CN207696756U - The process equipment of seabed concrete weight coating - Google Patents
The process equipment of seabed concrete weight coating Download PDFInfo
- Publication number
- CN207696756U CN207696756U CN201721685153.XU CN201721685153U CN207696756U CN 207696756 U CN207696756 U CN 207696756U CN 201721685153 U CN201721685153 U CN 201721685153U CN 207696756 U CN207696756 U CN 207696756U
- Authority
- CN
- China
- Prior art keywords
- spraying
- trolley
- loading trolley
- spraying loading
- controller
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000011248 coating agent Substances 0.000 title claims abstract description 18
- 238000000576 coating method Methods 0.000 title claims abstract description 18
- 239000004567 concrete Substances 0.000 title claims abstract description 17
- 238000000034 method Methods 0.000 title claims abstract description 8
- 238000005507 spraying Methods 0.000 claims abstract description 51
- 239000007921 spray Substances 0.000 claims abstract description 19
- 239000003973 paint Substances 0.000 claims abstract description 9
- 229910000831 Steel Inorganic materials 0.000 abstract description 11
- 239000010959 steel Substances 0.000 abstract description 11
- 239000002421 finishing Substances 0.000 description 5
- 238000005516 engineering process Methods 0.000 description 4
- 238000002347 injection Methods 0.000 description 4
- 239000007924 injection Substances 0.000 description 4
- 238000005260 corrosion Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 230000007812 deficiency Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 239000011378 shotcrete Substances 0.000 description 1
- 239000000243 solution Substances 0.000 description 1
- 238000003756 stirring Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Landscapes
- Application Of Or Painting With Fluid Materials (AREA)
Abstract
The utility model discloses a kind of process equipments of seabed concrete weight coating, it is characterised in that:It include spraying rectilinear orbit with trolley positioning belt, the first spraying loading trolley, the second spraying loading trolley, broken-circuit controller, tuning controller, paint finishing, and the spray controller being connected with paint finishing;The first spraying loading trolley sprays loading trolley with second and is sequentially arranged on trolley positioning belt, the first track terminal locator and the second track terminal locator that the both ends of the trolley positioning belt are respectively equipped with.The utility model passes through two spraying loading trolleys connected by adjustable rod-type of upper setting in spraying rectilinear orbit, spraying loading trolley while sprayed wherein may be implemented, another spraying loading trolley can synchronize at least 1 times or more of coating work improved efficiency for carrying out down tube operation, and then making steel pipe.
Description
Technical field
The utility model belongs to the manufacture field of concrete weight coating, is related to a kind of processing of seabed concrete weight coating
Equipment.
Background technology
The processing technology of traditional concrete weight coating, predominantly gunite, but single steel pipe can only be placed on every time
Concrete ejection is carried out on counterweight trolley.Upper tube is needed before injection, down tube is needed after injection, is required for falling into a long wait halfway,
Production efficiency is very low.
In addition, because the working life of only half an hour has stirred if counterweight trolley breaks down after concrete stirring
The concrete mixed without injection can only be scrapped, and waste is serious.
Utility model content
The purpose of this utility model is that the deficiency in for the above-mentioned prior art, provides a kind of seabed concrete weight coating
The process equipment of pipe, by the upper setting two in spraying rectilinear orbit by the way that the spraying loading trolleys of rod-type connection are adjusted,
While to realize that a spraying loading trolley is sprayed wherein, another spraying loading trolley can synchronize and carry out down tube
Operation, and then make at least 1 times or more of the coating work improved efficiency of steel pipe.
In order to solve the above technical problems, the utility model adopts the following technical solution:
A kind of process equipment of seabed concrete weight coating, it is characterised in that:It include the spraying with trolley positioning belt
Rectilinear orbit, the first spraying loading trolley, the second spraying loading trolley, broken-circuit controller, tuning controller, paint finishing, with
And the spray controller being connected with paint finishing;The first spraying loading trolley is sequentially arranged in small with the second spraying loading trolley
On vehicle positioning belt, the first track terminal locator and the second track terminal positioning that the both ends of the trolley positioning belt are respectively equipped with
Device, the first spraying loading trolley are equipped with the first register control for being connected with the first track terminal locator, and described the
Two spraying loading trolleys are equipped with the second register control being connected with the second track terminal locator;The broken-circuit controller,
Tuning controller is connected with the first spraying loading trolley, the second spraying loading trolley simultaneously.
