CN207665318U - Metal shell fixed structure - Google Patents

Metal shell fixed structure Download PDF

Info

Publication number
CN207665318U
CN207665318U CN201721082639.4U CN201721082639U CN207665318U CN 207665318 U CN207665318 U CN 207665318U CN 201721082639 U CN201721082639 U CN 201721082639U CN 207665318 U CN207665318 U CN 207665318U
Authority
CN
China
Prior art keywords
metal shell
link block
elastic component
fixed structure
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721082639.4U
Other languages
Chinese (zh)
Inventor
向军军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Chuanggong Telecom Technology Co Ltd
Original Assignee
Shanghai Chuanggong Telecom Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Chuanggong Telecom Technology Co Ltd filed Critical Shanghai Chuanggong Telecom Technology Co Ltd
Priority to CN201721082639.4U priority Critical patent/CN207665318U/en
Application granted granted Critical
Publication of CN207665318U publication Critical patent/CN207665318U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model is related to mounting technology fields, disclose a kind of metal shell fixed structure.In the utility model, metal shell fixed structure includes:First link block, the second link block and an at least elastic component;Second link block is movably installed in the first link block, and is formed between the first link block and the second link block and house cavity;Elastic component is located in accommodating cavity, and the both ends of elastic component are held in the first link block and the second link block respectively;Second metal shell is equipped with resigning portion, and when the first metal shell and mutually fixed the second metal shell, the second link block is fastened in resigning portion;During the second metal shell connect or dismantles with the first metal shell, elastic component is compressed so that the second link block on the first metal shell enters or leave the resigning portion of the second metal shell.The utility model can to realize between metal shell can deformability connection, fixation and dismounting provide a convenient for metal shell between, and improve the appearance of metal shell.

