CN207648452U - A kind of Simple bottle group filling apparatus filled by pump - Google Patents

A kind of Simple bottle group filling apparatus filled by pump Download PDF

Info

Publication number
CN207648452U
CN207648452U CN201721623365.5U CN201721623365U CN207648452U CN 207648452 U CN207648452 U CN 207648452U CN 201721623365 U CN201721623365 U CN 201721623365U CN 207648452 U CN207648452 U CN 207648452U
Authority
CN
China
Prior art keywords
main line
return
valve
line
connect
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721623365.5U
Other languages
Chinese (zh)
Inventor
孙立华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Huamai Gas Equipment Co Ltd
Original Assignee
Tianjin Huamai Gas Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Huamai Gas Equipment Co Ltd filed Critical Tianjin Huamai Gas Equipment Co Ltd
Priority to CN201721623365.5U priority Critical patent/CN207648452U/en
Application granted granted Critical
Publication of CN207648452U publication Critical patent/CN207648452U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The utility model is related to a kind of Simple bottle group filling apparatus filled by pump, including inlet and gas returning port, inlet is connect by liquid flowing valve with feed liquor main line, gas returning port is connect by return air valve with return-air main line, the charging line that multichannel carries low temperature check-valves is mounted in parallel on feed liquor main line, charging line after liquid phase valve and metal hose with the liquid phase mouth of LNG steel cylinders by connecting, the return line that multichannel carries gas phase valve is mounted in parallel on return-air main line, return line is connect by metal hose with the gas phase mouth of LNG steel cylinders, the crossover piping that valve is bridged with gas-liquid is connected between the inlet ductwork and return-air main line of each liquid phase valve, it is mounted on low-temperature safety valve on feed liquor main line and return-air main line.The utility model is quick, convenient, easily operated, easy to maintenance, safe and reliable, cost of investment is low, and can prevent medium from flowing backwards.

