CN207671649U - Construction material transports lifter - Google Patents

Construction material transports lifter Download PDF

Info

Publication number
CN207671649U
CN207671649U CN201721714134.5U CN201721714134U CN207671649U CN 207671649 U CN207671649 U CN 207671649U CN 201721714134 U CN201721714134 U CN 201721714134U CN 207671649 U CN207671649 U CN 207671649U
Authority
CN
China
Prior art keywords
motor
sliding block
leading screw
construction material
sliding rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721714134.5U
Other languages
Chinese (zh)
Inventor
史冠勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201721714134.5U priority Critical patent/CN207671649U/en
Application granted granted Critical
Publication of CN207671649U publication Critical patent/CN207671649U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses construction materials to transport lifter, including frame, first motor, first leading screw, first sliding rail, first sliding block, connecting plate, second sliding rail, second sliding block, second motor, second leading screw, the construction material transports lifter, clever structure, it is powerful, it is easy to operate, it is time saving and energy saving, by using the device, without staff using cart by construction material transports and staff manually promotes construction material mode, the processing promoted again can be first transported to construction material, greatly reduce the working strength of staff.

Description

Construction material transports lifter
Technical field
The utility model is related to lifters more particularly to construction material to transport lifter.
Background technology
Currently, the construction material on construction site does not have dedicated transport lifter, the traditional transport of construction material to be promoted Mode is that staff first transports construction material using construction material cart mostly, when construction material is transported to specified Behind region, staff carries out promotion processing by way of manually carrying to the construction material after transport again, and such mode is taken When it is laborious, significantly increase the working strength of staff, in view of disadvantages described above, it is really necessary to design building transport of materials to carry Rise device.
Utility model content
The technical problem to be solved by the utility model is to:Construction material is provided and transports lifter, to solve background skill The problem of art proposes.
In order to solve the above technical problems, the technical solution of the utility model is:Construction material transports lifter, including frame Frame, first motor, the first leading screw, the first sliding rail, the first sliding block, connecting plate, the second sliding rail, the second sliding block, the second motor, second Leading screw, the first motor are located at left and right sides of lower portion, and the first motor is connected with frame screw thread, and described the One leading screw is located at the top of first motor, and first leading screw is connected with first motor close-fitting, and first leading screw runs through Frame, first leading screw are connected with frame member, and first sliding rail is located at left and right sides of frame roof, and described the One sliding rail is connected with frame welding, and first sliding block is located on the inside of the first sliding rail, first sliding block and the first sliding rail Sliding is connected, and first sliding block, through the first leading screw, first sliding block is connected with the first threads of lead screw, described Connecting plate be located at the first sliding block between any two, the connecting plate is weldingly connected with the first sliding block, the second sliding rail position At the top of connecting plate, second sliding rail is connected with connecting plate screw thread, and second sliding block is located at the top of the second sliding rail, institute The second sliding block stated is connected with the sliding of the second sliding rail, and second motor is located at connecting plate top left side, the described second electricity Machine is connected with connecting plate screw thread, and second leading screw is located on the right side of the second motor, and second leading screw and the second motor are tight With being connected, and second leading screw runs through the second sliding block, and second leading screw is connected with the second sliding block screw thread.
Further, second slider top is additionally provided with placing box, and the placing box is connected with the second sliding block screw thread.
Further, the lower portion middle-end is additionally provided with transformer, and the transformer is connected with frame screw thread.
Further, it is additionally provided with plug on the right side of the transformer, the plug is connected with transformer conducting wire.