Description

Metal shell fixed structure
Technical field
The utility model is related to mounting technology field, more particularly to a kind of metal shell fixed structure.
Background technology
With the development of the electronic equipments such as mobile phone, computer, the material of the element of electronic device selection is presented diversification and becomes Gesture, wherein due to metal material good heat dissipation effect, texture and appearance is good and the advantages such as intensity is high, the element of metal material It is largely used in the electronic device.
A large amount of uses of metalwork relate to the connection between metalwork, and the connection type between existing metalwork is logical There are three types of often:(1) connection between metalwork is realized by welding;(2) mode being screwed realizes metal Connection between part;(3) connection being bonded by mucigel between realizing metalwork.
However, it is found by the inventors that at least there are the following problems in the prior art:(1) connection type welded so that two It can not dismantle, make troubles for reprocessing for electronic equipment, and cause a degree of material waste between metalwork;(2) screw Fixed mode so that nut exposes to appearance, affects the integrality of appearance, and the efficiency of assembling of screw is relatively low, Appropriation of labour time is larger with manpower, to realize that the Automated assembly of screw, then higher to equipment requirement and cost are higher. (3) in the fixed mode of mucigel, if adhesive strength causes greatly very much the dismounting between metalwork is more difficult (or to need other auxiliary Mode is helped to dismantle, such as heating or solvent corrosion mucigel), if adhesive strength is weaker to lead between metalwork that connection can not It leans on.
Utility model content
The purpose of this utility model is to provide a kind of metal shell fixed structures so that can be realized between metal shell Can deformability connection, for metal shell between fixation and dismounting provide a convenient, and improve the appearance of metal shell.
In order to solve the above technical problems, the embodiment of the utility model provides a kind of metal shell fixed structure, use In fixing the first metal shell and the second metal shell;The metal shell fixed structure includes:It is fixed on first metal The first link block, the second link block on shell and an at least elastic component;Second link block is movably installed in institute The first link block is stated, and is formed between first link block and second link block and houses cavity;The elastic component is located at In the accommodating cavity, and the both ends of the elastic component are held in first link block and second link block respectively;Institute It states the second metal shell and is equipped with resigning portion, when first metal shell and second metal shell are mutually fixed, described the Two link blocks are fastened in the resigning portion;When the mistake that second metal shell connect or dismantles with first metal shell Cheng Zhong, the elastic component are compressed so that second link block on first metal shell enters or leave described the The resigning portion of two metal shells.
The utility model embodiment in terms of existing technologies, metal shell fixed structure include the first link block, Second link block and at least an elastic component;I.e. in metal shell fixed structure provided by the utility model, the second link block It is movably installed in the first link block, elastic component is formed between the first link block and the second link block in accommodating cavity, And the both ends of elastic component are held in the first link block and the second link block respectively;Make the first metal shell and the second metal shell Between can realize can deformability connection instead of the mode being welded and fixed between metal shell be in the prior art metal-back Reprocessing for dismounting and electronic equipment between body provides a convenient;And instead of mucigel between metal shell in the prior art Fixed mode so that is connected between metal shell is relatively reliable;In addition, the first metal shell of the utility model embodiment with When second metal shell is mutually fixed, the second link block is fastened in the resigning portion of the second metal shell, instead of metal shell Between the fixed mode of screw so that between metal shell mutually fix when, metal shell fixed structure can be hidden in two gold Belong to enclosure interior rather than be exposed at appearance, improves the appearance of metal shell, and the utility model embodiment makes metal-back Assembly becomes simple between body, to improve efficiency of assembling.
In addition, during second metal shell is connect with first metal shell, second link block by Initial position is mobile towards first metal shell and the elastic component is compressed;When second metal shell arrival and institute When stating the fixed position of the first metal shell, second link block is under the elastic force effect of the elastic component towards described second Metal shell is mobile and is fastened in the resigning portion, and second link block is located at card and sets position;Second metal shell During being dismantled with first metal shell, second link block is set by the card and is positioned against first metal-back Body is mobile and the elastic component is compressed;When second metal shell leaves first metal shell, described second connects It connects block and is back to the initial position under the elastic force effect of the elastic component.
In addition, there is first link block the first stopper section, second link block to have and first stopper section Matched second stopper section;When second link block is located at the initial position, second stopper section backstop is in described First stopper section.In the present embodiment, by the first stopper section and the second stopper section, realize that the second link block is movably installed in First link block provides a kind of realization method that the second link block is movably installed in the first link block.
In addition, the second link block has the first inclined-plane and the second inclined-plane;Second metal shell and first metal During shell connects, second metal shell makes the elastic component compress by oppressing first inclined-plane, to lead Second link block is caused to slide into the resigning portion of second metal shell;Second metal shell and first metal During shell is dismantled, second metal shell makes the elastic component compress by oppressing second inclined-plane, to lead Second link block is caused to be skidded off from the resigning portion of second metal shell.In the present embodiment, the first inclined-plane reduces One metal shell and the fixed difficulty of the second metal shell, the second inclined-plane reduce the first metal shell and the second metal shell it Between the difficulty dismantled.