Description

A kind of Simple bottle group filling apparatus filled by pump
Technical field
The utility model belongs to liquefied natural gas filling equipment technical field, specifically a kind of Simple bottle group filled by pump Filling apparatus.
Background technology
Liquefied natural gas (LNG) is because its storage and transportation is convenient, the characteristics such as safe and clean, in industrial, civilian and some special industries It is widely used.And LNG bottles of groups are small suitable for gas consumption, as small-sized deposit compressed air source unit, steel cylinder fills always Comparatively laborious problem, while in view of steel cylinder uses the actual conditions of process, majority does not have cylinder filling platform, not to vapour yet The corollary apparatus of vehicle liquid feeding, but it is desirable to the tank bottle pump sleds in LNG gasification station to solve the problems, such as filling for steel cylinder.
Invention content
The purpose of this utility model is in view of the deficiencies of the prior art, and to propose that a kind of Simple bottle group filled by pump is filling Device.
The utility model solves its technical problem and following technical scheme is taken to realize:
A kind of Simple bottle group filling apparatus filled by pump, include with prize outer source of supply pump pull out inlet that mouth is connect and The gas returning port being connect with the outer BOG recovery systems of sled, inlet are connect by liquid flowing valve with feed liquor main line, and gas returning port is by returning Air valve is connect with return-air main line, and the charging line that multichannel carries low temperature check-valves is mounted in parallel on feed liquor main line, It is connect with the liquid phase mouth of LNG steel cylinders after the liquid phase valve and metal hose that pass through concatenation per road charging line, in return-air main line On be mounted in parallel the return line that multichannel carries gas phase valve, the gas for passing through metal hose and LNG steel cylinders per road return line Phase mouth connect, meanwhile, be connected between the inlet ductwork and return-air main line of each liquid phase valve with gas-liquid bridge valve across Take over road, moreover, being mounted on low-temperature safety valve on feed liquor main line and return-air main line.
Moreover, being mounted on pressure gauge on feed liquor main line and return-air main line.
The advantages of the utility model and good effect are:
1, utility model device is quick, convenient, easily operated, easy to maintenance, safe and reliable, flow setting is simple, throws It provides at low cost, and can prevent medium from flowing backwards.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model.
Specific implementation mode
The utility model implementation is further described below in conjunction with attached drawing, following embodiment is descriptive, is not Limited, protection scope of this utility model cannot be limited by this.
A kind of Simple bottle group filling apparatus filled by pump, as shown in Figure 1, including pulling out mouth with the outer source of supply pump of sled to connect Inlet 10 and with the gas returning port 11 prizing outer BOG recovery systems and connect, inlet passes through liquid flowing valve 9 and feed liquor main line company It connects, gas returning port is connect by return air valve 12 with return-air main line, has been mounted in parallel on feed liquor main line multiple with low temperature The charging line of check-valves 6, the liquid after liquid phase valve 1 and metal hose 3 that each charging line passes through concatenation with LNG steel cylinders 2 Phase mouth connects, and multiple return lines with gas phase valve 4 is mounted in parallel on return-air main line, each return line passes through Metal hose is connect with the gas phase mouth of LNG steel cylinders, moreover, being managed between the inlet ductwork and return-air main line of each liquid phase valve Road is connected with gas-liquid bridging valve 5.
In the specific implementation of the utility model, in order to ensure the safe operation of bus-bar, in feed liquor main line and return-air Low-temperature safety valve 8 is mounted on main line.
In the specific implementation of the utility model, in order to constantly monitor the operating status of bus-bar, in feed liquor main line and Pressure gauge 7 is mounted on return-air main line.
Operation principle
The device be by LNG steel cylinders gas phase mouth and liquid phase mouth by gas phase at flange-connection stainless steel metal flexible pipe and bus-bar and Liquid phase valve is connected, and inlet pulls out mouth with the outer source of supply pump of sled and connect, and gas returning port is connect with outer BOG recovery systems are prized, low temperature Safety valve bottom valve is opened, and in filling process, gas-liquid bridges valve and closes, remaining valve opening.Liquefied natural gas passes through inlet, By main line liquid flowing valve and to pass sequentially through concatenated low temperature check-valves, bus-bar bottle group liquid phase valve, stainless steel metal soft Pipe reaches LNG Dewar bottle body liquid feed valves and enters interior of steel bottle.The BOG gases generated in steel cylinder in filling process, pass sequentially through LNG Dewar bottle bodies drain valve, flange-connection stainless steel metal flexible pipe, bus-bar bottle group gas phase valve by main line return air valve and return Gas port enters recovery system.Steel cylinder opens gas-liquid bridging by after weighing and ensuring to be full of, closing steel cylinder ontology feed liquor and drain valve Valve will be discharged into the outer BOG systems of sled after residual LNG gasification in header by return-air duct, and filling process terminates, here, low temperature Check-valves effectively prevent liquid in filling process to flow backwards.

Claims (2)

1. a kind of Simple bottle group filling apparatus filled by pump, it is characterised in that:It is connect including pulling out mouth with the outer source of supply pump of sled Inlet and with the gas returning port prizing outer BOG recovery systems and connect, inlet connect by liquid flowing valve with feed liquor main line, time Gas port is connect by return air valve with return-air main line, and multichannel is mounted in parallel on feed liquor main line and carries low temperature check-valves Charging line connect with the liquid phase mouth of LNG steel cylinders after the liquid phase valve and metal hose that pass through concatenation per road charging line, time It is mounted in parallel the return line that multichannel carries gas phase valve on gas main line, passes through metal hose and LNG per road return line The gas phase mouth of steel cylinder connects, meanwhile, be connected between the inlet ductwork and return-air main line of each liquid phase valve band gas-liquid across The crossover piping of valve is connect, moreover, being mounted on low-temperature safety valve on feed liquor main line and return-air main line.
2. the Simple bottle group filling apparatus according to claim 1 filled by pump, it is characterised in that:In feed liquor main line and It is mounted on pressure gauge on return-air main line.
CN201721623365.5U 2017-11-29 2017-11-29 A kind of Simple bottle group filling apparatus filled by pump Expired - Fee Related CN207648452U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721623365.5U CN207648452U (en) 2017-11-29 2017-11-29 A kind of Simple bottle group filling apparatus filled by pump

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721623365.5U CN207648452U (en) 2017-11-29 2017-11-29 A kind of Simple bottle group filling apparatus filled by pump

Publications (1)

Publication Number Publication Date
CN207648452U true CN207648452U (en) 2018-07-24

Family

ID=62882400

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721623365.5U Expired - Fee Related CN207648452U (en) 2017-11-29 2017-11-29 A kind of Simple bottle group filling apparatus filled by pump

Country Status (1)

Country Link
CN (1) CN207648452U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109458548A (en) * 2018-12-12 2019-03-12 河南省日立信股份有限公司 Perfluor isobutyronitrile subpackage apparatus and its method for filling
CN113464836A (en) * 2021-07-07 2021-10-01 广州市粤佳气体有限公司 Full-automatic supply process for low-temperature liquid gas dewar tank

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109458548A (en) * 2018-12-12 2019-03-12 河南省日立信股份有限公司 Perfluor isobutyronitrile subpackage apparatus and its method for filling
CN109458548B (en) * 2018-12-12 2024-05-14 河南省日立信股份有限公司 Perfluoro-isobutyronitrile split charging device and split charging method thereof
CN113464836A (en) * 2021-07-07 2021-10-01 广州市粤佳气体有限公司 Full-automatic supply process for low-temperature liquid gas dewar tank

Similar Documents

Publication Publication Date Title
CN201057357Y (en) Mobile liquefied natural gas gasifying and supplying plant
CN105864636B (en) LNG filling stations unload without pump, fill, charging system and fill technique
CN207648452U (en) A kind of Simple bottle group filling apparatus filled by pump
CN105043886B (en) A kind of natural gas pressure vessel carries out double dielectric testing devices of gas and water pressure experiment
CN204986384U (en) Recovery purge system at marine LNG filling station
CN107588323A (en) Liquefied natural gas loading-unloading vehicle system and its method unloaded
CN203868681U (en) Liquefied natural gas flash steam recovery device
WO2019227328A1 (en) Household alcohol-based fuel supply system
CN204284925U (en) A kind of LNG Liquefied natural gas tank car discharge mechanism
CN205781982U (en) LNG filling station is unloaded without pump, is filled and charging system
CN205079057U (en) Liquid ammonia tank field system
CN204154563U (en) PTA Equipment oxidation reaction tail gas on-line checkingi sample gas pretreating system
CN207762553U (en) A kind of LNG bank bases formula loading system peculiar to vessel
CN206247018U (en) LNG gasification air supply system
CN206221985U (en) A kind of liquefied natural gas gasifying pressure regulation metering system
CN206669315U (en) A kind of band helping air supply function CNG routines gas station
CN205877703U (en) Liquefied natural gas immersed pump unloading vehicle device
CN204879455U (en) Atmospheric pressure drain
CN108131562A (en) A kind of liquefied natural gas of controllable pressure is unloaded and storage tank supercharging device
CN212929539U (en) Liquefied petroleum gas filling pipeline system
CN210465008U (en) Toxic and harmful medium sampler
CN208268771U (en) A kind of Dewar tank fills and device for recovering tail gas
CN205979160U (en) LNG (liquefied natural gas) gasification station
CN204704607U (en) A kind of cold compensation type liquefied natural gas filling device
CN204328463U (en) A kind of LNG Liquefied natural gas is unloaded regulator

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180724

Termination date: 20211129

CF01 Termination of patent right due to non-payment of annual fee