CN207704483U - Safe operation of electric network risk management and control system based on CIM standards - Google Patents

Safe operation of electric network risk management and control system based on CIM standards Download PDF

Info

Publication number
CN207704483U
CN207704483U CN201721508122.7U CN201721508122U CN207704483U CN 207704483 U CN207704483 U CN 207704483U CN 201721508122 U CN201721508122 U CN 201721508122U CN 207704483 U CN207704483 U CN 207704483U
Authority
CN
China
Prior art keywords
net
information
application
risk
server
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721508122.7U
Other languages
Chinese (zh)
Inventor
陈锐
林成
马覃峰
曹杰
刘明顺
王国松
马忠海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Power Dispatch Control Center of Guizhou Power Grid Co Ltd
Original Assignee
Electric Power Dispatch Control Center of Guizhou Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Dispatch Control Center of Guizhou Power Grid Co Ltd filed Critical Electric Power Dispatch Control Center of Guizhou Power Grid Co Ltd
Priority to CN201721508122.7U priority Critical patent/CN207704483U/en
Application granted granted Critical
Publication of CN207704483U publication Critical patent/CN207704483U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The safe operation of electric network risk management and control system based on CIM standards that the utility model is related to a kind of, including main website and the substation that information exchange is carried out by integrated data network and main website;Main website includes acquiring net, the publication net using net and with application net connection with acquisition net connection;Acquisition net is used to obtain risk information according to the collected risk factors monitoring information of acquisition net for collecting risk factors monitoring information, using net, and publication net is used to receive the risk information using net, and risk information is distributed to power supply bureau, Yun Jian companies or power plant;Integrated data network is connected with publication net, and substation receives the risk information that main website is sent by the integrated data network;Risk information includes risk data, warning information, plan information and emergency information.Risk factors monitoring information is collected by acquiring to net, acquisition, displaying, early warning and the analysis of real time information are carried out to power grid, risk information is obtained according to collected risk factors monitoring information, risk information is distributed to power supply bureau, Yun Jian companies or power plant by issuing net, it can reinforce prevention and control ability of the power grid to operation risk, improve the operational safety of power grid.