In addition, the range of grade on first inclined-plane of the second link block and second inclined-plane is all higher than or is equal to 45 degree And it is less than or equal to 60 degree.In the present embodiment, the value range of the gradient on the first inclined-plane and the second inclined-plane is provided.
In addition, first link block is fixed in one end of elastic component, and the other end of the elastic component be held in it is described Second link block.In the present embodiment, the first link block is fixed in one end of elastic component so that elastic component can be supported more reliably It holds between the first link block and the second link block.
In addition, elastic component includes spring or shrapnel.In the present embodiment, two kinds of concrete types of elastic component are provided.
Description of the drawings
Fig. 1 is the seperated schematic diagram of metal shell fixed structure according to first embodiment;
Fig. 2 is the diagrammatic cross-section of metal shell fixed structure according to first embodiment;
Fig. 3 is the fit schematic diagram of metal shell fixed structure according to first embodiment;
Fig. 4 is the schematic diagram in the first metal shell and the second metal shell fixation procedure according to first embodiment;
Fig. 5 is the first metal shell according to first embodiment and the second metal shell fix before schematic diagram;
Fig. 6 is the seperated schematic diagram according to the metal shell fixed structure of second embodiment;
Fig. 7 is the diagrammatic cross-section according to the metal shell fixed structure of second embodiment;
Fig. 8 is the fit schematic diagram according to the metal shell fixed structure of second embodiment;
Fig. 9 is the schematic diagram in the first metal shell and the second metal shell fixation procedure according to second embodiment;
Figure 10 is the schematic diagram before being fixed according to the first metal shell of second embodiment and the second metal shell.
Specific implementation mode
It is new to this practicality below in conjunction with attached drawing to keep the purpose of this utility model, technical solution and advantage clearer Each embodiment of type is explained in detail.However, it will be understood by those skilled in the art that each in the utility model In embodiment, in order to make the reader understand this application better, many technical details are proposed.But even if without these skills Art details and various changes and modifications based on the following respective embodiments can also realize that each claim of the application is required and protect The technical solution of shield.
The first embodiment of the utility model is related to a kind of metal shell fixed structure, for fixing the first metal shell With the second metal shell, as shown in Fig. 1 to 5, metal shell fixed structure includes:First be fixed on the first metal shell 11 Link block 21, the second link block 22 and an at least elastic component 23.
In present embodiment, the second link block 22 is movably installed in the first link block 21, and the first link block 21 with It is formed between second link block 22 and houses cavity 24;Elastic component 23 is located in accommodating cavity 24, and the both ends difference of elastic component 23 It is held in the first link block 21 and the second link block 22;Second metal shell 12 is equipped with resigning portion 121.
In present embodiment, when the first metal shell 11 is mutually fixed with the second metal shell 12, the second link block 22 card It is located in resigning portion 121;During the second metal shell 12 connect or dismantles with the first metal shell 11,23 quilt of elastic component Compression so that the second link block 22 on the first metal shell 11 enters or leave the resigning portion 121 of the second metal shell 12.
The utility model embodiment in terms of existing technologies, metal shell fixed structure include the first link block, Second link block and at least an elastic component;I.e. in metal shell fixed structure provided by the utility model, the second link block It is movably installed in the first link block, elastic component is formed between the first link block and the second link block in accommodating cavity, And the both ends of elastic component are held in the first link block and the second link block respectively;Make the first metal shell and the second metal shell Between can realize can deformability connection instead of the mode being welded and fixed between metal shell be in the prior art metal-back Reprocessing for dismounting and electronic equipment between body provides a convenient;And instead of mucigel between metal shell in the prior art Fixed mode so that is connected between metal shell is relatively reliable;In addition, the first metal shell of the utility model embodiment with When second metal shell is mutually fixed, the second link block is fastened in the resigning portion of the second metal shell, instead of metal shell Between the fixed mode of screw so that between metal shell mutually fix when, metal shell fixed structure can be hidden in two gold Belong to enclosure interior rather than be exposed at appearance, improves the appearance of metal shell, and the utility model embodiment makes metal-back Assembly becomes simple between body, to improve efficiency of assembling.
The first metal shell is connect with the second metal shell to be realized to the metal shell fixed structure of present embodiment below It is specifically described with the details of dismounting, the following contents only for convenience of the realization details provided is understood, not implements this programme It is necessary.
In present embodiment, as shown in Figure 4,5, during the second metal shell 12 is connect with the first metal shell 11, Second link block 22 is moved towards the first metal shell 11 by initial position and elastic component 23 is compressed;When the second metal shell 12 When reaching the fixed position with the first metal shell 11, the second link block 22 is under the elastic force effect of elastic component 23 towards the second gold medal Belong to shell 12 to move and be fastened in resigning portion 121, the second link block 22 is located at card and sets position.
