embodiment is as follows:
1. in vertical support installation condition, bolt 1 transmits jumbo or structure on main body disc spring bearing structure top
Pressure, main body disc spring bearing structure can be directly mounted on ground or pedestal, or be indirectly attached to ground by adjusting seat structure
On base or pedestal.In vertical hanging installation condition, bolt 1 is set in main body disc spring structural bearing structure bottom for fastening heavy type
Standby or structure simultaneously transmits downward pulling force, and main body disc spring bearing structure is mounted on by adjusting seat structure hanging on pedestal.Support
Identical part is utilized with hanging state, it is simple in construction, easy to disassemble and assemble;
2. disk spring is the core of entire support hanging apparatus, disk spring rigidity is big, shock resistance damping capacity
By force, big load can be born with small deformation.It can be according to the various combination mode of disk spring, to increase entire support hanging dress
The carrying range set, support hanging apparatus can be designed to the type new product of different bearer ability.
3. described device is in normal use, protection cap 7 be supported in the position real-time display of the scale-board 9 of shell 4 or
Hang the loaded state of device structure.Scale on scale-board 9 is that support hanging apparatus is obtained by load-deflection experimental test
It arrives, the support hanging apparatus carrying range of same type is consistent, and meter full scale is also consistent.
Claims (3)
1. a kind of sustainable and erecting by overhang of big load, it is characterised in that:Described device is mainly by that can transmit pressure and pulling force
Bolt installation element, main body disc spring bearing structure, adjust bearing (10) and mating bolt fastening component (12) composition;Bolt
Installation part includes bolt (1), adjusting nut (2) and upper branching holder (3);Main body disc spring bearing structure includes shell (4), disc spring piece
(5), fulcrum bearing (6), protection cap (7) and scale-board (9), bolt fastening component (12) are more than two, and every group by two or more
Bolt fastener composition;
Fulcrum bearing (6) is cylinder, is made up of the middle part vulcanization of rubber steel superstructure and lower part steel construction, lower part steel construction
For the structure of inner thread sleeve, coordinates with bolt (1), transmit vertical pressure or pulling force;Bolt (1) connects with fulcrum bearing (6)
Nut at the top of polish flat, and carry out antirust treatment;In " circle is recessed " shape structure, circular hole, fulcrum bearing (6) are arranged shell (4) at bottom
Lower part steel construction pass through, shell (4) loin is equipped with square installing plate, with there are four bolt hole, is fastened by bolts component
(12) it is connect with pedestal or adjusting bearing (10);It is rectangular to adjust mounting surface and lower mounting surface on bearing (10), passes through cylindrical shape
Steel construction piece be welded to form, upper mounting surface has big opening, is connect with shell (4) by one group of bolt fastening component (12), under
Mounting surface is connect by another group of bolt fastening component (12) with pedestal or ground;
Before jumbo or structure installation, the disc spring piece (5) of a piece of above cirque structure is stacked successively and is sleeved on bearing
On the screw shell of seat (6) lower part steel construction, fulcrum bearing (6) and disc spring piece (5) are then buckled in the shell (4) of " circle is recessed " type
It is interior, all there is gap, ease of assembly dismounting between disc spring piece (5), fulcrum bearing (6) and shell (4);Circular ring shape protection cap (7) is anti-
To being buckled on fulcrum bearing (6) steel superstructure and fixing, scale-board (9) is fixed on shell (4) outer surface, and combination installation is led
Body disc spring bearing structure;
It is first that upper branching holder (3) is solid by one group of bolt fastening component (12) when jumbo or the vertical support of structure are installed
Be scheduled in jumbo or structure, then by bolt (1) and adjusting nut (2) be mounted on upper branching holder (3) and jumbo or
In the mounting hole of structure, main body disc spring bearing structure is finally fixed on ground or base by another group of bolt fastening component (12)
On seat;By the distance between adjusting nut (2) adjusting bolt (1) and sub-body disc spring bearing structure, that is, complete equipment or
The horizontal support installation of structure;When being not allow for big trepanning on ground or pedestal, pass through one group of bolt fastening component (12)
Main body disc spring bearing structure connect with the upper mounting surface for adjusting bearing (10), then under adjusting bearing (10) mounting surface pass through it is another
One group of bolt fastening component (12) connect with ground or pedestal, that is, completes the transition installation of main body disc spring bearing structure;
When jumbo or the vertical hanging of structure are installed, main body disc spring bearing structure is constant, and bolt (1) is passed through from the bottom up
The mounting surface of jumbo or structure, and be screwed into fulcrum bearing (6) internal whorl sleeve from main body disc spring bearing structure bottom, and
It is fixed by adjusting nut (2) and gasket (11);Then bearing (10) will be adjusted and be reversely sleeved on main body disc spring bearing structure top,
And by the fixed locking of one group of bolt fastening component (12), finally positioning adjusts the mounting hole on pedestal at the top of bearing (10),
And it is connect with pedestal by another group of bolt fastening component (12).
2. a kind of sustainable and erecting by overhang of big load according to claim 1, it is characterised in that:Circular ring shape protection cap
(7) it is reversely buckled on fulcrum bearing (6) steel superstructure and fixed by screw (8).
3. a kind of sustainable and erecting by overhang of big load according to claim 1 or 2, it is characterised in that:Scale-board (9)
It is fixed on shell (4) outer surface by screw (8), totally three, divides 90 degree of arranged for interval.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721833643.XU CN207715996U (en) | 2017-12-25 | 2017-12-25 | A kind of sustainable and erecting by overhang of big load |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721833643.XU CN207715996U (en) | 2017-12-25 | 2017-12-25 | A kind of sustainable and erecting by overhang of big load |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207715996U true CN207715996U (en) | 2018-08-10 |
Family
ID=63049700
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721833643.XU Expired - Fee Related CN207715996U (en) | 2017-12-25 | 2017-12-25 | A kind of sustainable and erecting by overhang of big load |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207715996U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108223977A (en) * | 2017-12-25 | 2018-06-29 | 中国船舶重工集团公司第七〇九研究所 | A kind of sustainable and erecting by overhang of big load |
-
2017
- 2017-12-25 CN CN201721833643.XU patent/CN207715996U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108223977A (en) * | 2017-12-25 | 2018-06-29 | 中国船舶重工集团公司第七〇九研究所 | A kind of sustainable and erecting by overhang of big load |
CN108223977B (en) * | 2017-12-25 | 2023-10-27 | 中国船舶重工集团公司第七一九研究所 | Large-load supportable and hanging device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202301728U (en) | Fundamental damping device and fundamental damping system | |
CN207715996U (en) | A kind of sustainable and erecting by overhang of big load | |
CN202274032U (en) | Limited shock absorber | |
CN202381171U (en) | Locomotive diesel engine set elastic supporting structure | |
CN101775763B (en) | Failure indicator of vibration isolator of damping spring floating track bed | |
CN102776811A (en) | Rubber spring vibration isolator | |
CN205445948U (en) | Piston compressor's vibration isolation system for oxygenerator | |
CN207595277U (en) | A kind of preposition single arm type gondola hanger | |
CN108223977A (en) | A kind of sustainable and erecting by overhang of big load | |
CN205187283U (en) | Buffer floats | |
CN205156297U (en) | Seismic isolation device of air conditioning unit installation foot | |
CN207195971U (en) | Shock resistance disc spring pedestal | |
CN206233090U (en) | Bridge vibration damping holder | |
CN203528284U (en) | Power device suspension mechanism | |
CN202469249U (en) | Wall mixture vertical conveying pipeline shock absorber | |
CN205221985U (en) | Unsteady buffer's in area panel turnover machine | |
CN105033932B (en) | Gas-filling cabinet adnexa special installation tool | |
CN210979156U (en) | Anti-seismic underframe device for high-voltage lightning arrester | |
CN202180054U (en) | Vibration reduction supporting device of vibrating screen | |
CN209140861U (en) | Detachable mobile tooling shelf is adjusted | |
CN207633194U (en) | A kind of Bridge Seismic structure | |
CN208136712U (en) | A kind of support force-reducing device | |
CN208115857U (en) | A kind of removable shock mitigation system of vertical mill | |
CN205187282U (en) | Suspension type power take off head of area buffering | |
CN202162145U (en) | Single-layer screening equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20190513 Address after: 430064 No. 450 Zhongshan Road, Wuchang District, Wuhan City, Hubei Province Patentee after: Wuhan Haiwang Technologies Co., Ltd. Address before: 430064 No. 450 Zhongshan Road, Wuchang District, Wuhan City, Hubei Province Patentee before: No.719 Inst. China Shipping Heavy Industry Group Corp. |
|
TR01 | Transfer of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180810 Termination date: 20191225 |
|
CF01 | Termination of patent right due to non-payment of annual fee |