Description

Safe operation of electric network risk management and control system based on CIM standards
Technical field
The utility model is related to power grid security management and control fields, pacify more particularly to a kind of operation of power networks based on CIM standards Full blast danger managing and control system.
Background technology
Power grid security risk refers in production operation active procedure, and due to organizing, not perfect, management is not in place, behavior is not advised Not practicable etc. the risk that may cause industrial accident of model, measure.The main reason for being formed according to production operation risk, by it It is divided into management class risk and two class of operation behaviour risk;Refer mainly to planning, work organization, field conduct stage correlation leader It is not in place due to managing with administrative staff, cause key link, key node is out of control and causes the risk of safety accident.
As power grid construction puts more effort, electric network composition constantly enhances, and resisting risk ability is persistently promoted, and still, is in The power grid in high speed development stage, production, maintenance, technological transformation, capital construction task are heavy, interim, transient mode is more, electric network composition contradiction It still protrudes, influence of the factors to power grid security, the power grid security risk such as bad weather, external force destruction are still each power supply in addition The greateset risk that unit faces, and there is also many safety problems in process of production.
Utility model content
Based on this, for the security risk problem occurred in operation of power networks, it is necessary to provide a kind of electricity based on CIM standards Network operation security risk managing and control system.
A kind of safe operation of electric network risk management and control system based on CIM standards, including main website and pass through integrated data network The substation of information exchange is carried out with the main website;
The main website include acquire net, with it is described acquisition net connection using net and the hair being connect with the application net It arranges net;The acquisition net is used to net collected risk according to acquisition for collecting risk factors monitoring information, the application net Factor monitoring information obtains risk information, and the publication net is used to receive the risk information of the application net, and by the risk Information is distributed to power supply bureau, Yun Jian companies or power plant;
The integrated data network is connected with publication net, and the substation receives the main website by the integrated data network The risk information of transmission;The risk information includes risk data, warning information, plan information and emergency information.
The acquisition net includes each third party's information system by linking Internet in one of the embodiments, respectively Third party's information system acquire risk factors monitoring information, the risk factors monitoring information include weather information, the communication information, Emergency advance warning information, water tune information and coal feelings information it is at least one or more of.
The application net includes application server, the database clothes connected by internet in one of the embodiments, Business device, acquisition server and file server;
The acquisition server is used to acquire the relevant data of risk factors monitoring information of third party's information system;
The risk factors monitoring information that the database server is used to store acquired third party's information system is related Data;
The risk factors monitoring information that the application server is used to handle acquired third party's information system is relevant Data;
The file server is used to store acquired data and the data file that reports, and the file to being stored into Row checking and killing virus.
The system is additionally provided with interchanger in one of the embodiments, the deployment way used for dual computer group formula, For realizing data forwarding;
The database server is handed over by application the first interchanger of net or application net second switch with acquisition net first Change planes or acquire the connection of net second switch;
The application server is exchanged by application the first interchanger of net or application net second switch with acquisition net first Machine or acquisition net second switch connection;
The acquisition server is exchanged by application the first interchanger of net or application net second switch with acquisition net first Machine or acquisition net second switch connection;
The file server is exchanged by application the first interchanger of net or application net second switch with acquisition net first Machine or acquisition net second switch connection.
The database server includes main database server and from database service in one of the embodiments, Device, the main database server and from database server respectively with application the first interchanger of net and apply net second switch Connection;
The application server includes master application server and from application server, the master application server and from application Server is connect with application the first interchanger of net and using net second switch respectively;
The acquisition server includes main acquisition server and from acquisition server, the main acquisition server and from acquisition Server is connect with application the first interchanger of net and using net second switch respectively;
The file server includes main file server and from file server, the main file server and from file Server is connect with application the first interchanger of net and using net second switch respectively.
The database server is handed over by application the first interchanger of net or application net second in one of the embodiments, It changes planes and is connect with publication the first interchanger of net or publication net second switch;
The application server is exchanged by application the first interchanger of net or application net second switch with publication net first Machine or publication net second switch connection;
The acquisition server is exchanged by application the first interchanger of net or application net second switch with publication net first Machine or publication net second switch connection;
The file server is exchanged by application the first interchanger of net or application net second switch with publication net first Machine or publication net second switch connection.
The system is additionally provided with fire wall in one of the embodiments, the deployment way used for dual computer group formula, For protecting the security boundary for applying net, acquisition net and publication net;It is provided with the first fire prevention between the application net and acquisition net Wall is provided with the second fire wall between the application net and publication net.
The publication net adjusts interface to connect with total in one of the embodiments, realizes information reporting;
The publication net further includes WEB server, for providing information distribution service.
In one of the embodiments, the system also includes:Application support platform and pass through service bus with application The data center of support platform connection;
The application support platform is connect by interface and adapter with service bus, for providing application system development Basic technology component and Service Component needed for journey.
The data center provides comprehensive data supporting and model service for system in one of the embodiments, will The process data and result of generation are sent to publication net.
