CN207661902U - Dehumidifier - Google Patents

Dehumidifier Download PDF

Info

Publication number
CN207661902U
CN207661902U CN201721731504.6U CN201721731504U CN207661902U CN 207661902 U CN207661902 U CN 207661902U CN 201721731504 U CN201721731504 U CN 201721731504U CN 207661902 U CN207661902 U CN 207661902U
Authority
CN
China
Prior art keywords
strainer
pipe
shell
water
condenser
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721731504.6U
Other languages
Chinese (zh)
Inventor
戴维光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN SAIYU FOOD CO Ltd
Original Assignee
TIANJIN SAIYU FOOD CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN SAIYU FOOD CO Ltd filed Critical TIANJIN SAIYU FOOD CO Ltd
Priority to CN201721731504.6U priority Critical patent/CN207661902U/en
Application granted granted Critical
Publication of CN207661902U publication Critical patent/CN207661902U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Drying Of Gases (AREA)

Abstract

The utility model discloses a kind of dehumidifiers,Its key points of the technical solution are that including shell,The air inlet being arranged on shell,The exhaust outlet being arranged on shell,The dehumidification pipe being arranged in shell,The strainer close to air inlet one end in dehumidification pipe is set,Wind turbine in the dehumidification pipe other end is set,The discharge pipe being connected with exhaust outlet in wind turbine outlet air one end is set,Condenser positioned at strainer rear is set in dehumidification pipe,The evaporator being arranged above condenser,The header tank for carrying out the compressor of hot transmission between condenser and evaporator and being arranged below condenser is set in shell,Header tank side is connected with sparge pipe,The sparge pipe other end extend into above strainer and concordant with above strainer,The part that sparge pipe is located above strainer opens up the fountain head sprayed water on oriented strainer,Strainer inclined downward is provided with water receiving tank,The relatively low one end of water receiving tank passes through shell.The utility model solves the problems, such as that the strawberry powder removed on dehumidifier strainer is cumbersome and inconvenient.

Description

Dehumidifier
Technical field
The utility model is related to dehumidifying technology fields, more specifically, it is related to a kind of dehumidifier.
Background technology
Dehumidifier is air dewetting equipment more commonly used in family life and industrial production, dried strawberry production process All it is often to need to dehumidify to air using dehumidifier in the middle in order to reduce the air humidity in workshop, it is traditional Dehumidifier includes strainer, evaporator, condenser, compressor and wind turbine, and extraneous air is drawn into dehumidifier by wind turbine It is handled, strainer is filtered the air of sucking, the moisture quilt therein under the action of condenser of the air after filtering Condensation is fallen in water droplet, and cold air is sent after evaporator heating by wind turbine, and compressor is in evaporator and condenser Between carry out heat exchange.But in dried strawberry processing enterprise, a large amount of strawberry powder, shadow can be adhered in the strainer of dehumidifier Ring to dehumidifier dehumidification efficiency, in order to remove strawberry powder generally require dismounting lower filter screen manually cleaned, exist removing filter The cumbersome and inconvenient problem of online strawberry powder.
Utility model content
In view of the deficienciess of the prior art, the purpose of this utility model is to provide a kind of dehumidifier, it can be convenient The strawberry powder on dehumidifier strainer is removed.
To achieve the above object, the utility model provides following technical solution:A kind of dehumidifier, including shell, setting Air inlet on shell, the exhaust outlet being arranged on shell, the dehumidification pipe being arranged in shell, setting dehumidification pipe close into The strainer of air port one end, be arranged the dehumidification pipe other end wind turbine, be arranged to go out what wind turbine outlet air one end was connected with exhaust outlet Air hose is arranged in dehumidification pipe the condenser positioned at strainer rear, the evaporator being arranged above condenser, is arranged in shell The header tank for carrying out the compressor of hot transmission between condenser and evaporator and being arranged below condenser, the condenser Lower section is provided through the outlet pipe of dehumidification pipe side wall, and outlet pipe is stretched into relative to the other end of condenser in header tank, described Header tank bottom is provided with drainpipe, it is characterised in that:The header tank side is provided with water pump, is provided with above the strainer The sparge pipe being connected with water pump, sparge pipe are located at the part above strainer and open up the fountain head sprayed water on oriented strainer, described Strainer inclined downward is provided with water receiving tank, and the relatively low one end of water receiving tank passes through shell.
By using above-mentioned technical proposal, water pump is opened, water is ejected on strainer in fountain head, will be adhered on strainer Strawberry powder cleaning under, strawberry powder cleaning under is flow to dampening in water receiving tank, then from water receiving tank it is relatively low one section arrange Except dehumidifier.
The utility model is further arranged to:The strainer is detachably connected on the dehumidifying pipeline.
By using above-mentioned technical proposal, convenient for carrying out dismounting and change to strainer.
The utility model is further arranged to:The strainer is connected on the dehumidifying pipeline.
The utility model is further arranged to:Described strainer one end is equipped with two fixture blocks, and the dehumidification pipe is equipped with and two cards The mutually matched card slot of block, the strainer are provided with elastic piece relative to the other side of fixture block, and the elastic piece is set in arc-shaped It sets, the elastic piece is equipped with the plectrum equal with strainer away from the side of strainer, position corresponding with elastic piece on the dehumidification pipe Install the groove being equipped with the matched section of elastic piece in convex shape.
By using above-mentioned technical proposal, two fixture blocks are snapped onto in card slot first when strainer is installed, then by bullet Property piece snap onto in groove, when dismounting, stirs the elastic piece that plectrum will snap onto in groove and transfers to, then by fixture block from card The dismounting that can be completed to strainer is taken out in slot, convenient for being disassembled and installed to strainer.
The utility model is further arranged to:Be provided on the water receiving tank can along the scraper plate that water receiving tank is slided, The scraper plate can scrape the strawberry powder washed down from water receiving tank.
By using above-mentioned technical proposal, scraper plate can work as the strawberry powder adhered in water receiving tank and water from water receiving tank In scrape.
The utility model is further arranged to:Waste water tank is provided with below the water receiving tank lower end, in the waste water tank It is provided with the filter screen that the strawberry powder in waste water can be filtered out.
By using above-mentioned technical proposal, setting filter screen is conducive to filter out the strawberry powder in waste water, so as to right Waste water is discharged.
The utility model is further arranged to:The filter screen is detachably connected in the waste water tank.
By using above-mentioned technical proposal, convenient for removing filter screen, consequently facilitating to the strawberry filtered out on filter screen Powder is purged.
The utility model is further arranged to:The filter screen surrounding is evenly provided with four sliding blocks, the waste water tank Opened up on inner wall there are four with the mutually matched sliding slot of sliding block.
By using above-mentioned technical proposal, can filter screen be directly placed on filter screen by the cooperation of sliding block and sliding slot On, consequently facilitating being dismantled to filter screen, the strawberry powder convenient for being filtered out to filter screen is cleared up.
The utility model is further arranged to:The waste water tank bottom is provided with the company being connected with the drainpipe of header tank It takes over.
By using above-mentioned technical proposal, directly header tank can be arranged together with the water in waste water tank by drainpipe Go out.
In conclusion the utility model has the advantages that compared with the prior art:
1, water can be sprayed onto filter by the utility model by the way that the sparge pipe being located above strainer is arranged, is arranged on sparge pipe The water receiving tank that online nozzle and header tank are connected to the water pump of sparge pipe water supply and are arranged positioned at strainer inclined downward, just It is cleaned in the strawberry powder on strainer.
2, the utility model is located at the waste water tank below water receiving tank lower end by setting and is arranged in waste water tank Filter screen for filtering out strawberry powder is convenient for the discharge of waste water by strawberry powder after being filtered out in waste water.
Description of the drawings
Fig. 1 is the axonometric schematic diagram of the complete structure of embodiment;
Fig. 2 is the schematic diagram that embodiment embodies dehumidification pipe;
Fig. 3 is the portions the A enlarged diagram of Fig. 2;
Fig. 4 is the portions the B enlarged diagram of Fig. 2;
Fig. 5 is the explosive view of the strainer and fixed plate of embodiment;
Fig. 6 is the portions the C enlarged diagram of Fig. 5;
Fig. 7 is the axonometric schematic diagram that embodiment embodies condenser and evaporator;
Fig. 8 is the portions the D enlarged diagram of Fig. 7;
Fig. 9 is the portions the E enlarged diagram of Fig. 7.
In figure:1, babinet;11, air inlet;12, exhaust outlet;2, dehumidification pipe;21, fixed plate;211, card slot;212, groove; 22, strainer;221, fixture block;222, elastic piece;223, plectrum;23, condenser;231, outlet pipe;24, evaporator;25, it compresses Machine;251, cooling tube;252, heating tube;3, filter gauze cleaning mechanism;31, water pump;32, flow pipe;33, sparge pipe;34, it sprays water Head;4, wind turbine;41, blast pipe;42, discharge pipe;421, exhaust duct;5, header tank;51, drainpipe;6, water receiving tank;61, waste water Case;611, sliding block;62, filter screen;621, sliding slot;63, connecting tube;64, cylinder;65, scraper plate.
Specific implementation mode
The utility model is described in further detail below in conjunction with the accompanying drawings.
Embodiment:A kind of dehumidifier referring to attached drawing 1 and attached drawing 2, including babinet 1, is opened in 1 side of babinet close to bottom The air inlet 11 of position, be opened in babinet 1 and 11 homonymy of air inlet close to 1 top position of babinet exhaust outlet 12, be arranged in case The sky for the end that will dehumidify above dehumidification pipe 2 is arranged in babinet 1 in dehumidification pipe 2 corresponding with air inlet 11 in body 1 Gas from the wind turbine 4 that exhaust outlet 12 is sent out, the water for being cleared out of dehumidification pipe 2 below dehumidification pipe 2 is set in the babinet 1 Carry out the header tank 5 of access, be arranged dehumidification pipe 2 close to 11 one end of air inlet strainer 22, be arranged and be used for above strainer 22 Strainer 22 is cleaned filter gauze cleaning mechanism 3 and is arranged below strainer 22 for being carried out to the water after cleaning strainer 22 The water receiving tank 6 of collection.
Extraneous air is drawn into dehumidification pipe 2 later through filter screen 62 by the effect of wind turbine 4 when being worked It dehumidifies, the moisture of removing, which is flowed into header tank 5, to be stored, and the air for the end that dehumidifies passes through row after wind turbine 4 Air port 12 is discharged, and can adhere to a large amount of strawberry powder on strainer 22 after work after a period of time, in order not to dehumidifying The working effect of machine has an impact us and needs to be purged the strawberry powder on strainer 22, by filter gauze cleaning mechanism 3 to filter It sprays water on net 22, under strawberry powder is rinsed under the action of water, and works as with the water receiving tank 6 that water is flowed into below strainer 22 In, it is flowed out in water receiving tank 6, continues dehumidification work after cleaning.
The lower section of wind turbine 4 is equipped with the blast pipe 41 being connected with dehumidification pipe 2, and 4 top of wind turbine is provided with to be connected with wind turbine 4 Discharge pipe 42, discharge pipe 42 are equipped with the exhaust duct 421 being connected with discharge pipe 42, exhaust duct 421 relative to the other end of wind turbine 4 It is connected with the exhaust outlet 12 of babinet 1 relative to the other end of discharge pipe 42, wind turbine 4 will be in dehumidification pipe 2 by blast pipe 41 The air terminated dehumidify by being passed out in exhaust duct 421 by discharge pipe 42, and is sent and removes eventually by exhaust outlet 12 Wet machine.
Referring to attached drawing 2 and attached drawing 3, water receiving tank 6 is fixedly connected on dehumidification pipe 2, and 6 top of water receiving tank is arranged in semicircle shape, And babinet 1 is stretched out in one end(See attached drawing 1), water receiving tank 6 is obliquely installed and one end of the stretching babinet 1 of water receiving tank 6 is relatively low one It holds, is provided with the cylinder 64 being fixedly connected on dehumidification pipe 2 at 6 higher end of water receiving tank, cylinder 64 is obliquely installed and tilts Direction is identical as the inclined direction of water receiving tank 6, and the piston rod of cylinder 64 is fixedly connected with relative to the other end of air pump and at half The circular and matched scraper plate 65 in 6 top surface of water receiving tank, cylinder 64 can by driving scraper plate 65 to carry out sliding on water receiving tank 6 By in water receiving tank 6 strawberry powder and water scraped from water receiving tank 6.
Referring to attached drawing 2 and attached drawing 4, it is provided with waste water tank 61 below 6 lower end of water receiving tank, is provided in waste water tank 61 by water In strawberry powder filtering at filter screen 62,5 bottom of header tank is provided with the drainpipe 51 being connected with inside header tank 5, gives up It is provided with the connecting tube 63 being connected with inside drainpipe 51 and waste water tank 61 between water tank 61 and drainpipe 51, row can be passed through Water in header tank 5 and waste water tank 61 is discharged water pipe 51 together.Sliding block there are four being fixedly connected in 62 surrounding of filter screen 611, open up on 61 inner wall of waste water tank there are four with 611 mutually matched sliding slot 621 of sliding block, pass through sliding slot 621 and sliding block 611 Filter screen 62 can be placed in waste water tank 61 by cooperation, convenient for being dismantled to filter screen 62, consequently facilitating to filter screen 62 On the strawberry powder that filters down cleaned.
Referring to attached drawing 2 and attached drawing 5, dehumidification pipe 2 is provided with close to the position of strainer 22 for being installed to strainer 22 Fixed plate 21, there are two card slots 211 for the setting of 21 side of fixed plate, and 22 side of strainer is provided with matched with two card slots 211 Fixture block 221.
Referring to attached drawing 5 and attached drawing 6, fixed plate 21 is provided with section in the recessed of convex shape relative to the other side of card slot 211 Slot 212, strainer 22 close to the side of groove 212 be provided with 212 matched elastic piece 222 of groove, 222 bottom of elastic piece is in Arc-shaped setting can cooperate with groove 212, and side of the elastic piece 222 far from strainer 22 is provided with equal with strainer 22 Plectrum 223.
When carrying out the installation of strainer 22, two fixture blocks 221 are snapped onto in card slot 211 first, then block elastic piece 222 Enter to making in groove 212 itself and groove 212 cooperate, to which strainer 22 to be mounted in fixed plate 21, when dismounting stirs Plectrum 223 transfers to elastic piece 222 from groove 212, then takes out fixture block 221 in card slot 211, thus by strainer 22 Under being dismantled from fixed plate 21.
It is provided with and is fixedly connected in dehumidification pipe 2 close to the position of strainer 22 referring to attached drawing 7 and attached drawing 8, in dehumidification pipe 2 Condenser 23,23 bottom of condenser are provided with the outlet pipe 231 being connected with condenser 23, and outlet pipe 231 passes through dehumidification pipe 2 It extend into header tank 5, the moisture that condenser 23 condenses is fed to by outlet pipe 231 in header tank 5.Condensation 23 top of device is provided with the evaporator 24 being fixedly connected on dehumidification pipe 2, after evaporator 24 is used to condense condenser 23 Air heated, 2 side of dehumidification pipe is provided with compressor 25, and compressor 25 is provided through close to the position of condenser 23 The cooling tube 251 that dehumidification pipe 2 is connected with condenser 23,25 top of compressor are provided through dehumidification pipe 2 and 24 phase of evaporator The heating tube 252 of connection, compressor 25 carry out hot transmission between condenser 23 and evaporator 24.
Referring to attached drawing 7 and attached drawing 9, filter gauze cleaning mechanism 3 includes being fixedly connected on inside 5 side of header tank and header tank 5 The water pump 31 that is connected is arranged the flow pipe 32 being connected with water pump 31 above water pump 31 and is arranged above strainer 22 Sparge pipe 33,33 one end of sparge pipe close the other end of the other end with flow pipe 32 relative to water pump 31 and are connected, sparge pipe 33 On be fixedly connected with several fountain heads 34 being connected with sparge pipe 33 being obliquely installed, water can be sprayed at filter by fountain head 34 On net 22, the cleaning to strainer 22 is realized.
The operation principle of the dehumidifier when in use is as follows:When being dehumidified, wind turbine 4 and compressor 25 are opened, air exists Dehumidifier is entered by air inlet 11 under the suction of wind turbine 4, and dehumidification pipe 2 is entered after the filtering through filter screen 62 In the middle, the moisture content in air is condensed into water droplet, water droplet by the condensation that condenser 23 is first passed around in dehumidification pipe 2 It is discharged in header tank 5 by outlet pipe 231, the air after condensation passes through evaporator 24, and evaporator 24 ties condensation The air of beam is heated, and the air for being heated to room temperature is entered by the blast pipe 41 of wind turbine 4 in wind turbine 4, and is being passed through It is discharged in exhaust outlet 12 after crossing discharge pipe 42 and exhaust duct 421.
Because of the environmental problem in factory, a large amount of strawberry powder is contained in air, strainer after a period of time that works A large amount of strawberry powder can be remained on 22, in order to portion influence dehumidifier normal work we need to the strawberry powder on strainer 22 It is purged, we need to close wind turbine 4 and compressor 25 first, then open water pump 31, and water is passing through flow pipe 32 Strainer 22 is cleaned with being ejected on strainer 22 in fountain head 34 after sparge pipe 33, the strawberry powder washed down It is flowed into water in the water receiving tank 6 of 22 lower section of strainer, and babinet 1 is flowed out along water receiving tank 6, is flowed into waste water tank 61 In the middle, it is filtered on filter screen 62 by the effect strawberry powder of filter screen 62 in waste water tank 61, water is being flowed into waste water It is stored in case 61, and is discharged eventually by drainpipe 51, cleaning can drive scraper plate after finishing by motor 65 scrape remaining strawberry powder on water receiving tank 6 and water from water receiving tank 6.
The above is only the preferred embodiment of the utility model, and the scope of protection of the utility model is not limited merely to Above-described embodiment, technical solution belonging to the idea of the present invention belong to the scope of protection of the utility model.It should refer to Go out, for those skilled in the art, it is without departing from the principle of the utility model it is several improvement and Retouching, these improvements and modifications also should be regarded as the scope of protection of the utility model.

Claims (9)

1. a kind of dehumidifier, including shell, be arranged on shell air inlet (11), the exhaust outlet that is arranged on shell(12)、 The dehumidification pipe (2) that is arranged in shell, setting dehumidification pipe (2) close to the strainer (22) of air inlet (11) one end, setting except The wind turbine (4) of wet pipe (2) other end is arranged in wind turbine (4) outlet air one end and exhaust outlet(12)The discharge pipe (42) that is connected is set Set the condenser (23) in the dehumidification pipe (2) positioned at strainer (22) rear, the evaporator (24) being arranged above condenser (23), The compressor (25) for carrying out hot transmission between condenser (23) and evaporator (24) is set in shell and setting is condensing Header tank (5) below device (23), condenser (23) lower section are provided through the outlet pipe (231) of dehumidification pipe (2) side wall, Outlet pipe (231) is stretched into relative to the other end of condenser (23) in header tank (5), and header tank (5) bottom is provided with row Water pipe (51), it is characterised in that:Header tank (5) side is provided with water pump (31), be provided with above the strainer (22) with The sparge pipe (33) that water pump (31) is connected, sparge pipe (33) are located at the part above strainer (22) and open up on oriented strainer (22) Fountain head (34), the strainer (22) inclined downward of water spray are provided with water receiving tank (6), and water receiving tank (6) relatively low one end passes through shell Body.
2. dehumidifier according to claim 1, it is characterised in that:The strainer (22) is detachably connected on the dehumidification pipe (2) on road.
3. dehumidifier according to claim 2, it is characterised in that:The strainer (22) is connected to the dehumidification pipe (2) road On.
4. dehumidifier according to claim 3, it is characterised in that:Described strainer (22) one end is equipped with two fixture blocks (221), institute State dehumidification pipe (2) be equipped with two fixture blocks (221) mutually matched card slot (211), the strainer (22) is relative to fixture block (221) The other side be provided with elastic piece (222), the elastic piece (222) is arranged in arc-shaped, and the elastic piece (222) deviates from strainer (22) side is equipped with the plectrum (223) equal with strainer (22), position corresponding with elastic piece (222) on the dehumidification pipe (2) Install the groove (212) being equipped with elastic piece (222) matched section in convex shape.
5. dehumidifier according to claim 1, it is characterised in that:Being provided on the water receiving tank (6) can be along water receiving tank (6) scraper plate (65) slided, the scraper plate (65) can scrape the strawberry powder washed down from water receiving tank (6).
6. dehumidifier according to claim 1, it is characterised in that:It is provided with waste water below water receiving tank (6) lower end Case (61), the waste water tank (61) is interior to be provided with the filter screen (62) that can filter out the strawberry powder in waste water.
7. dehumidifier according to claim 6, it is characterised in that:The filter screen (62) is detachably connected on the waste water In case (61).
8. dehumidifier according to claim 7, it is characterised in that:Filter screen (62) surrounding is evenly provided with four Sliding block (611), open up on waste water tank (61) inner wall there are four with sliding block (611) mutually matched sliding slot (621).
9. dehumidifier according to claim 6, it is characterised in that:Waste water tank (61) bottom is provided with and header tank (5) connecting tube (63) that drainpipe (51) is connected.
CN201721731504.6U 2017-12-13 2017-12-13 Dehumidifier Active CN207661902U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721731504.6U CN207661902U (en) 2017-12-13 2017-12-13 Dehumidifier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721731504.6U CN207661902U (en) 2017-12-13 2017-12-13 Dehumidifier

Publications (1)

Publication Number Publication Date
CN207661902U true CN207661902U (en) 2018-07-27

Family

ID=62940421

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721731504.6U Active CN207661902U (en) 2017-12-13 2017-12-13 Dehumidifier

Country Status (1)

Country Link
CN (1) CN207661902U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108895619A (en) * 2018-07-02 2018-11-27 珠海格力电器股份有限公司 A kind of dehumidifier self cleaning method, device and dehumidifier
CN113531714A (en) * 2021-09-15 2021-10-22 江苏竣昌科技有限公司 Air cooler with dust circulation filtration structure
CN117803995A (en) * 2023-12-28 2024-04-02 南京远光环保科技有限公司 Energy-saving air treatment device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108895619A (en) * 2018-07-02 2018-11-27 珠海格力电器股份有限公司 A kind of dehumidifier self cleaning method, device and dehumidifier
CN113531714A (en) * 2021-09-15 2021-10-22 江苏竣昌科技有限公司 Air cooler with dust circulation filtration structure
CN117803995A (en) * 2023-12-28 2024-04-02 南京远光环保科技有限公司 Energy-saving air treatment device

Similar Documents

Publication Publication Date Title
CN207661902U (en) Dehumidifier
CN101164659B (en) Bag-type dew dust remover
CN206701014U (en) A kind of high Combined dust-cleaning apparatus of efficiency of dust collection
CN205517080U (en) Weaving is air filter for equipment
CN109126172A (en) A kind of novel intelligent environmental protection and energy saving multi-effect evaporator
CN109127138A (en) A kind of Wet-type electric dust removal system for capacitor production
CN110215790A (en) A kind of low-heat steam total heat recovery dedusting dehumidifying seperator
CN205461502U (en) Cross deduster of filter cylinder
CN214808480U (en) Tower spray drying device of raw materials for ceramic tile production
CN109621611A (en) A kind of weaving air filter based on water-wet dust suction
CN209711449U (en) A kind of ginger removes native cleaning plant
CN105084782B (en) A kind of glass powder blower
CN209138870U (en) High-pressure static cleaner cooling device
CN205784494U (en) WHRS in a kind of drying machine waste gas
CN108613585A (en) A kind of waste gas utilization device of woven dacron printing and dyeing forming machine
CN209809794U (en) Water-cooling dust remover
CN210584271U (en) Dry sand dust collecting equipment
CN211328735U (en) Environmental protection dust collecting equipment of building engineering construction
CN109011962A (en) Paint spray booth exhaust treatment system
CN209162442U (en) For producing the forming machine of filtering material
CN208626858U (en) A kind of dedicated high-efficiency environment friendly exhaust gas processing device in chemical plant
CN207163108U (en) A kind of drying tower energy-saving circulating layer assembly
CN209392963U (en) A kind of polyacrylamide granulation spray sedimentation device
CN204689876U (en) A kind of novel glass dusting device
CN209631411U (en) A kind of blower air inlet removes powder equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant