CN207714587U - A kind of T-type combination metal stone material dry suspending pendant - Google Patents
A kind of T-type combination metal stone material dry suspending pendant Download PDFInfo
- Publication number
- CN207714587U CN207714587U CN201820216769.0U CN201820216769U CN207714587U CN 207714587 U CN207714587 U CN 207714587U CN 201820216769 U CN201820216769 U CN 201820216769U CN 207714587 U CN207714587 U CN 207714587U
- Authority
- CN
- China
- Prior art keywords
- pendant
- stone material
- main
- decorative panel
- steel tank
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Panels For Use In Building Construction (AREA)
Abstract
The embodiments of the present invention disclose a kind of T-type combination metal stone material dry suspending pendant, including the U-shaped reinforcement steel tank being arranged at the top and bottom of decorative panel of stone material, the main pendant, the first pendant, the second pendant that are arranged in stone curtain wall transom;Main pendant includes level board and vertical plate, and level board is arranged in stone curtain wall transom, and graduation mark is provided on vertical plate;One end of first pendant is arranged in U-shaped reinforcement steel tank, and the other end is connected to the top of main pendant, and adjustment screw is vertically arranged with across the joint of the first pendant and main pendant;One end of second pendant is arranged in U-shaped reinforcement steel tank, and the other end is removably attachable on main pendant.The present apparatus is contrasted by the top surface and the graduation mark of the vertical plate of main pendant of the second pendant, the error of the false keel of curtain wall known to i.e. and the installation of main pendant, it is adjusted in advance, the present apparatus can make every piece of decorative panel of stone material independent stressed and detachable, it is easy to operate, difficulty of construction is reduced, construction quality is improved.
Description
Technical field
The utility model is related to stone curtain wall technical fields, and in particular to a kind of T-type combination metal stone material dry suspending pendant.
Background technology
Existing major part dry-fasten stone curtain wall metal hanger, common independent T-type pendant, back of the body bolt pendant, steel pin pendant and
SE type pendants etc..No matter which kind of pendant all needs to slot to decorative panel of stone material or drill to install, decorative panel of stone material fluting scene
Installation AB glue adhesive used is easily influenced by weather, especially rainy day and cold winter, is unfavorable for constructing, installation effectiveness is relatively low, stone
Material decoration panel back of the body bolt drilling installation cost is higher.
Utility model content
To solve the above-mentioned problems in the prior art, it is dry that the utility model provides a kind of T-type combination metal stone material
Hang pendant, which is characterized in that including be arranged at the top of the decorative panel of stone material in mounting groove and bottom mounting groove U-shaped reinforcement steel tank,
The main pendant that is arranged in stone curtain wall transom, be arranged decorative panel of stone material bottom the first pendant, be arranged in stone facing
The second pendant at the top of plate;
The main pendant includes level board and vertical plate, and the level board is arranged in the stone curtain wall transom, institute
It states and is provided with graduation mark on vertical plate;
One end of first pendant is arranged in the U-shaped reinforcement steel tank of decorative panel of stone material bottom, and the other end is removable
That unloads is connected to the top of the main pendant, and adjustment is vertically arranged with across the joint of first pendant and the main pendant
Screw rod;
In the U-shaped reinforcement steel tank that one end of second pendant is arranged at the top of decorative panel of stone material, the other end is removable
That unloads is connected on the main pendant.
Further, there is the main pendant T-type structure, level board to be vertically set on the center of the vertical plate,
The main pendant is fixed on by passing vertically through the bolt of the level board in the stone curtain wall transom.
Further, one end of first pendant is vertically arranged in the U-shaped reinforcement steel tank of decorative panel of stone material bottom
Interior, the other end is provided with the fixing groove that Open Side Down, and first pendant hangs over the perpendicular of the main pendant by the fixing groove
At the top of straight panel, the adjustment screw passes vertically through the top of the fixing groove.
Further, second pendant has Z-type structure, and one end is vertically arranged in the U at the top of decorative panel of stone material
Type is reinforced in steel tank, and the other end is fixed on by limiting fixed screw on the vertical plate of the main pendant.
Further, the U-shaped reinforcement steel tank bonding insertion is fixed in the mounting groove at the top and bottom of decorative panel of stone material.