The above-mentioned safe operation of electric network risk management and control system based on CIM standards collects risk factors monitoring by acquiring to net Information carries out power grid acquisition, displaying, early warning and the analysis of real time information, is obtained according to collected risk factors monitoring information To risk information, risk information is distributed to power supply bureau, Yun Jian companies or power plant by issuing net, power grid can be reinforced to running wind The prevention and control ability of danger, improves the operational safety of power grid.
Description of the drawings
Fig. 1 is the integrated stand composition of the safe operation of electric network risk management and control system based on CIM standards in one embodiment;
Fig. 2 be the utility model in the safe operation of electric network risk management and control system based on CIM standards in one embodiment System-level interactive structure figure;
Fig. 3 be the utility model in the safe operation of electric network risk management and control system based on CIM standards in one embodiment Internal topology figure;
Fig. 4 is based on the safe operation of electric network risk management and control system of CIM standards in the utility model in another embodiment In system pie graph.
Specific implementation mode
The content of the utility model is described in further detail below in conjunction with preferred embodiment and attached drawing.Obviously, under Literary described embodiment is only used for explaining the utility model, rather than the restriction to the utility model.Based in the utility model Embodiment, every other embodiment obtained by those of ordinary skill in the art without making creative efforts, It shall fall within the protection scope of the present invention.It should be noted that illustrating only for ease of description, in attached drawing new with this practicality The relevant part of type rather than full content.
Fig. 1 is that the safe operation of electric network risk management and control system based on CIM standards is in one embodiment in the utility model Integrated stand composition.Shown in referring to Fig.1, the safe operation of electric network risk management and control system based on CIM standards in the present embodiment, packet It includes main website 10 and carries out the substation 20 of information exchange by integrated data network 30 and main website.
Main website 10 includes acquisition net 102, the publication net using net 104 and with application net connection with acquisition net connection 106。
Acquisition net 102 is for collecting risk factors monitoring information.
Specifically, multiple third party information systems of the risk factors monitoring information from access that acquisition net 102 is collected, Risk factor monitoring information includes weather information, the communication information, emergency advance warning information, water tune information and coal feelings information etc..It closes Fig. 2 is please referred in the specifying information of multiple third party's information systems of access.
Fig. 2 is that the safe operation of electric network risk management and control system based on CIM standards is in one embodiment in the utility model System-level interactive structure figure.Power networks risk managing and control system needs and multiple third party's information during work flow System carries out data interaction, to complete risk management and control business.Wherein, third party's information system includes intelligent inspection platform 202, energy Buret manages system 204, emergency commanding platform 206, Safety Risk in Production managing and control system 208, on-line pre-decision system system 210, energy saving Dispatching management information system 212, waterpower scheduling automation 214 and weather information application decision support system 216.
It is pre-planned before approval in maintenance, it need to will overhaul pre-planned be sent in power networks risk managing and control system into sector-style Danger assessment.After the completion of risk assessment, whether power networks risk managing and control system can perform risk evaluation result and repair schedule It is recommended that feeding back to intelligent inspection platform 202, as intelligent inspection platform 202 overhaul the foundation of pre-planned subsequent processing.
The whole network model can be obtained from Energy Management System 204, including Equipment Foundations account and topological structure of electric, It can be used as the basic data of system data interaction and displaying.In emergent risk management and control, obtains and run from Energy Management System 204 Metric data, to support to carry out the operations such as tidal current analysis, the deduction of chain accident to power grid.
If risk evaluation result, which is the risk, may cause the general and above electric power safety accident, notified in Risk-warning When book is issued, need single to the push emergency advance warning publication of emergency commanding platform 206 simultaneously.When risk releases, need simultaneously to emergent finger It waves platform 206 and sends emergency advance warning releasing list.
After carrying out risk assessment to safe operation of electric network risk, control measure execute, risk management and control result is synchronized to Safety Risk in Production managing and control system 208, the basic data carried out as network-wide security production risk management and control work.
On-line pre-decision system system 210 obtains electric network model from this system, to support it to carry out data analysis.It is online to determine in advance The analysis result arrived that plan system 201 analyzes the electric network model got, including accident development trend, security evaluation knot Fruit is sent to Safety Risk in Production managing and control system 208, the reference data as risk assessment.
Same day coal feelings report messages can be obtained by being managed in system 212 from energy-saving distribution, using coal feelings report messages as coal feelings The basic data of early warning management and control.
The operation information of all hydroelectric power plants in compass of competency, including regimen, water can be obtained from waterpower scheduling automation 214 Tune, generating set etc., using these operation informations as the basic data of regimen early warning management and control.
It supports that weather information in power grid scope can be obtained in system 216 from weather information application decision, including temperature, wet Degree, wind-force, wind direction, ignition point, icing situation etc., can be using these weather informations as the foundation factors number of emergent risk management and control According to.
Continuing with reference to Fig. 1, wherein be used for according to acquisition 102 collected risk factors monitoring information of net using net 104 Obtain risk information.
Specifically, risk information includes risk data, warning information, plan information and emergency information etc..Wherein, risk number According to including the weather information when natural calamity and bad weather, such as temperature, humidity, wind-force, wind direction, ignition point and cover Ice condition condition etc..
Warning information includes that system carries out analyzing processing, the phase obtained according to handling result to collected risk data The information prevented in advance and warn answered.
Plan information is that system carries out analyzing processing according to collected risk data, is carried out according to handling result next The scheduling information of step.Further, plan information includes daily risk management and control plan, repair schedule, ice-melt plan and answers Anxious risk management and control plan.
Include that the application server 1041, database server 1043, acquisition connected by internet services using net 104 Device 1045, file server 1047 and maintenance management work station 1049.
Acquisition server 1045 is used to acquire the relevant data of risk factors monitoring information of third party's information system.
Data acquisition refers to the automatic collection non-electrical from the analog- and digital- unit under test such as sensor and other Devices to test Amount or electric quantity signal, are sent in host computer and are analyzed, and handle.Data collecting system be combine based on computer or other The measurement software and hardware product of dedicated testing platform realizes flexible, user-defined measuring system.Specifically, acquisition service The risk factors monitoring information that device 1045 acquires includes weather information, the communication information, emergency advance warning information, water tune information and coal feelings Information etc..
The risk factors monitoring information that database server 1043 is used to store acquired third party's information system is related Data.
Database server is total to by running one or more computer in a local network and database management system software With constituting, data service is provided for application program.Database server is established on the basis of Database Systems, has data base set The characteristic of system, and have its unique one side.Major function includes:
1) database management function, including system configuration and management, data access and more new management, data integrity management With data security management.
2) inquiry of database and operating function, the function include database retrieval and modification.
3) database maintenance function, including data import management and data export management, and database structure is safeguarded, data are extensive Multiple function and performance monitoring.
4) data base concurrency operation function, due in the same time, user's more than one of database being accessed, so data Library server must support parallel operating mechanism, occur while handling multiple events.
The risk factors monitoring information that application server 1041 is used to handle acquired third party's information system is relevant Data.
File server 1047 is used to store acquired data and the data file that reports, and the file to being stored into Row checking and killing virus.
File server is a computer responsible to centralized storage and data file management, its in consolidated network He can access these files by computer.File server allows user to share information on the network, and without passing through soft magnetism Disk or some other External memory equipments physically move file.File server can be a common individual calculus Machine, it handles documentation requirements and sends them in a network.In more complicated network, file server can also be one special The network additive storage device of door, can also be used as other computer remote hard disk drives to run, and allow in network Portrait in themselves hard disk the same storage file in the server.
Maintenance management work station 1049 is used for examination and maintenance system, excludes hidden danger in time, safeguards system it is safe and efficient Operation.
System needs to carry out daily maintenance, including network device management, such as computer and server and operating system It safeguards, including system patch installing and system upgrade etc., network security and virus prevention etc..In the case of network normal operation, Ensure the normal of network transmission.In the case where there is hidden danger, takes timely measure and hidden danger is handled.
It issues net 106 and is used to receive the risk information using net 104, and risk information is distributed to power supply bureau, fortune inspection public affairs Department or power plant.
Publication net 106 receives the risk information issued using net 104 in one of the embodiments, again by internet Risk information is passed through into short message, the phase of mail push information to provincial company relevant departments, power supply bureau, Yun Jian companies and subordinate power plant Close person liable.
In another embodiment, publication net 106 adjusts interface to connect with total, realizes information reporting.Issuing net 106 further includes WEB server 1062, for providing information distribution service.
Web server refers generally to Website server, refers to the program for residing at certain type computer on internet, can be with The internal and external issuing function of information is provided.Wherein, internally by delivery system, substation issue risk information, plan information and Other information etc., externally provide Risk Results publication, file export function.
Integrated data network 30 is connect with publication net 106, and substation 20 receives the wind that main website 10 is sent by integrated data network 30 Dangerous information.
Integrated data network 30 is a kind of novel wide area network switching technology, it is developed based on integrated digital telephone network Made of, it is capable of providing number connection end to end.That is, integrated data network 30 can will be between main website 10 and substation 20 Connection becomes digital connection so that transmission between the two all digitizes.Substation 20 and main website 10 can pass through integrated data Net carries out two-way information exchange, and main website 10 issues risk, early warning, plan and the information such as meet an urgent need to son by integrated data network 30 Stand 20, and 20 end of substation reports risk factors, feedback risk control measure and submits maintenance application etc. by integrated data network 30 To main website 10.
The above-mentioned safe operation of electric network risk management and control system based on CIM standards collects risk factors monitoring by acquiring to net Information carries out power grid acquisition, displaying, early warning and the analysis of real time information, is obtained according to collected risk factors monitoring information To risk information, risk information is distributed to power supply bureau, Yun Jian companies or power plant by issuing net, power grid can be reinforced to running wind The prevention and control ability of danger, improves the operational safety of power grid.
Fig. 3 be the utility model in the safe operation of electric network risk management and control system based on CIM standards in one embodiment Internal topology figure.
System is additionally provided with interchanger in one of the embodiments, and the deployment way used is used for for dual computer group formula Realize data forwarding.
Database server passes through application the first interchanger of net 312 or application net second switch 314 and acquisition net first Interchanger 352 or acquisition net second switch 354 connect.
Application server is crossed all using the first interchanger of net 312 or application net second switch 314 and acquisition net first Interchanger 352 or acquisition net second switch 354 connect.
Acquisition server is handed over by application the first interchanger of net 312 or application net second switch 314 with acquisition net first Change planes 352 or acquisition net second switch 354 connect.
File server is handed over by application the first interchanger of net 312 or application net second switch 314 with acquisition net first Change planes 352 or acquisition net second switch 354 connect.
In another embodiment, database server includes main database server 302 and from database server 304, main database server 302 and from database server 304 respectively with application the first interchanger of net 312 and apply net second Interchanger 314 connects.
Application server includes master application server 322 and from application server 324, master application server 322 and from answering It is connect respectively with application the first interchanger of net 312 and application net second switch 314 with server 324.
Acquisition server includes main acquisition server 342 and from acquisition server 344, main acquisition server 342 and from adopting Collection server 344 is connect with application the first interchanger of net 312 and application net second switch 314 respectively.
File server includes main file server 362 and from file server 364, main file server 362 and from text Part server 364 is connect with application the first interchanger of net 312 and application net second switch 314 respectively.
In a further embodiment, database server is exchanged by application the first interchanger of net 312 or application net second Machine 314 is connect with publication the first interchanger of net 372 or publication net second switch 374.
Application server is handed over by application the first interchanger of net 312 or application net second switch 314 with publication net first Change planes 372 or publication net second switch 374 connect.
Acquisition server is handed over by application the first interchanger of net 312 or application net second switch 314 with publication net first Change planes 372 or publication net second switch 374 connect.
File server is handed over by application the first interchanger of net 312 or application net second switch 314 with publication net first Change planes 372 or publication net second switch 374 connect.
In another embodiment, system is additionally provided with fire wall 40, and the deployment way used is used for for dual computer group formula Protection is using net 104, acquisition net 102 and the security boundary for issuing net 106.
So-called fire wall refers to that one is composed of software and hardware equipment, refers to a kind of visiting intranet and the public It asks and nets separated method, actually a kind of isolation technology sets up a security gateway between internet, in protection Intrusion of portion's net from disabled user so that the all-network communication of computer inflow and outflow and data packet are intended to by fire prevention Wall.
Fire wall isolation is done to acquisition net 102, publication net 106 and the higher application net of risk class 104, each region is pressed Security level does security isolation, and configures Different Strategies.Do subregion by each region security rank, ensure between different zones every From the minimum with security implication.
Region division explicitly defines server correspondence according to the difference of the business function of system and the difference of safety requirements The region of placement, such as database server, these equipment of WEB server all individually divide region, and Different Strategies, control is arranged Lawful access avoids mutual shadow, is used between safety zone and minimizes right access control strategy, passed through and dispose firewall policy Security isolation measure is provided.
It is provided with the first fire wall 402 using between net 106 and acquisition net 102, using between net 104 and publication net 106 It is provided with the second fire wall 404.
Fig. 4 is based on the safe operation of electric network risk management and control system of CIM standards in the utility model in another embodiment In system pie graph.Safe operation of electric network risk management and control system further includes:Application support platform 50 and pass through service bus 70 data centers 90 being connect with application support platform.
Application support platform 50 is connect by interface and adapter with service bus 70, for providing application system development Basic technology component and Service Component needed for journey.
Specifically, application support platform 50 is developing, integrate and running for the enterprise application system towards power industry Support platform, it is responsible for providing every basic technology component and Service Component needed for application system development process, and is answering Safe and stable run time infrastructure is provided with the runtime of system.The platform is mainly handled in application software development activities Be related to the technical detail of bottom, various supports provided for the structure of upper-layer service subsystem, with realize application rapid build and Publication etc. functions, the platform mainly by basic operation frame, application development tool, workflow engine service, all-purpose financial statements service, Data switch engine service, system security controls, system message center, graph visualization subsystem, electric topology algorithm, enterprise The functions such as portal and platform reliability management form.
Service bus 70 is that the application of power networks risk managing and control system provides technical support with integrated, built-in to service The functions such as registration, management, routing, scheduling, the bus use the data transmission technology across isolator, can be given birth in Dispatch Safety Forward and reverse physical isolation apparatus is passed through in the areas Chan great and the big section of management information, realizes automated system and power networks risk pipe Control system integrates, and application is integrated to which support such as power networks risk assessment, repair schedule execute security evaluation scheduling.
Data center 90 provides comprehensive data supporting and model service for power networks risk managing and control system, by generation Process data and result are sent to publication net 106.
Specifically, data center 90 provides comprehensive data supporting and model service for power networks risk managing and control system, Main includes that metadata management, panorama model center, data acquisition, data management, data integration, on-line analysis and data are dug The functions such as pick.The basic electric network model used needed for power networks risk managing and control system application function and each integrated application system is equal Support is obtained when the model center of data center is managed collectively, and is built and is run from model center by model view itself to answer Electric network model and parameter information, while the respective services of data storage and retrieval being provided for all kinds of service applications.
The above-mentioned safe operation of electric network risk management and control system based on CIM standards collects risk factors monitoring by acquiring to net Information carries out power grid acquisition, displaying, early warning and the analysis of real time information, is obtained according to collected risk factors monitoring information To risk information, risk information is distributed to power supply bureau, Yun Jian companies or power plant by issuing net, power grid can be reinforced to running wind The prevention and control ability of danger, improves the operational safety of power grid.
Each technical characteristic of embodiment described above can be combined arbitrarily, to keep description succinct, not to above-mentioned reality It applies all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited In contradiction, it is all considered to be the range of this specification record.
Above-described embodiments merely represent several embodiments of the utility model, the description thereof is more specific and detailed, But therefore it can not be interpreted as the limitation to utility model patent range.It should be pointed out that for the common skill of this field For art personnel, without departing from the concept of the premise utility, various modifications and improvements can be made, these are belonged to The scope of protection of the utility model.Therefore, the protection domain of the utility model patent should be determined by the appended claims.

Claims (10)

1. a kind of safe operation of electric network risk management and control system based on CIM standards, which is characterized in that including main website and pass through Integrated data network carries out the substation of information exchange with the main website;
The main website include acquire net, with it is described acquisition net connection using net and the publication net being connect with the application net; The acquisition net is used to net collected risk factors according to acquisition and supervise for collecting risk factors monitoring information, the application net Measurement information obtains risk information, and the publication net is used to receive the risk information of the application net, and the risk information is sent out Cloth is to power supply bureau, Yun Jian companies or power plant;
The integrated data network is connected with publication net, and the substation receives the main website by the integrated data network and sends Risk information;The risk information includes risk data, warning information, plan information and emergency information.
2. the safe operation of electric network risk management and control system according to claim 1 based on CIM standards, which is characterized in that institute It includes each third party's information system by linking Internet to state acquisition net, each third party's information system acquisition risk factors monitoring Information, the risk factors monitoring information include weather information, the communication information, emergency advance warning information, water tune information and coal feelings letter What is ceased is at least one or more of.
3. the safe operation of electric network risk management and control system according to claim 1 based on CIM standards, which is characterized in that institute It includes application server, database server, acquisition server and the file server connected by internet to state using net;
The acquisition server is used to acquire the relevant data of risk factors monitoring information of third party's information system;
The database server is used to store the relevant number of risk factors monitoring information of acquired third party's information system According to;
The application server is used to handle the relevant data of risk factors monitoring information of acquired third party's information system;
The data file that the file server is used to store acquired data and report, and the file to being stored carries out disease Malicious killing.
4. the safe operation of electric network risk management and control system according to claim 3 based on CIM standards, which is characterized in that institute The system of stating is additionally provided with interchanger, and the deployment way used is dual computer group formula, for realizing data forwarding;
The database server passes through application the first interchanger of net or application net second switch and acquisition the first interchanger of net Or acquisition net second switch connection;
The application server by application the first interchanger of net or application net second switch with acquisition the first interchanger of net or Acquire the connection of net second switch;
The acquisition server by application the first interchanger of net or application net second switch with acquisition the first interchanger of net or Acquire the connection of net second switch;
The file server by application the first interchanger of net or application net second switch with acquisition the first interchanger of net or Acquire the connection of net second switch.
5. the safe operation of electric network risk management and control system according to claim 4 based on CIM standards, which is characterized in that institute It includes main database server and from database server, the main database server and from database to state database server Server is connect with application the first interchanger of net and using net second switch respectively;
The application server includes master application server and from application server, the master application server and from application service Device is connect with application the first interchanger of net and using net second switch respectively;
The acquisition server includes main acquisition server and is serviced from acquisition server, the main acquisition server and from acquisition Device is connect with application the first interchanger of net and using net second switch respectively;
The file server includes main file server and from file server, the main file server and from file service Device is connect with application the first interchanger of net and using net second switch respectively.
6. the safe operation of electric network risk management and control system according to claim 4 based on CIM standards, which is characterized in that institute It states database server and passes through application the first interchanger of net or application net second switch and publication the first interchanger of net or publication Net second switch connects;
The application server by application the first interchanger of net or application net second switch with publication the first interchanger of net or Issue the connection of net second switch;
The acquisition server by application the first interchanger of net or application net second switch with publication the first interchanger of net or Issue the connection of net second switch;
The file server by application the first interchanger of net or application net second switch with publication the first interchanger of net or Issue the connection of net second switch.
7. the safe operation of electric network risk management and control system according to claim 1 based on CIM standards, which is characterized in that institute The system of stating is additionally provided with fire wall, and the deployment way used is dual computer group formula, for protecting using net, acquisition net and publication net Security boundary;It is provided with the first fire wall between the application net and acquisition net, is arranged between the application net and publication net There is the second fire wall.
8. the safe operation of electric network risk management and control system according to claim 1 based on CIM standards, which is characterized in that institute State publication net adjusts interface to connect with total, realizes information reporting;
The publication net further includes WEB server, for providing information distribution service.
9. the safe operation of electric network risk management and control system according to claim 1 based on CIM standards, which is characterized in that institute The system of stating further includes:Application support platform and the data center being connect with application support platform by service bus;
The application support platform is connect by interface and adapter with service bus, for during providing application system development Required basic technology component and Service Component.
10. the safe operation of electric network risk management and control system according to claim 9 based on CIM standards, which is characterized in that institute It states data center and provides comprehensive data supporting and model service for system, the process data of generation and result are sent to publication Net.
CN201721508122.7U 2017-11-13 2017-11-13 Safe operation of electric network risk management and control system based on CIM standards Active CN207704483U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721508122.7U CN207704483U (en) 2017-11-13 2017-11-13 Safe operation of electric network risk management and control system based on CIM standards

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721508122.7U CN207704483U (en) 2017-11-13 2017-11-13 Safe operation of electric network risk management and control system based on CIM standards

Publications (1)

Publication Number Publication Date
CN207704483U true CN207704483U (en) 2018-08-07

Family

ID=63022482

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721508122.7U Active CN207704483U (en) 2017-11-13 2017-11-13 Safe operation of electric network risk management and control system based on CIM standards

Country Status (1)

Country Link
CN (1) CN207704483U (en)

Similar Documents

Publication Publication Date Title
US10116165B2 (en) Powergrid operation and supervision system
CN103762723B (en) Method and system for managing a power grid
CN102882969B (en) A kind of safety production cloud service platform of industrial and mining enterprises
CN102932419B (en) A kind of data-storage system for the safety production cloud service platform towards industrial and mining enterprises
CN102917032B (en) A kind of safety production cloud service platform of industrial and mining enterprises
Nan et al. Analyzing vulnerabilities between SCADA system and SUC due to interdependencies
CN105631522A (en) IT system operation and maintenance management system
CN110336373A (en) Photovoltaic power station Information Management System and method
CN105843182A (en) Power dispatching accident handling scheme preparing system and power dispatching accident handling scheme preparing method based on OMS
Shittu et al. Meta-analysis of the strategies for self-healing and resilience in power systems
CN105096047A (en) Overall process task control and assessment system and realization method thereof
CN102917031A (en) Data computing system of safety production cloud service platform for industrial and mining enterprises
CN102903010A (en) Support vector machine-based abnormal judgment method for safety production cloud service platform orientating industrial and mining enterprises
CN103716184B (en) The operation maintenance system of multistage interconnection domain
CN111047143A (en) Power grid OMS-based regional and county team index management system
CN110647567A (en) Power failure plan auxiliary decision system based on end data fusion
CN109709839A (en) A kind of biomass electric power plant multistage method for real-time monitoring
CN103295164A (en) Power grid safety monitoring management information system and management method
CN108256770A (en) Photo-voltaic power generation station O&M managing and control system based on mobile application
CN102915482A (en) Safety production process control and management method for cloud service platforms of industrial and mining enterprises
CN110245163A (en) A kind of Operation of Electric Systems hidden troubles removing method
CN207704483U (en) Safe operation of electric network risk management and control system based on CIM standards
CN107748672A (en) Secondary remote interface integrated management approach based on IEC61850 sites protection model
CN103106555A (en) Maintenance and management system and method based on online and offline integration
CN105790974A (en) Power intensive network management system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant