CN207677413U - Powerline ice-covering removal device in electric power electric engineering - Google Patents
Powerline ice-covering removal device in electric power electric engineering Download PDFInfo
- Publication number
- CN207677413U CN207677413U CN201820002413.7U CN201820002413U CN207677413U CN 207677413 U CN207677413 U CN 207677413U CN 201820002413 U CN201820002413 U CN 201820002413U CN 207677413 U CN207677413 U CN 207677413U
- Authority
- CN
- China
- Prior art keywords
- chuck
- bar
- ice
- draw
- removal device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Electric Cable Installation (AREA)
Abstract
The utility model is provided for the powerline ice-covering removal device in electric power electric engineering, including guide sleeve and connecting rod;The inside of the supporting rod, which is run through, is combined with the draw-in bar that a foundation end carries pull handle arrangement, and guide sleeve is equipped with the chuck of rubber material at one at the top of institute's draw-in bar logical one;Two connecting rods in left and right are installed by angled manner between the chuck and the bar wall of supporting rod;The chuck is cylinder-shaped sleeve structure, its top surface offers notch, spring is pulled using pull rod, spring is set inwardly to pull rubber collet, chuck set is set to sting on transmission line of electricity, the layer ice of lid on the line is set to be bitten into pieces, since tension spring is eight, exert oneself convenient for chuck occlusion, structure is more reasonable, and in the mode of operation of hand pull rod, keep operation easier, instead of original whole bar type structure single similar to structure, bar is made instead of this structure, when beating except ice sheet on harness, and caused by electric shock accidents.
Description
Technical field
The utility model belongs to the technical field of line project deicing structure, more particularly, in electric power electric engineering
Powerline ice-covering removal device.
Background technology
Stringing cable due to it is exposed in the environment, when winter approached, ice sheet, therefore work about electric power people can be formed on its surface
Member needs to carry out ice-breaking processing to these ice sheets, prevents the quick-fried rubber of cable from bursting.
The single pure rod-like structure of the ice-breaking bar of some existing rod-like structures, mostly structure, staff utilize this
When the ice-breaking bar of structure carries out break process to the layer ice on cable, hand conference of exert oneself leads to the larger shaking of cable generation,
Possibly even cause broken cable, operates and lack of standardization.
Then, in view of this, the study of the practice experience and deep-going by this profession, provides a kind of convenient for folder ice ice-breaking
Electric power electric engineering on powerline ice-covering after thawing removal device, improve the practicality.
Utility model content
The utility model is reached by technological means in detail below:
Powerline ice-covering removal device in electric power electric engineering, including supporting rod, draw-in bar, chuck, steel tooth,
Seat, leakage ice hole are carried, pulling seat is helped pull a cart, the first tension spring, the second tension spring, guide sleeve and connecting rod;The inside of the supporting rod, which is run through, matches
The draw-in bar for having a foundation end to carry pull handle arrangement is closed, and guide sleeve is equipped with rubber at one at the top of institute's draw-in bar logical one
The chuck of material;Two connecting rods in left and right are installed by angled manner between the chuck and the bar wall of supporting rod;The chuck
For cylinder-shaped sleeve structure, top surface offers notch, and melts load in the arc inner chamber bottom surface of chuck and be connected to load seat at one;
The guide sleeve and chuck are to melt the monolithic construction being welded together, and when off working state, the top head of draw-in bar penetrated through
Guide sleeve.
Further, it is triangular structure to be inlaid with six sections by front and back symmetrical mode in the internal chamber wall of the chuck
Steel tooth, and be further opened in the lower arcuate surface of chuck one layer of leakage ice hole.
Further, it is also respectively welded helping pull a cart for double pipe structure at one at left and right sides of the top surface for carrying seat, and helped pull a cart
Interior tube chamber head is excessive by fillet.
Further, the pulling seat of platy structure everywhere is also welded on the top head top surface of the draw-in bar, and at this
First tension spring is respectively connected on the outside of pulling seat everywhere, and the first tension spring extends through the two of the tube chamber and chuck helped pull a cart
Side inner wall is connected.
Further, the inner wall middle position of first tension spring and chuck is also associated with four by symmetric mode
Two tension springs.
The utility model has the advantages that:
This structure continues to have adopted the deicing equipment of rod-like structure, with the prior art the difference is that this structural top
Deicing equipment is improved, and bar top is equipped with the chuck of rubber material at one by way of guide sleeve and connecting rod,
Six bar steel teeth are inlaid in chuck, and the open-close ways of chuck are to realize that hand exists by the rational tension spring of structure distribution
When lifting tubular rod segments, the pull rod inside idler arm can be descended in passing, and spring is pulled using pull rod, spring is made inwardly to pull rubber
Chuck makes chuck set sting on transmission line of electricity, and the layer ice of lid on the line is made to be bitten into pieces, since tension spring is eight, acts on simultaneously
It on the multiple pulling points of chuck, therefore pulls effect more preferable, exerts oneself convenient for chuck occlusion, structure is more reasonable, and is drawn in hand
The mode of operation of bar keeps operation easier, instead of original whole bar type structure single similar to structure, instead of this structure
Make bar, when beating except ice sheet on harness, cause harness stress excessive and the fracture that generates, and caused by electric shock accidents.