In present embodiment, during the second metal shell 12 and the dismounting of the first metal shell 11, the second link block 22 Set by card be positioned against the first metal shell 11 movement and elastic component 23 compressed;When the second metal shell 12 leaves the first metal When shell 11, the second link block 22 is back to initial position under the elastic force effect of elastic component 23.
In present embodiment, card, which sets position, to be initial position, so without being limited thereto in practice, and card sets position can not also It is same as initial position, card is set between the stiffness factor, the first metal shell 11 and the second metal shell 12 of position and elastic component 23 Fastening amount it is related.
In present embodiment, the first link block 21 can be fixed on by welding on the first metal-back 11, so real Without being limited thereto in border, the first link block of present embodiment pair 21 and the fixed form of the first metal shell 11 are not intended to be limited in any, Such as first link block 21 can also be fixed on by way of mucigel on the first metal-back 11.
In present embodiment, can by select the elastic component 23 of different stiffness factors adjust the first metal shell 11 with Second metal shell 12 is fixed or the complexity of dismounting;If the stiffness factor of elastic component 23 is smaller, the first metal shell 11 fix or remove opposite be easier to the second metal shell 12;If the stiffness factor of elastic component 23 is larger, first Metal shell 11 is fixed or removes with the second metal shell 12 relatively harder.
In present embodiment, the number of elastic component 23 is related with the length of the first link block 21 (or second link block 22), The number of elastic component 23 affects the first metal shell 11 and 12 fixation procedure of the second metal shell and metal-back in disassembly process The moving equilibrium of body fixed structure.In one example, when the ratio of the length of the length and elastic component 23 of the first link block 21 When less than or equal to 3.5, an elastic component 23 may be used;If the ratio of the length of the first link block 21 and the length of elastic component 23 When more than 3.5, then multiple elastic components 23 are used, as shown in Figure 1, the number of elastic component 23 is 2;It is so exemplary theory here It is bright, it is without being limited thereto in practice;The specific number of elastic component 23 can be set according to actual conditions.
In present embodiment, metal material may be used in the first link block 21 and the second link block 22, and intensity is high, the service life Long, assembly is relatively reliable;So without being limited thereto in practice, the present embodiment is not intended to be limited in any the material of link block itself, such as Link block can also use plastic material.
Preferably, in present embodiment, as shown in Fig. 2,4 and 5, the first link block 21 has the first stopper section 211, the Two link blocks 22 have and 211 matched second stopper section 221 of the first stopper section;Second link block 22 is located at initial position When, 221 backstop of the second stopper section is in the first stopper section 211;The second link block 22 is present embodiments provided movably to install A kind of realization method in the first link block 21, it is so without being limited thereto in practice.
The utility model second embodiment is related to a kind of metal shell fixed structure, and second embodiment is implemented first It is improved on the basis of mode, mainly thes improvement is that:As shown in Fig. 6 to 10, in the utility model second embodiment In, the second link block 22 has the first inclined-plane 222 and the second inclined-plane 223.
In present embodiment, as shown in Figure 10, during the second metal shell 12 is connect with the first metal shell 11, the Two metal shells 12 make elastic component 23 compress by oppressing the first inclined-plane 222, and the second gold medal is slid into so as to cause the second link block 22 In the resigning portion 121 for belonging to shell 12.
In present embodiment, during the second metal shell 12 and the dismounting of the first metal shell 11, the second metal shell 12 make elastic component 23 compress by oppressing the second inclined-plane 223, so as to cause the second link block 22 allowing from the second metal shell 12 It is skidded off in position portion 121.
In present embodiment, the first inclined-plane 222 of the second link block 22 and the range of grade on the second inclined-plane 223 be all higher than or Equal to 45 degree and it is less than or equal to 60 degree;In the present embodiment, the first metal shell 11 and the second metal shell 12 are fixed and are dismantled Complexity it is related with the gradient on inclined-plane, if the gradient on inclined-plane is smaller, the first metal shell 11 and the second metal shell 12 It is fixed to be relatively easy to removing, if the gradient on inclined-plane on the contrary is larger, the first metal shell 11 and the second metal shell 12 It fixes and removes more arduously.Present embodiment is not intended to be limited in any the specific value of slope on inclined-plane, can be according to practical feelings Condition is specifically set.
In present embodiment, elastic component 23 includes spring or shrapnel;So without being limited thereto in practice, the present embodiment is to elastic component 23 concrete type is not intended to be limited in any.
Preferably, in present embodiment, the first link block 21 is fixed in one end of elastic component 23, and elastic component 23 is another End is held in the second link block 22.In the present embodiment, the first link block 21 is fixed in one end of elastic component 23 so that elastic component 23 It can more reliably support between the first link block 21 and the second link block 22.
Preferably, in present embodiment, the first metal shell 11 is equipped with locating slot, and the first link block 21 is fixed on positioning In slot, (when no locating slot, needed when being fixed by modes such as welding or mucigels to save the step of needing jig to realize positioning Jig is wanted to be positioned in advance) so that the first link block 21 can be directly located and fixed in locating slot.
For present embodiment for first embodiment, the first inclined-plane reduces the first metal shell and the second metal The fixed difficulty of shell, the second inclined-plane reduce the difficulty dismantled between the first metal shell and the second metal shell.
It will be understood by those skilled in the art that the respective embodiments described above are to realize the specific implementation of the utility model Example, and in practical applications, can to it, various changes can be made in the form and details, without departing from the spirit of the utility model And range.

Claims (7)

1. a kind of metal shell fixed structure, for fixing the first metal shell and the second metal shell;It is characterized in that, described Metal shell fixed structure includes:It is fixed on the first link block on first metal shell, the second link block and at least One elastic component;
Second link block is movably installed in first link block, and first link block is connect with described second It is formed between block and houses cavity;
The elastic component is located in the accommodating cavity, and the both ends of the elastic component be held in respectively first link block with Second link block;
Second metal shell is equipped with resigning portion, when first metal shell is mutually fixed with second metal shell, Second link block is fastened in the resigning portion;
During second metal shell connect or dismantles with first metal shell, the elastic component is compressed, So that second link block on first metal shell enters or leaves the resigning portion of second metal shell.
2. metal shell fixed structure according to claim 1, which is characterized in that second metal shell and described the During one metal shell connects, second link block is mobile and described towards first metal shell by initial position Elastic component is compressed;
When second metal shell reaches the fixed position with first metal shell, second link block is described The elastic force of elastic component is mobile towards second metal shell under acting on and is fastened in the resigning portion, second link block Position is set positioned at card;
During second metal shell is dismantled with first metal shell, second link block sets position by the card Mobile towards the first metal shell and described elastic component is set to be compressed;
When second metal shell leaves first metal shell, elastic force of second link block in the elastic component The initial position is back under effect.
3. metal shell fixed structure according to claim 2, which is characterized in that first link block has first to stop Stopper, second link block have and matched second stopper section in first stopper section;
When second link block is located at the initial position, second stopper section backstop is in first stopper section.
4. metal shell fixed structure according to claim 1, which is characterized in that second link block is oblique with first Face and the second inclined-plane;
During second metal shell is connect with first metal shell, second metal shell is by oppressing institute Stating the first inclined-plane makes the elastic component compress, and the resigning portion of second metal shell is slid into so as to cause second link block In;
During second metal shell is dismantled with first metal shell, second metal shell, which passes through, oppresses institute Stating the second inclined-plane makes the elastic component compress, so as to cause second link block from the resigning portion of second metal shell It skids off.
5. metal shell fixed structure according to claim 4, which is characterized in that described the first of second link block The range of grade on inclined-plane and second inclined-plane is all higher than or equal to 45 degree and less than or equal to 60 degree.
6. metal shell fixed structure according to claim 1, which is characterized in that institute is fixed in one end of the elastic component The first link block is stated, and the other end of the elastic component is held in second link block.
7. metal shell fixed structure according to claim 1, which is characterized in that the elastic component includes spring or bullet Piece.
CN201721082639.4U 2017-08-28 2017-08-28 Metal shell fixed structure Active CN207665318U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721082639.4U CN207665318U (en) 2017-08-28 2017-08-28 Metal shell fixed structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721082639.4U CN207665318U (en) 2017-08-28 2017-08-28 Metal shell fixed structure

Publications (1)

Publication Number Publication Date
CN207665318U true CN207665318U (en) 2018-07-27

Family

ID=62935876

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721082639.4U Active CN207665318U (en) 2017-08-28 2017-08-28 Metal shell fixed structure

Country Status (1)

Country Link
CN (1) CN207665318U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111129848A (en) * 2019-11-20 2020-05-08 丹阳市精忠五金有限公司 Electronic connector aluminum shell structure convenient to assemble

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111129848A (en) * 2019-11-20 2020-05-08 丹阳市精忠五金有限公司 Electronic connector aluminum shell structure convenient to assemble

Similar Documents

Publication Publication Date Title
JP2017126059A (en) Display assembly and display including the same
US20150146364A1 (en) Solid state drive (ssd) assembly and an assembly method for ssd
CN207665318U (en) Metal shell fixed structure
US20140211403A1 (en) Mounting device for expansion card
JP2019046449A (en) Tool-less top service of m.2 latch on board
CN103491752A (en) Electromagnetic wave shielding case and electronic device with same
US20120228002A1 (en) Cable management apparatus
CN109676554A (en) A kind of general fast-positioning device of monoblock type for Airplane frame plate parts and its application method
EP3086017A1 (en) Mounting device
CN104181981A (en) Electronic device capable of being opened by utilizing magnetic force
CN108535894B (en) Fitting strength test fixture
CN206237465U (en) Mobile terminal
CN103296533A (en) Soft flat cable connector fixing device and portal electronic device with the same
CN204423010U (en) A kind of simple equivalent load replacement circuit being beneficial to household electrical appliances software debugging
CN204217279U (en) A kind of rail fixing device of electronic equipment
CN103906394A (en) Camera module fixation device
CN101360409B (en) Positioning device
CN204440843U (en) Display screen assembly structure
CN202602056U (en) Assembly fixture of coaxial electric connector
CN207426182U (en) A kind of ground structure for large screen vehicle entertainment system stent
US20160356813A1 (en) Test device for interface and electronic device assembly
CN201349081Y (en) Expansion card switching device
CN105446428A (en) Keyboard with Halbach magnetic module
CN201876780U (en) Tool-free mounting part
CN216531380U (en) Plug-in type mobile phone motherboard

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant