CN207658926U - A kind of bank formula unloader trolley track lifting tool - Google Patents
A kind of bank formula unloader trolley track lifting tool Download PDFInfo
- Publication number
- CN207658926U CN207658926U CN201721902415.3U CN201721902415U CN207658926U CN 207658926 U CN207658926 U CN 207658926U CN 201721902415 U CN201721902415 U CN 201721902415U CN 207658926 U CN207658926 U CN 207658926U
- Authority
- CN
- China
- Prior art keywords
- track
- fastener
- lifting tool
- bank formula
- trolley track
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The utility model proposes a kind of bank formula unloader trolley track lifting tools, the track includes track head and the track ontology being connect with track head, part is set including hanging, it is described to hang the escape port for setting and being provided on part and being hung described in perforation and set part lower end for avoiding track head, hanging to set and be both provided with fastener on part and screw part with appended claims positioned at the escape port both sides, it is described screw part can spiral be screwed into fastener and can be screwed out from fastener, two screw and form the bayonet for clamping track ontology between part.Solve the problems, such as when bank formula unloader trolley track in the prior art lifting that existing labor intensity is big, easily sliding falls off by the utility model.
Description
Technical field
The utility model is related to a kind of improvement of bank formula unloader trolley track lifting tool structure.
Background technology
The trolley track of bank formula unloader is located at 40 meters of high-altitude height, narrow space when operation is repaired, maintenance trolley track warp
Often track to be sling.The method used in the prior art is first to be levered up track with crowbar, is inserted in steel wire, then with pulling calabash
Reed is lifted by crane, such lifting mode:First, great manpower is needed to lever up, labor intensity is big, falls off second is that steel wire is easy sliding,
Generate huge risk.
Utility model content
The utility model provides a kind of bank formula unloader trolley track lifting tool, solves bank formula handling in the prior art
Existing labor intensity is big when lifting by crane for bridge trolley track, easily slides the problem of falling off.
To achieve the purpose that solve above-mentioned technical problem, the utility model uses proposed bank formula unloader trolley track
Lifting tool is achieved using following technical scheme:
A kind of bank formula unloader trolley track lifting tool, the track include track head and are connect with track head
Track ontology, including hang and set part, it is described hang to set to be provided with described in perforation to hang on part set part lower end for avoiding keeping away for track head
Allow mouth, positioned at the escape port both sides hang set be both provided on part fastener and with the part that screws of appended claims, the rotation
Tight part can spiral be screwed into fastener and can be screwed out from fastener, two screw and are formed for clamping track ontology between part
Bayonet.
The utility model further includes following additional technical feature:
Further, the fastener of both sides is fixed at the bottom end for setting part of hanging of the escape port both sides, and symmetrically sets
It sets.
Further, it is described hang to set hole for hoist or lifting lug are provided on part.
Further, described hang sets part to lift plate, and the escape port is to be opened in the notch of the lifting plate lower end.
Further, the interior line of the escape port is more than the track head outer wheels profile.
Further, the fastener is the fastening nut at the lifting board bottom end for being fixed at escape port both sides, described
It is bolt or screw rod to screw part.
Further, described screw is arranged with gasket on part.
Further, when ceiling mounted tracks, both sides screw part and bear against the both sides for being pressed on the track ontology.
Further, described hang sets part material as high-carbon steel.
There are following advantages and good effect for the utility model:
The utility model proposes a kind of bank formula unloader trolley track lifting tools, include to hang to set part, are set on part hanging
It is provided with described in perforation to hang and sets part lower end for avoiding the escape port of track head, hanging to set and be all provided on part positioned at escape port both sides
Be equipped with fastener and screw part with appended claims, by screw part can spiral be screwed into fastener and can from fastener
It screws out, the bayonet formed between part for clamping track ontology is screwed at two, it, can be by track head from keeping away when lifting by crane track
It allows in mouth and is inserted into, track ontology is located in bayonet, and what then spiral adjusted both sides screws part, so that it is constantly inwardly screwed, directly
It is screwed to two on the side wall that part screws the both sides for being resisted against track ontology respectively, realizes the clamping of track at this time, then
Track is lifted by suspender, using such lifting mode without expending a large amount of manpowers, reduces labor intensity, and pass through
The problem of railway clamping can effectively be prevented track from being fallen off in lifting by part is screwed, the safety of lifting is improved.
Description of the drawings
Fig. 1 is the utility model bank formula unloader trolley track lifting tool structure chart.
Specific implementation mode
The technical solution of the utility model is described in further detail with reference to the accompanying drawings and detailed description, this
Utility model proposes that a kind of embodiment of bank formula unloader trolley track lifting tool, bank formula unloader trolley track include mainly
Track head and the track ontology being connect with track head, track head are the protrusion extended from track ontology to both sides, this reality
Apply the lifting tool structure for ceiling mounted tracks in example and specifically include to hang and set part 1, it is described hang to set be provided with described in perforation on part 1
The escape port 2 for setting 1 lower end of part for avoiding track head is hung, in assembly, track head is first penetrated into hang and be set on part 1, is real
Existing track head penetrates, and sets 1 bottom end of part hanging the perforation of escape port 2 for setting and being opened up on part 1 and hanging, while positioned at the evacuation
The hanging of mouthful 2 both sides, which sets, to be both provided with fastener 3 and screws part 4 with what fastener 3 coordinate on part 1, it is described screw part 4 can spiral revolve
Enter to can screw out in fastener 3 and from fastener 3, while screwing at two and to be formed with for clamping track ontology between part 4
Bayonet 5.Be fixedly clamped for realizing to track ontology by two bayonets screwed between part 45, due to screw part 4 with
Fastener 3 can be screwed into or back-out, then can by adjust wherein side screw part 4 or adjust both sides simultaneously screw part
4 are screwed into the depth in fastener 3, realize to the adjustment of the spacing of two bayonets screwed between part 45, make it that can pass through tune
The whole sandwiched demand for screwing part 4 and being used to meet the track of different size width.Meanwhile when fixed, mainly by constantly adjusting
It screws part 4 to be brought to abutment against on the side wall of track ontology, when screwing part 4 completely against being pressed on nothing on track this body sidewall
Method is screwed then to correspond to realize when being screwed into and is fixedly clamped to track ontology, and tightening fixed mode by spiral can make to screw part
4 are applied to firmly against being pressed on track ontology and screw the counter force generated between part 4 by two of both sides
The clamping of track ontology can be kept more secured by the effect of opposition when on track, will not left-right rollover, slide back and forth,
Effectively avoid the problem of track slides in hoisting process.
Preferably, the fastener 3 of both sides is fixed at the bottom end for setting part 1 of hanging of 2 both sides of the escape port, and symmetrically sets
It sets.I.e. escape port 2, which will be hung, sets part 1 and is divided into two parts, and a part is located at the side of escape port 2, and another part is located at escape port 2
The other side, a fastener 3 is fixedly connected at two-part bottom position, for realize with fastener 3 coordinate screw part 4
Opposite and arranged symmetrically, 2 fasteners 3 are symmetrical arranged.Screwing the setting of 4 relative symmetry of part can make 2 to screw part 4 to be applied to rail
Position and active force on road ontology are located along the same line, and can effectively avoid the problem that turning on one's side when track sandwiched,
Screwing part 4 simultaneously should have sufficient intensity can bearing track weight.
It is lifted for convenience, the hanging to set of the present embodiment is provided with hole for hoist 6 or lifting lug on part 1.
As hung in the present embodiment set a kind of 1 preferred embodiment of part as:It is described hang set part 1 as lift plate, it is described to keep away
Mouth 2 is allowed to be the notch for being opened in the lifting plate lower end, lifting plate side is the inclined surface that side is obliquely installed from the top down, is used for
Convenient for assembly fastener 2 and part 4 is screwed, reduces the overall weight of lifting plate.The fastener 3 is to be fixed at escape port 2
The fastening nut at the lifting board bottom end of both sides, the part 4 that screws is bolt or screw rod.
Track head is located at after being penetrated in notch in the notch, while bolt or spiral shell by constantly screwing both sides
Bar is screwed into the depth in nut by adjusting bolt or screw rod, realizes the adjustment of 5 size of bayonet between two bolts,
By realizing being fixedly clamped to the track ontology below track head to the adjustment of 5 size of bayonet, it is preferred that this implementation
In example screw part 4 and fastener 3 is respectively positioned on the lower section setting of notch.
Further, to realize that track head can penetrate into escape port 2, the interior line of the escape port 2 is more than
The track head outer wheels profile.
Further, described screw is arranged with gasket on part 4.It avoids screwing part by gasket and directly be contacted with fastener,
Cause the wear damage of the two.
Further, when ceiling mounted tracks, both sides screw part and bear against the both sides for being pressed on the track ontology.
Preferably, described hang sets part material as high-carbon steel.With higher intensity, it can be used for meeting the intensity of ceiling mounted tracks
Demand.
Above example is only to illustrate the technical solution of the utility model, rather than is limited;Although with reference to before
Embodiment is stated the utility model is described in detail, it for those of ordinary skill in the art, still can be right
Technical solution recorded in previous embodiment is modified or equivalent replacement of some of the technical features;And these
Modifications or substitutions, the utility model technical solution claimed that it does not separate the essence of the corresponding technical solution spirit and
Range.
Claims (9)
1. a kind of bank formula unloader trolley track lifting tool, the track includes track head and the rail that is connect with track head
Road ontology, which is characterized in that set part including hanging, it is described hang to set to be provided with to hang described in perforation on part set part lower end for avoiding track
The escape port on head, hanging to set and be both provided with fastener on part and screwed with appended claims positioned at the escape port both sides
Part, it is described screw part can spiral be screwed into fastener and can be screwed out from fastener, two screw and are formed for card between part
Fill the bayonet of track ontology.
2. bank formula unloader trolley track lifting tool according to claim 1, which is characterized in that the fastener of both sides is solid
Fixed be arranged sets the bottom end of part in hanging for the escape port both sides, and is symmetrical arranged.
3. bank formula unloader trolley track lifting tool according to claim 1, which is characterized in that it is described hang to set set on part
It is equipped with hole for hoist or lifting lug.
4. bank formula unloader trolley track lifting tool according to claim 1, which is characterized in that described hang sets part to hang
Loading board, the escape port are to be opened in the notch of the lifting plate lower end.
5. bank formula unloader trolley track lifting tool according to claim 4, which is characterized in that the escape port it is interior
Contouring line is more than the track head outer wheels profile.
6. bank formula unloader trolley track lifting tool according to claim 4, which is characterized in that the fastener is solid
The fixed fastening nut being arranged at the lifting board bottom end of escape port both sides, the part that screws is bolt or screw rod.
7. bank formula unloader trolley track lifting tool according to claim 1, which is characterized in that described screw covers on part
Equipped with gasket.
8. bank formula unloader trolley track lifting tool according to claim 1, which is characterized in that when ceiling mounted tracks, two
The tight part of sidespin bears against the both sides for being pressed on the track ontology.
9. bank formula unloader trolley track lifting tool according to claim 1, which is characterized in that described hang sets part material
For high-carbon steel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721902415.3U CN207658926U (en) | 2017-12-29 | 2017-12-29 | A kind of bank formula unloader trolley track lifting tool |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721902415.3U CN207658926U (en) | 2017-12-29 | 2017-12-29 | A kind of bank formula unloader trolley track lifting tool |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207658926U true CN207658926U (en) | 2018-07-27 |
Family
ID=62944684
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721902415.3U Expired - Fee Related CN207658926U (en) | 2017-12-29 | 2017-12-29 | A kind of bank formula unloader trolley track lifting tool |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207658926U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107986150A (en) * | 2017-12-29 | 2018-05-04 | 青岛港国际股份有限公司 | A kind of bank formula unloader trolley track lifting tool |
-
2017
- 2017-12-29 CN CN201721902415.3U patent/CN207658926U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107986150A (en) * | 2017-12-29 | 2018-05-04 | 青岛港国际股份有限公司 | A kind of bank formula unloader trolley track lifting tool |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207658926U (en) | A kind of bank formula unloader trolley track lifting tool | |
CN209291874U (en) | A kind of distribution cable cover board boom hoisting | |
CN207030774U (en) | Suspension hook antiswing crane dolly | |
CN102278021A (en) | Door lock device of railway freight open wagon | |
CN209835428U (en) | Special wear-resisting welding hook of hoist | |
CN107986150A (en) | A kind of bank formula unloader trolley track lifting tool | |
CN203494080U (en) | Safety rope suspension device for transformer | |
CN217377008U (en) | Gantry hook with interval adjusting structure | |
CN202529714U (en) | Two-layered floor turnover hanger | |
CN207267787U (en) | Electric block lifting mounting device | |
CN206940257U (en) | Novel mechanical equipment hoisting frame | |
CN204096891U (en) | A kind of propeller blade lifting device | |
CN110219452A (en) | Protective frame and its lift structure | |
CN204897154U (en) | Big board handling auxiliary fixtures | |
CN205874981U (en) | Strand draws quick draw bail of ware with dragging | |
CN207046648U (en) | A kind of construction boost container | |
CN208485480U (en) | One kind rotating lifting beam device for gantry crane | |
CN206521216U (en) | A kind of across floor handling goods overhead traveling crane | |
CN207608210U (en) | A kind of Rail-type vehicle wheel lifting device | |
CN206606919U (en) | A kind of suspender in aluminium ingot conveying arrangement | |
CN204873471U (en) | Converter cast iron welt hoist device that insulates against heat | |
CN204897235U (en) | Safety rope fixing device for crane track | |
CN204517590U (en) | Penetrate rotor device taken out by horizontal machine | |
CN202023437U (en) | Door locking device for railway freight open wagon | |
CN204369421U (en) | A kind of freight container suspension hook |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180727 Termination date: 20181229 |