CN207709930U - A kind of spanner drilling equipment - Google Patents

A kind of spanner drilling equipment Download PDF

Info

Publication number
CN207709930U
CN207709930U CN201721899796.4U CN201721899796U CN207709930U CN 207709930 U CN207709930 U CN 207709930U CN 201721899796 U CN201721899796 U CN 201721899796U CN 207709930 U CN207709930 U CN 207709930U
Authority
CN
China
Prior art keywords
spanner
mobile station
sliding
support frame
screwing bolts
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721899796.4U
Other languages
Chinese (zh)
Inventor
简国民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaodong Jinwang Hardware Tools Manufacturing Co Ltd
Original Assignee
Shaodong Jinwang Hardware Tools Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaodong Jinwang Hardware Tools Manufacturing Co Ltd filed Critical Shaodong Jinwang Hardware Tools Manufacturing Co Ltd
Priority to CN201721899796.4U priority Critical patent/CN207709930U/en
Application granted granted Critical
Publication of CN207709930U publication Critical patent/CN207709930U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of spanner drilling equipments,Including drill main body,It is provided with support frame on the drill main body,And support frame is an integral structure with drill main body,It is provided with mobile station on the inside of the support frame,The both sides of the mobile station are both provided with third screwing bolts,And third screwing bolts are an integral structure with mobile station,The mobile station is slidably connected with support frame by third screwing bolts,The top of the support frame, which is carved, is equipped with scale directrix,The top of the mobile station, which is carved, is equipped with graduated scale,The side of the graduated scale is provided with baffle,The utility model is provided with baffle,First sliding shoe and two the second sliding shoes,Spanner hole to be drilled is positioned in spanner fixed seat,The spanner of arbitrary shape and size can be quickly fixed by sliding block and baffle,Later stage drilling is carried out convenient for back-up wrench,And cooperation mobile station can realize the quick change of spanner fixed position,Improve the efficiency of spanner drilling.

