CN207660551U - A kind of expansion bit structure for ore extraction - Google Patents

A kind of expansion bit structure for ore extraction Download PDF

Info

Publication number
CN207660551U
CN207660551U CN201721753168.5U CN201721753168U CN207660551U CN 207660551 U CN207660551 U CN 207660551U CN 201721753168 U CN201721753168 U CN 201721753168U CN 207660551 U CN207660551 U CN 207660551U
Authority
CN
China
Prior art keywords
positioning column
bit structure
ore extraction
drill
limit hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721753168.5U
Other languages
Chinese (zh)
Inventor
潘勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taizhou Weiye Machinery Manufacturing Co Ltd
Original Assignee
Taizhou Weiye Machinery Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taizhou Weiye Machinery Manufacturing Co Ltd filed Critical Taizhou Weiye Machinery Manufacturing Co Ltd
Priority to CN201721753168.5U priority Critical patent/CN207660551U/en
Application granted granted Critical
Publication of CN207660551U publication Critical patent/CN207660551U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model belongs to ore extraction accessory applied technical field, specifically disclose a kind of expansion bit structure for ore extraction, including the first positioning column, limit protrusion, the second positioning column, third positioning column, limit latch, taper connection circle, connecting pole, the first round limit hole, the first auxiliary positioning column, the first drill bushing, the second round limit hole, the second auxiliary positioning column, the second drill bushing and drill bit.A kind of advantageous effect of expansion bit structure for ore extraction of the utility model is:The drill bit structure for solving existing traditional structure is complicated, it is unfavorable for installation, safeguards and location and installation is not firm, the poor phenomenon of wear-resisting property, compressive resistance, its reasonable design, toughness are strong, extend the service life of drill bit, without often maintenance, first drill bushing and the second drill bushing constitute reducing drill bit structure, material stable working state is bored, the working efficiency of ore extraction machinery is improved, ensures that there is accurately construction precision.

Description

A kind of expansion bit structure for ore extraction
Technical field
The utility model belongs to ore extraction accessory applied technical field, and in particular to a kind of reducing for ore extraction Drill bit structure.
Background technology
Mining machinery industry is that the important foundation industry of equipment is provided for the exploitation and processing of solid material, material and fuel One of, the important basic industries such as black and nonferrous metallurgy, coal, building materials, chemical industry, nuclear industry department is served, product is being handed over Also there is extensive application in the capital construction of basic sectors such as logical, railway, building, water conservancy and hydropower.Mining machinery is to be directly used in mine Object is exploited and the machinery of the operations such as rich choosing, including mining machine and benficiation machinery, the operation principle and structure of machinery of prospecting with open The mining machine adopted used in similar mineral is mostly same or similar, and inventionbroadly, mine locating machinery also belongs to mining machinery, in addition, A large amount of crane, conveyer, ventilation blower and drainage machinery etc. are also applied in mine operation.
In ore production, need to use mining machines to ore layer progress drilling, since mining machines working environment is disliked Bad and soil property, rock stratum are harder, thus it is higher to composed structure part requirement, such as it is used for the drill bit of mining machines.Currently, traditional The drill bit of mining machines, one side is complicated, and installation and progress demolition and maintenance process are relatively more (time-consuming), are unfavorable for just Normal ore production and construction operation, the design of another aspect irrational mix lead to that drill bit is wear-resisting, corrosion-resistant intensity is poor and bore Expect that efficiency is low, during being used for a long time the phenomenon that easy appearance fracture, deformation, there are great security risks in work progress.
Based on the above issues, the utility model provides a kind of expansion bit structure for ore extraction.
Utility model content
Purpose of utility model:The purpose of this utility model is in view of the deficiencies of the prior art, to provide one kind and opened for ore The expansion bit structure adopted, the drill bit structure for solving existing traditional structure is complicated, is unfavorable for installation, maintenance and location and installation loosely It leans on, the poor phenomenon of wear-resisting property, compressive resistance, reasonable design, toughness are strong, extend the service life of drill bit, without frequent Maintenance, the first drill bushing and the second drill bushing constitute reducing drill bit structure, bore material stable working state, and then ensure ore extraction machinery Working efficiency.
Technical solution:The utility model provides a kind of expansion bit structure for ore extraction, including the first positioning column, And several limit protrusions being arranged on the first positioning column, and the second positioning column in first positioning column one end is set, and set The third positioning column in second positioning column one end is set, and several limit latches being arranged on third positioning column, and setting exists The taper connection circle of first positioning column one end, and the connecting pole in taper connection circle one end is set, and be arranged in connecting pole First round limit hole, and the first auxiliary positioning column for being arranged in the first round limit hole, and be arranged in the first auxiliary positioning The first drill bushing on column, and several drill bits for being arranged on the first drill bushing, and the second round limit for being arranged in the first drill bushing Position hole, and the second auxiliary positioning column for being arranged in the second round limit hole, and be arranged on the second auxiliary positioning column second Drill bushing, and be arranged in several drill bits on the second drill bushing, wherein between the first round limit hole and the first auxiliary positioning column It is fastened by the first positioning screw, is fastened by the second positioning screw between the second round limit hole and the second auxiliary positioning column.
The technical program, the expansion bit structure for ore extraction further includes being arranged in the second drill bushing outer layer Several grooves.
The technical program, the expansion bit structure for ore extraction, if further including being arranged on connecting pole Dry material-distributing tooth.
Compared with prior art, a kind of advantageous effect of expansion bit structure for ore extraction of the utility model exists In:The drill bit structure for solving existing traditional structure is complicated, is unfavorable for installation, safeguards and location and installation is not firm, wear-resisting property, resistance to The poor phenomenon of Compressive Strength, reasonable design, toughness are strong, extend the service life of drill bit, without often maintenance, the first drill bushing and Second drill bushing constitutes reducing drill bit structure, bores material stable working state, improves the working efficiency of ore extraction machinery, ensure have Accurately construction precision.
Description of the drawings
Fig. 1 is a kind of structural schematic diagram of expansion bit structure for ore extraction of the utility model;
Fig. 2 is a kind of vertical view part-structure schematic diagram of expansion bit structure for ore extraction of the utility model;
Wherein, serial number is as follows in figure:The first positioning columns of 1-, the second positioning columns of 2-, 3- thirds positioning column, 4- limit protrusions, 5- limits the round limit hole of latch, 6- taper connections circle, 7- connecting poles, 8- material-distributing tooths, 9- first, the first drill bushings of 10-, 11- the The round limit hole of one auxiliary positioning column, the first positioning screws of 12-, the second drill bushings of 13-, 14- second, the second positioning screws of 15-, 16- grooves, 17- drill bits, 18- the second auxiliary positioning columns.
Specific implementation mode
In the following with reference to the drawings and specific embodiments, the utility model is furtherd elucidate.
A kind of expansion bit structure for ore extraction as depicted in figs. 1 and 2, including the first positioning column 1, and set Several limit protrusions 4 on the first positioning column 1 are set, and the second positioning column 2 in 1 one end of the first positioning column is set, and are set The third positioning column 3 in 2 one end of the second positioning column is set, and several limit latches 5 being arranged on third positioning column 3, and set The taper connection circle 6 in 1 one end of the first positioning column is set, and the connecting pole 7 in 6 one end of taper connection circle is set, and setting is even The first round limit hole 9 in column 7 is connect, and the first auxiliary positioning column 11 being arranged in the first round limit hole 9, and setting exists The first drill bushing 10 on first auxiliary positioning column 11, and several drill bits 17 for being arranged on the first drill bushing 10, and setting is the The second round limit hole 14 in one drill bushing 10, and the second auxiliary positioning column 18 for being arranged in the second round limit hole 14, and The second drill bushing 13 being arranged on the second auxiliary positioning column 18, and be arranged in several drill bits 17 on the second drill bushing 13, In, it is fastened by the first positioning screw 12 between the first 9 and first auxiliary positioning column 11 of round limit hole, the second round limit hole 14 and second pass through the second positioning screw 15 between auxiliary positioning column 18 and fasten.
It is further preferred that the expansion bit structure for ore extraction, further includes being arranged in 13 outer layer of the second drill bushing Several grooves 16 are used for the expansion bit structure of ore extraction, further include several material-distributing tooths 8 being arranged on connecting pole 7 (realizing the effect for detaching ore charge with main body), said structure design, the drill bit structure for solving existing traditional structure is complicated, no Not firm conducive to installation, maintenance and location and installation, the poor phenomenon of wear-resisting property, compressive resistance, reasonable design, toughness are strong, The service life for extending drill bit, without often maintenance, the first drill bushing and the second drill bushing constitute reducing drill bit structure, bore material work shape State is stablized, and the working efficiency of ore extraction machinery is improved, and ensures there is accurately construction precision.
The above is only the preferred embodiment of the utility model, it is noted that for the common skill of the art It for art personnel, without departing from the principle of this utility model, can also make several improvements, these improvement also should be regarded as The scope of protection of the utility model.

Claims (3)

1. a kind of expansion bit structure for ore extraction, it is characterised in that:Including the first positioning column (1), and setting is the Several limit protrusions (4) on one positioning column (1), and the second positioning column (2) in the first positioning column (1) one end is set, and Third positioning column (3) in the second positioning column (2) one end is set, and several limiting cards being arranged on third positioning column (3) Tooth (5), and the taper connection circle (6) in the first positioning column (1) one end is set, and setting is in the company of taper connection circle (6) one end Column (7) is connect, and the round limit hole (9) of first be arranged in connecting pole (7), and setting is in the first round limit hole (9) First auxiliary positioning column (11), and first drill bushing (10) of the setting on the first auxiliary positioning column (11), and setting are bored first Several drill bits (17) on (10) are covered, and the round limit hole (14) of second be arranged in the first drill bushing (10), and setting exists The second auxiliary positioning column (18) in second round limit hole (14), and second brill of the setting on the second auxiliary positioning column (18) It covers (13), and several drill bits (17) on the second drill bushing (13) is set, wherein the first round limit hole (9) and first auxiliary It helps between positioning column (11) through the first positioning screw (12) fastening, the second round limit hole (14) and the second auxiliary positioning column (18) it is fastened by the second positioning screw (15) between.
2. a kind of expansion bit structure for ore extraction according to claim 1, it is characterised in that:It is described to be used for mine The expansion bit structure of stone exploitation further includes several grooves (16) of setting in the second drill bushing (13) outer layer.
3. a kind of expansion bit structure for ore extraction according to claim 1, it is characterised in that:It is described to be used for mine The expansion bit structure of stone exploitation further includes several material-distributing tooths (8) being arranged on connecting pole (7).
CN201721753168.5U 2017-12-15 2017-12-15 A kind of expansion bit structure for ore extraction Expired - Fee Related CN207660551U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721753168.5U CN207660551U (en) 2017-12-15 2017-12-15 A kind of expansion bit structure for ore extraction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721753168.5U CN207660551U (en) 2017-12-15 2017-12-15 A kind of expansion bit structure for ore extraction

Publications (1)

Publication Number Publication Date
CN207660551U true CN207660551U (en) 2018-07-27

Family

ID=62942622

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721753168.5U Expired - Fee Related CN207660551U (en) 2017-12-15 2017-12-15 A kind of expansion bit structure for ore extraction

Country Status (1)

Country Link
CN (1) CN207660551U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109915023A (en) * 2019-04-04 2019-06-21 河南城建学院 Extraction borehole multiple aperture drilling apparatus and its construction method based on gas permeability difference

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109915023A (en) * 2019-04-04 2019-06-21 河南城建学院 Extraction borehole multiple aperture drilling apparatus and its construction method based on gas permeability difference
CN109915023B (en) * 2019-04-04 2020-11-03 河南城建学院 Extraction drilling multi-aperture drilling device based on air permeability difference and construction method thereof

Similar Documents

Publication Publication Date Title
CN106381865B (en) A kind of brill milling combination engineering method applied to hard rock grooving
CN209011794U (en) A kind of solvable bridge plug equipped with enhancing sealing performance structure
CN204267058U (en) A kind of erecting tools for anchor cable resin explosive roll
CN207660551U (en) A kind of expansion bit structure for ore extraction
Quanxin et al. Progress in the research on drilling technology and equipment in coal mining areas of China
CN1982651A (en) Method for mining ultra-long roofbolt slip casting with top plate large-area and long-time exposed under mining well
CN206530356U (en) A kind of Novel hollow grouted anchor bar
CN205225078U (en) Detachable engineering roller bit
CN207813505U (en) A kind of modified stepped drill structure for ore extraction
CN207660556U (en) A kind of drilling rod applied to ore extraction machinery becomes connector
CN207660553U (en) Concentric down-the-hold drill bit with efficient supplementary structure
CN202788626U (en) Drill bit of rotary drilling machine
An Water prevention and control technology for coal seam floor grouting with high horizontal-vertical ratio ground oriented horizontal hole
CN205858186U (en) A kind of three axle blender drill bits being applicable under Complicated Geologic Condition
CN207660555U (en) Modified drilling rod for ore extraction machinery becomes connector
CN204877291U (en) Intelligence all around rotation bores in ore deposit
CN113236135A (en) Five-wing flat-top nine-tooth anti-tuberculosis drill bit
Sun et al. Bit optimization for Che 47 in Carboniferous stratum
CN207647531U (en) A kind of novel high-strength anchor rod pallet board
CN207332766U (en) A kind of metallic mineral exploration core bit
CN105672892A (en) PDC drill bit of rotary drilling rig
Xue et al. Surrounding rock pressure of deep roadway and influences on advance support
CN215761539U (en) Drill bit for petroleum drilling
CN205400598U (en) Dig rig PDC drill bit soon
CN216517819U (en) Novel combined drill bit

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180727

Termination date: 20181215