Description of the drawings
Fig. 1, Fig. 2 are the utility model axonometric schematic diagrams.
Fig. 3 is the utility model chuck internal structure schematic diagram.
Fig. 4 is the portions the A amplification steel dental structure schematic diagram of the utility model.
In figure:Supporting rod -1 is included, draw-in bar -2, chuck -3, steel tooth -301 carry seat -302, leakage ice hole -303, pulling seat -
305, help pull a cart -306, first tension spring -307, the second tension spring -308, guide sleeve -4, connecting rod -5.
Specific implementation mode
The utility model is described further below in conjunction with attached drawing:
Embodiment:
As shown in attached drawing 1 to attached drawing 4:
The utility model is provided for the powerline ice-covering removal device in electric power electric engineering, packet supporting rod 1, interior drawing
Bar 2, chuck 3, steel tooth 301 carry seat 302, leakage ice hole 303, pulling seat 305, help pull a cart 306, the first tension spring 307, the second tension spring 308,
Guide sleeve 4 and connecting rod 5;The inside of the supporting rod 1, which is run through, is combined with the draw-in bar 2 that a foundation end carries pull handle arrangement, and
Guide sleeve 4 is equipped with the chuck 3 of rubber material at one at the top of institute's draw-in bar 2 logical one;The chuck 3 and supporting rod 1
Two connecting rods 5 in left and right are installed by angled manner between bar wall;The chuck 3 is cylinder-shaped sleeve structure, and top surface opens up
There is notch, and melts load in the arc inner chamber bottom surface of chuck 3 and be connected to load seat 302 at one;The guide sleeve 4 is to melt with chuck 3
The monolithic construction being welded together, when off working state, the top head of draw-in bar 2 penetrated through guide sleeve 4.
Wherein, six are inlaid with for being engaged outside broken cable by front and back symmetrical mode in the internal chamber wall of the chuck 3
The steel tooth 301 of ice body layer on wall, as shown in figure 4, and being further opened with one layer in the lower arcuate surface of chuck 3 for lower leakage ice body
Leakage ice hole 303.
Wherein, help pull a cart 306, and the drawing of double pipe structure at one are also respectively welded at left and right sides of the top surface for carrying seat 302
Tube chamber head is excessive by fillet in set 306, as shown in figure 3, utilizing excessive 306 pair of first tension spring 307 of helping pull a cart of fillet
Pulling action is oriented to, and keeps 307 movement effects of the first tension spring more preferable.
Wherein, the pulling seat 305 of platy structure everywhere is also welded in the top head top surface of the draw-in bar 2, and at this
The outside of pulling seat 305 is respectively connected with first tension spring 307 everywhere, and the first tension spring 307 extend through help pull a cart 306 pipe
Chamber is connected with the both sides inner wall of chuck 3, thus constitutes a stretching structure, makes draw-in bar 2 when pulling down movement, makes first
First tension spring 307 carry out extensional motion, and drive chuck 3 realize in sting movement.
Wherein, the inner wall middle position of first tension spring 307 and chuck 3 is also associated with four by symmetric mode
Two tension springs 308, it will thus be seen that constituting one eight by the tension spring of the first tension spring 307 and second 308 8 extensional motions of tension spring
The drawing point of a stress point makes 3 clamping campaign of chuck more stablize, and structure is more reasonable.
The specifically used mode of the present embodiment and effect:
It holds and includes the lever position of 1 bottom of supporting rod, make chuck 3 close to the cable location for waiting for deicing, upper pressure draw-in bar 2,
Make the chuck 3 on 2 head of draw-in bar under the relaxation state of the first tension spring 307 and the second tension spring 308, realizes that opening is unclamped, will press from both sides
Set 3 is inserted in by the opening at top on cable, pulls down draw-in bar 2 again, 3 sets of chuck is made to sting on the outer wall of cable, repeatedly above-mentioned
Action, using the steel tooth 301 inlayed in chuck 3, the ice body of cable outer wall is crushed, and a broken ice body part can be by leaking
Ice hole 303 leaks out, and instead of original whole bar type structure single similar to structure, makes bar instead of this structure, is removed beating
When ice sheet on harness, cause harness stress excessive and the fracture that generates, and caused by electric shock accidents.
The opening in technical solutions of the utility model using technical solution described in the utility model or those skilled in the art
It gives, designs similar technical solution, and reach above-mentioned technique effect, be to fall into the scope of protection of the utility model.