Description

A kind of spanner drilling equipment
Technical field
The utility model belongs to drilling device technical field, and in particular to a kind of spanner drilling equipment.
Background technology
Spanner is a kind of common installation and extracting tool, is to utilize lever principle, twist bolt, screw, nut or its His screw thread tightly holds the hand tools of the trepanning firmwares such as bolt, nut, can be realized and be drilled to spanner by the drilling equipment of profession.
But spanner drilling equipment using effect currently on the market is bad, the structure of fixing device is more complex, fixed dress The spanner of the first model can only be fixed by setting, and need to be debugged repeatedly to just, working efficiency is relatively low to spanner bore position.
Utility model content
The purpose of this utility model is to provide a kind of spanner drilling equipments, mentioned above in the background art solid to solve Determine that apparatus structure is more complex, fixing device can only fix the spanner of the first model, need to debug repeatedly pair to spanner bore position Just, the relatively low problem of working efficiency.
To achieve the above object, the utility model provides the following technical solutions:A kind of spanner drilling equipment, including drilling machine master Body is provided with support frame on the drill main body, and support frame is an integral structure with drill main body, the inside of the support frame It is provided with mobile station, the both sides of the mobile station are both provided with third screwing bolts, and third screwing bolts and mobile station are one Body formula structure, the mobile station are slidably connected with support frame by third screwing bolts, and the top of the support frame is carved to be equipped with and be carved Directrix is spent, the top of the mobile station, which is carved, is equipped with graduated scale, and the side of the graduated scale is provided with baffle, and baffle and mobile station It being an integral structure, the side of the baffle is provided with spanner fixed seat, and spanner fixed seat is an integral structure with mobile station, Third sliding slot is offered in the spanner fixed seat, the side of the third sliding slot offers second sliding slot, the second sliding slot Side far from third sliding slot offers the first sliding groove, and the second sliding shoe is both provided in the third sliding slot and the first sliding groove, First screwing bolts are installed, the third sliding slot and the first sliding groove are solid by the first screwing bolts on the second sliding shoe Surely it is connected with the second sliding shoe, threaded rod is installed on the second sliding shoe, the top of the second sliding slot is provided with first Sliding shoe is equipped with the second screwing bolts on first sliding shoe, and the first sliding shoe and second sliding slot are screwed by second Bolt is fixedly connected, and the bottom end of the mobile station is provided with supporting rack, and supporting rack is an integral structure with mobile station, the branch Wheel is installed away on support, it is described walk wheel bottom end be provided with sliding rail, and sliding rail is an integral structure with support frame.
Preferably, sliding slot is offered on the support frame.
Preferably, two the second sliding shoes are symmetrical set.
Preferably, the scale directrix and bit central point are in same level.
Preferably, there are two the first screwing bolts for setting altogether on the second sliding shoe.
Compared with prior art, the utility model has the beneficial effects that:
(1) the utility model is provided with baffle, the first sliding shoe and two the second sliding shoes, and spanner hole to be drilled is positioned over In spanner fixed seat, you can the spanner for quickly fixing arbitrary shape and size by sliding block and baffle carries out convenient for back-up wrench Later stage drills, and coordinates mobile station that can realize the quick change of spanner fixed position, improves the efficiency of spanner drilling.
(2) the utility model be provided with mobile station and graduated scale, support frame position be it is fixed, the scale directrix of setting with Drill hole of drilling machine center can quickly read the difference of offset in same level by graduated scale after drop-down drill bit, primary to rectify The positioning of bore position can be just being fast implemented, working efficiency and precision are improved.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the outside drawing of the utility model;
Fig. 3 is the structural schematic diagram of the utility model spanner fixed seat;
Fig. 4 is the structural schematic diagram of the utility model support frame;
In figure:The first screwing bolts of 1-, the first sliding shoes of 2-, the second screwing bolts of 3-, 4- thirds screwing bolts, 5- scales Ruler, 6- scales directrix, 7- support frames, 8- baffles, 9- the first sliding grooves, 10- second sliding slots, 11- mobile stations, 12- thirds sliding slot, 13- spanners fixed seat, 14- threaded rods, 15- the second sliding shoes, 16- drill main bodies, 17- sliding rails, 18- walk wheel, 19- supporting racks.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work The every other embodiment obtained, shall fall within the protection scope of the present invention.
- 4 are please referred to Fig.1, the utility model provides a kind of technical solution:A kind of spanner drilling equipment, including drill main body 16, support frame 7 is provided on drill main body 16, and support frame 7 is an integral structure with drill main body 16, the inside of support frame 7 It is provided with mobile station 11, the both sides of mobile station 11 are both provided with third screwing bolts 4, and third screwing bolts 4 and mobile station 11 It is an integral structure, mobile station 11 is slidably connected with support frame 7 by third screwing bolts 4, and the top of support frame 7 is carved to be equipped with and be carved Directrix 6 is spent, scale directrix 6 is with drill bit in same level, and convenient for quickly check and correction bore position, the top of mobile station 11, which is carved, to be set There are graduated scale 5, the side of graduated scale 5 to be provided with baffle 8, plays the role of keeping out spanner, the first sliding shoe 2 of cooperation will be hole to be drilled Spanner clamping is fixed, and baffle 8 is an integral structure with mobile station 11, and the side of baffle 8 is provided with spanner fixed seat 13, and pulls Hand fixed seat 13 is an integral structure with mobile station 11, and third sliding slot 12 is offered in spanner fixed seat 13, third sliding slot 12 Side offers second sliding slot 10, and side of the second sliding slot 10 far from third sliding slot 12 offers the first sliding groove 9, third sliding slot 12 With the second sliding shoe 15 is both provided in the first sliding groove 9, the first screwing bolts 1, third sliding slot are installed on the second sliding shoe 15 12 and the first sliding groove 9 be fixedly connected with the second sliding shoe 15 by the first screwing bolts 1, spiral shell is installed on the second sliding shoe 15 Rasp bar 14 makes spanner laterally secure firm by adjusting threaded rod 14, and the top of second sliding slot 10 is provided with the first sliding shoe 2, Second screwing bolts 3 are installed, and the first sliding shoe 2 and second sliding slot 10 are solid by the second screwing bolts 3 on first sliding shoe 2 Fixed connection, the bottom end of mobile station 11 is provided with supporting rack 19, and supporting rack 19 is an integral structure with mobile station 11, supporting rack 19 On wheel 18 is installed away, the bottom end for walking wheel 18 is provided with sliding rail 17, and sliding rail 17 is an integral structure with support frame 7.
It is slided for the ease of mobile station 11, in the present embodiment, it is preferred that offer sliding slot on support frame 7.
In order to keep spanner fixed firm, in the present embodiment, it is preferred that two the second sliding shoes 15 are symmetrical set.
For the ease of proofreading bore position, in the present embodiment, it is preferred that scale directrix 6 is with bit central point in same water In plane.
In order to make 15 fixed stabilization of the second sliding shoe, in the present embodiment, it is preferred that be provided with altogether on the second sliding shoe 15 Two the first screwing bolts 1.
The operation principle and process for using of the utility model:In use, spanner hole to be drilled is placed on spanner fixed seat On 13, the spanner hole to be drilled one end that need to drill is positioned over 8 one end of baffle, pushes the movement of the first sliding shoe 2, passes through the first sliding shoe 2 Spanner is vertically fixedly clamped by cooperation baffle 8, then mobile two the second sliding shoes 15 arrive suitable position, pass through the first screwing bolts 1 makes the second sliding shoe 15 fix at this location, then adjusts threaded rod 14, completes the laterally-clamped fixation of spanner, and pass through tune The length that both sides threaded rod 14 stretches out is saved, then coordinate mobile station 11, you can realizes that spanner any position in limited range is consolidated It is fixed, it completes after fixing, pulls down drilling machine, can judge deviation by graduated scale 5 after bit location comparison scale directrix 6, then The positioning of drilling can be rapidly completed in adjustment mobile station 11, to improve working efficiency.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is appreciated that can these embodiments be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (5)

