CN207672972U - Civil engineering work construction bracket - Google Patents

Civil engineering work construction bracket Download PDF

Info

Publication number
CN207672972U
CN207672972U CN201721717701.2U CN201721717701U CN207672972U CN 207672972 U CN207672972 U CN 207672972U CN 201721717701 U CN201721717701 U CN 201721717701U CN 207672972 U CN207672972 U CN 207672972U
Authority
CN
China
Prior art keywords
outside
civil engineering
connecting rod
downside
engineering work
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721717701.2U
Other languages
Chinese (zh)
Inventor
刘丽
张伟
沈雪晶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaoning Urban Construction Technical College
Original Assignee
Liaoning Urban Construction Technical College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liaoning Urban Construction Technical College filed Critical Liaoning Urban Construction Technical College
Priority to CN201721717701.2U priority Critical patent/CN207672972U/en
Application granted granted Critical
Publication of CN207672972U publication Critical patent/CN207672972U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses civil engineering work construction brackets, including bottom plate, the base plate interior is equipped with opening, the baseplate underside quadrangle is equipped with support base, quadrangle is equipped with support column on the upside of the bottom plate, left and right ends are equipped with rack inside the support column, connection frame is equipped on the outside of the support base, the connection outer frame side is equipped with motor, shaft is equipped on the inside of the motor, gear is equipped on the outside of the shaft, the wheel and rack engagement, connecting plate is equipped between the connection frame, quadrangle is equipped with connecting rod on the downside of the connecting plate, idler wheel is equipped on the downside of the connecting rod, bearing basket is equipped on the upside of the connecting plate, connecting tube is equipped on the downside of the bearing basket, the bearing basket is internally provided with groove, the inside grooves are equipped with sliding block, connecting rod is equipped on the outside of the sliding block, link is equipped on the outside of the connecting rod.The utility model can effectively facilitate the movement, fixation and lifting of holder, facilitate the use of people.

Description

Civil engineering work construction bracket
Technical field
The utility model is related to a kind of building fields, specifically civil engineering work construction bracket.
Background technology
Civil engineering is the general designation for the science and technology for building all kinds of job facilities.It both referred to applied material, equipment and The technical activities such as the exploration, design, construction, the maintenance that are carried out;Also refer to the object of engineering construction, that is, build on the ground or ground Under, in land or water, directly or indirectly be human lives, production, military affairs, scientific research service various job facilities, such as House, road, railway, transport pipeline, tunnel, bridge, canal, dykes and dams, harbour, power station, airport, ocean platform, water supply and Draining and protection works etc..
Any one job facilities are always inevitably by nature or artificial effect(Traditionally it is known as load). It is the own wt and working load of the engineering that terrestrial gravitation generates first;Followed by wind, water, temperature, ice and snow, earthquake and quick-fried The effects that fried.In order to ensure safety, various job facilities must have the ability for resisting above-mentioned various load comprehensive functions.
The material base for building job facilities is soil, construction material, Architectural Equipment and construction equipment.By means of these objects Matter condition, it is economical and people's requirement and esthetic requirement can be met and bear various loads safely by easily building up Job facilities are the starting point and the objective of civil engineering subject.
In present civil engineering construction, need oh constructed at device, the present support device of major issue is generally set Standby stability is good, and it is very inconvenient that movement is got up, or movement is got up conveniently, and stabilization of equipment performance can be looked into.Therefore, this field Technical staff provides civil engineering work construction bracket, to solve the problems mentioned in the above background technology.
Utility model content
The purpose of this utility model is to provide civil engineering work construction brackets, to solve to propose in above-mentioned background technology The problem of.
To achieve the above object, the utility model provides the following technical solutions:
Civil engineering work construction bracket, including bottom plate, the base plate interior are equipped with opening, and the baseplate underside quadrangle is set There are support base, bottom plate upside quadrangle to be equipped with support column, left and right ends are equipped with rack, the support base inside the support column Outside is equipped with connection frame, and the connection outer frame side is equipped with motor, shaft is equipped on the inside of the motor, is equipped on the outside of the shaft Gear, the wheel and rack engage, and connecting plate is equipped between the connection frame, and quadrangle is equipped with connection on the downside of the connecting plate Bar is equipped with idler wheel on the downside of the connecting rod, bearing basket is equipped on the upside of the connecting plate, connecting tube is equipped on the downside of the bearing basket, The bearing basket is internally provided with groove, and the inside grooves are equipped with sliding block, connecting rod, the connecting rod are equipped on the outside of the sliding block Outside is equipped with link.
As further program of the utility model:The support base interior lower end is equipped with friction pad.
As further program of the utility model:Protective cover is equipped on the outside of the motor.
As further program of the utility model:The shaft is attached by shaft coupling and motor.
As the utility model further scheme:The connecting tube lower end is equipped with control valve.
Compared with prior art, the utility model has the beneficial effects that:The utility model is rotated by motor driven gear, Being engaged in this way by gear drives support plate and bearing basket to carry out up and down smoothly movement, to facilitate construction personnel to carry out work Make;By the setting of sliding slot and sliding block, the connection of the safety belt of staff can be facilitated, such staff is in bearing basket When portion is moved, safety belt can be effectively guaranteed the peace of staff in this way with being moved together Entirely;After idler wheel on the downside of connecting plate is contacted with ground, when the support base of quadrangle leaves ground, it can facilitate in this way The movement of equipment;Idler wheel on the downside of connecting plate leaves ground in this way can be square when support base and the ground of quadrangle contact Just the fixation of equipment can effectively facilitate equipment to be moved and fixed in this way, to facilitate the use of equipment.
Description of the drawings
Fig. 1 is the structural schematic diagram of civil engineering work construction bracket.
Fig. 2 is the structural schematic diagram of civil engineering work construction bracket front view.
Fig. 3 is the structural schematic diagram that frame left view sectional view is connected in civil engineering work construction bracket.
Specific implementation mode
It should be noted that in the absence of conflict, the feature in the embodiments of the present invention and embodiment can To be combined with each other.
In the description of the present invention, it should be understood that term "center", " longitudinal direction ", " transverse direction ", "upper", "lower", The orientation or positional relationship of the instructions such as "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outside" is It is based on the orientation or positional relationship shown in the drawings, is merely for convenience of describing the present invention and simplifying the description, rather than indicate Or imply that signified device or element must have a particular orientation, with specific azimuth configuration and operation, therefore cannot understand For limitations of the present invention.In addition, term " first ", " second " etc. are used for description purposes only, and should not be understood as indicating Or it implies relative importance or implicitly indicates the quantity of indicated technical characteristic." first ", " second " etc. are defined as a result, Feature can explicitly or implicitly include one or more this feature.It is in the description of the present invention, unless another It is described, the meaning of " plurality " is two or more.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " is pacified Dress ", " connected ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integrally Connection;It can be mechanical connection, can also be electrical connection;Can be directly connected, can also indirectly connected through an intermediary, It can be the connection inside two elements.For the ordinary skill in the art, on being understood by concrete condition State the concrete meaning of term in the present invention.
The utility model will be described in detail below with reference to the accompanying drawings and embodiments.
Refering to fig. 1~3, in the utility model embodiment, civil engineering work construction bracket, including bottom plate 1, the bottom plate 1 is internally provided with opening 2, and 1 downside quadrangle of the bottom plate is equipped with support base 3, and 3 interior lower end of the support base is equipped with friction pad, can Effectively to increase the frictional force between equipment and ground, it can be effectively guaranteed the stabilization of equipment in this way, on the bottom plate 1 Side quadrangle is equipped with support column 4, and 4 inside left and right ends of the support column are equipped with rack 5, and 4 outside of the support base is equipped with connection Frame 6,6 outside of the connection frame are equipped with motor 7, and 7 outside of the motor is equipped with protective cover, can be effectively protected motor 7, described 7 inside of motor is equipped with shaft 8, and the shaft 8 is attached by shaft coupling and motor 7, and 8 outside of the shaft is equipped with gear 9, The gear 9 is engaged with rack 5, and institute is by gear drive, the lifting that can effectively facilitate control device to stablize, in this way can be with The use for effectively facilitating equipment, states and is equipped with connecting plate 10 between connecting frame 6, and 10 downside quadrangle of the connecting plate is equipped with connecting rod 11,11 downside of the connecting rod is equipped with idler wheel 12, after the idler wheel 12 of 10 downside of connecting plate is contacted with ground, the support of quadrangle When seat 3 leaves ground, the movement of equipment can be facilitated in this way;Idler wheel 12 in the downside of connecting plate 10 leaves ground, and four When the support base 3 at angle is contacted with ground, the fixation of equipment can be facilitated in this way, can effectively facilitate equipment to carry out in this way Mobile and fixed, to facilitate the use of equipment and the work of construction personnel, 10 upside of the connecting plate is equipped with bearing basket 13, 13 downside of the bearing basket is equipped with connecting tube 14, and 14 lower end of the connecting tube is equipped with control valve, can effectively facilitate in discharge The dust and ponding in portion, the bearing basket 13 are internally provided with groove 15, and the groove 15 is internally provided with sliding block 16, the sliding block 16 Outside is equipped with connecting rod 17, and 17 outside of the connecting rod is equipped with link 18, and staff can will pacify in carrying out work progress The hook of full band is connect with link 18, and when such staff moves inside bearing basket, safety belt can be with It is moved together, the safety of staff can be effectively guaranteed in this way.
It is obvious to a person skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and And without departing substantially from the spirit or essential attributes of the utility model, it can realize that this practicality is new in other specific forms Type.Therefore, in all respects, the present embodiments are to be considered as illustrative and not restrictive, this practicality is new The range of type is indicated by the appended claims rather than the foregoing description, it is intended that containing in the equivalent requirements of the claims will be fallen All changes in justice and range are embraced therein.Any reference numeral in claim should not be considered as limitation Involved claim.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art The other embodiment being appreciated that.

Claims (5)

1. civil engineering work construction bracket, including bottom plate, which is characterized in that the base plate interior is equipped with opening, the bottom plate Downside quadrangle is equipped with support base, and quadrangle is equipped with support column on the upside of the bottom plate, and left and right ends are equipped with rack inside the support column, It is equipped with connection frame on the outside of the support base, the connection outer frame side is equipped with motor, equipped with shaft on the inside of the motor, described turn Gear is equipped on the outside of axis, the wheel and rack engages, and connecting plate, connecting plate downside quadrangle are equipped between the connection frame Equipped with connecting rod, it is equipped with idler wheel on the downside of the connecting rod, bearing basket is equipped on the upside of the connecting plate, is equipped on the downside of the bearing basket Connecting tube, the bearing basket are internally provided with groove, and the inside grooves are equipped with sliding block, connecting rod, institute are equipped on the outside of the sliding block It states and is equipped with link on the outside of connecting rod.
2. civil engineering work construction bracket according to claim 1, which is characterized in that the support base interior lower end is set There is friction pad.
3. civil engineering work construction bracket according to claim 1, which is characterized in that be equipped with protection on the outside of the motor Cover.
4. civil engineering work construction bracket according to claim 1, which is characterized in that the shaft by shaft coupling with Motor is attached.
5. civil engineering work construction bracket according to claim 1, which is characterized in that the connecting tube lower end is equipped with control Valve processed.
CN201721717701.2U 2017-12-12 2017-12-12 Civil engineering work construction bracket Expired - Fee Related CN207672972U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721717701.2U CN207672972U (en) 2017-12-12 2017-12-12 Civil engineering work construction bracket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721717701.2U CN207672972U (en) 2017-12-12 2017-12-12 Civil engineering work construction bracket

Publications (1)

Publication Number Publication Date
CN207672972U true CN207672972U (en) 2018-07-31

Family

ID=62969054

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721717701.2U Expired - Fee Related CN207672972U (en) 2017-12-12 2017-12-12 Civil engineering work construction bracket

Country Status (1)

Country Link
CN (1) CN207672972U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109025227A (en) * 2018-08-15 2018-12-18 胡浩成 A kind of construction adjustable working table
CN109166701A (en) * 2018-09-29 2019-01-08 国家电网公司 A kind of power transformer bracket
CN109209214A (en) * 2018-08-29 2019-01-15 石小帅 A kind of electric power installing engineering step ladder easy to remove

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109025227A (en) * 2018-08-15 2018-12-18 胡浩成 A kind of construction adjustable working table
CN109209214A (en) * 2018-08-29 2019-01-15 石小帅 A kind of electric power installing engineering step ladder easy to remove
CN109209214B (en) * 2018-08-29 2019-12-06 石小帅 electric power installation engineering is with ladder of ascending a height convenient to remove
CN109166701A (en) * 2018-09-29 2019-01-08 国家电网公司 A kind of power transformer bracket

Similar Documents

Publication Publication Date Title
CN207672972U (en) Civil engineering work construction bracket
CN202000684U (en) Outwards extending horizontal safety net system used in construction of main body structure of high-rise building
CN108643546A (en) A kind of construction liftable truss
CN207828798U (en) A kind of hanging basket device of bridge construction
CN207660263U (en) A kind of indoor mobile decoration platform for building
CN109518997A (en) A kind of lift traffic guidance platform carrying out multi-faceted rain cover
CN203040949U (en) Sunshade umbrella with folding seat
CN211513196U (en) Utensil falling prevention device for portable high-altitude operation
CN205840468U (en) The three pipe towers that a kind of stability is high
CN204995036U (en) Liftable shaking table
CN205709756U (en) A kind of communications maintenance lifting platform
CN204511008U (en) A kind of traveling tent
CN203870384U (en) Multifunctional double-shoulder bracket
CN203506593U (en) Vertical glass wall fixator
CN209469369U (en) A kind of fruit picker
CN208415897U (en) A kind of construction liftable truss
CN207393104U (en) A kind of high building cat ladder of protective
CN207420098U (en) A kind of garden architecture supporting rack
MX2014008789A (en) Articulated backpack apparatus and system.
CN206360180U (en) A kind of Combined light steel roof
CN104188443A (en) Hammock sleeping bag
CN204982834U (en) Support arrangement for ocean drilling platform's book arm hangs
CN211722127U (en) Portable storage box for outdoor articles
CN209113435U (en) A kind of civil engineering high security elevating platform
CN203182453U (en) Folding type earthquake resisting bed

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180731

Termination date: 20181212