Advantageous effect:
A kind of T-type provided in the embodiments of the present invention combines metal stone material dry suspending pendant, passes through the second pendant
The side of top surface contrasted with the positive graduation mark of vertical plate of main pendant, you can know curtain wall false keel and main pendant installation
Error, involved component is installed in next step for decorative panel of stone material and carries out required adjustment and preparation in advance, this T-type combines metal
Stone material dry suspending pendant can make every piece of decorative panel of stone material independent stressed and detachable after mounting, and when installation is easy to operate, reduces
Difficulty of construction is not easy the influence of climate factor, accelerates construction speed, improves construction quality.
Description of the drawings
Fig. 1 is a kind of structural schematic diagram of the embodiment of T-type combination metal stone material dry suspending pendant of the utility model;
Fig. 2 is a kind of side view of the embodiment of T-type combination metal stone material dry suspending pendant of the utility model;
Fig. 3 is a kind of installation front view of the embodiment of T-type combination metal stone material dry suspending pendant of the utility model;
Fig. 4 is a kind of vertical plate of the main pendant of the embodiment of T-type combination metal stone material dry suspending pendant of the utility model
Positive schematic diagram;
Fig. 5 is that a kind of axis of the U-shaped reinforcement steel tank of the embodiment of T-type combination metal stone material dry suspending pendant of the utility model is surveyed
Schematic diagram.
Wherein:
The main pendants of 1-;The first pendants of 2-;The second pendants of 3-;4-U types reinforce steel tank;5- adjustment screws;The fixed spiral shell of 6- limits
Silk;7- standing screws;8- transoms;9- main joists;10- decorative panel of stone material.
Specific implementation mode
Technical solutions of the utility model are discussed in detail below in conjunction with the accompanying drawings.
Embodiment 1
A kind of T-type combination metal stone material dry suspending pendant, including mounting groove and bottom installation are set at the top of decorative panel of stone material
U-shaped reinforcement steel tank 4 in slot, is arranged in 10 bottom of decorative panel of stone material the main pendant 1 being arranged in stone curtain wall transom 8
First pendant 2, the second pendant 3 being arranged at the top of decorative panel of stone material 10;
The main pendant 1 includes level board and vertical plate, and the level board is arranged in the stone curtain wall transom 8,
The vertical plate is provided with graduation mark;
One end of first pendant 2 is arranged in the U-shaped reinforcement steel tank 4 of 10 bottom of decorative panel of stone material, the other end
It is removably attachable to the top of the main pendant 1, is set vertically across the joint of first pendant 2 and the main pendant 1
It is equipped with adjustment screw 5;
One end of second pendant 3 is arranged in the U-shaped reinforcement steel tank 4 at 10 top of decorative panel of stone material, the other end
It is removably attachable on the main pendant 1.
Further, the U-shaped reinforcement steel tank 4 is embedded in the mounting groove of decorative panel of stone material top edge and is installed with bottom margin
In slot.
Further, one end of first pendant 2 is arranged in the U-shaped reinforcement steel tank 4 of 10 bottom of decorative panel of stone material, separately
One end fixing groove is hung on the vertical plate top surface of the main pendant 1.
Further, one end of second pendant 3 is arranged in the U-shaped reinforcement steel tank 4 at 10 top of decorative panel of stone material, separately
One end is fixed on by limiting fixed screw 6 on the vertical plate of the main pendant 1.
Further, the adjustment screw 5 passes through the center of the fixing groove of first pendant 2, with the main pendant 1
Vertical plate top surface is in contact.
Further, the adjustment screw 5 is used to adjust the position of first pendant 2 in vertical direction.
Further, the front of the vertical plate is provided with graduation mark.
Further, the side of the vertical plate towards decorative panel of stone material 10 is provided with graduation mark.
Further, the graduation mark is horizontal and parallel to each other, and in millimeters.
The U-shaped reinforcement steel tank 4 is adhesively fixed in 10 top edge mounting groove of decorative panel of stone material with AB and bottom margin
In mounting groove.
Further, the decorative panel of stone material 10 is concentrated in factory or scene and opens top edge mounting groove and lower edge installation
Slot.
Further, fixed U-shaped higher one side for reinforcing steel tank 4 of the interior AB glue of the mounting groove of the decorative panel of stone material 10
It is close to the bottom surface of the top surface of the mounting surface of decorative panel of stone material 10 and the mounting surface of decorative panel of stone material 10.
There is the main pendant 1 T-type structure, level board to be vertically set on the center of the vertical plate, the main extension
Part 1 is fixed on by passing vertically through the standing screw 7 of the level board in the stone curtain wall transom 8.
Further, 1 level board of main pendant is the T-type structure placed.
Further, 1 level board of main pendant is horizontally fixed on the top surface of the stone curtain wall transom 8.
Further, the main pendant 1 is fixed on by being horizontally mounted with the high-strength standing screws of M8 7 on curtain wall false keel 8.
One end of first pendant 2 is loaded vertically into the U-shaped reinforcement steel tank 4 being arranged in 10 bottom of the decorative panel of stone material
Interior, the other end is provided with the fixing groove that Open Side Down, and first pendant 2 hangs over the main pendant 1 by the fixing groove and erects
The top surface of straight panel, the adjustment screw 5 passes vertically through the top center position of the fixing groove and the top surface of 1 vertical plate of main pendant connects
It touches.
Further, first pendant 2 has S type structures, and bending place is rectangular, and it is soft that 1.5mm thickness is wrapped up in one end
Thin rubber cushion is loaded vertically into be arranged and be had been inserted into the U-shaped mounting groove for reinforcing steel tank 4 in 10 bottom margin of the decorative panel of stone material, carries out
Installation, 2 other end of the first pendant are provided with the fixing groove that Open Side Down.
Further, after the thick soft thin rubber cushions of 1 vertical plate top surface of main pendant package 1.5mm, be incorporated with that Open Side Down consolidates
The first pendant 2 for determining slot notch carries out occlusion installation.
Further, the adjustment screw 5 is M6 screw rods.
Further, the adjustment screw 5 passes vertically through the fixing groove top center of first pendant 2, and the tune
It is contacted right over the bottom of whole screw rod 5 and the vertical plate top surface of the main pendant 1.
Further, the height of the adjustment screw 5 is more than 3 times of the thickness of first pendant 2.
Further, by the adjustment screw 5, the installation height of the decorative panel of stone material 10 can accurately be adjusted
It is whole.
Second pendant 3 has Z-type structure, and one end is vertically provided at 10 top edge of the decorative panel of stone material and has been inserted into
In the U-shaped mounting groove for reinforcing steel tank 4, the other end is fixed on the main pendant 1 by limit fixed screw 6 the vertical of graduation mark
In plate face.
Further, the thick soft thin rubber cushions of one end package 1.5mm of second pendant 3 are packed into 10 top surface of decorative panel of stone material
Edge has been inserted into the U-shaped mounting groove for reinforcing steel tank 4, is installed.
Further, 3 another side of the second pendant is attached to the main pendant 1 and has in the vertical plate face of graduation mark vertically.
Further, limit fixed screw is offered among the one side that second pendant 3 is in contact with the main pendant 1
6 holes, the limit fixed screw 6 pass through 6 hole of limit fixed screw, the aperture in 6 hole of the limit fixed screw to be more than institute
State the aperture of limit fixed screw 6.
Further, 6 hole of limit fixed screw is made of the semicircle middle part rectangle of upper and lower side.
Further, the limit fixed screw 6 is that M5 encircles screw certainly.
Further, after the limit fixed screw 6 being unscrewed, second pendant 3 can have scale in the main pendant 1
The vertical plate face of line moves up and down.
Further, after the limit fixed screw 6 is tightened, second pendant 3 can not be perpendicular in 1 upper edge of main pendant
Histogram can not also move in the horizontal direction to sliding, and the limit fixed screw 6 and second pendant 3 are to the stone material
Decoration panel 10 plays limit and fixed function.
Further, it according to construction needs, after the limit fixed screw 6 is unscrewed, removes, you can complete to stone material curtain
Arbitrary decorative panel of stone material 10 described in wall carries out dismounting replacement.
In use, main pendant 1 is fixed on M8 high-strength bolts on curtain wall false keel 8, decorative panel of stone material 10 is existed
Mounting suspension member position, concentrates on factory or mounting groove is held at scene successfully, to be solidified with the fixedly embedded U-shaped reinforcement steel tank 4 of AB glue
Afterwards, it is transported to the curtain wall installation site of decorative panel of stone material 10;It is packed into the thick soft thin rubber cushions of 2 one end of the first pendant package 1.5mm
In the U-shaped reinforcement steel tank 4 of 10 bottom surface of decorative panel of stone material, installed;First pendant 2 hangs over main pendant 1 vertically by fixing groove
It is vertical accurate high that 10 plate of stone facing is adjusted by the centrally disposed M6 adjustment screws 5 of 2 fixing groove of the first pendant in plate top surface
It spends, the second pendant 3 wraps up the thick soft thin rubber cushions of 1.5mm and is packed into the U-shaped reinforcement steel tank 4 at 10 top of decorative panel of stone material, certainly with M5
Arch limit fixed screw 6, which is fixed on main pendant 1, to be had on the vertical plate of graduation mark, and M5 fixes the second extension from arch limit fixed screw 6
Part 3 has in main pendant 1 on the vertical plate of graduation mark, and in earthquake, the level and vertical spacing that can play decorative panel of stone material 10 are made
With.Since U-shaped 4 shape of reinforcement steel tank, the specification of 10 upper and lower mounting groove installation of decorative panel of stone material are consistent, so second
After 3 one end hanging plate of pendant is packed into U-shaped reinforcement steel tank 4, when with the U-shaped one side plane contact for reinforcing 4 notch bottom of steel tank, pass through observation
Second pendant, 3 top and main pendant 1 have the comparison of the vertical plate front graticule of graduation mark, you can learn stone curtain wall false keel or
The height error of 1 level board of main pendant installation, and then it is adjusted preparation in advance for the installation of next step decorative panel of stone material 10,
To complete the accurate installation of stone panel 10.It is erected if the second pendant 3 has the top of the vertical plate face of graduation mark to be higher than with main pendant 1
Straight panel face graduation mark established standards line illustrates that the installation site of main pendant 1 or curtain wall false keel 8 is relatively low, on the contrary then higher;It is not necessarily to
It is taken with dipstick metering, passes through the visual master scale line readout value in 1 front of main pendant, you can hung in advance to main pendant 1 or rotation second
The vertical screw rods of M6 on part 3 carry out height quantization, accurate adjustment, to ensure 10 installation quality of decorative panel of stone material and improve to imitate
Rate.
A kind of T-type provided in the embodiments of the present invention combines metal stone material dry suspending pendant, passes through the second pendant 3
Stationary plane top margin and the graduation mark of the vertical plate of main pendant 1 contrast, you can know curtain wall false keel 8 and main pendant 1 pacify
The error of dress is adjusted preparation, and when the next piece of installation of decorative panel of stone material 10 of progress, is adjusted in advance to corresponding component in advance
It is whole;This pendant can make every piece of decorative panel of stone material 10 independent stressed and detachable after mounting, and when installation is easy to operate, reduces
Difficulty of construction accelerates construction progress, and improves construction quality.
Finally it should be noted that:The above descriptions are merely preferred embodiments of the present invention, is not limited to this
Utility model, although the utility model is described in detail with reference to the foregoing embodiments, for those skilled in the art
For, it still can be with technical scheme described in the above embodiments is modified, or to which part technical characteristic
Carry out equivalent replacement.Within the spirit and principle of the utility model, any modification, equivalent replacement, improvement and so on,
It should be included within the scope of protection of this utility model.
Claims (5)
1. a kind of T-type combines metal stone material dry suspending pendant, which is characterized in that including be arranged at the top of decorative panel of stone material mounting groove and
U-shaped reinforcement steel tank in the mounting groove of bottom, is arranged in decorative panel of stone material bottom the main pendant being arranged in stone curtain wall transom
The first pendant, the second pendant for being arranged at the top of decorative panel of stone material;
The main pendant includes level board and vertical plate, and the level board is arranged in the stone curtain wall transom, described perpendicular
Graduation mark is provided in straight panel;
One end of first pendant is arranged in the U-shaped reinforcement steel tank of decorative panel of stone material bottom, and the other end is dismountable
It is connected to the top of the main pendant, adjustment spiral shell is vertically arranged with across the joint of first pendant and the main pendant
Bar;
In the U-shaped reinforcement steel tank that one end of second pendant is arranged at the top of decorative panel of stone material, the other end is dismountable
It is connected on the main pendant.
2. a kind of T-type according to claim 1 combines metal stone material dry suspending pendant, which is characterized in that the main pendant tool
There are T-type structure, level board to be vertically set on the center of the vertical plate, the main pendant is by passing vertically through the level
The bolt of plate is fixed in the stone curtain wall transom.
3. a kind of T-type according to claim 1 combines metal stone material dry suspending pendant, which is characterized in that first pendant
One end be vertically arranged in the U-shaped reinforcement steel tank of decorative panel of stone material bottom, the other end is provided with the fixation that Open Side Down
Slot, first pendant are hung over by the fixing groove at the top of the vertical plate of the main pendant, and the adjustment screw passes vertically through
The top of the fixing groove.
4. a kind of T-type according to claim 1 combines metal stone material dry suspending pendant, which is characterized in that second pendant
With Z-type structure, one end is vertically arranged in the U-shaped reinforcement steel tank at the top of decorative panel of stone material, and the other end is solid by limiting
Determine screw to be fixed on the vertical plate of the main pendant.
5. a kind of T-type according to claim 1 combines metal stone material dry suspending pendant, which is characterized in that the U-shaped reinforcement steel
Slot bonding insertion is fixed in the mounting groove at the top and bottom of decorative panel of stone material.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820216769.0U CN207714587U (en) | 2018-02-07 | 2018-02-07 | A kind of T-type combination metal stone material dry suspending pendant |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820216769.0U CN207714587U (en) | 2018-02-07 | 2018-02-07 | A kind of T-type combination metal stone material dry suspending pendant |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207714587U true CN207714587U (en) | 2018-08-10 |
Family
ID=63053345
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820216769.0U Active CN207714587U (en) | 2018-02-07 | 2018-02-07 | A kind of T-type combination metal stone material dry suspending pendant |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207714587U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111075042A (en) * | 2020-01-06 | 2020-04-28 | 洪斯衍 | Installation method and installation structure of heat-insulation decorative composite board |
CN113775134A (en) * | 2021-09-27 | 2021-12-10 | 谭力 | Detachable hanging piece |
-
2018
- 2018-02-07 CN CN201820216769.0U patent/CN207714587U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111075042A (en) * | 2020-01-06 | 2020-04-28 | 洪斯衍 | Installation method and installation structure of heat-insulation decorative composite board |
CN113775134A (en) * | 2021-09-27 | 2021-12-10 | 谭力 | Detachable hanging piece |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207714587U (en) | A kind of T-type combination metal stone material dry suspending pendant | |
CN104929297A (en) | Combined type ceiling hanging part and wood veneer ceiling installing process | |
CN114059735A (en) | Assembled revetment decorative board dry-type installing the system | |
CN210767366U (en) | Aluminum alloy frame for glass installation | |
CN209309465U (en) | Single tube antidetonation suspension and support | |
CN205153440U (en) | Structure is hung futilely to interior wall convenient to installation | |
CN207277630U (en) | A kind of stone curtain wall that can be mounted and dismounted from outside | |
CN207750698U (en) | A kind of wall hanging rack of projection screen | |
CN204850208U (en) | Modular furred ceiling pendant | |
CN209082789U (en) | A kind of building body curtain wall construction | |
CN208718184U (en) | Tilt the back of the body bolt system of metope installation curtain wall panel | |
CN207974336U (en) | Furred ceiling hitch assembly | |
CN209070941U (en) | A kind of adjustable exhibition frame | |
CN207812926U (en) | A kind of decoration of exterior wall board mounting assembly | |
CN208187332U (en) | A kind of large scale structure deflection test device | |
CN209384478U (en) | A kind of skeleton component of secured curtain wall column | |
JPS6334059Y2 (en) | ||
CN219931374U (en) | Light steel joist furred ceiling structure | |
JPH0449533Y2 (en) | ||
CN209620354U (en) | A kind of upright posts of glass curtain wall structure | |
CN219587002U (en) | Supporting structure | |
CN203129385U (en) | Keel hanging part for decorative curtain walls | |
CN220704876U (en) | Metal curtain wall mounting assembly | |
CN205334291U (en) | Computer all -in -one machine's supporting seat and computer all -in -one machine | |
JPH0542166Y2 (en) |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20230828 Address after: 2710B, Overseas Friendship Building, No. 12 Yingchun Road, Jiabei Community, Nanhu Street, Luohu District, Shenzhen City, Guangdong Province, 518000 Patentee after: Shenzhen tongwenceng Technology Co.,Ltd. Address before: Room 401, Unit 3, Building 31, Boya Xinyuan, No. 498 Kashi East Road, Xinshi District, Urumqi, Xinjiang Uygur Autonomous Region, 830011 Patentee before: Tang Xian |