CN207673038U - A kind of novel reinforced load bearing wall - Google Patents

A kind of novel reinforced load bearing wall Download PDF

Info

Publication number
CN207673038U
CN207673038U CN201721813342.0U CN201721813342U CN207673038U CN 207673038 U CN207673038 U CN 207673038U CN 201721813342 U CN201721813342 U CN 201721813342U CN 207673038 U CN207673038 U CN 207673038U
Authority
CN
China
Prior art keywords
newly
load bearing
increased
steel plate
bearing wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721813342.0U
Other languages
Chinese (zh)
Inventor
刘兰斗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Italian Strong Line Engineering Co Ltd
Original Assignee
Jiangsu Italian Strong Line Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Italian Strong Line Engineering Co Ltd filed Critical Jiangsu Italian Strong Line Engineering Co Ltd
Priority to CN201721813342.0U priority Critical patent/CN207673038U/en
Application granted granted Critical
Publication of CN207673038U publication Critical patent/CN207673038U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model is related to building material technical fields, disclose a kind of novel reinforced load bearing wall, including:Newly-increased wall beam is installed on the former collar tie beam bottom of load bearing wall, and beam bottom is shored top and is installed in newly-increased wall beam, and the other end is exposed to outside;Beam bottom is shored including steel pipe, steel plate resistance to compression piece and grout blanket, steel plate resistance to compression piece is installed at the top of newly-increased wall beam and at the top of newly-increased door opening, steel pipe one end is welded in the steel plate resistance to compression on piece at the top of newly-increased wall beam, the steel pipe other end and another piece of steel plate resistance to compression piece seamless welding;Grout blanket is filled in steel pipe;It is banded with newly-increased wall beam stirrup in the outside of former collar tie beam and newly-increased wall beam;Steel plate resistance to compression piece bottom of two pieces of cushion block wedgings at the top of newly-increased door opening.The utility model is torn open afterwards by first building, and is realized and is improved on existing building, only need to be removed part building materials, be improved construction efficiency, the problem of reducing building materials waste and pollute environment, is more saved, construction is simple, operation is easy, design more science.