Compared with prior art, which transports lifter, in use, staff promotes required transport first Construction material be positioned in placing box, staff again with hand open the second motor positive rotating function, at this point, the second motor drive Dynamic second leading screw does clockwise rotation, under the action of the second leading screw and the second sliding block screw-driven so that the second sliding block It drives placing box to do along the direction of the second sliding rail to move from left to right, in the above manner, to the construction material in placing box Transport processing is carried out, after the distance that placing box moves from left to right reaches the demand of staff, staff is first closed with hand The second motor is closed, then opens the positive rotating function of first motor with hand, at this point, first motor drives the first leading screw to rotate clockwise Function, under the action of the first leading screw and the first sliding block screw-driven so that the first sliding block drives connecting plate to be done together with placing box It moves from bottom to top, in the above manner, promotion processing is carried out to the construction material in placing box, when placing box moves from bottom to top After dynamic distance reaches the demand of staff, staff closes first motor with hand again, in the above manner, finally So that the device first transports construction material the processing promoted again, which transports lifter, clever structure, function It is powerful, it is easy to operate, it is time saving and energy saving, by using the device, construction material is transported using cart without staff And the mode that staff manually promotes construction material, you can construction material first transported and is promoted again After processing greatly reduces the working strength of staff, while construction material after being promoted in placing box is removed, work Make personnel again with hand open first motor reverse function, allow placing box to do with this and move from top to bottom, when placing box on to After the distance of lower movement reaches the demand of staff, staff first closes first motor with hand, is then turned on the second motor Reverse function allows placing box to do and moves from right to left with this, when the distance that placing box moves from right to left reaches staff's After demand, staff closes the second motor with hand, and staff again places the construction material that promotion is transported needed for next group In in placing box, then similarly above step is first transported the processing promoted again, plug to the construction material in placing box It is to allow extraneous power supply to carry out energy supply to the device with this, transformer is in order to ensure the dress to connect extraneous power supply The stability of voltage is set, the first motor and the second motor are clockwise and anticlockwise motor, and the first motor model is preferably OKD3KW220VAC, second motor model is preferably 2IK6RGN-C+2GN3K.
Description of the drawings
Fig. 1 is the local front sectional view of construction material transport lifter;
Fig. 2 is the connection sectional view of the first sliding rail, the first sliding block and the first leading screw;
Fig. 3 is the connection sectional view of the second sliding rail, the second sliding block and the second leading screw.
Frame 1, first motor 2, the first leading screw 3, the first sliding rail 4, the first sliding block 5, connecting plate 6, the second sliding rail 7, second Sliding block 8, the second motor 9, the second leading screw 10, transformer 101, plug 102, placing box 801.
Following specific implementation mode will be further illustrated in conjunction with above-mentioned attached drawing.
Specific implementation mode
Hereinafter, a variety of specific details are elaborated, in order to provide the saturating of the concept to constituting described embodiment basis Thorough understanding.However, it will be apparent to those skilled in the art that described embodiment can be in these no specific details In some or all situations get off practice.In other cases, well-known processing step is not specifically described.