The utility model passes through two spraying load-carryings connected by adjustable rod-type of upper setting in spraying rectilinear orbit
Trolley, a spraying loading trolley wherein may be implemented, and while sprayed, another spraying loading trolley can same stepping
Down tube operates on row, and then makes at least 1 times or more of the coating work improved efficiency of steel pipe.In addition, broken-circuit controller can be to list
A spraying loading trolley is controlled, and prevents a certain spraying loading trolley catastrophic failure and whole the case where shutting down is caused to be sent out
It is raw.
Description of the drawings
Fig. 1 is the application effect figure of the utility model.
In figure:1- first sprays loading trolley, and 2- second sprays loading trolley, 3- paint finishings, 4- trolley positioning belts, 5-
First track terminal locator, 6- the second track terminal locators, the first register controls of 7-, the second register controls of 8-, 9-
The inlet pipe region of anti-corrosion pipe to be sprayed and direction, 10- have sprayed the outlet pipe region and direction of counterweight tube, and 11- sprays rectilinear orbit,
12- tuning controllers, 13- broken-circuit controllers, 14- spray controllers.
Specific implementation mode
The preferred embodiment that according to the present invention will be described in detail below with reference to the accompanying drawings.
Referring to Fig. 1, the utility model discloses a kind of process equipment of seabed concrete weight coating, feature exists
In:Include that the spraying rectilinear orbit 11, first with trolley positioning belt 4 sprays the spraying of loading trolley 1, second loading trolley 2, breaks
Road controller 13, tuning controller 12, paint finishing 3, and the spray controller 14 that is connected with paint finishing 3;Described first
Spraying loading trolley 1 and second sprays loading trolley 2 and is sequentially arranged on trolley positioning belt 4, the both ends difference of the trolley positioning belt 4
The the first track terminal locator 5 and the second track terminal locator 6 being equipped with, it is described first spraying loading trolley 1 be equipped with
The first connected register control 7 of first track terminal locator 5, the second spraying loading trolley 2 are equipped with and the second rail
The second connected register control 8 of road terminal locator 6;The broken-circuit controller 13, tuning controller 12 are simultaneously with first
The spraying loading trolley 2 of loading trolley 1, second is sprayed to be connected.
A kind of processing technology of seabed concrete weight coating, process equipment as described above carry out concrete spray to steel pipe
Penetrate operation.
The processing technology of seabed concrete weight coating specifically includes:
1)Second spraying loading trolley 2 sprays the steel pipe on the first spraying loading trolley 1 while upper tube
Step;
2)Laydown area is shifted to after the completion of steel pipe injection on first spraying loading trolley 1(The laydown area please refers in Fig. 1
Outlet pipe region and the direction 10 of counterweight tube are sprayed), meanwhile, the steel pipe linkage on the second spraying loading trolley 2 is started to spray
The step of;
3)Steel pipe on second spraying loading trolley 2 is completed to spray and checks weight coating quality;Meanwhile first sprays load-carrying
Trolley 1 synchronizes down tube and upper tube(Please refer to inlet pipe region and the direction 9 of the anti-corrosion pipe to be sprayed in Fig. 1);
4)Second spraying loading trolley negative direction shifts to laydown area;Meanwhile first spraying loading trolley linkage start to spray
The step of.
The utility model can make at least 1 times or more of the concrete coating work improved efficiency of steel pipe.Double vehicle sprayings are joined
It starts building to make, while the first spraying loading trolley sprays steel pipe, the second spraying loading trolley progress weight coating inspection,
The operation of upper tube, down tube, vice versa.Broken-circuit controller 13 can carry out single crab control simultaneously, prevent a certain trolley from happening suddenly
Failure and the case where cause to shut down.
It is above illustrative to the description of the utility model and application, is not wishing to the scope of the utility model being limited in
In above-described embodiment.Do not depart from the scope of the utility model and spirit in the case of, can to embodiments disclosed herein into
The other deformations of row and change.
Claims (1)
1. a kind of process equipment of seabed concrete weight coating, it is characterised in that:Include that the spraying with trolley positioning belt is straight
Trajectory, the first spraying loading trolley, the second spraying loading trolley, broken-circuit controller, tuning controller, paint finishing, and
The spray controller being connected with paint finishing;The first spraying loading trolley and the second spraying loading trolley are sequentially arranged in trolley
On positioning belt, the first track terminal locator and the second track terminal locator that the both ends of the trolley positioning belt are respectively equipped with,
The first spraying loading trolley is equipped with the first register control being connected with the first track terminal locator, second spray
It applies loading trolley and is equipped with the second register control being connected with the second track terminal locator;The broken-circuit controller, coordination
Controller is connected with the first spraying loading trolley, the second spraying loading trolley simultaneously.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721685153.XU CN207696756U (en) | 2017-12-07 | 2017-12-07 | The process equipment of seabed concrete weight coating |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721685153.XU CN207696756U (en) | 2017-12-07 | 2017-12-07 | The process equipment of seabed concrete weight coating |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207696756U true CN207696756U (en) | 2018-08-07 |
Family
ID=63025088
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721685153.XU Expired - Fee Related CN207696756U (en) | 2017-12-07 | 2017-12-07 | The process equipment of seabed concrete weight coating |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207696756U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108202390A (en) * | 2017-12-07 | 2018-06-26 | 海隆管道工程技术服务有限公司 | The process equipment and technique of seabed concrete weight coating |
-
2017
- 2017-12-07 CN CN201721685153.XU patent/CN207696756U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108202390A (en) * | 2017-12-07 | 2018-06-26 | 海隆管道工程技术服务有限公司 | The process equipment and technique of seabed concrete weight coating |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104959252B (en) | A kind of automatic paint-spraying machine | |
CN203778247U (en) | Automatic spraying production line integrating pretreatment and spraying | |
CN207696756U (en) | The process equipment of seabed concrete weight coating | |
CN104525566A (en) | Continuous casting and rolling device and process for composite plate | |
CN106272089A (en) | H-shaped steel shot blasting device and shot blasting processing method | |
CN108202390A (en) | The process equipment and technique of seabed concrete weight coating | |
CN201543577U (en) | Machine of coating steelbar surfaces | |
CN111169018A (en) | 3D printing equipment, 3D printing system and 3D printing method | |
CN206461056U (en) | Lithium battery adjust automatically spacing device | |
CN108453021A (en) | A kind of enamel technology method of metal product | |
CN209735847U (en) | High efficiency epoxy powder automatic spraying equipment | |
CN207861168U (en) | A kind of intelligence beat crawler belt assembly line conveying equipment | |
CN208512851U (en) | A kind of planer-type automatic sand blasting spray equipment for large-scale steel structure surface | |
CN103410099B (en) | Bridge Erector | |
CN205441741U (en) | Conveyer of sandblast system | |
CN106985269B (en) | A yard technique is cut in ring rotation formula tunnel oven adobe | |
CN205563255U (en) | Monitoring system for aluminum alloy architectural shape does not have chromium capillary chemistry conversion technology | |
CN104261086B (en) | Two-wheeled monorail conveyer and excessively curved control method | |
CN105098147A (en) | Novel acid dripping and rolling device for smearing unformed plate | |
CN203700563U (en) | Integral electrophoresis production line for cab | |
CN203173552U (en) | Automatic plate turnover machine used for coating films on two sides of ceramic substrate in thermal spraying mode | |
CN209865624U (en) | Aerial fog spraying device | |
CN203173447U (en) | Magnetic vibration blanking device | |
CN201567349U (en) | Secondary mesh belt adjustable oil circulation equipment of oil tank of mesh belt furnace | |
CN208098461U (en) | A kind of ring gauge hanging passes through the surface preparation production line of formula steel pipe bundle structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP02 | Change in the address of a patent holder |
Address after: No. 1825 Luodong Road, Baoshan Industrial Park, Shanghai, 2010 Patentee after: HILONG PIPELINE ENGINEERING TECHNOLOGY SERVICE Co.,Ltd. Address before: 201901 No. 1825 Luo Dong Road, Baoshan Industrial Park, Minhang District, Shanghai. Patentee before: HILONG PIPELINE ENGINEERING TECHNOLOGY SERVICE Co.,Ltd. |
|
CP02 | Change in the address of a patent holder | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180807 |
|
CF01 | Termination of patent right due to non-payment of annual fee |