Claims (5)
1. for the powerline ice-covering removal device in electric power electric engineering, it is characterised in that:This is used for electric power electric engineering
On powerline ice-covering removal device, including supporting rod (1), draw-in bar (2), chuck (3), steel tooth (301) carries seat (302),
It leaks ice hole (303), pulling seat (305) is helped pull a cart (306), the first tension spring (307), the second tension spring (308), guide sleeve (4) and connecting rod
(5);The inside of the supporting rod (1), which is run through, is combined with the draw-in bar (2) that a foundation end carries pull handle arrangement, and in institute's draw-in bar
(2) guide sleeve (4) is equipped with the chuck (3) of rubber material at one at top logical one;The chuck (3) and supporting rod (1)
Two connecting rods (5) in left and right are installed by angled manner between bar wall;The chuck (3) is cylinder-shaped sleeve structure, top surface
Notch is offered, and melts load in the arc inner chamber bottom surface of chuck (3) and is connected to load seat (302) at one;The guide sleeve (4) with
Chuck (3) is to melt the monolithic construction being welded together, and when off working state, the top head of draw-in bar (2) penetrated through guide sleeve
(4)。
2. as described in claim 1 for the powerline ice-covering removal device in electric power electric engineering, it is characterised in that:It is described
Six sections are inlaid with as the steel tooth (301) of triangular structure by front and back symmetrical mode in the internal chamber wall of chuck (3), and
One layer of leakage ice hole (303) is further opened in the lower arcuate surface of chuck (3).
3. as described in claim 1 for the powerline ice-covering removal device in electric power electric engineering, it is characterised in that:It is described
It carries and is also respectively welded helping pull a cart (306) for double pipe structure at one at left and right sides of the top surface of seat (302), and (306) interior tube chamber of helping pull a cart
Head is excessive by fillet.
4. as described in claim 1 for the powerline ice-covering removal device in electric power electric engineering, it is characterised in that:It is described
Also it is welded with the pulling seat (305) of platy structure everywhere on the top head top surface of draw-in bar (2), and in this pulling seat (305) everywhere
Outside be respectively connected with first tension spring (307), and the first tension spring (307) extend through help pull a cart (306) tube chamber with
The both sides inner wall of chuck (3) is connected.
5. for the powerline ice-covering removal device in electric power electric engineering as described in claim 1 or 4, it is characterised in that:
The inner wall middle position of first tension spring (307) and chuck (3) is also associated with four second tension springs by symmetric mode
(308)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820002413.7U CN207677413U (en) | 2018-01-02 | 2018-01-02 | Powerline ice-covering removal device in electric power electric engineering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820002413.7U CN207677413U (en) | 2018-01-02 | 2018-01-02 | Powerline ice-covering removal device in electric power electric engineering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207677413U true CN207677413U (en) | 2018-07-31 |
Family
ID=62973348
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820002413.7U Expired - Fee Related CN207677413U (en) | 2018-01-02 | 2018-01-02 | Powerline ice-covering removal device in electric power electric engineering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207677413U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111092403A (en) * | 2020-02-16 | 2020-05-01 | 郑鹏艺 | Aerial working cable deicing unmanned aerial vehicle |
-
2018
- 2018-01-02 CN CN201820002413.7U patent/CN207677413U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111092403A (en) * | 2020-02-16 | 2020-05-01 | 郑鹏艺 | Aerial working cable deicing unmanned aerial vehicle |
CN111092403B (en) * | 2020-02-16 | 2020-12-15 | 台州市阿里菜鸟电子商务有限公司 | Aerial working cable deicing unmanned aerial vehicle |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207677413U (en) | Powerline ice-covering removal device in electric power electric engineering | |
CN206678167U (en) | Vertical external mold for pipe of concrete shaping | |
CN203495873U (en) | Hydraulic drawing device of cylinder body shaft sleeve | |
CN206325057U (en) | A kind of new obstetrics' washer | |
CN203430416U (en) | Rope ladder ground fixer with oblique needle | |
CN201962678U (en) | Anti-deformation pile chuck for pile foundation construction | |
CN214464264U (en) | Shield constructs sealed compacting device that fills up of section of jurisdiction | |
CN202280128U (en) | Refuse cleaning clamp | |
CN207792471U (en) | A kind of machine-building draft gear | |
CN207892627U (en) | A kind of winged ductule that processing weak surrounding rock caves in | |
CN213014399U (en) | Novel excavator bucket is fixed device | |
CN206333871U (en) | A kind of novel sponge mop | |
CN210299851U (en) | Push-and-pull integrated umbrella | |
CN108635070A (en) | A kind of dental device | |
CN208690120U (en) | A kind of multi-functional disconnecting switch back brake Job Operations handle | |
CN205662959U (en) | Instrument spade | |
CN218556943U (en) | Machine for opening and pulling buffer sleeve of switch sleeper concrete sleeper | |
CN207377244U (en) | Broken rod pulling device | |
CN220538595U (en) | River course restoration fishing device | |
CN218719020U (en) | Electromagnetic one-way valve | |
CN216834565U (en) | Quick butt fusion capper | |
CN206815311U (en) | Hand-held dynamic compaction machinery with rock-steady structure | |
CN207273141U (en) | Flexible extension bar | |
CN216315815U (en) | Trouser leg overturning machine | |
CN211409300U (en) | Free body extractor with snatch and adsorb function |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180731 Termination date: 20190102 |
|
CF01 | Termination of patent right due to non-payment of annual fee |