As shown in Figure 1, Figure 2, Figure 3 shows, construction material transports lifter, including frame 1, first motor 2, the first leading screw 3, the One sliding rail 4, the first sliding block 5, connecting plate 6, the second sliding rail 7, the second sliding block 8, the second motor 9, the second leading screw 10, described first Motor 2 is located at the 1 inside left and right sides of frame, and the first motor 2 is connected with 1 screw thread of frame, and first leading screw 3 is located at 2 top of first motor, first leading screw 3 is connected with 2 close-fitting of first motor, and first leading screw 3 runs through frame 1, First leading screw 3 is rotatedly connected with frame 1, and first sliding rail 4 is located at the top of frame 1 left and right sides, and described the One sliding rail 4 is weldingly connected with frame 1, and first sliding block 5 is located at 4 inside of the first sliding rail, first sliding block 5 and first The sliding of sliding rail 4 is connected, and first sliding block 5 is through the first leading screw 3,3 screw thread of the first sliding block 5 and the first leading screw It is connected, the connecting plate 6 is located at the first sliding block 5 between any two, and the connecting plate 6 is weldingly connected with the first sliding block 5, described The second sliding rail 7 be located at the top of connecting plate 6, second sliding rail 7 is connected with 6 screw thread of connecting plate, second sliding block 8 In 7 top of the second sliding rail, second sliding block 8 is connected with the sliding of the second sliding rail 7, and second motor 9 is located at connecting plate 6 Top left side, second motor 9 are connected with 6 screw thread of connecting plate, and second leading screw 10 is located at 9 right side of the second motor, Second leading screw 10 is connected with 9 close-fitting of the second motor, and second leading screw 10 runs through the second sliding block 8, and described the Two leading screws 10 are connected with 8 screw thread of the second sliding block, and 8 top of the second sliding block is additionally provided with placing box 801, the placing box 801 are connected with 8 screw thread of the second sliding block, and the 1 inside middle-end of frame is additionally provided with transformer 101, the transformer 101 and frame 1 screw thread of frame is connected, and 101 right side of transformer is additionally provided with plug 102, the plug 102 and 101 conducting wire phase of transformer Even.
The construction material transports lifter, in use, staff places the construction material that required transport is promoted first In in placing box 801, staff opens the positive rotating function of the second motor 9 with hand again, at this point, the second motor 9 drives second Thick stick 10 does clockwise rotation, under the action of the second leading screw 10 and the second 8 screw-driven of sliding block so that 8 band of the second sliding block Dynamic placing box 801 is done along the direction of the second sliding rail 7 to be moved from left to right, in the above manner, to the building in placing box 801 Material carries out transport processing, and after the distance that placing box 801 moves from left to right reaches the demand of staff, staff is first The second motor 9 is closed with hand, is then turned on the positive rotating function of first motor 2, at this point, first motor 2 drives the first leading screw 3 to do up time Needle rotation function, under the action of the first leading screw 3 and the first 5 screw-driven of sliding block so that the first sliding block 5 drives connecting plate 6 to connect It does with placing box 801 and moves from bottom to top, in the above manner, promotion processing is carried out to the construction material in placing box 801, when After the distance that placing box 801 moves from bottom to top reaches the demand of staff, staff closes first motor 2 with hand again and is Can, in the above manner, finally the device is made first to be transported the processing promoted again to construction material, meanwhile, work as placing box After construction material after being promoted in 801 is removed, staff opens the reverse function of first motor 2 with hand again, is allowed and is put with this It sets case 801 and does and move from top to bottom, after the distance that placing box 801 moves from top to bottom reaches the demand of staff, work Personnel first close first motor 2 with hand, then the reverse function of the second motor 9 is opened with hand, allow placing box 801 to do by dextrad with this It moves left, after the distance that placing box 801 moves from right to left reaches the demand of staff, staff closes second with hand The construction material that promotion is transported needed for next group is positioned in placing box 801 by motor 9, staff again, then the similarly above step Suddenly the processing promoted again is first transported to the construction material in placing box 801, plug 102 is to connect extraneous electricity Source allows extraneous power supply to carry out energy supply to the device with this, and transformer 101 is in order to ensure the stabilization of the device voltage Property, the first motor 2 and the second motor 9 are clockwise and anticlockwise motor, and 2 model of first motor is preferably OKD3KW220VAC, 9 model of the second motor is preferably 2IK6RGN-C+2GN3K.
The utility model is not limited to above-mentioned specific embodiment, and those skilled in the art visualize from above-mentioned Hair, without performing creative labour, the various transformation made are all fallen within the scope of protection of the utility model.