Description

A kind of novel reinforced load bearing wall
Technical field
The utility model is related to building material technical fields, more particularly to a kind of novel reinforced load bearing wall.
Background technology
It typically now opens larger door-window opening in larger area bearing wall or when half wall eminence adds spandrel girder, is generally The wall on door opening lintels and newly-increased spandrel girder top is all removed, or after setting up load-bearing and the unloading of lateral stability maintenance scaffold, so Carry out the construction of the various processes of newly-increased beam again afterwards.
It is first to tear open to build afterwards to remove wall mode, causes the waste of a large amount of building materials, and the efficiency constructed is relatively low, at This is uneconomical, causes a large amount of building waste, and then pollute environment;When door-window opening position is located exactly at bearing wall root When, upper wall body is removed with regard to infeasible.The lateral stability maintenance scaffold unloading manner for setting up large area, although scaffold can return It receives, but artificial and space waste is serious, when setting up scaffold and having security risk, when removing the wall at wall beam position and adding beam, meeting There is the security risk of lateral bucking.
Utility model content
The utility model mainly solving the technical problems that first tear open a large amount of building materials waste caused by building afterwards, and construct Efficiency is relatively low, and cost is uneconomical, the problem of causing a large amount of building waste, and then pollute environment.
In order to solve the above technical problems, the technical solution that the utility model uses is:It provides a kind of novel reinforced Load bearing wall, including:Newly-increased wall beam, beam bottom shore and are installed on the former collar tie beam bottom of load bearing wall with 2 pieces of cushion blocks, the newly-increased wall beam, The beam bottom is shored top and is installed in the newly-increased wall beam, and the other end is installed at the top of newly-increased door opening;
The beam bottom is shored, and further includes steel pipe, two pieces of steel plate resistance to compression pieces and grout blanket, two pieces of steel plate resistance to compression piece difference It is installed at the top of the newly-increased wall beam and at the top of newly-increased door opening, described steel pipe one end is welded at the top of the newly-increased wall beam The steel plate resistance to compression on piece, the steel pipe transverse centerline and another piece of steel plate resistance to compression piece seamless welding;In the steel Grout blanket is filled in pipe;It is banded with newly-increased wall beam stirrup in the outside of the former collar tie beam and newly-increased wall beam;
Steel plate resistance to compression piece bottom of two pieces of cushion block difference wedgings at the top of the newly-increased door opening.
Preferably, in a kind of above-mentioned novel reinforced load bearing wall, the cushion block is correcting wedge.
Preferably, in a kind of above-mentioned novel reinforced load bearing wall, antirust coat is provided on the steel pipe inner wall.
Preferably, in a kind of above-mentioned novel reinforced load bearing wall, the antirust coat is tin coating.
Preferably, in a kind of above-mentioned novel reinforced load bearing wall, the correcting wedge is wooden or steel cushion block.
Preferably, in a kind of above-mentioned novel reinforced load bearing wall, former collar tie beam stirrup is provided with outside the former collar tie beam.
Preferably, in a kind of above-mentioned novel reinforced load bearing wall, reinforcing bar is internally provided in the newly-increased wall beam.
Preferably, in a kind of above-mentioned novel reinforced load bearing wall, the reinforcing bar is half frame-type reinforcing bar curved on both ends.
Preferably, in a kind of above-mentioned novel reinforced load bearing wall, the steel plate resistance to compression piece is welded using 10mm steel plates It forms, the model Q235B of steel material.
Preferably, in a kind of above-mentioned novel reinforced load bearing wall, the steel pipe uses Φ 50X4.0 steel pipes.
The utility model has the beneficial effects that:
Newly-increased wall beam is installed on the former collar tie beam bottom of load bearing wall by the utility model, and beam bottom shores top and is installed on newly-increased wall In beam, the other end is exposed to outside;The utility model compared with prior art, is torn open afterwards by first building, and is realized in existing building On be improved, only need to remove part building materials, improve construction efficiency, reduce building materials waste and pollution environment the problem of, more About, construction is simple, operation is easy supernumerary segment, design more science.
Description of the drawings
Fig. 1 is a kind of structural schematic diagram of novel reinforced load bearing wall of the utility model;
Fig. 2 is a kind of structural schematic diagram of novel reinforced load bearing wall of the utility model;
The label of each component is as follows in attached drawing:
Newly-increased wall beam 1, reinforcing bar 11, beam bottom shore 2, steel pipe 21, steel plate resistance to compression piece 22,23, grout blanket 24, antirust coat 25, Cushion block 3, former collar tie beam 4 increase door opening 5 newly, increase wall beam stirrup 6, former collar tie beam stirrup 7, original wall body a, b, c, d newly.
Specific implementation mode
In order to which so that the utility model technology is realized measure, creation characteristic, reached purpose and effect are easy to understand, under Face will combine the attached drawing in the utility model embodiment, be carried out to the technical scheme in the embodiment of the utility model clear, complete Ground describes, it is clear that the described embodiments are only a part of the embodiments of the utility model, instead of all the embodiments.Base In the embodiments of the present invention, institute that those of ordinary skill in the art are obtained without creative efforts There is other embodiment, shall fall within the protection scope of the present invention.