1. a kind of spanner drilling equipment, including drill main body (16), it is characterised in that:It is provided with branch on the drill main body (16) Support frame (7), and support frame (7) is an integral structure with drill main body (16), and mobile station is provided on the inside of the support frame (7) (11), the both sides of the mobile station (11) are both provided with third screwing bolts (4), and third screwing bolts (4) and mobile station (11) it is an integral structure, the mobile station (11) is slidably connected with support frame (7) by third screwing bolts (4), the branch The top of support frame (7), which is carved, is equipped with scale directrix (6), and the top of the mobile station (11), which is carved, is equipped with graduated scale (5), the graduated scale (5) side is provided with baffle (8), and baffle (8) is an integral structure with mobile station (11), and the side of the baffle (8) is set It is equipped with spanner fixed seat (13), and spanner fixed seat (13) is an integral structure with mobile station (11), the spanner fixed seat (13) third sliding slot (12) is offered on, the side of the third sliding slot (12) offers second sliding slot (10), and described second slides Side of the slot (10) far from third sliding slot (12) offers the first sliding groove (9), on the third sliding slot (12) and the first sliding groove (9) It is both provided with the second sliding shoe (15), the first screwing bolts (1), the third sliding slot are installed on the second sliding shoe (15) (12) and the first sliding groove (9) is fixedly connected with the second sliding shoe (15), the second sliding shoe by the first screwing bolts (1) (15) threaded rod (14) is installed, the top of the second sliding slot (10) is provided with the first sliding shoe (2), first sliding on Second screwing bolts (3) are installed, and the first sliding shoe (2) and second sliding slot (10) pass through the second screwing bolts (3) on block (2) It is fixedly connected, the bottom end of the mobile station (11) is provided with supporting rack (19), and supporting rack (19) is integrated with mobile station (11) Formula structure, is equipped with away wheel (18) on support frame as described above (19), it is described walk wheel (18) bottom end be provided with sliding rail (17), and sliding rail (17) it is an integral structure with support frame (7).
2. a kind of spanner drilling equipment according to claim 1, it is characterised in that:Cunning is offered on the support frame (7) Slot.
3. a kind of spanner drilling equipment according to claim 1, it is characterised in that:Two the second sliding shoes (15) are in It is symmetrical arranged.
4. a kind of spanner drilling equipment according to claim 1, it is characterised in that:In the scale directrix (6) and drill bit Heart point is in same level.
5. a kind of spanner drilling equipment according to claim 1, it is characterised in that:It is set altogether on the second sliding shoe (15) First screwing bolts (1) there are two setting.
CN201721899796.4U 2017-12-29 2017-12-29 A kind of spanner drilling equipment Expired - Fee Related CN207709930U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721899796.4U CN207709930U (en) 2017-12-29 2017-12-29 A kind of spanner drilling equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721899796.4U CN207709930U (en) 2017-12-29 2017-12-29 A kind of spanner drilling equipment

Publications (1)

Publication Number Publication Date
CN207709930U true CN207709930U (en) 2018-08-10

Family

ID=63053506

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721899796.4U Expired - Fee Related CN207709930U (en) 2017-12-29 2017-12-29 A kind of spanner drilling equipment

Country Status (1)

Country Link
CN (1) CN207709930U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109128909A (en) * 2018-10-08 2019-01-04 海盐县鸿搏工具有限公司 A kind of stationary fixture for processing spanner worm hole

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109128909A (en) * 2018-10-08 2019-01-04 海盐县鸿搏工具有限公司 A kind of stationary fixture for processing spanner worm hole

Similar Documents

Publication Publication Date Title
CN204843524U (en) Motor housing stationary work table that drills
CN205437901U (en) Green wood board drilling clamping device
CN103909296B (en) A kind of adjustable drilling guide tool with a scale
CN204818183U (en) Radial haplopore of cylindrical parts footpath or multiple aperture processing multipurpose plant
CN207709930U (en) A kind of spanner drilling equipment
CN104985220A (en) Pattern block air hole drilling machine
CN204381935U (en) Aluminium busbar drilling-hole positioning device
CN210998472U (en) A pressfitting tool for irregular part
CN205996577U (en) A kind of drilling jig
CN203887961U (en) Multifunctional drilling machine
CN205290418U (en) Special tool that punches of adjustable work piece
CN204209175U (en) A kind of pipe fitting drilling positioning fixture
CN208483508U (en) A kind of guide rail end drilling and tapping all-in-one machine
CN207464716U (en) Rotary type hole drilling device for workpieces
CN203765325U (en) Milling machine supporting frame milling tool
CN102990425A (en) Combined fixture of drilling machine
CN106363532A (en) Special grinding fixture and grinding method for chamfering tooth-shaped template profile
CN207431797U (en) A kind of different miniature parts drill jig of clamping
CN203062338U (en) Clamp for drilling hole in angle iron
CN210188563U (en) Square pipe drilling auxiliary device
CN209078310U (en) A kind of profile drilling-hole positioning device
CN208034840U (en) A kind of support plate positioning device
CN207873199U (en) A kind of overturning drill jig drilling Thin-wall Barrel class part
CN208924008U (en) A kind of electric machine stand
CN209335608U (en) A kind of large size arc forging radial center benchmark scribing tooling

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180810

Termination date: 20191229

CF01 Termination of patent right due to non-payment of annual fee