Claims (4)

1. construction material transports lifter, it is characterised in that slided including frame, first motor, the first leading screw, the first sliding rail, first Block, connecting plate, the second sliding rail, the second sliding block, the second motor, the second leading screw, the first motor are located at lower portion or so Both sides, the first motor are connected with frame screw thread, and first leading screw is located at the top of first motor, described first Thick stick is connected with first motor close-fitting, and first leading screw runs through frame, and first leading screw is connected with frame member, institute The first sliding rail stated is located at left and right sides of frame roof, and first sliding rail is connected with frame welding, first sliding block On the inside of the first sliding rail, first sliding block is slided with the first sliding rail to be connected, and first sliding block is through first Leading screw, first sliding block are connected with the first threads of lead screw, and the connecting plate is located at the first sliding block between any two, described Connecting plate is weldingly connected with the first sliding block, and second sliding rail is located at the top of connecting plate, second sliding rail and connecting plate Screw thread is connected, and second sliding block is located at the top of the second sliding rail, and second sliding block is connected with the sliding of the second sliding rail, described The second motor be located at connecting plate top left side, second motor is connected with connecting plate screw thread, the second leading screw position On the right side of the second motor, second leading screw is connected with the second motor close-fitting, and second leading screw runs through the second sliding block, Second leading screw is connected with the second sliding block screw thread.
2. construction material as described in claim 1 transports lifter, it is characterised in that second slider top is additionally provided with Placing box, the placing box are connected with the second sliding block screw thread.
3. construction material as claimed in claim 2 transports lifter, it is characterised in that the lower portion middle-end is additionally provided with Transformer, the transformer are connected with frame screw thread.
4. construction material as claimed in claim 3 transports lifter, it is characterised in that be additionally provided on the right side of the transformer slotting Head, the plug are connected with transformer conducting wire.
CN201721714134.5U 2017-12-11 2017-12-11 Construction material transports lifter Expired - Fee Related CN207671649U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721714134.5U CN207671649U (en) 2017-12-11 2017-12-11 Construction material transports lifter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721714134.5U CN207671649U (en) 2017-12-11 2017-12-11 Construction material transports lifter

Publications (1)

Publication Number Publication Date
CN207671649U true CN207671649U (en) 2018-07-31

Family

ID=62967958

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721714134.5U Expired - Fee Related CN207671649U (en) 2017-12-11 2017-12-11 Construction material transports lifter

Country Status (1)

Country Link
CN (1) CN207671649U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108868095A (en) * 2018-08-27 2018-11-23 卢凌凌 A kind of room building materials carrying frame

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108868095A (en) * 2018-08-27 2018-11-23 卢凌凌 A kind of room building materials carrying frame

Similar Documents

Publication Publication Date Title
CN206227942U (en) A kind of adjustable study table
CN207671649U (en) Construction material transports lifter
CN104868372A (en) Double door for switchgear
CN208974353U (en) Transfer car(buggy) in multi-functional institute
CN107485568A (en) The broken medicine device of oncology
CN206731215U (en) It is multi-functional to grind medicine device
CN204793660U (en) A two opening door for cubical switchboard
CN205764504U (en) A kind of effective integrated guard automatic cloth silk equipment
CN108011346A (en) One kind has thermostatically controlled electric wire feeder pillar
CN207890783U (en) Adhesive tape banding machine cutter frame mechanism
CN206709314U (en) A kind of automatic air curtain device for refrigeration house
CN206865647U (en) Movable type detecting CCTV camera
CN207189181U (en) Precision pulling bench saw pole track-type facilities
CN204532014U (en) A kind of automatic door can walked along curve track
CN206692282U (en) Librarian's special lifting is taken books device
CN208428218U (en) A kind of carpenter being convenient for carrying hardware tool placing box
CN204272828U (en) A kind of top has the booth of ventilating opening
CN208093252U (en) A kind of wire stranding machine and its automatic opening and closing door
CN206511434U (en) A kind of large-size box with cap-opening mechanism
CN206704718U (en) Polybasic drugs device for labeling
CN206667550U (en) A kind of glass sunlight house girder adjustable connecting structure
CN208212836U (en) Chinese medicine off-gas cleaning equipment
CN205911636U (en) Upward -acting door block terminal
CN205370339U (en) Improved generation abnormal shape translation door
CN206344038U (en) A kind of mechanical electric positioner

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180731

Termination date: 20181211

CF01 Termination of patent right due to non-payment of annual fee