Embodiment 1:
Fig. 1, Fig. 2 are a kind of structural schematic diagrams of novel reinforced load bearing wall of the utility model;
As shown in Figure 1, 2, a kind of novel reinforced load bearing wall of the utility model, including:Newly-increased wall beam 1, beam bottom shore 2 and 2 pieces of cushion blocks 3, newly-increased wall beam 1 are installed on 4 bottom of former collar tie beam of load bearing wall, and beam bottom is shored 2 tops and is installed in newly-increased wall beam 1, separately One end is installed at the top of newly-increased door opening;It further includes 21, two pieces of steel plate resistance to compression pieces 22,23 of steel pipe and grout blanket 24 that beam bottom, which shores 2, and two Block steel plate resistance to compression piece 22,23 is respectively arranged in 5 top of 1 top of newly-increased wall beam and newly-increased door opening, and 21 one end of steel pipe, which is welded in, to be located at On the steel plate resistance to compression piece 22 at 1 top of newly-increased wall beam, at 21 cross central line of steel pipe with another piece of 23 seamless welding of steel plate resistance to compression piece; Grout blanket 24 is filled in steel pipe 21;It is banded with newly-increased wall beam stirrup 6 in the outside of former collar tie beam 4 and newly-increased wall beam 1;Two pieces of pads Block 3 distinguishes steel plate resistance to compression piece bottom of the wedging at the top of the newly-increased door opening.
The prior art be first tear open build afterwards caused by a large amount of building materials waste, and the efficiency constructed is relatively low, cost without Ji causes a large amount of building waste, and then the problem of pollution environment.Newly-increased wall beam 1 is installed on load bearing wall by the utility model 4 bottom of former collar tie beam, beam bottom shores 2 tops and is installed in newly-increased wall beam 1, and the other end is exposed to outside;The utility model with it is existing There is technology to compare, torn open afterwards by first building, realize and be improved on existing building, only need to remove part building materials, improve and apply Work efficiency rate is more saved, construction is simple the problem of reducing building materials waste and pollute environment, and operation is easy, design more section It learns.
Embodiment 2:
As shown in Fig. 2, a kind of novel reinforced load bearing wall of the utility model, on the basis of embodiment 1, in the steel pipe Antirust coat 25 is provided on 21 inner walls.Preferably, antirust coat 25 is tin coating.Tin coating is a kind of good weldability and has one Determine the coating of anti-corrosion capability, requirement and anti-corrosion, the advantages that antirust is anti-oxidation of the welding of steel pipe 21 can be met.
Further, cushion block 3 is correcting wedge;Correcting wedge has good support force, by adjusting correcting wedge Highly, the planarization of former collar tie beam 4, newly-increased wall beam 1 is improved;Preferably, correcting wedge is wooden or steel cushion block.Wooden wedge Shape cushion block has the advantages that more to be bonded with contact material, keeps former collar tie beam 4, the contact of newly-increased wall beam 1 even closer;Steel wedge shape The support force of cushion block is more preferable, is hardly damaged, and the service life is longer.
Further, former collar tie beam stirrup 7 is provided with outside former collar tie beam 4.Former collar tie beam stirrup 7 improves the steady of former collar tie beam 4 Solidity.
Further, it is internally provided with reinforcing bar 11 in newly-increased wall beam 1;Reinforcing bar 11 is half frame-type reinforcing bar curved on both ends.Steel Muscle 11 improves the bearing capacity of newly-increased wall beam 1, extends the service life of newly-increased wall beam 1;Half curved frame-type reinforcing bar makes on both ends Install, dismantle it is more convenient.
Further, steel plate resistance to compression piece 22 is welded using 10mm steel plates, the model Q235B of steel material.
Further, steel pipe 21 uses Φ 50X4.0 steel pipes.
The concrete construction method of the novel reinforced load bearing wall of the utility model is:
First, after determining the increased size h of former collar tie beam, original wall body a is removed at scene;
Secondly, make the novel reinforced load bearing wall of the utility model, length should 1~2cm short compared with a, steel plate resistance to compression After piece 22 derusts, in steel pipe 21 after setting antirust coat 25, steel pipe 21 is aligned to seamless welding company with 23 center of steel plate resistance to compression piece It connects, and is filled with grout blanket 24 in steel pipe 21, after to be achieved 80% intensity, other one piece of top (center alignment) welding is same Specification steel plate resistance to compression piece 22;After installation completes, 3 wedging of cushion block is used in combination, former collar tie beam 4 is made to be held out against with pre-demolition original wall body b;
Third, remove original wall body b, by the tops original wall body c mortar plastering it is levelling after, carry out template support, the steel of wall beam Muscle side is pricked and pouring construction, and c, and this reality of lossless excision wall beam lower part protrusion are removed after wall beam reaches 95% design strength Lower part is shored with novel, keeps wall beam lower part smooth;
Finally, doorway sections wall d is removed according to construction drawing, is formed and increase door opening 5 newly, and paints completion.
The above description is only the embodiments of the present invention, and it does not limit the scope of the patent of the present invention, every Equivalent structure or equivalent flow shift made based on the specification and figures of the utility model, is applied directly or indirectly in Other related technical areas are equally included in the patent within the scope of the utility model.

Claims (10)

1. a kind of novel reinforced load bearing wall, which is characterized in that including:Newly-increased wall beam, beam bottom shore with 2 pieces of cushion blocks, it is described newly-increased Wall beam is installed on the former collar tie beam bottom of load bearing wall, and the beam bottom is shored top and is installed in the newly-increased wall beam, other end installation At the top of newly-increased door opening;
The beam bottom is shored, and further includes steel pipe, two pieces of steel plate resistance to compression pieces and grout blanket, and two pieces of steel plate resistance to compression pieces are installed respectively At the top of the newly-increased wall beam and at the top of newly-increased door opening, described in described steel pipe one end is welded at the top of the newly-increased wall beam Steel plate resistance to compression on piece, the steel pipe transverse centerline and another piece of steel plate resistance to compression piece seamless welding;In the steel pipe Filled with grout blanket;It is banded with newly-increased wall beam stirrup in the outside of the former collar tie beam and newly-increased wall beam;
Steel plate resistance to compression piece bottom of two pieces of cushion block wedgings at the top of the newly-increased door opening.
2. a kind of novel reinforced load bearing wall according to claim 1, which is characterized in that the cushion block is correcting wedge.
3. a kind of novel reinforced load bearing wall according to claim 1, which is characterized in that be provided on the steel pipe inner wall Antirust coat.
4. a kind of novel reinforced load bearing wall according to claim 3, which is characterized in that the antirust coat is tin coating.
5. a kind of novel reinforced load bearing wall according to claim 2, which is characterized in that the correcting wedge be it is wooden or Steel cushion block.
6. a kind of novel reinforced load bearing wall according to claim 1, which is characterized in that be provided with outside the former collar tie beam Former collar tie beam stirrup.
7. a kind of novel reinforced load bearing wall according to claim 1, which is characterized in that be arranged inside the newly-increased wall beam There is reinforcing bar.
8. a kind of novel reinforced load bearing wall according to claim 7, which is characterized in that the reinforcing bar is curved half on both ends Frame-type reinforcing bar.
9. a kind of novel reinforced load bearing wall according to claim 1, which is characterized in that the steel plate resistance to compression piece uses 10mm Steel plate is welded, the model Q235B of steel material.
10. a kind of novel reinforced load bearing wall according to claim 1, which is characterized in that the steel pipe uses Φ 50X4.0 Steel pipe.
CN201721813342.0U 2017-12-22 2017-12-22 A kind of novel reinforced load bearing wall Expired - Fee Related CN207673038U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721813342.0U CN207673038U (en) 2017-12-22 2017-12-22 A kind of novel reinforced load bearing wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721813342.0U CN207673038U (en) 2017-12-22 2017-12-22 A kind of novel reinforced load bearing wall

Publications (1)

Publication Number Publication Date
CN207673038U true CN207673038U (en) 2018-07-31

Family

ID=62970877

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721813342.0U Expired - Fee Related CN207673038U (en) 2017-12-22 2017-12-22 A kind of novel reinforced load bearing wall

Country Status (1)

Country Link
CN (1) CN207673038U (en)

Similar Documents

Publication Publication Date Title
CN109183607B (en) Prefabricated spliced UHPC pipe-concrete ultrahigh pier and construction method
CN202925762U (en) Novel reinforced concrete superposed beam
CN102926504B (en) Construction method of steel and concrete overlapped beam combined part
CN102322025B (en) Pre-stressing reinforced and widened bridge structure
CN102817325A (en) Construction method of simply supported-continuous switching system of negative moment beam prestressed precast box beam
CN104060542A (en) Transverse bridge direction prestress exerting device for combined beam cable-stayed bridge and transverse bridge direction prestress exerting method
CN107964870A (en) A kind of detachable assembling type reinforced concrete bridge pier cushion cap connection structure
CN203768810U (en) Prefabricated bridge deck space steel pipe concrete truss combined beam
CN105464399A (en) Prefabricated checkered plate steel truss strengthening reinforced concrete frame beam structure and strengthening method
CN106087711A (en) Antinode work beam-steel concrete top board-external prestressing combines T-shaped simply supported beam
CN101122115B (en) Construction method for tower crane shift
CN103790176B (en) Construction method for embedded short limb column structure
CN208267198U (en) A kind of building profiled sheet and combination floor support plate
CN205934687U (en) Antinode worker roof beam - steel concrete roof - external prestress combination T type simple beam
CN106012808B (en) A kind of Wavelike steel webplate profiled sheet combination beam and its construction method
CN212270679U (en) Novel anti-drawing composite beam joint structure
CN207673038U (en) A kind of novel reinforced load bearing wall
CN205259072U (en) Hollow mound of railway formwork support system that binds
CN114075853A (en) Bottom plate for concrete prestress superposition
CN217869978U (en) Steel-concrete combined bridge deck and wet seam structure thereof
CN103397778A (en) Method for constructing high-rise commercial and residential building structure transfer floor
CN110821021A (en) Floor slab capable of being installed rapidly
CN102733308A (en) Method for connecting steel guide girder with box girder
CN206693469U (en) A kind of precast floor slab connecting node
CN209556203U (en) Long-span underground power house furred ceiling arched girder steel-concrete structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180731

Termination date: 20181222